Care should be taken to assure that the floor loading capacity is sufficient to support the UPS and
batteries. Floor loading of UPS will vary based on the capacity and the type of the UPS.
Most of the UPSs are designed for a maximum operating temperature of 40°C. The losses of the
UPS is dissipated as heat and the UPS room should have the ventilation arrangement to remove the
heat to maintain the ambient temperature below 40°C.The ventilation can be in the form of cross
ventilation of hot & cold air (using air exchangers-inlet & exhaust fans with suitable filters) or with
air conditioner.
It is also possible to install a duct either on the top side or the rear side of the UPS to suck out the
heat produced by the UPS.
In order to provide for adequate ventilation, the UPS should be installed in a room, which has at
least 1000mm of clearance on the top side or the rear side of the UPS based on the ventilation type.
This area of UPS should be cleared of any obstruction, which would impede air flow. Since cooling
air enters through a grill at the bottom front/front of the equipment, this area must also be kept
clear of any obstructions.
UPS systems are designed to operate at full load in an ambient temperature of 0-40°C (32-104°F);
0-95% relative humidity; to altitudes of 1000m above mean sea level. However, as with all
electronic equipment, operating over a prolonged period of time at elevated temperatures may be
detrimental to the extended life of the equipment. In all probability, we would expect the normal
temperature range to be between 25-35°C. Some installations may require that equipment be
designed to operate at 50°C (122°F) for periods of time when normal cooling or ventilation has
failed. High temperatures do have a negative effect on life of virtually all electronic components.
For maximum service life, plan the equipment room so that normal operating temperatures are
between 25-35°C. The UPS room should be relatively free of dust and dirt and other airborne
contaminates as heavy layers of dust will reduce the cooling efficiency of the electronic
components. It is important that the room low temperature control be adjusted to maintain the
room temperature above the dew point in order to prevent condensation of moisture on the UPS.
Also in areas of high humidity, UPS designed to operate under such conditions must be chosen or an
adequate dehumidifier or precision air conditioner must be deployed to maintain humidity.
Multiply the length of UPS room by its width, which will gives us the total area of the room. Based
on the below table, the basic capacity in BTU/Hr required for the UPS room can be calculated
Step 2: Arrive at the no of person who will work in the UPS room
Generally the UPS room is unmanned apart from the time when the technician visits to service the
UPS or during the visit of maintenance engineer. It is ideal to consider 600 BTU/Hr per person to
arrive at the air conditioner capacity of the UPS room.
To arrive at the capacity of the air conditioner required for UPS, we need to calculate the heat loss
of UPS in KW using the formula
Heat Loss of UPS = heat loss of UPS in KW x 3412.14 BTU/Hr (in BTU/Hr)
As a thumb rule, 7% of the UPS capacity can be considered as heat loss which gives the thumb rule
formula of
In the event, UPS manufacturers is not specifying the need of an air conditioner, adequate care
must be taken to install inlet fans to bring in fresh air from outside the UPS room and exhaust fans
to exhaust the hot air from the UPS room. The fans must have the required CFM to ensure the
required air changes and should have filters to limit the dust in the UPS room.
From the above formula, we can derive at the No of Air exchanges required to arrive at the capacity
of fans required to remove the heat from the UPS room and to maintain a room temperature of less
than 40°C. The number of air exchanges can be calculated from the below formula,
ds = CFM x 60
CFM calculated was 2400 and room size was 27m3 (952.7ft3)(from previous example)
The Fan arrangement & fan CFM must ensure 15 air exchange/hr in the room
Figure 2 Cross Ventilation of UPS Room
The control cables like UPS paralleling cable, communication cables like BMS, SNMP, battery
monitoring, EPO needs to be grouped together separately and has to be laid separately to avoid any
EMI/EMC issues. The control cables should be in a separate cable tray.
Cable termination
The terminals for connecting the input, output & battery cables are located on the bottom of the
UPS system and most UPS have bottom cable entry provision.
Taking into consideration of the minimum area available for cable entry and the bending radius, it is
ideal to use single core flexible copper cables for terminating the input, output and battery cables.
Figure 4 Termination of Cables with Single Core Flexible Cables
Figure 5 Installing of UPS with Armored Aluminium Cables
In case of usage of armored aluminium cables, the UPS system has to be installed on a elevated
platform to get the necessary cable bending radius.
Electrical protection
Electrical protection with breakers or SFU (Switch Fuse Units) are important in two aspects
To protect the other loads connected to the same distribution bus and to isolate the fault
To protect the cables connected between the source and the loads.
