Building 230 (30b)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 84

SINDALAH NON-MANAGERIAL STAFF

ACCOMMODATION

REGION
NEOM
KINGDOM OF SAUDI ARABIA

RECREATIONAL HUB & GYM BUILDING 230

BILL OF QUANTITIES
FOR
SKELETON & FINISHING PACKAGE

CLIENT DESIGN CONSULTANT CONTRACTOR

FEB. 2024
REV.01
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
SKELETON & FINISHING PACKAGE
RECREATIONAL HUB AND GYM BUILDING - (230) - GENERAL CONTENTS
Div. DIVISION BOQ PAGES
FROM PAGE TO PAGE
GENERAL SUMMARY
00 GENERAL PROJECT REQUIREMENTS
01 GENERAL REQUIREMENTS
02 EXISTING CONDITIONS
03 CONCRETE 230/DIV.03/01 230/DIV.03/05
04 MASONRY 230/DIV.04/01 230/DIV.04/02
05 METALS - NON-STRUCTURE 230/DIV.05/01 230/DIV.05/04
06 METALS - STRUCTURE 230/DIV.05/01 230/DIV.05/04
06 WOOD, PLASTICS, AND COMPOSITES
07 THERMAL AND MOISTURE PROTECTION 230/DIV.07/01 230/DIV.07/05
08 OPENINGS 230/DIV.08/01 230/DIV.08/06
09 FINISHES 230/DIV.09/01 230/DIV.09/06
10 SPECIALTIES 230/DIV.10/01 230/DIV.10/03
11 EQUIPMENT
12 FURNISHINGS
13 SPECIAL CONSTRUCTION
14 CONVEYING EQUIPMENT
21 FIRE SUPPRESSION 230/DIV.21/01 230/DIV.21/03
22 PLUMBING 230/DIV.22/01 230/DIV.22/04
23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 230/DIV.23/01 230/DIV.23/04
25 INTEGRATED AUTOMATIONS
26 ELECTRICAL 230/DIV.26/01 230/DIV.26/05
27 COMMUNICATIONS 230/DIV.27/01 230/DIV.27/04
28 ELECTRONIC SAFETY AND SECURITY 230/DIV.28/01 230/DIV.28/04
31 EARTHWORKS 230/DIV.31/01 230/DIV.31/03
32 EXTERIOR IMPROVEMENTS
33 UTILITIES
34 TRANSPORTATIONS
35 WATERWAY AND MARINE CONSTRUCTION
40 PROCESS INTEGRATION
41 MATERIAL PROCESSING AND HANDLING EQUIPMENT
42 PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND
43
STORAGE EQUIPMENT
44 POLLUTION AND WASTE CONTROL EQUIPMENT
45 INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
46 WATER AND WASTEWATER EQUIPMENT
48 ELECTRICAL POWER GENERATION

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION General Summary - 230
Division 03 – Concrete,
Steel Reinforcement
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 03 - CONCRETE WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are
complementary to the mentioned items in
the B.O.Q;
A. Supply of materials and equipment.
Off loading and handling from trucks on
B. site to place of installation (including
carnage, unpacking, erecting in place).
On-site material protection and storage
C
before installation.
D Installation of materials and equipment
All civil works required and related to the
landscape works, such as: equipment,
tools, concrete bases and supports, cutting
and chasing through block and concrete
E walls and slabs for passage of conduits,
sleeves, trays, trunking and ladders,
excavation and back-fillings, riggings,
hoisting, waterproofing, cleaning &
protection
All labor, materials, tools, instruments,
electric power, water supply, fuel and
F
water required for work executions,
testing, and commissioning
Preparation of the shop-drawings and As-
G
built drawings
Preparation of the operation and
H
maintenance manuals
J Samples as required by the Engineer
Maintenance as per the Contract
K
Conditions
Coordination with other specialty
L contractors, such as special equipment
supplier(s) and subcontractor(s) etc.

****** *******

SINDALAH NON MANAGERIAL 230 / Div. 03 / 1


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

DIVISION 03 - CONCRETE WORK


SUB- STRUCTURE WORK

032000 - Concrete Reinforcement

Supply and install deformed high tensile


yield steel bars reinforcement grade 60 (fy
≥ 414 Mpa) minimum yield characteristic
strength, including all necessary preparation
work, complete as shown on drawings and
as specified (Reinforcement shall comply
with BS4449, BS4461 & BS4483)

Steel reinforcement various diameters, for


A Sub structure work, including steel reinf.
For slab on grade 20 TON

03100 - Concrete formwork


03300 - Cast in place concrete
03370 - Concrete Curing

Supply and cast-in-situ ready-mix plain


concrete of minimum compressive
characteristic cube strength equal to (15
MPA), 150 kg/cm2 based on 28 day test,
including all necessary formwork,
preparation work & curing, complete as
shown on drawings and as specified

(Quantity given in Cubic meters)


100 mm thick, plain concrete blinding,
B
below footings 23 M3

To Collection SAR

SINDALAH NON MANAGERIAL 230 / Div. 03 / 2


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

CONCRETE WORK ( Cont'd )


SUB- STRUCTURE WORK (Cont'd)
031000 - Concrete formwork
03300 - Cast in place concrete
03370 - Concrete Curing

Supply and cast-in-situ ready-mix


Reinforced Concrete of minimum
compressive characteristic cube strength
equal to (35 Mpa) 350 kg/cm2 based on 28
day test, including all necessary formwork,
preparation works & curing, complete as
shown on drawings and as specified
Structural drawings:
STR.DRG. 130101
STR.DRG. 530102
STR.DRG. 630101

(By Cubic Meters)


A Single footings (F1 to F6) - isolated 40 M3
B Tie beams (TB.1 TO TB.6) 36 M3
C Column necks (C1 & C2) 11 M3

031000 - Concrete formwork


03300 - Cast in place concrete
03370 - Concrete Curing

Supply and cast-in-situ ready-mix


Reinforced Concrete of minimum
compressive characteristic cube strength
equal to (35 Mpa) 350 kg/cm2 based on 28
day test, including all necessary formwork,
preparation works & curing, complete as
shown on drawings and as specified
Structural drawing:
DWG. STR. DRG. 130103
DWG. STR. DRG. 530102
(By Cubic Meters)
Slab On Grade (SOG)
150mm thick, slab on grade (Area = 520
D
m2) (at level 22150) 78 M3

To Collection SAR

SINDALAH NON MANAGERIAL 230 / Div. 03 / 3


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

CONCRETE WORK ( Cont'd )


SUPER - STRUCTURE WORK

03530 - CONCRETE TOPPING


Cement sand screed trowelled surface
smooth finish, including mesh
reinforcement; including water curing,
jointing and pointing, complete as shown
on drawings and as per specifications
A 90mm thick to internal flooring 520 M2

03 40 00 Precast Concrete

Precast Concrete shaft covers (topping),


sloped, including steel reinforcement, rain
water drip, with fixing, jointing, supporting,
and pointing, complete as shown on
drawings and as per specifications

DWG. STR. DRG. 131003


(Quantity enumerated)
D OVERAL SIZE 900x900mm 1 No.
B OVERAL SIZE 1000x650mm 1 No.
C OVERAL SIZE 500x350mm 5 No.

To Collection SAR

SINDALAH NON MANAGERIAL 230 / Div. 03 / 4


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION - CONCRETE & STEEL REINFORCEMENT WORK

CARRIED FROM PAGE DIV.03 /01 Preambles ******


CARRIED FROM PAGE DIV.03 /02

CARRIED FROM PAGE DIV.03 /03

CARRIED FROM PAGE DIV.03 /04

Total Carried to Summary (Division 03)


GRAND TOTAL (SAR)

SINDALAH NON MANAGERIAL 230 / Div. 03 / 5


STAFF ACCOMMODATION
Division 04 – Masonry
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 4 - MASONRY WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are
complementary to the mentioned
items in the B.O.Q;
A. Supply of materials and equipment.
Off loading and handling from trucks
on site to place of installation
B.
(including carnage, unpacking,
erecting in place).
On-site material protection and
C
storage before installation.
D Installation of materials and equipment
All civil works required and related to
the landscape works, such as:
equipment, tools, concrete bases and
supports, cutting and chasing through
block and concrete walls and slabs
E
for passage of conduits, sleeves,
trays, trunking and ladders,
excavation and back-fillings, riggings,
hoisting, waterproofing, cleaning &
protection
All labor, materials, tools,
instruments, electric power, water
F supply, fuel and water required for
work executions, testing, and
commissioning
Preparation of the shop-drawings
G
and As-built drawings
Preparation of the operation and
H
maintenance manuals
J Samples as required by the Engineer
Maintenance as per the Contract
K
Conditions
Coordination with other specialty
contractors, such as special
L
equipment supplier(s) and
subcontractor(s) etc.

