Nothing Special   »   [go: up one dir, main page]

Sudheej Kumar. N.K Btech (Civil), Pmi-Pmp: K S P S

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Sudheej Kumar. N.

K
BTech(Civil),PMI-PMP
E-Mail: sudheejkumar@gmail.com | Phone: +971 567 123 154

Senior Professional of global, multi-cultural and rich experience in successfully spearheading functions related to Project Management, People
Management, Engineering Coordination, Quality Assurance, Erection & Installation and Engineering Projects, with proven track record of executing
multimillion dollar prestigious Construction Projects within Schedule, Cost & Quality across India & Overseas locations

KE Y SKILLS PR OFILE SUMMARY


Strategic Planning & Leadership • Excellence in spearheading entire construction management activities that
Quick & Continuous learner include project time schedules & plans, engineering drawings & technical
Budgeting & Expenditure Tracking specifications, construction drawing review including review of project scope, cost,
Project Management and schedule baselines according to the management plan
Risk Identification & Management
Good Interpersonal & Multi-Tasking • Experienced in successfully managing various projects such as Mixed-use
Contract & Subcontract Agreements constructions, Data Centres, Villas and apartments, Interior Fitouts, Infrastructure
Excellent Organizational Skills Projects like Utilities, Substations, Bridges & Interchange, Express Way Project,
Resource Optimization Roads, STPs, Culverts, Drains, Metro Railways etc.
Quality Control & Safety Measurement • People Leader, acknowledge for delivering excellence in developing highly skilled
Program Execution & Management and talented workforce, grooming team as future leaders, preparing emergency plans
Commissioning & new set-up for all possible emergencies at site
Excellent player in Problem Solving
People Leadership • Project Leader, conceptualizing and implementing project management strategies
Training & Development with focus on delivering project with cost, quality and timeline and managing the
entire functions related to contractor and sub-contractor management, material
QUALIFICATIONS resource planning, project budgeting and cost estimation, project procurements,
1. Postgraduate in Project Mgmt project progress reporting & documentation.
2. BTech in Civil Engineering • Excellence in drawing-up a detailed plan to achieve each stage of the project, a
3. Diploma in Civil Engineering hardworking team member, can lead a design team, managing the changes in project
scope, identifying potential risks & developing contingency plans, taking positive
KE Y CLIENTS MAN AGED action & ownership, reducing the timeline & generating error free drawing.
• Strategize techniques for maximum utilization of manpower with thorough
McLaren Group, United Arab Emirates understanding of industry & technology trends; implemented techniques &
Electricity & Water Authority, Bahrain methodologies to achieve product excellence.
Viscas- Furukawa Middle East • Successfully adherence to construction safety, environment, regulatory and energy
Saudi Electricity Company (EOA), Saudi Arabia conservation norms; experience in project budgets formulation, annual project
Rainbow Realtors Ltd planning, troubleshooting, manpower planning & risk assessment analysis
Indian Navy (Ministry of Defence-India)
Greygold Constructions Pvt Ltd. • Capability to sustain a positive work environment that fosters team performance with
KAOSER Charitable Trust strong communication and relationship management skills
The Western India Plywood
• Well versed with Oil and Gas companies’ construction and safety procedures.

CERTIFICATION & MEMBERSHIPS


• Certified Project Management Professional (PMI-PMP)- PMP # 2312813.
• Member of the Institution of Engineering and Technology (IET)-UK- MIET Reg # 1100901510
• Professional Engineer – PE- Engineering Council of India- Reg # PE/00013/2020
• Member American Society of Civil Engineers. (M. ASCE) – Member ID # 11933741
• Member of the Institution of Engineers (India). (MIE) – Member ID # M-1700868
• Chartered Engineer (India)- The Institution of Engineers (India) – ID # 019303
• Member International Association of Engineers, Hongkok. MIAENG- Membership # 265879
• Civil Engineer- Cat-A, The Council for Regulating the Practice of Engineering Professions (CRPEP)- Bahrain – Registration #
EPP/C4098/CE/01-A
• Management of Urban Infrastructures from École Polytechnique Fédérale de Lausanne (EPFL)Switzerland

ORGANISATI ONAL EXPERIENCE


Al Afiah Contracting, United Arab Emirates Apr ‘22 – Present
Projects Manager
Role: -

