`Dear Sir ,

We Sajit Enterprise are awarded the project name


' Creation of false flooring and additional work at new Jeerat telecom room at GIS
(Gas Insulated Substation) building.

Specification No. ERTCC/CS/22-23/I-278/T-190/Jeerat/False_Flooring. RFx No :-


5005007947.

We are proposing some material and the manufactoring company name for the above
mentioned job ( You can also find those name in powergrid
approved vendor ( Manufactoring comany ) list :-

( i ) Cement :- ACC PPC, Ultratech PPC


( ii ) Sand :- Damodar River
( iii ) Structural Steel :- SAIL , JINDAL
( v ) Aluminium for Door and Winow :- JINDAL
( vi ) Material Testing Lab :- Jadavpur University , Salt Lake Campus.

Kindly Approved this material manufacturar for the above mentined job so that we
can process our further work progress as fast as possible.

Dear Sir ,

We Sajit Enterprise are awarded the project name


' Creation of false flooring and additional work at new Jeerat telecom room at GIS
(Gas Insulated Substation) building.

Specification No. ERTCC/CS/22-23/I-278/T-190/Jeerat/False_Flooring. RFx No :-


5005007947.

Sir ,

Kindly Provide the following things , so that we can pocess our further work
progress .

( i ) Batary Rack Lay out.


( ii ) Battary rack Structural Drawing with.
( iii ) Aluminium Sliding window Drawing with Details.
( iv ) False Flooring :- Material Manufactoreer Company name

Specification No. ERTCC/CS/22-23/I-278/T-190/Jeerat/False Flooring.


RFx No :- 5005007947.

Dear Sir ,

We M/s Sajit Enterprise are awarded the project name ' Creation of false
flooring and additional work at new Jeerat telecom
room at GIS (Gas Insulated Substation) building 'on 10.02.2023. Sir , Its Been
Almost 02 Month from day of Awarded but Till date we Did't recived
any drawing of following work. so that we are unable to start our work.

we are hoping your kind attention on this matter and please Provide the following
things as fast as possible.
so that we can pocess our further work progress .

( i ) Batary Rack Lay out.


( ii ) Battary rack Structural Drawing with details of structur
( iii ) Aluminium Sliding window Drawing with Details.

Thanking You.

Regards ( Sajit Mondal for M/s Sajit Enterprise )