****** *******
SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230/ DIV. 04/1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
DIVISION 4 - MASONRY WORKS
04 20 00 Unit Masonry
04 21 00 Clay Unit Masonry
Block Work
Hollow concrete blockwork in cement
and sand mortar (1:4) including but
not limited to all cutting, fire rated
gap at top level with mastic sealant,
bonding beams, control and
expansion joints, and bond beams,
complete as shown on drawings and
as per specifications
( By square meters )
Interior blockwork
A 100mm thick 35 M2
B Ditto; 60 Min. fire rating 60 M3
C 150mm thick 414 M2
D Ditto; 60 Min. fire rating 82 M2
E Ditto; 120 Min. fire rating 46 M2
2
F Ditto; 150 Min. fire rating 45 M

G 200mm thick 24 M2
H 250mm thick 15 M2

Solid concrete blockwork in cement


and sand mortar (1:4) including but
not limited to all cutting, fire rated
gap at top level with mastic sealant,
bonding, control and expansion joints,
and bond beams, complete as shown
on drawings and as per
specifications.
External, main building facades

J 200mm thick, W4-EXT-350 90 M2


K 200mm thick, W6-EXT-480 352 M2
L 150mm thick, shaft walls at roof 7 M2

Total Carried to Summary (Division 04)


GRAND TOTAL (SAR)
SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230/ DIV. 04/2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION - CONCRETE & STEEL REINFORCEMENT WORK

CARRIED FROM PAGE DIV.04 /01 Preambles ******


CARRIED FROM PAGE DIV.04 /02

Total Carried to Summary (Division


04)
GRAND TOTAL (SAR)
SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230/ DIV. 04/3
Division 05 – Metals
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 5 - METALS MANUFACTURERS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the
mentioned items in the B.O.Q;
A. Supply of materials and equipment.

Off loading and handling from trucks on site to place of


B.
installation (including carnage, unpacking, erecting in place).

C On-site material protection and storage before installation.


D Installation of materials and equipment

All civil works required and related to the landscape works,


such as: equipment, tools, concrete bases and supports, cutting
and chasing through block and concrete walls and slabs for
E
passage of conduits, sleeves, trays, trunking and ladders,
excavation and back-fillings, riggings, hoisting, waterproofing,
cleaning & protection

All labor, materials, tools, instruments, electric power, water


F supply, fuel and water required for work executions, testing,
and commissioning
G Preparation of the shop-drawings and As-built drawings
H Preparation of the operation and maintenance manuals
J Samples as required by the Engineer
K Maintenance as per the Contract Conditions
Coordination with other specialty contractors, such as special
L
equipment supplier(s) and subcontractor(s) etc.

****** *******
SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / Div. 05 / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
METAL WORK
05 50 00 Metal Fabrications
Composite Aluminum Cladding

GREY PVDF coated 100mm composit aluminum cladding fixed to


modular porta cabines structural system, complete with all
fittings and accessores as per drawings and specifications

Quantity in SQM.
To facades, W4 - Wall Type-Exterior Aluminum cladding
A
(EALUM 002) - Light Grey Color 88 m2

YELLOW PVDF coated 100mm composite aluminum cladding to


building facades fixed to modular porta cabines structural
system, complete with all fittings and accessores as per
drawings and specifications

Quantity in SQM.
To facades, W6 - Wall Type-Exterior Aluminum cladding
B
(EALUM 003) - Yellow Color 396 m2

Aluminium Coping
Detail (6) , DWG. STR. DRG. 822001
(By linear meters)
4mm ACP with non combustible mineral core, 450mm approx.
C
width 98 lm
05 51 00 - Metal Stairs
Stainless Steel cat ladder, comprising of side rail and rungs,
flat plate & support brackets, including welding, bolts, steel
angles, fixings, fittings, accessories and epoxy painting,
complete as shown on drawings & specifications

Quantity enumerated
D 6050mm high, safty cage steel ladder 1 No.
05 52 00 Metal Railings
Metal railings including but not limited to all necessary posts,
raking, brackets, support system, fittings, painting, complete as
shown on drawings and specifications
(by linear meters)
E 915mm high. to ramps (external) 36 LM

TOTAL PAGE (2) - (METAL WORK) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / Div. 05 / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION
CARRIED FROM PAGE #1 (PREAMBLES)
********
CARRIED FROM PAGE #2

Total Carried to Summary (Division 05)


GRAND TOTAL (SAR)
SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / Div. 05 / 3
Division 05 – Structural Metals
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 05 - STRUCTURAL METAL WORK
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are
complementary to the mentioned items in
the B.O.Q;
Supply of materials and equipment.
Off loading and handling from trucks on
site to place of installation (including
carnage, unpacking, erecting in place).
On-site material protection and storage
before installation.
Installation of materials and equipment
All civil works required and related to the
landscape works, such as: equipment,
tools, concrete bases and supports, cutting
and chasing through block and concrete
walls and slabs for passage of conduits,
sleeves, trays, trunking and ladders,
excavation and back-fillings, riggings,
hoisting, waterproofing, cleaning &
protection
All labor, materials, tools, instruments,
electric power, water supply, fuel and
water required for work executions,
testing, and commissioning
Preparation of the shop-drawings and As-
built drawings
Preparation of the operation and
maintenance manuals
Samples as required by the Engineer
Maintenance as per the Contract Conditions

Coordination with other specialty


contractors, such as special equipment
supplier(s) and subcontractor(s) etc.

****** *******

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230/ DIV.5B / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
STRUCTURAL METAL WORK
05 10 00 Structural Metal Framing
Design, Supply, Fabricate, install and carry
out load test by third party Steel Structural
skeleton as shown on the design structural
drawings, consisting of steel structure
members such as Steel columns, Steel
beams, Steel tubes, anchor bolts, brackets,
screws, plates and the like, including drilling
in the column necks as per the structural
details, including stiffeners, brackets, joints,
full strength welding and fixation with
anchorage system, with all necessary
fittings, accessories, conduits and
supporting, complete as shown on
specifications
Structural drawings:
DWG. STR. DRG. 130104
DWG. STR. DRG. 130105
DWG. STR. DRG. 230101
DWG. STR. DRG. 330101
DWG. STR. DRG. 530101
DWG. STR. DRG. 530102
(PER TON)
A HEA160 Steel structural columns 1 Ton
B HEA240 Steel structural columns 5.60 Ton
C HEA300 Steel structural columns 0.50 Ton

Steel Strutural for suspended slabs

IPE220, IPE240, IPE270, IPE300, IPE400,


IPE450, IPE500, Steel structural beams,
D
including steel Bracing RHS 160*10 & SHS
200*5 30 Ton

DWG. STR. DRG. 130103


DWG. STR. DRG. 130104
DWG. STR. DRG. 530101
Steel Plates to Concrete Bases, including
non-shrink grout material
(By Numbers)
PLATE SIZE 400*400 MM, PL35MM , 8M20-
E
PL125 F1554 GRADE 105 (DET. 1) 18 No.
PLATE SIZE 500*500 MM, PL35MM , 8M24-
F
PL125 F1554 GRADE 105 (DET. 2) 4 No.

To Collection SAR

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230/ DIV.5B / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

STRUCTURAL METAL WORK (Cont'd)


05 10 00 Structural Metal Framing
05 30 00 Metal Decking
Steel Structural Slab Deck Covering
(Topping)

Steel structural slab deck covering,


consisting of 0.6 mm galvanized corrugated
sheets, 10 cm thick concrete deck topping
with compressive concrete strength of
21N/mm2 in 28 days & steel reinforcement
mesh T10mm/ 150mm, with all necessary
sheet overlabs and all related work
DWG. STR. DRG. 130104
DWG. STR. DRG. 130105
(PER SQM.)
A 100mm thick steel slab decking 515 M2

Steel Structural Canopies


Steel structural canopies, consisting of
steel tubes RHS 80*40*3, galvanized steel
rods, steel plates and brackets, with
powder coated aluminium sheet cladding,
with all necessary sheet overlabs and all
related work
DWG. STR. DRG. 130104
DWG. STR. DRG. 130105

(Quantity enumerated)
B OVERAL SIZE 2330 x 2970 mm 7 No.
C OVERAL SIZE 2330 x 2905 mm 3 No.
D OVERAL SIZE 3540 x 2945 mm 3 No.
E OVERAL SIZE 2430 x 2945 mm 1 No.