• Responsible multiple Project sites and to ensure compliance with the project objectives, specifications, standards, codes and local
regulations.
• Review and approve drawings, specifications and technical documents for all civil and MEP related work.
• Prepare an integrated Project Plan in line with all the objectives of the Project document and ensure that the mechanical and electrical
departments are aware of their responsibilities and time schedules to ensure smooth workflow.
• Provide technical, full-time, on-site inspection of the progress and quality of the construction work performed and that it is completed
in accordance with the Contract Documents.
• Overall planning and monitoring of resources, cost, material and machinery for various construction projects.
• Managing project operations with a view to ensure timely accomplishment of targets within the scope, time and cost parameters.
• Monitoring project compliance with project management standard policies, procedures and templates through project audits.
• Providing the site team with the required look ahead schedule and progress update in order to meet the project schedule and planned
milestones.
• Conducts site meetings with various site personnel and consultant / client representatives to update them on progress of construction
and respond to queries.
• Conduct risk assessment of the construction work and construction site and ensure safety standards are in line with company HSE
policy.
• Ensure that state-of-the-art technology is applied throughout the engineering phase for cost effective solutions and application of value-
added engineering throughout the assigned works.
• Ramp up projects in close coordination with various project personnel, vendors, architects, consultants & other external agencies to
ensure time bound deadlines.

Al Halabi Group, United Arab Emirates Feb’21 – Mar’22


Project Manager
Role: -

• Implement a comprehensive project management schedule, liaising with the relevant personnel within the company and externally
appointed contractors to ensure that information is continuously updated and made available to all key stakeholders.
• Accountable for the delivery of a broad range of brand projects within agreed timeframes (as per specifications) and within approved
budgets.
• Manage the relationship and contracts defining the commercial terms and scope of works agreed with the designer, contractor and
project management companies so as to ensure that individual projects are delivered to appropriate specifications and to the
satisfaction of all parties.
• Oversee the financials for each project, ensuring that agreed costings are adhered to, projects are completed within pre-specified and
approved financial limits, post-completion project reviews are undertaken and variances to the projected scope of investment are
highlighted and recovered.
• Maintain full post project appraisals with the Commercial Manager, assisting in the production and verification of budget variances.
• Continuously review project efficiencies and to challenge the methods applied by both the company and third-party personnel; to
implement a program of continuous improvement to project management processes.
• To ensure that processes and systems are established and developed to accurately assess the impact of property and project
management activity on business performance.
• Chair internal project review meetings and 3rd party site review meetings.
• Liaise with the maintenance team during the design and construction phase and ensure all project documentation and information is
handed over to the maintenance team at handover of the project
• Perform other duties as requested by the Line Manager

Prysmian Powerlink, Italy (Foreign Branch), Bahrain May’18 – Dec’20


Construction Manager / Civil Design Manager
Role: -

• Spearheaded entire functions related to civil engineering activities of the project


• Followed up with subcontractors for submittals like approval for materials, drawings and documents from Owner/ Engineer
• Implemented guidelines for submittals for approvals, preparing of designs, and drawings
• Interfaced with the Owner / Engineer and other stakeholders regarding the approval of planning permission and way leave clearances
• Aligned and confirmed project execution as per the design and drawings & coordinate with the relevant Authorities
• Ensured the quality of materials and workmanship as stipulated in the contract documents
• Performed calculations, bar charts, manpower allocation and equipment schedules
• Checked construction requirements and procedures, specifications, commercial matters needed for the execution of the projects
• Maintained quality, health, safety policy of the organization
• Coordinating with various Wet & Dry Utility stakeholders and facilitating the finalization of cable route
• Developed full scale project plans and associated communication documents like Progress reports, budget reports, requirements
documentation and presentations
• Managed project dependencies, timelines, milestones and critical path using appropriate tools
• Monitored project milestone payments by raising a milestone completion certificate, invoice, bank guarantee/bond (finance) as per the contract
• Managed and maintained project planning and reporting systems in accordance with the requirements of the contract, and for Project sponsors
and stakeholders
• Attended & presented project monthly cost and status report, Project Financial Reports (Project Revenue, Planned & Actual, Forecast, and Margin)

