Nothing Special   »   [go: up one dir, main page]

Sitedev Meufinal

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1 46.

22

TECHNICAL DESCRIPTION
8
1.6
0
4.0

5.0
0
0
4.0

0
3.0

BEARING DISTANCE

12
LINE

.00
2.0
0
0
4.0

0
3.0
.00
24

5.0
0

0
4.0

0
3.0

4.0
0
4.0
0

3.0
0

1.6
8
1-2 N 87° E 46.22 m
0
3.0

82.14 m
0
4.0

3.0
0

4.0
0
2-3 S 23° W
34.58 m
0

3-4
3.0

N 74° W
0
4.0

.00
24

0
3.0

0
4.0

4-1 N 16° E
0

66.59 m
3.0

0
4.0
0
22.0

0
3.0

0
4.0

AREA = 2885.161 m²
66.59

0
10.0

4
82.1
4.00
3.00
3.00
4.00

4.00
3.00
3.00
4.00

4.00
2.99
3.00

24.00
4.00

SD SITE DEVELOPMENT PLAN


4.00
24.00

2 N.D.T.S.
3.00
3.00
4.00

4.00
3.00
3.00
4.00

4.00
3.00
3.00
4.00

5.00

2.00
12.00
5.00

4
34.58

BSCE-3B SEAL Drawings and Specifications duly signed, PROJECT TITLE: APPROVED BY: SHEET CONTENT SHEET NO.
stamped or sealed, as instruments of service,

SD
are the intellectual properties and documents of
the architect, whether the object for which they
GROUP MEMBERS: are made is executed or not. It shall be unlawful
PROPOSED FIVE-STOREY MALE ENGR. VICKY ALFARERO
for any person, without the consent of the
LEAHLYN LAURENTE MAKILING architect or author of said documents to ENGR. CLEIFFORD ALFARERO
duplicate or to make copies of said documents
for use in the repetition of and for other projects DORMITORY BUILDING AS SHOWN
KRYZYL CYNDEE AQUILAM LADERA

2 2
or buildings, whether executed partly or in whole.
KIM CAMANIAN INSTRUCTOR
KENAN ACE EJEDO FRANCISCO Rep. Act 9266, Sec. 33
Architecture Act of 2004
LOCATION: University Town, CMU, Musuan, Maramag, Bukidnon DATE: MAY 17, 2024 DATE: MAY 17, 2024
Rd
Maison de Musuan CMU Dairy Project

ezon
Qu
o-
us c
New CMULHS Building

-B
on
log
Do
PRYCEGAS CMU

y
Hw
SITE LOCATION College of

yre
College of Forestry and Engineering

Sa
Environmental Science CMU College of
Agriculture CMU Motorpool

CMU College of Forestry


College of Business and

d
nR
Management

ezo
CFES Admin Building

Qu
N

o-
University Convention

usc
-B
Center

on
log
Do
W E

SD SITE LOCATION S
1 N.D.T.S.

BSCE-3B SEAL Drawings and Specifications duly signed, PROJECT TITLE: APPROVED BY: SHEET CONTENT SHEET NO.
stamped or sealed, as instruments of service,

SD
are the intellectual properties and documents of
the architect, whether the object for which they
GROUP MEMBERS: are made is executed or not. It shall be unlawful
PROPOSED FIVE-STOREY MALE ENGR. VICKY ALFARERO
for any person, without the consent of the
LEAHLYN LAURENTE MAKILING architect or author of said documents to ENGR. CLEIFFORD ALFARERO
duplicate or to make copies of said documents
for use in the repetition of and for other projects DORMITORY BUILDING AS SHOWN
KRYZYL CYNDEE AQUILAM LADERA

1 2
or buildings, whether executed partly or in whole.
KIM CAMANIAN INSTRUCTOR
KENAN ACE EJEDO FRANCISCO Rep. Act 9266, Sec. 33
Architecture Act of 2004
LOCATION: University Town, CMU, Musuan, Maramag, Bukidnon DATE: MAY 17, 2024 DATE: MAY 17, 2024

You might also like