It is recommended to have breakers or SFU(Switch Fuse Units with semiconductor fuses) at the
input of the UPS. Protection in form of MCCB/MCB/fuses can be used in the downstream circuit
while an isolator can be used at the output of UPS.
It is also recommended to have a split mains, a dedicated input breaker for input of the rectifier and
a dedicated input for the bypass mains. This could avoid single point of failure. (figure 6)
Earthing
Earthing is very important for UPS as the fault current tends to flow through the earth back to
mains to activate the protection system used in the circuit. Please refer Figures 8,9,10 on the
earthing arrangement of the UPS.
In case of multiple UPS or parallel UPS configuration, all the UPS has to be connected together to
the same earthing system.
The most common battery used in UPS system is SMF VRLA battery. These batteries produce
Hydrogen gas during the
charging process and it combines with the oxygen inside the battery to form water. This process is
called recombination. But however, under certain condition like overcharging of battery, the
Hydrogen gas escapes from the container though the safety vents. If the Hydrogen content is more
than 4%, then the atmosphere becomes a combustible environment.
This has paved way for special considerations of battery installation and is regulated as per IEEE –
1187 recommended practice for installation of valve regulated Lead-acid batteries same as
equivalent practice for wet cells
Smoke detectors may be installed in battery rooms along with hydrogen detectors. Fan
operation may be interlocked with hydrogen detector actuation and the same can also be
linked with the EPO of UPS system, so that in the event of hydrogen gas accumulation, the UPS
can be switched off and the charging process can be stopped.
The room ceiling should be flat to ensure that pockets of trapped Hydrogen gas do not occur,
particularly at the ceiling, to prevent the accumulation of an explosive mixture,
Light fittings should be fixed to the wall or suspended at more than 50 cm from the ceiling, but
not vertically above the batteries or charging units.
Light fittings as well as any other equipment should be of closed type to prevent accumulation
of gas.
Heat
The minimum air flow rate for ventilation of a battery location or compartment shall be calculated
by the following formula:
Where:
With v • q • s = 0,05 m3/Ah the ventilation air flow calculation formula is:
The amount of ventilation air flow shall preferably be ensured by natural ventilation, otherwise by
forced (artificial)ventilation. Battery rooms or enclosures require an air inlet and an air outlet with a
minimum free area of opening calculated by the following formula:
A = 28 • Q
with Q = ventilation flow rate of fresh air [m3/h]
A = free area of opening in air inlet and outlet [cm2]
NOTE: For the purpose of this calculation, the air velocity is assumed to be 0.1 m/s. The air inlet and
outlet shall be located at the best possible location to create best conditions for exchange of air i.e,
exchange of air, i.e.
SMF VRLA battery are designed for an operating temperature of 25-27°C, it is important to ensure
that same with proper sizing of air conditioner to maintain the temperature in the battery room.
The heat loss of the battery under normal float conditions is too low, the air-conditioner has to be
sized based on the room area, latent heat and the air exchanges required.
Heat loss of the battery in float mode is calculated with the voltage and trickle charging current
Air exchanges required for Battery Room (Only for SMF VRLA Battery)
The air conditioner for battery is designed based on the heat loss during float conditions and the
flow rate of fresh air [m3 /h] required to limit the hydrogen content in the atmospheric air to less
than 4%.
The air exchanges required can be calculated using the formula shown in Table 2
Sample Calculation
In case of multiple battery banks of used, it is ideal to have a common isolator with fuse or an MCCB
and an individual battery isolator for each string of battery
Figure 7 Typical Schematic of battery protection
The diagram shown below, shows the earthing arrangement of an Transformerless UPS and its
battery rack.
Figure 8 Earthing arrangement of Transformerless UPS (TNS System)
The diagram shown below, shows the earthing arrangement of an Transformer based UPS with
bypass enabled and its battery rack
Figure 9 Earthing arrangement of UPS with Inbuilt Transformer and bypass Enabled(TNS System)
The diagram shown below, shows the earthing arrangement of an Transformer based UPS and its
Battery rack. The UPS is acting as a separately derived source as the bypass is disabled and the
transformer neutral is earthed.
Figure 10 Earthing arrangement of UPS with Inbuilt Transformer and bypass Disabled(TNS System)
Quick reference battery selection
Note:
The battery sizing is based on output Power factor of 0.8 with an cutoff Voltage of 10.5V/Battery
This is only for reference and has no obligation of the company. The battery capacity can vary based
on sizing considerations and battery make ageing factor & design margin are not considered in the
battery sizing.
Area required for UPS installation
Automation Products +
Solutions +
Services +
About Fuji Electric +
Resources +
Email*
SUBMIT
Follow us
Site Map | Privacy Policy for Web & Mobile App | Terms of Use