A Project Report On
“PERVIOUS CONCRETE”
DESIGN ENGINEERING -2A
B.E., SEMESTER - 6
(Civil Branch)
Prepared by:
CERTIFICATE I
ACKNOWLEDGEMENT II
ABSTRACT III
LIST OF CONTENT IV
LIST OF FIGURE V
1. 1.1 What is Design thinking? 1
2.1.1 Activities 3
2.1.2 Environment 4
2.1.3 Interactions 5
2.1.4 Object 6
2.1.5 Users 7
3.1.1 users 8
3.1.2 Stakeholders 9
3.1.3 Activities 9
iv
5. Ideation Canvas 11
5.1.1 Peoples 11
5.1.2 Activities 11
5.1.3 Props / Tools/Object/Equipment 11
5.1.4 Context/Location/Situation 12
6.1.1 Purpose 13
6.1.2 Product experience 13
6.1.3 Product functions 14
6.1.4 Product features 14
6.1.5 Component 14
7 Learning need matrix sheet 15
7.1.1 Purpose/Product Concept 15
7.1.2 Theories/Method/Application Process involved 16
7.1.3 Application standard & Design specification 16
7.1.4 Component materials & strength criteria 16
7.1.5 Software/tools/simulation/skill 17
reference 19
v
LIST OF FIGURES
2.1 Activities 4
2.2 Interactions 5
2.3 Objects 6
2.4 Users 7
3.1 User 8
3.2 Stakeholders 9
5.1 Empathy mapping 12
6.1 Product development canvas 13
7.1 L N matrix 15
8.1 standard concrete cube casting mould 18
8.2 curing of concrete block 18
8.3 concrete cube 18
vi
CERTIFICATE
This is to certify that work presented is the first phase of the entitled
“PERVIOUS CONCRETE” has been carried out by the
1. MOHOD KARAN G.
i
ACKNOWLEDGEMENT
We wish to express our sincere gratitude and regard to our project guide Prof. Ashwin
Sharma and all faculty members for helping us so much and showing his interest and
cooperation in completing this work.
We would also like thank our parents, friends and all members of our family for
encouraging us for this work. This work would not have culminated into the present form
without his invaluable suggestions and generous help.
We are thankful to the college personnel for providing their valuable suggestions and
allowing us to use and experience their facilities for the project.
ii
ABSTRACT
At many projects water logging at parking and walkways is the major issue especially
during monsoon as pavements and floors are normally impermeable. This results in
considerable amount of investment in repairs and providing storm water drain systems,
which may get clogged during peak over flow. Besides this there are many other
problems that arise due to the above. In such situations it is very important to think
about an economical solution which helps in getting rid of all above problems.The best
solution to above problem is “PERVIOUS CONCRETE”
iii
Chapter – 1 – Introduction
We are ENGINEERS
Our group is of three members.
Design Thinking (We) believes that rather waiting for Moses (Genius) to come and showed us
Innovation;
1
With Design Thinking, we can build the bridges to cross over the other side to that new land of
promised future, so we can reliably manufactured our own Miracles.
✓ Approaches challenges from the point of view (POV) of the end user
A skill that allows a Designer to align what people want with what can be done,
And produce a viable business strategy that creates customer value and
Market opportunity.
2
Chapter – 2 - AEIOU Summary
Evaluation of idea
AEIOU charts describe us overall idea about all details about pervious concrete.
2.1.1 ACTIVITIES:
These are goal-directed sets of actions—paths towards things people want to accomplish.
What are the modes people work in, and the specific activities and processes they go through
In Summary of ACTIVITIES
Here people are engaged in some other activities some of us are mentioned below:
3
FIGURE 2.1 (ACTIVITIES)
2.1.2 ENVIRONMENT:
It include the entire arena where activities take place
In Summary of ENVIRONMENT
❖ Noise pollution
❖ Cool atmosphere
❖ Air pollution
❖ Cloudy
❖ Humidity
4
2.1.3 INTERACTION:
These are between a person and someone or something else; they are the building blocks
of activities.
