Name of the Job Site: NXTRA DATA CENTER PROJECT, Chennai Date : 16.02.202
Activity/ Facility/ Equipment/ Substance*: PU ESD Flooring – DC Building Ref. No : HIRA/NDC/ /Rev 00
Hira Prepared by with the involvement of ---- I have read and understood the
Reviewed by Approved by
Team (workmen representatives names/ s/c names, Understood and agree to comply contents
members etc.,) (respective seniors) (only PD/ PM)
(communicated down the line)
Mr. Sreeram – P&M in charge
Mr. Saravana kumar G – Finishing Manager Mr. Saravana kumar G – Finishing
Name & Mr. Mohan Babu Mr. S Arun kumar Mr. Saravana kumar G – Finishing Manager
Mr. Prasanth kumar – Site Engineer Manager
role: Finishing Incharge Project Director Mr. Prasanth kumar – Site Engineer
Mr. VENKATESH – QA/QC In charge Mr. Prasanth kumar – Site Engineer
R. Vimal – EHS In charge
Signature
Ref No; 52. HIRA Register / NXTRA DATA CENTER & TELEPHONE EXCHANGE PROJECT/ EHS Formats / Rev 00 / Aug 2019
Anticipated
Probability
Risk Level
Popula
Severity
Rating
Rating
Sl
Risk
Sub activity Hazard Hazardous Possible tion at Existing Control Measure* Additional Control Measures Action By
No
Event Outcome risk
Ref No; 52. HIRA Register / NXTRA DATA CENTER & TELEPHONE EXCHANGE PROJECT/ EHS Formats / Rev 00 / Aug 2019
Anticipated
Probability
Risk Level
Popula
Severity
Rating
Rating
Sl
Risk
Sub activity Hazard Hazardous Possible tion at Existing Control Measure* Additional Control Measures Action By
No
Event Outcome risk
Risk Level
Popula
Severity
Rating
Rating
Sl
Risk
Sub activity Hazard Hazardous Possible tion at Existing Control Measure* Additional Control Measures Action By
No
Event Outcome risk
coving Mr.
Chemical will stack in designated area.
junction Access & Materials Applica Prasanth
Access will maintain for safe approach. Full time supervision for
& top egress and stacked in Hit injury tor / 4 4 H kumar –
terminatio Water stagnation or other oil spillage will avoid slippery in access.
slip & trip access Helper Site
n not allow for avoid slippery.
Engineer
Chemical handling Training will ensure for
Breathing
crew on periodic basic.
Inhalation problem / 2 3 M Full time supervisor
MSDS display in Stores and ensure to follow
stress
the instruction. Mr. Mr.
Contact Applica Flammable material will store in separate or Saravana
Intake / Organ kumar G –
with tor / 2 3 M designated area to avoid unauthorized Signage will display.
Consuming burns / fatal Finishing
Nito flor chemical Helper handling.
L Manager
SL.Diss
Rubber hand gloves will ensure for chemical Mr.
Under
coat Organ handling. Full time supervisor for Prasanth
Injection 2 3 M
applicatio burns / fatal MSDS awareness training will ensure the handling the chemical. kumar –
04 n (Two crew. Site
Compone Full time supervisor will Engineer
Spillage of Soil Ground Dip tray / Tarpaulin will ensure for handling
nt),to be Land 2 3 M ensure for handling the Saravana
Chemical Pollution area of chemicals at store & Site.
mixed Chemical. kumar G –
with Only authorized electrician Finishing
paddle Electrical test will be done before starting g
chipping activity. shall provide all connections. Manager
mixer. Contact with
Electrocutio Portable power tools shall Mr.
Electricity electricity / Staffs / 4 Regular maintenance and servicing of all
n / Burn 2 2 be of double insulated type. L Prasanth
(PH - 12) Defective Supervi (L) equipment.
Injury Machine and cable shall be kumar –
machine sor / All power supply must be routed through
Workm checked daily before starting Site
RCCB with 30mA sensitivity. Engineer
en the work.
Excessive Noise Organ 1 2 L Regular maintenance will be carried out. Proper PPEs (Hand gloves,
Noise / creating by Failure Workmen provided with Ear Plug Nose mask & L
Dust Machine
Chemical handling Training will ensure for
Breathing Mr.
crew on periodic basic.
