GENERAL NOTE

0.15
1.10 0.30 2.00 0.55 2.00 0.25
1 - ALL DIMENSIONS & LEVELS ARE IN METERS
UNLESS OTHERWISE SPECIFIED

1.30
2 - DO NOT SCALE THE DRAWING

3 - ALL MATERIALS TO BE APPROVED BY


ARCHITECTS/ENGINEERS
4 - THE CONTRACTOR SHALL SUBMIT THE SHOP
DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
FOR APPROVAL, BEFORE COMMENCING THE
WORK/FABRICATION ON
SITE

5- ALL LEVELS INDICATED ARE FINISHED FLOOR


LEVELS UNLESS OTHERWISE INDICATED .

2.00 6 - THIS DRAWING TO BE READ IN CONJUNCTION


WITH
RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
DETAILS & SPECIFICATION THE CONTRACTOR

HALL 4
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF

5.96
ANY
DISCREPANCY FOR CLARIFICATION BEFORE
2 PROCEEDING
WITH THE WORK INVOLVED .
7.10

3 E 1
4
KEY PLAN
1.00
2.00

OWNER:
0.05

‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬


LINK INVESTMENT
PROJECT:
1.00

DEVELOPMENT OF PLOT C-1/Z-9


0.80

SHK. MOHAMMED BIN ZAYED CITY


3.60 0.45 2.15 ABU DHABI,TOWER -3

CONSALTUANT:

DRAWING TITLE :

DISGINER:
ARCITCTURAL

CHECKED: DRAWING NO:

SCALE: DATE
19-4-2030

REFERENCE NO.
FLOOR SLAB

7.10

0.70
FALSE CEILING

1.40 4.00 1.70


GENERAL NOTE
1D
1 - ALL DIMENSIONS & LEVELS ARE IN METERS
3 UNLESS OTHERWISE SPECIFIED
6 7 6 2 - DO NOT SCALE THE DRAWING
3.23

3 - ALL MATERIALS TO BE APPROVED BY


2.53

ARCHITECTS/ENGINEERS

0.45 0.20 0.39 4 - THE CONTRACTOR SHALL SUBMIT THE SHOP


DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
FOR APPROVAL, BEFORE COMMENCING THE
WORK/FABRICATION ON
1 SITE
5- ALL LEVELS INDICATED ARE FINISHED FLOOR
LEVELS UNLESS OTHERWISE INDICATED .
6 - THIS DRAWING TO BE READ IN CONJUNCTION
2 WITH
RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
FLOOR SLAB DETAILS & SPECIFICATION THE CONTRACTOR
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF
ANY
DISCREPANCY FOR CLARIFICATION BEFORE
PROCEEDING
WITH THE WORK INVOLVED .

ELEVATION 1 KEY PLAN


SCALE 1:20

FLOOR SLAB ELEVATION FINISHING MATERIALS:


FALSE CEILING
1. GYPSUM BOARD DECOR
0.70

6.20 2. CARPET FLOOR FINISH


3. WALL PAINT ON CEMENT BOARD
4. FOLDING DOOR
0.34

5. WOOD DOOR
6. WOOD FINISHING
7. STAINLESS STEEL STRIP
OWNER:
‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬
3.23

LINK INVESTMENT
2 3 3 3
1
2.53

PROJECT:
1 DEVELOPMENT OF PLOT C-1/Z-9
2.20

SHK. MOHAMMED BIN ZAYED CITY


1.40 2.00 0.55 2.00 0.25 ABU DHABI,TOWER -3

CONSALTUANT:

FLOOR SLAB DRAWING TITLE :

ELEVATION 2 DISGINER:
ARCITCTURAL

SCALE 1:20 CHECKED: DRAWING NO:

SCALE: DATE
19-4-2030

REFERENCE NO.
FLOOR SLAB

7.10

0.70
FALSE CEILING

7.10
GENERAL NOTE

1 - ALL DIMENSIONS & LEVELS ARE IN METERS


UNLESS OTHERWISE SPECIFIED
0.80 2.00 1.00 2.00 1.30 2 - DO NOT SCALE THE DRAWING
3.23
5
3 - ALL MATERIALS TO BE APPROVED BY
2 2
2.53 ARCHITECTS/ENGINEERS

2.53
3 3
4 - THE CONTRACTOR SHALL SUBMIT THE SHOP
DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
3
FOR APPROVAL, BEFORE COMMENCING THE
WORK/FABRICATION ON
SITE
5- ALL LEVELS INDICATED ARE FINISHED FLOOR
LEVELS UNLESS OTHERWISE INDICATED .
6 - THIS DRAWING TO BE READ IN CONJUNCTION
1 WITH
RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
FLOOR SLAB DETAILS & SPECIFICATION THE CONTRACTOR
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF
ANY

ELEVATION 3
DISCREPANCY FOR CLARIFICATION BEFORE
PROCEEDING
WITH THE WORK INVOLVED .