To Collection SAR

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230/ DIV.5B / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Item Description Total Amount (SAR)

STRUCTURAL METAL WORK (Cont'd)

COLLECTION

CARRIED FROM PAGE DIV.05 /01 Preambles ***** *****


CARRIED FROM PAGE DIV.05 /02
CARRIED FROM PAGE DIV.05 /03

Total Carried to Summary (Division 05)


GRAND TOTAL (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230/ DIV.5B / 4
Division 06
Wood, Plastics, and Composites

(N/A)
Division 07
Thermal and Moisture Protection
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 07 - THERMAL & MOISTURE PROTECTION
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are
complementary to the mentioned items in
the B.O.Q;
A. Supply of materials and equipment.
Off loading and handling from trucks on
B. site to place of installation (including
carnage, unpacking, erecting in place).
On-site material protection and storage
C
before installation.
D Installation of materials and equipment
All civil works required and related to the
landscape works, such as: equipment,
tools, concrete bases and supports, cutting
and chasing through block and concrete
E walls and slabs for passage of conduits,
sleeves, trays, trunking and ladders,
excavation and back-fillings, riggings,
hoisting, waterproofing, cleaning &
protection
All labor, materials, tools, instruments,
electric power, water supply, fuel and
F
water required for work executions,
testing, and commissioning
Preparation of the shop-drawings and As-
G
built drawings
Preparation of the operation and
H
maintenance manuals
J Samples as required by the Engineer
Maintenance as per the Contract
K
Conditions
Coordination with other specialty
L contractors, such as special equipment
supplier(s) and subcontractor(s) etc.

****** *******

SINDALAH NON MANAGERIAL 230/ Div. 07 / 1


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

DIVISION 07 - MOISTURE PROTECTION

07535 - Modified Bitumen Membrane


07 10 00 - Dampproofing and Waterproofing

Waterproofing insulation to underground


structural elements
Supply and lay-on two layers of roll
applied waterproofing membrain, including
all necessary preparation works, primer
coat, applying horizontally and vertically,
overlaps, including testing and cleaning,
complete as shown on related drawings,
specifications and as Engineer's
instructions

Quantities given by square meters


Laid horizontally & vertically to
A
foundations in any type & column necks 450 M2

To Collection SAR

SINDALAH NON MANAGERIAL 230/ Div. 07 / 2


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
DIVISION 07 - MOISTURE PROTECTION
07535 - Modified Bitumen Membrane
07 120 - Bitumenous waterproofing
07 22 00 - Roof and Deck Insulation
ROOFING PROTECTION
03530 - CONCRETE TOPPING

Cement sand screed including pouring,


curing & smooth finish, complete as shown
on drawings and as per specifications

A 100mm thick screed, to slope 497 M2


2mm thick EPDM membrane water
proofing including but not limited to all
necessary fixings, complete as shown on
drawings and as per Technical
Specifications.
B To main roof, horizontally 497 M2
C To main roof, vertically 25 M2

Roof protection layers, including all


necessary cuttings, jointing and the like,
complete as shown on drawings and as
per specifications.
D 80mm thick thermal insulation, horizontally 497 M2
E 48mm thick Geotextile Protection layer 497 M2
F 50-100mm thick gravel layer, horizontally 497 M2

07620- SHEET METAL FLASHING AND TRIM


Aluminum continuous flashing, including
but not limited to anchors, cut-off mastic
and all necessary accessories, complete
as shown on drawings and as per
specifications.
G To perimeter of parapet/upstands at roof 100 lm
H Cement/sand angle fillet 100 lm

07900 - JOINT SEALANTS


Mastic sealant including making grooves,
prepare surface to receive sealant and
closed cell backing cord, complete
J To perimeter of parapet/upstands at roof 100 lm

To Collection SAR

SINDALAH NON MANAGERIAL 230/ Div. 07 / 3


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

DIVISION 07 - MOISTURE PROTECTION


07535 - Modified Bitumen Membrane
07120 - BITUMENOUS WATERPROOFING

07 20 00 - Thermal Protection
Rock-wool thermal insulation, including
all necessary fixing, cuttings, and
accessories complete as shown on
drawings and as per Technical
Specifications.
(Refer to detailed drawing # 822001)
Quantities given by square meters
150mm thick, to building facades, vertically
A (EIFS), COVERED WITH
BREATHABLE FACER 485 M2

Waterproofing to wet areas


2mm thick EPDM Rubber membrane water
proofing including all necessary surface
preparation, complete as shown on
drawings and as per specifications
Quantities given by square meters
C To wet area flooring, horizontally 70 M2
D Ditto; vertically applied on wet area walls 20 M2
To exterior building elevations behind
E 2
aluminium cladding, applied vertically 450 M

Protection below Slab On Grade


POLYTHENE SHEET (250 Microns),
including all necessary surface
preparation, cuttings, overlapping, jointing
and the like, complete as shown on
drawings and as per specifications
Quantities given by square meters
F Laid horizontally 485 M2

To Collection SAR

SINDALAH NON MANAGERIAL 230/ Div. 07 / 4


STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION - MOISTURE PROTECTION

CARRIED FROM PAGE DIV.07 /01 Preambles ******


CARRIED FROM PAGE DIV.07 /02

CARRIED FROM PAGE DIV.07 /03

CARRIED FROM PAGE DIV.07 /04

Total Carried to Summary (Division 07)


GRAND TOTAL (SAR)

SINDALAH NON MANAGERIAL 230/ Div. 07 / 5


STAFF ACCOMMODATION
Division 08
Openings
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 8 - OPENINGS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the
mentioned items in the B.O.Q;
A. Supply of materials and equipment.

Off loading and handling from trucks on site to place of


B.
installation (including carnage, unpacking, erecting in place).

C On-site material protection and storage before installation.


D Installation of materials and equipment

All civil works required and related to the landscape works,


such as: equipment, tools, concrete bases and supports,
cutting and chasing through block and concrete walls and
E
slabs for passage of conduits, sleeves, trays, trunking and
ladders, excavation and back-fillings, riggings, hoisting,
waterproofing, cleaning & protection

All labor, materials, tools, instruments, electric power, water


F supply, fuel and water required for work executions, testing,
and commissioning
G Preparation of the shop-drawings and As-built drawings
H Preparation of the operation and maintenance manuals
J Samples as required by the Engineer
K Maintenance as per the Contract Conditions
Coordination with other specialty contractors, such as special
L
equipment supplier(s) and subcontractor(s) etc.

****** *******

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230/ DIV. (8) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

DIVISION (8) - OPENINGS


08 10 00 Doors and Frames
08 11 13 Hollow Metal Doors and Frames
REFER TO DWG ARC. 625001 & ARC. 625003

Flush steel doors, comprising steel frames and steel leaf,


including all necessary fixings, fittings, accessories, openings
to grills, glass vision panels, heavy duty hardware
(Ironmongery), foam filling, locking bolt, heavy duty overhead
door closer and epoxy paint, complete as shown on drawings
and as per specifications

By Numbers
Single leaf Metal Doors - One way hinged
A S01 size 1000x 2200 mm high, H.M. PTD 1 No.
B S03 size 1000x 2200 mm high, H.M. PTD 1 No.

Single leaf Metal Doors - One way hinged


60 MIN. FIRE RATING
C S02 size 1000x 2200 mm high, H.M. PTD 2 No.

Single leaf Metal Doors - One way hinged


90 MIN. FIRE RATING
D S04 size 1000x 2200 mm high, H.M. PTD 1 No.

TOTAL PAGE (2) - (OPENINGS) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230/ DIV. (8) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

DIVISION (8) - OPENINGS (Cont'd):

08 14 00 - Wood Doors

Supply and install HDF flush laminated wooden doors,


comprising steel door frames and flush laminated wood leaf,
including all necessary fixings, fittings, accessories, openings
to grills, heavy duty hardware (Ironmongery), foam filling,
locking bolt, heavy duty overhead door closer and epoxy paint,
complete as shown on drawings and as per specifications

By Numbers
Single leaf Metal Doors - One way hinged
A W01 size VAR W. x 2200 mm high, S.W, PTD 16 No.

TOTAL PAGE (3) - (OPENINGS) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230/ DIV. (8) / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

DIVISION (8) - OPENINGS (Cont'd):

08 40 00 - Entrances, Storefronts, and Curtain Walls

Supply and install double glazed powder coated aluminum


curtain walls, special section aluminium profile, consisting of
double glazing - 6mm thick clear float toughened glass inner
pane, 12mm air gap and 6mm thick reflective float toughened
glass exterior pane, including aluminium frames, trims,
flashing, mastic sealants, weather stripping, architrave, sills,
thresholds, fly screen, hardware and caulking, complete as
shown on drawings and as specified, to Engineer's approval

Quantity enumerated
A CO1, (W. 2400 x H 3000 mm) 11 No.
B CO2, (W. 3200 x H 3000 mm) 1 No.
C CO3, (W. 2400 x H 3000 mm), double leaf doors 2 No.
CO4, (W. 3600 x H 3000 mm), including single leaf door size
D
1200x2200 mm 1 No.

(08520) - ALUMINUM DOORS AND WINDOWS


Powder coated aluminum doors double glazing, complete
including frames, angles, mullions, channels, rubber strips,
mastic pointing, ironmongery, cover joints where required
and all necessary fixing accessories; as specified and as
shown on drawings

E W01 - sliding window ( W. 840 x H. 2000 mm) 2 No.


E A01 - sliding door ( W. 1600 x H. 2200 mm) 1 No.