Inhalation problem / 2 3 M Full time supervisor Saravana
Coving MSDS display in Stores and ensure to follow
stress kumar G –
(Nito flor Contact Applica the instruction.
UT coving Finishing
05 with tor / Flammable material will store in separate or L
75mmx75 Intake / Organ Manager
chemical Helper 2 3 M designated area to avoid unauthorized Signage will display.
mm to be Consuming burns / fatal Mr.
mixed) handling.
Prasanth
kumar –
Injection Organ 2 3 M Rubber hand gloves will ensure for chemical Full time supervisor for
Ref No; 52. HIRA Register / NXTRA DATA CENTER & TELEPHONE EXCHANGE PROJECT/ EHS Formats / Rev 00 / Aug 2019
Anticipated
Probability
Risk Level
Popula
Severity
Rating
Rating
Sl
Risk
Sub activity Hazard Hazardous Possible tion at Existing Control Measure* Additional Control Measures Action By
No
Event Outcome risk
handling.
burns / fatal MSDS awareness training will ensure the handling the chemical.
crew.
Spillage of Soil Ground Dip tray / Tarpaulin will ensure for handling Site
Land 2 3 M Full time supervisor. Engineer
Chemical Pollution area of chemicals at store & Site.
Chemical handling Training will ensure for
Breathing
crew on periodic basic.
Inhalation problem / 2 3 M Full time supervisor
MSDS display in Stores and ensure to follow Mr.
stress
the instruction. Saravana
Contact Applica Flammable material will store in separate or kumar G –
Intake / Organ
with tor / 2 3 M designated area to avoid unauthorized Signage will display. Finishing
Consuming burns / fatal
chemical Helper handling. Manager
L
Rubber hand gloves will ensure for chemical Mr.
Surface Organ handling. Full time supervisor for Prasanth
Injection 2 3 M
to be rub burns / fatal MSDS awareness training will ensure the handling the chemical. kumar –
by Emery crew. Site
sheet & Full time supervisor will Engineer
carborun Spillage of Soil Ground Dip tray / Tarpaulin will ensure for handling
Land 2 3 M ensure for handling the
06 dum Chemical Pollution area of chemicals at store & Site.
Chemical.
stone &
cleaning Electrical test will be done before starting g
by using chipping activity. Mr.
vacuum Staffs / Saravana
Contact with Regular maintenance and servicing of all Only authorized electrician
cleaner. Electrocutio Supervi kumar G –
Electricity electricity / 4 equipment. shall provide all connections.
n / Burn sor / 2 2 L Finishing
(PH - 12) Defective (L) All power supply must be routed through Portable power tools shall
Injury Workm Manager
machine RCCB with 30mA sensitivity. be of double insulated type.
en
Mr.
Machine and cable shall be checked daily
Prasanth
before starting the work.
kumar –
Excessive Noise Noise / Applica 1 2 L Regular maintenance will be carried out. Proper PPEs (Hand gloves, Site
Noise / creating by Dust tor / Workmen provided with Ear Plug Nose mask & L Engineer
Dust Helper
Chemical handling Training will ensure for
Nito flor Breathing
SL 3000 crew on periodic basic. Mr.
Inhalation problem / 2 3 M Full time supervisor
UT ESD MSDS display in Stores and ensure to follow Saravana
Contact stress Applica
applicatio the instruction. kumar G –
07 with tor / L
n 3mm Finishing
chemical Helper Flammable material will store in separate or
thick. Intake / Organ Manager
(Four 2 3 M designated area to avoid unauthorized Signage will display.
Consuming burns / fatal Mr.
compone handling.
Ref No; 52. HIRA Register / NXTRA DATA CENTER & TELEPHONE EXCHANGE PROJECT/ EHS Formats / Rev 00 / Aug 2019
Anticipated
Probability
Risk Level
Popula
Severity
Rating
Rating
Sl
Risk
Sub activity Hazard Hazardous Possible tion at Existing Control Measure* Additional Control Measures Action By
No
Event Outcome risk
_______________________________________________ _______________________________________________
Ref No; 52. HIRA Register / NXTRA DATA CENTER & TELEPHONE EXCHANGE PROJECT/ EHS Formats / Rev 00 / Aug 2019
Ref No; 52. HIRA Register / NXTRA DATA CENTER & TELEPHONE EXCHANGE PROJECT/ EHS Formats / Rev 00 / Aug 2019