SCALE 1:20 KEY PLAN

ELEVATION FINISHING MATERIALS:


1. GYPSUM BOARD DECOR
0.70

2. CARPET FLOOR FINISH


3. WALL PAINT ON CEMENT BOARD
4. FOLDING DOOR
5. WOOD DOOR
COLUMN
6. WOOD FINISHING
7. STAINLESS STEEL STRIP
OWNER:
CURTIN WALL ‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬
3.23

LINK INVESTMENT
6
3 PROJECT:
2.53

DEVELOPMENT OF PLOT C-1/Z-9


2 SHK. MOHAMMED BIN ZAYED CITY
ABU DHABI,TOWER -3
2.15 4.05
CONSALTUANT:

DRAWING TITLE :

DISGINER:

ELEVATION 4
ARCITCTURAL

CHECKED: DRAWING NO:

SCALE 1:20 SCALE: DATE


19-4-2030

REFERENCE NO.
4.00

DETAIL A

GENERAL NOTE

1 - ALL DIMENSIONS & LEVELS ARE IN METERS


ROOF SLAB UNLESS OTHERWISE SPECIFIED
2 - DO NOT SCALE THE DRAWING

3 - ALL MATERIALS TO BE APPROVED BY


SCREWS
ARCHITECTS/ENGINEERS

CHANNEL
4 - THE CONTRACTOR SHALL SUBMIT THE SHOP
DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
2.30

FOR APPROVAL, BEFORE COMMENCING THE


WORK/FABRICATION ON
SITE
5- ALL LEVELS INDICATED ARE FINISHED FLOOR
LEVELS UNLESS OTHERWISE INDICATED .
6 - THIS DRAWING TO BE READ IN CONJUNCTION
WITH
DOOR RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
DETAILS & SPECIFICATION THE CONTRACTOR
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF
0.11 0.84 0.15 0.84 0.15 0.84 0.15 0.84 0.10 ANY
DISCREPANCY FOR CLARIFICATION BEFORE
PROCEEDING
DETAIL A WITH THE WORK INVOLVED .

KEY PLAN

ELEVATION ELEVATION FINISHING MATERIALS:


1. GYPSUM BOARD DECOR
2. CARPET FLOOR FINISH
3. WALL PAINT ON CEMENT BOARD
4. FOLDING DOOR
5. WOOD DOOR
6. WOOD FINISHING
4.00
7. STAINLESS STEEL STRIP
OWNER:
‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬
LINK INVESTMENT
PROJECT:
DEVELOPMENT OF PLOT C-1/Z-9
SHK. MOHAMMED BIN ZAYED CITY
ABU DHABI,TOWER -3

CONSALTUANT:

DRAWING TITLE :

DISGINER:
ARCITCTURAL

CHECKED: DRAWING NO:

FOLDING DOOR DETAIL SCALE: DATE


19-4-2030

REFERENCE NO.
GENERAL NOTE

1 - ALL DIMENSIONS & LEVELS ARE IN METERS


UNLESS OTHERWISE SPECIFIED
2 - DO NOT SCALE THE DRAWING

3 - ALL MATERIALS TO BE APPROVED BY


ARCHITECTS/ENGINEERS
4 - THE CONTRACTOR SHALL SUBMIT THE SHOP
DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
FOR APPROVAL, BEFORE COMMENCING THE
WORK/FABRICATION ON
SITE
5- ALL LEVELS INDICATED ARE FINISHED FLOOR
LEVELS UNLESS OTHERWISE INDICATED .
6 - THIS DRAWING TO BE READ IN CONJUNCTION
WITH
RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
DETAILS & SPECIFICATION THE CONTRACTOR
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF
ANY
DISCREPANCY FOR CLARIFICATION BEFORE
PROCEEDING
WITH THE WORK INVOLVED .