TOTAL PAGE (4) - (OPENINGS) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230/ DIV. (8) / 4
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION

CARRIED FROM PAGE #1 (PREAMBLES)


********
CARRIED FROM PAGE #2
CARRIED FROM PAGE #3
CARRIED FROM PAGE #4

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230/ DIV. (8) / 5
Division 09
Finishes
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 9 - FINISHING WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the
mentioned items in the B.O.Q;
A Supply of materials and equipment.

Off loading and handling from trucks on site to place of


B
installation (including carnage, unpacking, erecting in place).

C On-site material protection and storage before installation.


D Installation of materials and equipment

All civil works required and related to the landscape works,


such as: equipment, tools, concrete bases and supports,
cutting and chasing through block and concrete walls and
E
slabs for passage of conduits, sleeves, trays, trunking and
ladders, excavation and back-fillings, riggings, hoisting,
waterproofing, cleaning & protection

All labor, materials, tools, instruments, electric power, water


F supply, fuel and water required for work executions, testing,
and commissioning
G Preparation of the shop-drawings and As-built drawings
H Preparation of the operation and maintenance manuals
J Samples as required by the Engineer
K Maintenance as per the Contract Conditions
Coordination with other specialty contractors, such as special
L
equipment supplier(s) and subcontractor(s) etc.

****** *******

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (9) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

FINISHING WORK
09 20 00 - Plaster and Gypsum Board
09 24 00 Cement Plastering

Three coats of cement/sand mix plasterwork to walls, edges,


parapets and the like, including all necessary accessories,
sccaffolding, water-curing, alignement, and all related work,
complete as shown on drawings and specifications

Items given in square meters


A To interior block and concrete walls 2
870 m
B To exterior block walls for parapets and toppings 2
100 m
C To walls behind ceramic work 263 m2

09 21 16 - GYPSUM BOARD ASSEMBLIES


09 22 00 Supports for Plaster and Gypsum Board
09 29 00 Gypsum Board
Item given in square meters
Moisture resistant Gypsum board suspended ceiling 12.5mm
thick with decorative texture white paint including but not
limited to suspension system, fittings, accessories and skim
coat, complete as shown on drawings and as per
specifications

D Gypsum board horizontally, IGYP-01 53 m2


E Ditto; IGYP-02, Water resistant 80 m2
F Gypsum board bulkheads, (by linear meters) 135 lm

TOTAL PAGE (2) - (FINISHING WORK) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (9) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

FINISHING WORK (Cont'd):


09 30 00 - Tiling
Laser cut ceramic floor tiles, including cement/ sand mortar
bed, adhesive material, cuttings, grouting, jointing and
pointing, complete as shown in drawings and as per
specifications.
Floor tile items are given in square meters
Skirting tile items are given in linear meters

ICT-02 - Anti-slip barefoot ceramic floor tiles, size 300x600


A
mm (light grey) 80 m2
Ref. (3) - 400*400mm high resistance anti-slip ceramic tiles,
B
white color, to waste room 10 m2
C IPTB-02 - grey color skirting tiles, size 600 x 100mm 115 lm

09 96 00 High-Performance Coatings
09 96 56 Epoxy Coatings
Heavy duty anti slip high solid content Epoxy floor coating to
be applied on smoothed finished concrete screed, complete as
shown on drawings and as per specifications

Flooring given in square meters, bases in linear meters


Colors to Engineer approvals
D To smooth finished concrete floors (Ref. 01) 26 m2
E To floor bases (skirting), 100mm high 38 lm

09651- VINYL TILES


Factory applied static dissipative homogeneous Vinyl floor
tiles, including adhesive glue material, cuttings, grouting,
jointing and pointing, complete as shown in drawings and as
per specifications.
F IVT-01 - To floors wood look matt 115 m2
IVT-02 - To floors, non-slip gym vinyl flooring, impact
G
resistance 156 m2
Ref. 02 - To floors, size 600*600mm factory applied static
H
dissipative homogeneous 4 m2
Skirting tiles (by linear meters)
J IVTB-01 - wood look 36 lm
K IVTB-02 - dark grey 50 lm
Ref-02 - coved static conductive vinyl, 100 mm high (by linear
L
meters) 7 lm

TOTAL PAGE (2) - (FINISHING WORK) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (9) / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

FINISHING WORK (Cont'd):


09 30 00 - Tiling

Porcelain floor tiles, including cement/ sand mortar bed,


adhesive material, cuttings, grouting, jointing and pointing,
complete as shown in drawings and as per specifications.
Floor tile items are given in square meters

A IPT-02 - 300*600mm, grey matt porcelain floor tiles 52 m2

B Ref. 5 - coved porcelain skirting 100mm high(by linear meters)


10 lm

09 63 00 Masonry Flooring
09 63 40.14 Marble Flooring
Marbel flooring tiles, including cement/sand mortar, cuttings,
grouting, jointing polishing and pointing, complete as shown in
drawings and as per specifications.
C 25mm thick marble threshold marfil marble to wet areas 8 lm
D 20mm thick marble threshold, generally 20 lm

09 70 00 Wall Finishes
09 72 00 Wall Coverings
Porcelain wall tiles, including adhesive material, cuttings,
grouting, jointing and pointing, complete as shown in drawings
and as per specifications
E ICT-001 to walls, light grey, size 300x600 mm 263 m2
(Ref. 03) glazed high-glossy impact & chimical resistance
F
ceramic wall tiles, size 400x400 mm 53 m2

TOTAL PAGE (3) - (FINISHING WORK) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (9) / 4
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

FINISHING WORK (Cont'd):


CEILING FINISHES
09 51 00 Acoustical Ceilings
09 53 00 Acoustical Ceiling Suspension Assemblies
09 51 23 Acoustical Tile Ceilings

Acoustic mineral fiber tile ceiling, including galvaized metal


grids, suspension system, accessories, fixing, complete as
shown on drawings and as per specifications
2
A Size 600x600x15mm , ACT-01 252 m

09 90 00 - Painting and Coating


09 91 00 Painting
(FENOMASTIC HYGIENE OIL PAINT)
Three coats of Anti-bacterial and anti-fungus, stain resistant
based emulsion paint, including but not limited to preparation
works, under-coat, tapes, complete as per drawings and
specifications
Item given by square meters
Paint colors to Engineer approvals
(IPNT-01) (RAL 9010 pure white silk finish paint to interior
B
plastered walls 570 m2
C (IPNT-04) (TAUPE MATT) to interior plastered walls 125 m2
(IPNT-07) (BLUE TONES) Textured paint to interior plastered
D
walls 175 m2
E To interior gypsum false ceiling & bulkheads 170 m2

Heavy duty high glossy epoxy wall coating to be applied on


smoothed plastered wall finish, complete as shown on
drawings and as per specifications
Item given in square meters
Colors to Engineer approvals
F (Ref. 01) To smooth finished plastered walls, internally 168 m2
G Ditto; externally, parapet walls 100 m2

100% Acrylic based emulsion paint to be applied on cement


plaster, smooth texture wall finish paint, including surface
preparation, putty and final paint coat, complete as shown on
drawings and as per specifications
Item given in square meters
Colors to Engineer approvals
H (Ref. 02) To smooth finished plastered walls, internally 35 m2
2
H (Ref. 05) ditto; 43 m

TOTAL PAGE (5) - (FINISHING WORK) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (9) / 5
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

FINISHING WORK (Cont'd):


CEILING FINISHES
09 90 00 - Painting and Coating
09 91 00 Painting

TRAFFIC COATING

Aliphatic Urethan traffic coating system, applied on reinforced


concrete screed at receiving area, including preparation work,
surface cleaning, grouting, jointing and pointing, complete as
shown in drawings and as per specifications.

Item given by square meters


A To exterior landings, ramps and pathways 68 m2
B To exterior steps 30 m
2

TOTAL PAGE (5) - (FINISHING WORK) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (9) / 6
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
CARRIED PAGES GRAND TOTAL (RAL)

COLLECTION
CARRIED FROM PAGE #1 ********
CARRIED FROM PAGE #2
CARRIED FROM PAGE #3
CARRIED FROM PAGE #4
CARRIED FROM PAGE #5
CARRIED FROM PAGE #6

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (9) / 7
DIVISION (10) - SPECIALTIES
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 10 - SPECIALTIES
Unit Rate Total Amount
Item Description Quantity Unit
JOD JOD

Preambles:
The item unit rate shall include the followings:
The following requirements are
complementary to the mentioned items in
the B.O.Q;
Supply of materials and equipment.
Off loading and handling from trucks on site
to place of installation (including carnage,
unpacking, erecting in place).
On-site material protection and storage
before installation.
Installation of materials and equipment

All civil works required and related to the


landscape works, such as: equipment, tools,
concrete bases and supports, cutting and
chasing through block and concrete walls
and slabs for passage of conduits, sleeves,
trays, trunking and ladders, excavation and
back-fillings, riggings, hoisting,
waterproofing, cleaning & protection
All labor, materials, tools, instruments,
electric power, water supply, fuel and water
required for work executions, testing, and
commissioning
Preparation of the shop-drawings and As-
built drawings
Preparation of the operation and
maintenance manuals
Samples as required by the Engineer

Maintenance as per the Contract Conditions

Coordination with other specialty


contractors, such as special equipment
supplier(s) and subcontractor(s) etc.