Alkomed Engineering Services WLL, Bahrain Apr’16 – May’18


As Project Engineer
Role: -

• Reviewed engineering drawings and structural drawings related to the Project


• Created Method statements and Risk assessments for each item of works
• Managed the group of Engineers in the Drawings office/Design department and Site Team
• Led the project execution for all Civil Engineering aspects for the above project
• Attending meetings with various Government Agencies for design approval and way leave clearances
• Executed the project as per the design and drawings & coordinate with the relevant Authorities
• Ensured the quality of materials and workmanship as stipulated in the contract documents
• Performed calculations, bar charts, manpower allocation and equipment schedules.
• Checked construction requirements and procedures as per plan and specifications including commercial matters
• Allocated the work to the supervisory staff and ensuring the work progress and look after all project activities on a daily basis to
maintain the progress and quality of work as per specifications and QHSE standards

Al Jazirah Engineers & Consultants, Al Khobar, Saudi Arabia May’13 – Mar’16


As Senior Civil Engineer
Role: -

• Reviewed Inspector’s daily reports; prepared engineer’s daily Diary


• General oversight of inspectors’ daily activities including work assignments, on site performance, and guidance on the site performance,
and guidance on the supervision of the Contractor’s operations
• Reviewed Contractor’s joint measurement and testing requests and subsequent completed reports
• Took approval of the Contractor’s Shop Drawings as delegated by the Resident Engineer
• Monitored the performance of the survey party
• Reviewed and approved of the contractor’s proposed materials and methods as delegated by the Resident Engineer
• Coordinated with Contractor’s supervisory personnel regarding schedule, sequence and method of work
• Monitored conformance with the Contractor’s schedule
• Conducted Continuous Field Inspections of the work in progress and consultation with both the Engineer’s and Contractor’s supervisory staff
• Prepared written and oral reports to the Resident engineer on contractual and procedural matters
• Reviewed as-built drawings, in coordination with inspectors and surveyors
• Coordinated with Contractor’s Engineer regarding request routing, checking, testing and calculations for approved works
• Recorded and reported to RE about abnormal weather, accidents, hazards, etc. at site or third party
• Coordinated and cooperated with RE for all data collection necessary for design orders preparation
• Maintained daily report to the RE containing the activities of the contractor, the progress, the constrains and proposals

RCC Engineering Pvt Ltd, May’03 - Apr’13


As Senior Project Manager
Role:-

• Manage all Engineering, Procurement and Construction/Fabrication and Installation activities of projects to ensure completion in
accordance with design criteria, within time, within budget and within safety targets, for the achievement of profit objectives in a cost-
effective manner.
• Fabrication and erection of cranes and launching girders.
• Manage the activities of all personnel assigned Construction project, including work allocation and utilization, and ensure their duties
and responsibilities are performed in accordance with the project objectives.
• Exercise authority at the level determined by management for the position.
• Ensure the project’s compliance with the Company’s established policy and procedures, including HSE, Quality and Human Resources;
its ISO 9001 /ISO14001accreditation; Building rules; and client requirements.
• Ensure that continual safety vigilance and awareness is reinforced to all subordinates and ensure all work is performed to the highest
standards of safety.
• Ensure all project activities are performed productively, according to specification and schedule, in the most efficient and cost-effective
manner, and continually seek improvements in the work systems.
• Control indirectly through subordinate project planning, cost control, scheduling, quality control, procurement and contract
administration through all phases of the project.
• Ensure all company reports, schedules and documentation are completed accurately and on time.
• Be focused on the needs of the client and strive to exceed their expectations.
• Ensure all activities are performed with close co-ordination of Consultants and Client. Eg. Contracts, Planning, Procurements, Quality
Assurance and Quality Control.

Greygold Constructions Pvt. Ltd., Jun’96 – Apr’03


As Sr. Project Engineer
Role:-

KAP Constructions, Trissur, Kerala, Apr’93 – May’96


As Site Engineer
Role:-

PERS ONAL DETAILS


Date of Birth: 15th January 1975 | Languages Known: English, Hindi, Tamil & Malayalam
Passport Number & Visa: Z5428913 Valid up to 03.10.2030. Employment Visa Transferable.
Present Address: Dubai, United Arab Emirates.
Driving License:
• Indian Light Motor Vehicle Valid up to 21.05.2018
• Saudi Arabian Light Motor Vehicle Valid up to 22.02.2023
• Dubai- UAE Light Motor Vehicle Valid up to 28.02.2023

You might also like