KEY PLAN

ELEVATION FINISHING MATERIALS:

OWNER:
‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬
LINK INVESTMENT
PROJECT:
DEVELOPMENT OF PLOT C-1/Z-9
SHK. MOHAMMED BIN ZAYED CITY
ABU DHABI,TOWER -3

CONSALTUANT:

DRAWING TITLE :

DISGINER:
ARCITCTURAL

CHECKED: DRAWING NO:

SCALE: DATE
19-4-2030

REFERENCE NO.
GENERAL NOTE

1 - ALL DIMENSIONS & LEVELS ARE IN METERS


UNLESS OTHERWISE SPECIFIED
2 - DO NOT SCALE THE DRAWING

3 - ALL MATERIALS TO BE APPROVED BY


ARCHITECTS/ENGINEERS
4 - THE CONTRACTOR SHALL SUBMIT THE SHOP
DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
FOR APPROVAL, BEFORE COMMENCING THE
WORK/FABRICATION ON
SITE
5- ALL LEVELS INDICATED ARE FINISHED FLOOR
LEVELS UNLESS OTHERWISE INDICATED .
6 - THIS DRAWING TO BE READ IN CONJUNCTION
WITH
RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
DETAILS & SPECIFICATION THE CONTRACTOR
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF
ANY
DISCREPANCY FOR CLARIFICATION BEFORE
PROCEEDING
WITH THE WORK INVOLVED .

KEY PLAN

ELEVATION FINISHING MATERIALS:

OWNER:
‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬
LINK INVESTMENT
PROJECT:
DEVELOPMENT OF PLOT C-1/Z-9
SHK. MOHAMMED BIN ZAYED CITY
ABU DHABI,TOWER -3

CONSALTUANT:

DRAWING TITLE :

DISGINER:
ARCITCTURAL

CHECKED: DRAWING NO:

SCALE: DATE
19-4-2030

REFERENCE NO.
GENERAL NOTE

1 - ALL DIMENSIONS & LEVELS ARE IN METERS


UNLESS OTHERWISE SPECIFIED
2 - DO NOT SCALE THE DRAWING

3 - ALL MATERIALS TO BE APPROVED BY


ARCHITECTS/ENGINEERS
4 - THE CONTRACTOR SHALL SUBMIT THE SHOP
DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
FOR APPROVAL, BEFORE COMMENCING THE
WORK/FABRICATION ON
SITE
5- ALL LEVELS INDICATED ARE FINISHED FLOOR
LEVELS UNLESS OTHERWISE INDICATED .
6 - THIS DRAWING TO BE READ IN CONJUNCTION
WITH
RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
DETAILS & SPECIFICATION THE CONTRACTOR
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF
ANY
DISCREPANCY FOR CLARIFICATION BEFORE
PROCEEDING
WITH THE WORK INVOLVED .

KEY PLAN

ELEVATION FINISHING MATERIALS:

OWNER:
‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬
LINK INVESTMENT
PROJECT:
DEVELOPMENT OF PLOT C-1/Z-9
SHK. MOHAMMED BIN ZAYED CITY
ABU DHABI,TOWER -3

CONSALTUANT:

DRAWING TITLE :

DISGINER:
ARCITCTURAL

CHECKED: DRAWING NO:

SCALE: DATE
19-4-2030

REFERENCE NO.
GENERAL NOTE

1 - ALL DIMENSIONS & LEVELS ARE IN METERS


UNLESS OTHERWISE SPECIFIED
2 - DO NOT SCALE THE DRAWING

3 - ALL MATERIALS TO BE APPROVED BY


ARCHITECTS/ENGINEERS
4 - THE CONTRACTOR SHALL SUBMIT THE SHOP
DRAWINGS AS PER ACTUAL SITEMEASUREMENTS
FOR APPROVAL, BEFORE COMMENCING THE
WORK/FABRICATION ON
SITE
5- ALL LEVELS INDICATED ARE FINISHED FLOOR
LEVELS UNLESS OTHERWISE INDICATED .
6 - THIS DRAWING TO BE READ IN CONJUNCTION
WITH
RELEVANT
ARCHITECTURAL.STRUCTURAL,M&EDRWAINGS,
DETAILS & SPECIFICATION THE CONTRACTOR
SHALL
COORDINATE THESE DRAWINGS AND REPORT IF
ANY
DISCREPANCY FOR CLARIFICATION BEFORE
PROCEEDING
WITH THE WORK INVOLVED .

KEY PLAN

ELEVATION FINISHING MATERIALS:

OWNER:
‫ﻣﺮﻛﺰ ﺇﺣﺼﺎء ﺃﺑﻮﻇﺒﻲ‬
LINK INVESTMENT
PROJECT:
DEVELOPMENT OF PLOT C-1/Z-9
SHK. MOHAMMED BIN ZAYED CITY
ABU DHABI,TOWER -3

CONSALTUANT:

DRAWING TITLE :

DISGINER:
ARCITCTURAL

CHECKED: DRAWING NO:

SCALE: DATE
19-4-2030

REFERENCE NO.

You might also like