****** *******
SINDALAH NON MANAGERIAL 230 / DIV.10 / 1
STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
JOD JOD
SPECIALTIES
10 21 00 Compartments and Cubicles
10 21 13 Toilet Compartments
Supply and install full package of toilet
cubicles, from TRESPA Panels or approved
equally, (13mm thick), consisting of high-
pressure laminated melamine surfaces
partitions, fixed on a moisture-resistant
particleboard core, with internal supporting
frames and pilasters, including side hinged
openable single leaf laminated doors in
proprietary toilet cubicles, swing type,
comprising hot pressed laminated on both
sides with hardwood lipping and timber jambs
frames, including all necessary fixings,
fittings, accessories, anti-fungus rubber
silicon, supporting system, heavy gauge
stainless steel hardware, stainless steel foot
support, stainless steel mortised lever-turn
indicator bolt with external emergency
released facility, and door closers, complete
as shown on drawings, specifications, and
Engineer's approval of samples
Complete package of Toilets Cubicles
partitions, including:

(By Numbers)
Front Partitions
Overall size 1000mm width x 1950 mm high,
A
Including (1) single leaf hinged door 2 No.
Overall size 2750mm width x 1950 mm high,
B
Including (1) single leaf hinged door 2 No.
Side partitions
C Size 1500mm width x 1950 mm high 2 No.

10 14 00 Interior Signage
Interior Signage shall be Good rigidity and
tensile strength. Resistant to chemicals and
corrosion and incorporates UV inhibitors to
reduce fading of colors, including fixing,
fittings, accessories, supporting and cleaning,
complete as shown on drawings and as per
specifications
Interior Signage
Quantity enumerated
D SR01 14 No.
E SR02 5 No.
F SR03 2 No.

TOTAL PAGE (2) - (JOD)


SINDALAH NON MANAGERIAL 230 / DIV.10 / 2
STAFF ACCOMMODATION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Item Description Total Amount / JD

COLLECTION

CARRIED FROM PAGE DIV.10 /01 Preambles


CARRIED FROM PAGE DIV.10 /02

Total Carried to Summary (Division 10)


GRAND TOTAL (JOD)
SINDALAH NON MANAGERIAL 230 / DIV.10 / 3
STAFF ACCOMMODATION
DIVISION (21)
FIRE SUPRESSION
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR FIRE SUPPRESSION PACKAGE
DIVISION 21 - FIRE SUPPRESSION WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the
mentioned items in the B.O.Q;
The rates and prices for plant, equipment and installations are
to be all inclusive of supply, installation, testing,
commissioning and all associated builders work required for
A. the full operation of such plant, equipment and installations, to
comply in all respects with the Specifications, Drawings and to
the complete satisfaction of Municipality, Local Authorities and
the Engineer.
Builder’s Work shall include for all secondary steelwork
B. supports for plant, equipment, trunking and the like not
specifically shown or indicated on the drawings.
Rates for pipes and ducts generally are to include for all
cuttings, short lengths, back stops, couplers, wooden plugs
and retaining and alignment pegs required in laying and for the
C extra involved over normal trench excavating in hand packing
and tamping selected fine material around the lower half of
the pipes to buttress them against the side of the trench.
Rates are to include for leaving all pipes clean and clear.

Pipes are measured nett as laid and are to include for all
fittings on all types of pipes, extra joints of all types, cuttings,
D waste, fixing with approved holderbats or pipe clips, sleeves
through walls, thrust blocks, etc., for laying in trenches of any
depth, and building in to sides of inspection chambers.

Rates for accessories shall include for concrete surrounds


E
and any additional excavation and disposal.

The total cost for the services shall include for the detail
design, together with the preparation of all necessary
calculations and workshop drawings which, together with all
F manufacturing data shall be submitted to the Consultant for
approval before purchase, manufacture or installation.
Generally including spares for all Mechanical Installation item
as recommended by the manufacturer.

****** *******

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (21) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR FIRE SUPPRESSION PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

FIRE SUPPRESSION WORK


21 13 00 Wet-Pipe Sprinkler Systems
A Pendent type Sprinkler 45 No
B Upright type Sprinkler 5 No

21 13 13 Fire Fighting Pipes


C 25mm Dia 101 lm
D 32mm Dia 17 lm
E 40mm Dia 23 lm
F 50mm Dia 20 lm
G 65mm Dia 9 lm
H 80mm Dia 11 lm
J 100mm Dia 6 lm

21 12 00 Fire Extinguishers
K FE-1 6 No
L FE-2 2 No

21 05 23 Zone Control Valves


M 230-M-ZCV-01 1 No

21 11 19 Fire-Departments Connections
N SIAMESE CONNECTION 1 No

TOTAL PAGE (2) - (FIRE SUPPRESSION WORK) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (21) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR FIRE SUPPRESSION PACKAGE
CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION
CARRIED FROM PAGE #1 ********
CARRIED FROM PAGE #2

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (21) / 3
DIVISION (22)
PLUMBING WORK
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR PLUMBING PACKAGE
DIVISION 22 - PLUMBING WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the
mentioned items in the B.O.Q;
The rates and prices for plant, equipment and installations are
to be all inclusive of supply, installation, testing,
commissioning and all associated builders work required for
A. the full operation of such plant, equipment and installations, to
comply in all respects with the Specifications, Drawings and to
the complete satisfaction of Municipality, Local Authorities and
the Engineer.
Builder’s Work shall include for all secondary steelwork
B. supports for plant, equipment, trunking and the like not
specifically shown or indicated on the drawings.
The rates for trenches for pipes shall include for disposal and
C backfilling. The rates for drains, inspection chambers, etc., are
to allow for testing.
Rates for pipes and ducts generally are to include for all
cuttings, short lengths, back stops, couplers, wooden plugs
and retaining and alignment pegs required in laying and for the
D extra involved over normal trench excavating in hand packing
and tamping selected fine material around the lower half of the
pipes to buttress them against the side of the trench. Rates are
to include for leaving all pipes clean and clear.

Pipes are measured nett as laid and are to include for all
fittings on all types of pipes, extra joints of all types, cuttings,
E waste, fixing with approved holderbats or pipe clips, sleeves
through walls, thrust blocks, etc., for laying in trenches of any
depth, and building in to sides of inspection chambers.

Rates for fittings on all types of drain pipes are to include for
F
extra joints of all types and cutting and waste on all pipes.

Rates for accessories shall include for concrete surrounds and


G
any additional excavation and disposal.
Prices and rates for insulation shall include for insulation to all
H
fittings, flange boxes, valve boxes, etc and around all supports.

The rates for sanitary fittings and the like, unless otherwise
described, shall be deemed to include all accessories,
assembling component parts including suitable bedding
compounds, all necessary plugging and brass screwing, fixing
I accessories, joints to water services with straight or bent
proprietary connectors, joints to waste soils or drain pipes
with approved proprietary connectors, cleaning off all
protective wrappers and leaving ready for use and leaving taps
and valves greased, clean and in full working order.

****** *******
SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (22) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR PLUMBING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
PLUMBING WORK
22 13 16 - Sanitary Soil, Waste, Vent, and CDP pipes
Above Ground Pipes
Waste Pipe
A 50mm dia 7 ml
B 82mm dia 3 ml
Soil Pipe
C 110mm dia 4 ml
Vent Pipe
D 50mm dia 62 ml
82mm dia 11 ml
Rain Pipe
E 82mm dia 37 ml
Condesate Drain Pipe
F 20mm dia 41 ml
G 32mm dia 15 ml
H 50mm dia 17 ml

Below Ground Pipes


Waste Pipe
J 50mm dia 6 ml
K 82mm dia 24 ml
L 110mm dia 25 ml
Soil Pipe
M 110mm dia 20 ml
Vent Pipe
N 50mm dia 11 ml
Condesate Drain Pipe
P 32mm dia 13 ml

22 14 26 - Roof Drains
Q Rain Water Outlet 4'' 4 No.
R Emergency Rain Water Outlet 4'' 4 No.

22 05 76 - Facility Drainage Piping Cleanouts


S 4'' Floor Clean Out 3 No.

22 13 16 - Traps
T Floor Drain 3'' 13 No.
U Shower Drain 6 No.

22 13 19 - Sanitary Drains
V Funnel drain 1 No.

TOTAL PAGE (2) - (PLUMBING WORK) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (22) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR PLUMBING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

PLUMBING WORK (Cont'd):


22 13 16 - Vent Flashings and Caps
A Vent cap ( Vent Cowl ) 3 No.