In Summary of INTERACTONS
We describe interactions that how people should interact with each other
Here we describe general impression and elements
Figure 2.2(INTERACTION)
5
2.1.4 OBJECT:
What are the objects and devices people have in their environments and how do they relate
to their activities?
In Summary of OBJECT
➢ mould
➢ Cement (53 grade).
➢ Sand.
➢ Aggregate.
➢ Concrete mixture
➢ Vibrators
➢ Water tank
Figure:-2.3 (OBJECTS)
6
2.1.5 USERS:
Users are the people whose behaviours, preferences, and needs are being observed.
In Summary of USERS
In elements we describe
❖ Owner
❖ Architect
❖ People
❖ Builder
❖ Engineer
Figure:-2.4(USERS)
7
CHAPTER :- 3 EMPATHY MAPPING
It creates hilarious nuisance due to lack of basic sense in the people. In spite of all hard work by
the cleaners there people were not following cleanliness.
The passengers were helped out from beginning till end of their process of travelling but still
people were not ready to wait for their turn and created haphazard situation there.
People who came to see off the passengers and drivers were allotted sufficient space to park their
vehicle and move inside still created traffic there due to some or the other reason.
3.1.1 Users:
➢ Labor
➢ Contractor
➢ Engineer
➢ Owner
8
3.1.2 STAKEHOLDERS:
➢ Labour
➢ Engineer
➢ Architecture
➢ Contractor
3.1.3 ACTIVITIES:
9
CHAPTER :-4 MIND MAPPING
Mind mapping is canvas is the easy way to know about what is the project and what is
done after completion of the project.
10
Chapter :- 5 Ideation Canvas
5.1.1 PEOPLES:
Parking area and garden walking path commonly used by people so people indirectly
attached to it
Some of the people are mentioned below which are effected indirectly.
➢ Builder
➢ Manager
➢ Labor
➢ Officer
➢ Engineer
➢ Securitis
5.1.2 ACTIVITIES:
Here people are engaged in some other activities some of us are mentioned below:
❖ Selection of materials
❖ Selection of moulds
❖ Lubing
❖ Material mixing
❖ Curing
❖ Material testing
❖ Result
❖ SAND
❖ WATER
❖ CONCRETE MIXTURE
❖ AGGRIGATE
❖ CEMENT
❖ WATER CEMENT RATIO
11
5.1.4 Context/Location/Situation:
Then thought for context/location/situation and finally for possible solutions. We conclude that
people’s emotions when using an interactive system do not only influence the current interaction
itself.
12
Chapter – 6 - Product Development Canvas
6.1.1 Purpose:
The main purpose of the pervious concrete are cost effect construction, easily workable.
The facilities provided any many different ways after acquiring the product or to take at their own
hand.
13
6.1.3 Product functions:
The main function of the pervious concrete is the heat absorb , water absorb ,efficient and ground
water recharge.
1. eco friendly
2. less costly
3. permeable
6.1.5 Component:
❖ sand
❖ oven
❖ aggregate
❖ mould
❖ cement
14
Chapter 7. Learning Need Matrix
Learning need matrix will help students to identify the learning requirements at an early stage along
with prioritization of specific learning along with defined time duration time allocation for each learning
priority.
The purpose and product concept is to give accommodation for the better life style and
amenities with lots of salient features.
• Road improvement
• Traffic control
• Parking improvement
• Accident safety
15
7.1.2 Theories/Method/Application Process involved:
Stage: 1
Observation
Stage: 2
Try experiments
Stage: 3
Final result
Stage: 1
Stage: 2
Take result
Stage: 3
Apply on site
A part or element of larger whole especially of part of machine. An assembly plant for imported
component.
Stage: 1
16
Stage: 2
Stage: 3
7.1.5 Software/tools/simulation/skill:
Component software or simply software, is a part of computer system that consist of data or computer
instructions, in contrast to the physical hardware from which the system is built.
Stage: 1
3d modeling
Stage: 2
Stage: 3
Result
17
8. Prototype
18
Reference
Google
https://www.google.co.in/
https://en.wikipedia.org/wiki/Main_Page
Book:- concrete technology
19