22 00 00 - Manholes
B 30-M-MH-01 (600x600mm) 2 No.

22 00 00 - Gully Trap
C Gully Trap 2 No.

22 33 33 - Electric Domestic Water Heaters


D 30-M-EWH-01 2 No.

22 11 13 - Facility Water Distribution Piping


Above Ground Cold Water Pipes
E 20mm Dia 94 ml
F 25mm Dia 19 ml
G 32mm Dia 12 ml
H 40mm Dia 4 ml
J 50mm Dia 18 ml
K 63mm Dia 26 ml

Below Ground Cold Water Pipes


L 63mm Dia 2 ml

Above Ground Hot Water Pipes


M 20mm Dia 113 ml
N 25mm Dia 3 ml
P 32mm Dia 8 ml
Q 40mm Dia 9 ml
R 50mm Dia 22 ml

22 11 23 - CIrculation Pumps
S 30-M-DHWCP-01 2 No.

TOTAL PAGE (3) - (PLUMBING WORK) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (22) / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR PLUMBING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

PLUMBING WORK (Cont'd):

22 42 00 - Commercial Plumbing Fixtures


Sanitary Fixtures
A Wash Basin 8 No.
B WC 6 No.
C Hand spray 6 No.
D Shower 6 No.
E Sink 1 No.
Sanitary Mixers
F Wash Basin Mixer 8 No.
G Shower Mixer 6 No.
H Sink Mixer 1 No.

TOTAL PAGE (4) - (PLUMBING WORK) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (22) / 4
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR PLUMBING PACKAGE
CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION
CARRIED FROM PAGE #1 ********
CARRIED FROM PAGE #2

CARRIED FROM PAGE #3

CARRIED FROM PAGE #4

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (22) / 5
DIVISION (23)
HEATING, VENTILATION & AIR CONDITIONING
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR MECHANICAL PACKAGE
DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the
mentioned items in the B.O.Q;
The rates and prices for plant, equipment and installations are
to be all inclusive of supply, installation, testing,
commissioning and all associated builders work required for
A. the full operation of such plant, equipment and installations, to
comply in all respects with the Specifications, Drawings and to
the complete satisfaction of Municipality, Local Authorities and
the Engineer.
Builder’s Work shall include for all secondary steelwork
B. supports for plant, equipment, trunking and the like not
specifically shown or indicated on the drawings.

Rates for pipes and ducts generally are to include for all
cuttings, short lengths, back stops, couplers, wooden plugs
and retaining and alignment pegs required in laying and for the
C extra involved over normal trench excavating in hand packing
and tamping selected fine material around the lower half of
the pipes to buttress them against the side of the trench.
Rates are to include for leaving all pipes clean and clear.

A Prices and rates for ductwork shall include for all bends,
hangers, vanes, Splitters, dampers, accessories flexible
D connections, joints, waste, seams, stiffeners, bracing, access
doors, sleeves, acoustic sleeves and all items include in the
sections of the specifications.
Prices and rates for insulation shall include for insulation to
E all fittings, flange boxes, valve boxes, etc and around all
supports.
The total cost for the services shall include for the detail
design, together with the preparation of all necessary
calculations and workshop drawings which, together with all
F manufacturing data shall be submitted to the Consultant for
approval before purchase, manufacture or installation.
Generally including spares for all Mechanical Installation item
as recommended by the manufacturer.

****** *******

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (23) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR HEATING, VENTILATING AND AIR CONDITIONING WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

HEATING, VENTILATING AND AIR CONDITIONING WORK

23 73 13 Fresh Air Handling Unit (FAHU)


A 30-M-FAHU-01 1 No

23 62 00 - Condensing Unit
B 30-M-CU-01 1 No

23 34 16 Exhaust and Fresh Fans


C 30-M-EF-01 1 No
D 30-M-EF-02 1 No
E 30-M-EF-03 1 No

23 62 13 DX Type Air Conditioning Unit (Indoor/Outdoor)


F 30-M-SRAC-01 3 No

23 62 13 VRF Type Air Conditioning Unit (Indoor/Outdoor)


Outdoor
G 30-M-VRFU-01 1 No
Indoor
H 30-M-FCU-01 3 No
J 30-M-FCU-02 8 No

23 31 13 Rectangular Metal Ducts


K Gauge 24 336
L Gauge 26 591 Kg

23 07 13 Insulation ductwork
M Indoor insulation 123 m2
2
N Outdoor insulation 23 m

TOTAL PAGE (2) - (MECHANICAL WORK) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (23) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR HEATING, VENTILATING AND AIR CONDITIONING WORKS
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

MECHANICAL WORK (Cont'd):

23 37 13 Air Outlets
Supply Diffuser
A 30-M-SD-01 (150x150) 3 No
B 30-M-SD-02 (300x300) 5 No
C 30-M-SD-03 (380x380) 8 No

Return Diffuser
D 30-M-RD-01 (150x150) 3 No
E 30-M-RD-02 (300x300) 5 No
F 30-M-RD-03 (380x380) 8 No

Exhaust Grille
G 30-M-EG-01 (150x150) 15 No
H 30-M-EG-02 (450x450) 1 No

Door Grille
J 30-M-DG-01 (300x250) 1 No

23 37 15 Fresh Air Louver - Sand Trap


K 1500x1200 1 No

L 23 05 02 BMS LS LS

TOTAL PAGE (3) - (MECHANICAL WORK) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (23) / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR HEATING, VENTILATING AND AIR CONDITIONING WORKS
CARRIED PAGES GRAND TOTAL (RAL)

COLLECTION
CARRIED FROM PAGE #1 ********
CARRIED FROM PAGE #2
CARRIED FROM PAGE #3

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (23) / 4
DIVISION (26)
ELECTRICAL WORK
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ELECTRICAL PACKAGE
ELECTRICAL DIVISION 26 - ELECTRICAL

Item Description Quantity Unit Unit Rate Total Amount


SAR SAR
Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the mentioned items
in the B.O.Q;
The rates and prices for plant, equipment and installations are to be all
inclusive of supply, installation, testing, commissioning and all
associated builders work required for the full operation of such plant,
A
equipment and installations, to comply in all respects with the
Specifications, Bill of Quantities, Drawings and to the complete
satisfaction of Municipality, Local Authorities and the Engineer.
B Prices and rates shall include for the following:
a) Marking positions of holes, mortices, chases, etc.
b) Cutting and pinning ends of supports to structures.
c) Painting as required.
d) Fixings, including all steelwork, supports, slips holderbats and
hanges.
e) Joints, bolts, washers, nuts, junctions and everything necessary for
the satisfactory jointing of pipes or ducts to each other, to items of
equipment or connecting ducts to voids, shafts etc.

f) All waste, cuttings, short lengths etc.


g) Labels, nameplates, belt guards and all accessories called for in the
specification.
h) Rates for conduit are to include for all necessary accessories
including conduit Boxes
i) Pipe sleeves through walls.
j) Draw wires in empty conduits.
Cable trunking and tray items are to include for complete installation
C
as required.

Rates for cable terminations are to include for terminations are to


D include for Termination glands, lock nuts, drilling entries into
equipment, lugs, earth tags, spreader boxes, etc. where applicable.

All items containing equipment, accessories and fittings shall include


E
for earth Terminals and bonding as necessary.
Rates for main voltage sub-circuits shall include for each continuity
F
conductor.
Rates for main and sub-main distribution boards shall include for all
G
spares as Specified.
The total cost for the services shall include for the detail design,
together with the preparation of all necessary calculations and
H workshop drawings which, together with all manufacturing data shall
be submitted to the Consultant for approval before purchase,
manufacture or installation.
The cable and conduit to sub-main circuits are to be enumerated and
any vertical or horizontal cable required for connections, loops, etc. at
I
equipment, appliances, control gear or the like will be deemed to be
included.
The Tenderer shall include for the supply of manufacturers
recommended spares in accordance with the Specification for all
J Electrical/ Mechanical Engineering Installations to be handed to the
Engineer and shall submit details of spares to be provided by him on a
separate sheet accompanying his tender submission.

TOTAL PAGE (1) - (ELECTRICAL) - (SAR) ****** *******

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (26) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ELECTRICAL PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
26 24 00-SWITCHBOARDS AND PANELBOARDS
26 24 16-Panelboards
A ECBS-30-01 1 No.
B LP-30-01 1 No.
C DP-30-01 1 No.
D PP-30-01 1 No.
E UPP-30-01 1 No.
26 24 19-Motor Control Centers
F MCP-30-01 1 No.

26 43 13-Surge Protective Devices


G 4 POLE 100KA SURGE ARRESTOR 1 No.

26 09 00-INSTRUMENTATION AND CONTROL FOR ELECTRICAL SYSTEMS


26 09 13-Electrical Power Monitoring
H Digital Meter 2 No.

26 05 00-COMMON WORK RESULTS FOR ELECTRICAL


26 05 19-Low Voltage Cables
J 4X6+1X6mm2 CU/XLPE/PVC 25 m
K 4X10+1X10mm2 CU/XLPE/PVC 20 m
L 4X16+1X16mm2 CU/XLPE/PVC 10 m
M 4X70+1X35mm2 CU/XLPE/PVC 5 m
P 4X240+1X120mm2 CU/XLPE/SWA/PVC 20 m
Q 3X4mm2 CU/XLPE/PVC 10 m
R 5X4mm2 CU/XLPE/PVC 10 m

TOTAL PAGE (2) - (ELECTRICAL) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (26) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ELECTRICAL PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

26 05 26-Grounding and Bonding for Electrical Systems LS

26 05 36-Cable Trays For Electrical Systems


A 600 mmx 100 mm GI Cable Tray 10 m
B 300 mmx 100 mm GI Cable Tray 240 m
C 300 mmx 100 mm GI Cable Ladder 240 m

26 41 00-FACILITY LIGHTING PROTECTION


26 41 13-Lightning Protection For Structure LS

26 27 00-LOW-VOLTAGE DISTRIBUTION EQUIPMENT


26 27 26-Wiring Devices
26 27 26.10-Low Voltage Switching
D 1-gang, 1-way light switch 19 No.

26 27 26.20-Switch Points
E Switch Points 19 No.
26 27 26.30-Wiring Devices Elements
F 13A Single Switched Socket Outlet 25 No.
G 13A Single Switched Socket Outlet W/P 7 No.
H Floor box contains 1 number- 13A Double Switched Socket Outlet 2 No.
20A ceiling mounted industrial socket outlet 2P+E220V,IPA,60 HZ,IP44,
J 4 No.
plug

K 20A, spur outlet, ceiling mounted, switched, IP-20 11 No.

L 20A, spur outlet, wall mounted, switched, IP-20 3 No.

M 13A Double Switched Socket Outlet 12 No.


N Floor Box with 2NO. 13A double socket outlet and dual data outlet 5 No.

26 28 16-Enclosed Switches and Circuit Breakers


P 20A 1 Phase Isolator, IP65, pedestial type 6 No.
Q 20A 3 Phase Isolator, IP65, pedestial type 2 No.
R 63A 3 Phase Isolator, IP65 2 No.
S 20A 1 Phase Isolator, IP65 1 No.
T 40A 3 Phase Isolator, IP65, pedestial type 1 No.
26 33 00-BATTERY EQUIPMENT
26 33 24-DC Central Battery System Equipment For Emergency Lighting
U 2 KVA Electrical Central Pattery 1 No.
26 33 53-Static Uninterruptible Power Supply
V 15 KVA UPS 1 No.

TOTAL PAGE (3) - (ELECTRICAL) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (26) / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ELECTRICAL PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

26 51 00-INTERIOR LIGHTING
26 51 19.10-Led Interior Lighting
A L2S 6 No.

B L3S 3 No.
C L5S 1 No.
D D1 12 No.
E D2 10 No.
F B3 9 No.
G B2 27 No.
H D9 6 No.
J L2SE 2 No.
K L3SE 1 No.
L L5SE 1 No.
M D1E 6 No.
N D2E 4 No.
P B3E 4 No.
Q B2E 6 No.
R D9E 2 No.
S 8w led, Ceiling mounted exit sign with indicates the escape direction 14 No.
T 8w led, Wall mounted exit sign with indicates the escape direction 2 No.
26 51 19.20-Wiring (Interior Lighting Points)
U Interior Lighting Points 74 No.

26 52 00-SAFTY LIGHTING
26 52 13-Emergency and Exit Signs
26 52 13.13.10-Wiring(Emergency Lighting Points)
V Emergency Lighting Points 26 No.
26 52 13.13.20-Wiring(Emergency Lighting Points)
Exit Lighting Points 16 No.

26 56 00-EXTERIOR LIGHTING

26 56 13.10-Lighting Poles and Standards


W BH1 4 No.

26 56 13.20-Wiring (Exterior Lighting Points)


X External Lighting Points 4 No.

26 09 00-INSTRUMENT AND CONTROL FOR ELECTRICAL SYSTEM


26 09 23-Lighting Control Devices
Y Occupancy sensor 34 No.

TOTAL PAGE (4) - (ELECTRICAL) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (26) / 4
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR PLUMBING PACKAGE

CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION
CARRIED FROM PAGE #1 ********
CARRIED FROM PAGE #2

CARRIED FROM PAGE #3

CARRIED FROM PAGE #4

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (26) / 5
DIVISION (27)
COMMUNICATIONS
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ICT\ELV PACKAGE
ELECTRICAL DIVISION 27 - COMMUNICATION
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
27 - COMMUNICATIONS

271105 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS


(TIA)

Supply, installation, testing, commissioning, putting into


satisfactory operation and handing over complete
Communication Equipment Room Fittings ; including all
necessary accessories, fittings, Support, fixation, cable
bonding and labelling, cable management, licenses and all
required software ; complete; As shown on drawings and
described in specifications

Telecommunications Equipment Racks

Wall Cabinet, door & ventilation provisions as specified; 600


A 2 No.
x 600 mm; 21RU ;

271305 - COMMUNICATIONS BACKBONE CABLING (TIA)

Supply, installation, testing, commissioning, putting into


satisfactory operation and handing over complete
communication backbone cabling ; including all necessary
accessories, fittings, Support, fixation, cable bonding and
labelling, cable management, licenses and all required
software ; complete; As shown on drawings and described
in specifications

Backbone Cables: SMF Fiber Optic; Type OS2; suitable for


indoor use as specified;

12-Core; SMF Type OS2; as specified; for the Connection


B from the Telecom Room to Tie-in Connection with Infra
package

4-Core; SMF Type OS2; from FACP to Tie-in Connection with


C
Infra Package

Main and Intermediate Cross-Connects, as specified

D 12-Port, SMF, Fiber Optic Patch Panels; 4 No.

TOTAL PAGE (1) - ( COMMUNICATION) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (27) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR COMMUNICATION
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
271505 - COMMUNICATIONS HORIZONTAL CABLING (TIA)

Supply, installation, testing, commissioning, putting into


satisfactory operation and handing over complete
communication horizontal cabling ; including all necessary
accessories, fittings, Support, fixation, cable bonding and
labelling, cable management, licenses and all required
software ; complete; As shown on drawings and described
in specifications

Telecommunications Outlets/Connectors

A Simplex (1) Data Outlet ; Wall Mounted 3 No.

B Duplex (2) Data Outlet ; Wall Mounted 22 No.

C Duplex (2) Data Outlet ; Ceiling Mounted 25 No.

Duplex (2) Data Outlet ; Floor Mounted 3 No.

Horizontal Cross-connects:

D 48-Port, Cat 6A, RJ45; fully equipped; Patch Panels; 2 No.

272109 - DATA COMMUNICATIONS

Supply, installation, testing, commissioning, putting into


satisfactory operation and handing over complete
communication horizontal cabling ; including all necessary
accessories, fittings, Support, fixation, cable bonding and
labelling, cable management, licenses and all required
software ; complete; As shown on drawings and described
in specifications

Active Communications and Data Processing Equipment

E 48-Ports Access data switches ; 2 No.

TOTAL PAGE (2) - ( COMMUNICATION) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (27) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR COMMUNICATION
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
272133 - WIRELESS DATA NETWORK

Supply, installation, testing, commissioning, putting into


satisfactory operation and handing over complete Wireless
Data Network ; including all necessary accessories, fittings,
Support, fixation, cable bonding and labelling, cable
management, licenses and all required software ; complete;
As shown on drawings and described in specifications

Wireless data network components

A Wireless Radio Access points; Pendant 10 No.

273123 - IP-BASED TELEPHONY COMMUNICATIONS SYSTEM

Supply, installation, testing, commissioning, putting into


satisfactory operation and handing over complete IP-
Telephony System ; including all necessary accessories,
fittings, Support, fixation, cable bonding and labelling, cable
management, licenses and all required software ; complete;
As shown on drawings and described in specifications

IP Phones

B IP Phone, Standard Phone; as specified; 3 No.


C IP Phone, Wall-Mounted Phone; as specified; 3 No.

TOTAL PAGE (3) - ( COMMUNICATION) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (27) / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR COMMUNICATION
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
274116 - INTEGRATED AUDIOVISUAL SYSTEMS AND
EQUIPMENT

Supply, installation, testing, commissioning, putting into


satisfactory operation and handing over complete
Audiovisual System ; including all necessary accessories,
fittings, Support, fixation, cable bonding and labelling, cable
management, licenses and all required software ; complete;
As shown on drawings and described in specifications

GYM

A Speaker Ceiling Mounted; 4 No.

B Audio Amplifier; 1 No.

C Audio DSP; 1 No.

D Blu-ray Player; 1 No.

E Set top-box; 1 No.

F System Controller; 1 No.

G AV Rack 1 No.

TOTAL PAGE (4) - ( COMMUNICATION) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (27) / 4
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR COMMUNICATION

CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION

CARRIED FROM PAGE #1


********
CARRIED FROM PAGE #2

CARRIED FROM PAGE #3

CARRIED FROM PAGE #4

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (27) / 5
DIVISION (28)
ELECTRONIC SAFETY & SECURITY
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SEC\FPR PACKAGE
ELECTRICAL DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
28 ELECTRONIC SAFETY AND SECURITY

281300 - ACCESS CONTROL SOFTWARE AND DATABASE


MANAGEMENT &
281500 - ACCESS CONTROL HARDWARE DEVICES

Central (Headend) System Components;

Supply, install, testing, commissioning, put into operation


Access Control System components complete with cables,
wires, as indicated in related plans, specifications and all
related contract documents including all necessary
accessories for fully functional integrated system.

Controllers: (ACP’s);

A Main Controller; 2 No.

B Entry-Control Annunciation Controller 11 No.

Card readers

C Proximity Readers 5 No.

D Biometric Readers 6 No.

Miscellaneous Access Control Devices & Sub-systems;

E Door and gate hardware interface; Item

F Door Contact 11 No.

TOTAL PAGE (1) - (ELECTRONIC SAFETY AND SECURITY) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (28) / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ELECTRONIC SAFETY AND SECURITY
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
282000 - VIDEO SURVEILLANCE

Supply, install, testing, commissioning, put into operation


Video Surveillance System components complete with
cables, wires, as indicated in related plans, specifications
and all related contract documents including all necessary
accessories for fully functional integrated system.

CCTV cameras & accessories


Fixed camera, 5 Megapixel Resolution; Wall Mounted;
A 6 No.
Weather Proof;
PTZ camera, 5 Megapixel Resolution; Wall Mounted; Weather
B 4 No.
Proof;
Fixed camera, 5 Megapixel Resolution; Ceiling/Pendant
C 15 No.
Mounted;

284621.11 - DIGITAL, ADDRESSABLE FIRE ALARM SYSTEMS


Control Panels;

Supply, install, testing, commissioning, put into operation


Fire Alarm System components complete with cables,
wires, as indicated in related plans, specifications and all
related contract documents including all necessary
accessories for fully functional integrated system.
D Fire Alarm Control Panel (FACP); with NAC 1 No.

Miscellaneous system components

E Network communications; as specified; 1 Item


F Digital alarm communicator transmitter (Auto Dialer); 1 Item

G Interface to PA/VA system, as specified; 1 Item

Fire-alarm signal initiation devices and systems;


H Manual fire alarm stations; 5 No.
J Smoke detectors, photoelectric type; 44 No.
K Heat Detector, 2 No.
Audiovisual notification appliances,

L Combination device: Horn/Strobe unit; 16 No.


M Strobe lights; 4 No.

TOTAL PAGE (2) - (ELECTRONIC SAFETY AND SECURITY) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (28) / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ELECTRONIC SAFETY AND SECURITY
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Addressable interface devices


A Control modules; 5 No.

B Monitoring modules; 2 No.

C Line isolation modules; 5 No.

285111 - DISABLED PERSON TOILET ALARM SYSTEM

Supply, install, testing, commissioning, put into operation


Disabled person toilet alarm system components complete
with cables, wires, as indicated in related plans,
specifications and all related contract documents including
all necessary accessories for fully functional integrated
system.

D Handy Capped Toilet Alarm Panel (HTAP) 4 No.


E Pull cord 4 No.
F Reset Point 4 No.
G Overdoor Light and Sounder Unit 4 No.
H Panic Bar 4 No.

TOTAL PAGE (3) - (ELECTRONIC SAFETY AND SECURITY) - (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / DIV. (28) / 3
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR ELECTRONIC SAFETY AND SECURITY

CARRIED PAGES GRAND TOTAL (SAR)

COLLECTION
CARRIED FROM PAGE #1 ********
CARRIED FROM PAGE #2

CARRIED FROM PAGE #3

GRAND TOTAL CARRIED TO GRAND SUMMARY (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / DIV. (28) / 4
Division 31 - Earthwork
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
DIVISION 31 - EARTHWORK
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

Preambles:
The item unit rate shall include the followings:
The following requirements are complementary to the
mentioned items in the B.O.Q;
A. Supply of materials and equipment.

Off loading and handling from trucks on site to place of


B.
installation (including carnage, unpacking, erecting in place).

C On-site material protection and storage before installation.


D Installation of materials and equipment

All civil works required and related to the landscape works,


such as: equipment, tools, concrete bases and supports,
cutting and chasing through block and concrete walls and
E
slabs for passage of conduits, sleeves, trays, trunking and
ladders, excavation and back-fillings, riggings, hoisting,
waterproofing, cleaning & protection

All labor, materials, tools, instruments, electric power, water


F supply, fuel and water required for work executions, testing,
and commissioning
G Preparation of the shop-drawings and As-built drawings
H Preparation of the operation and maintenance manuals
J Samples as required by the Engineer
K Maintenance as per the Contract Conditions
Coordination with other specialty contractors, such as special
L
equipment supplier(s) and subcontractor(s) etc.

****** *******
SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / Div. 31 / 1
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR

EARTHWORK

31 23 16 Excavation

General Excavation Work


General Excavation in any kind of soil & rocks and the like, for
pits, footings and the like, starting from natural ground level
(NGL) down to the level of base course level below slab on
grade down & to bottom of plain concrete blinding of footings,
price should including hand excavation where necessary to
design levels, with cart-away the surplus material from site
to an approved dumping area, complete as shown on
drawings and as specifications

Quantity given by qubic meters


General excavation work for foundation, pits, trenches and
A
the like, starting from natural ground level (NGL) 500 M3

31 23 23 Fill
31 23 23.13 Backfill

Supply, lay-on and compact well selected & Engineering


approved filling materials, price should include filling in
layers, 20 cm each layer, (Compaction to 95% according to
AASHTO T-199), the Lab test results should be submit to
Engineer for approval, filling should be to the required level
according to design drawings, and as per specifications

Quantity given by qubic meters


Selected & approved filling materials between footings &
B
walls to reduce levels 245 M3
250mm thick, crushed stone sub-base filling below concrete
C
SOG. & Ramp on grade 80 M3
Backfill shall not be executed unless the waterproofing layer
for concrete walls and its protection shall be officially taking-
over by the Engineer

TOTAL PAGE (2) - (SAR)


SINDALAH NON MANAGERIAL
STAFF ACCOMMODATION 230 / Div. 31 / 2
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
BILL OF QUANTITIES FOR SKELETON & FINISHING PACKAGE
Unit Rate Total Amount
Item Description Quantity Unit
SAR SAR
COLLECTION - EXCAVATION & BACKFILL
CARRIED FROM PAGE DIV.31 /01 ******** ********

CARRIED FROM PAGE DIV.31 /02

Total Carried to Summary (Division 31)


GRAND TOTAL (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION 230 / Div. 31 / 3
GENERAL SUMMARY
RECREATIONAL HUB AND GYM BUILDING
(230)
SINDALAH NON MANAGERIAL STAFF ACCOMMODATION
NEOM - KINGDOM OF SAUDI ARABIA
SKELETON & FINISHING PACKAGE
RECREATIONAL HUB AND GYM BUILDING (230) - GENERAL SUMMARY
Div. Description Total Amount (SAR)

GENERAL SUMMARY
00 GENERAL PROJECT REQUIREMENTS
01 GENERAL REQUIREMENTS
02 EXISTING CONDITIONS
03 CONCRETE
04 MASONRY
05 METALS
06 WOOD, PLASTICS, AND COMPOSITES
07 THERMAL AND MOISTURE PROTECTION
08 OPENINGS
09 FINISHES
10 SPECIALTIES
11 EQUIPMENT
12 FURNISHINGS
13 SPECIAL CONSTRUCTION
14 CONVEYING EQUIPMENT
21 FIRE SUPPRESSION
22 PLUMBING
23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
25 INTEGRATED AUTOMATIONS
26 ELECTRICAL
27 COMMUNICATIONS
28 ELECTRONIC SAFETY AND SECURITY
31 EARTHWORKS
32 EXTERIOR IMPROVEMENTS
33 UTILITIES
34 TRANSPORTATIONS
35 WATERWAY AND MARINE CONSTRUCTION
40 PROCESS INTEGRATION
41 MATERIAL PROCESSING AND HANDLING EQUIPMENT
42 PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
43 PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT
44 POLLUTION AND WASTE CONTROL EQUIPMENT
45 INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
46 WATER AND WASTEWATER EQUIPMENT
48 ELECTRICAL POWER GENERATION

Total Carried to Grand Summary (SAR)

SINDALAH NON MANAGERIAL


STAFF ACCOMMODATION General Summary - 130

You might also like