Bu - 08 - 05 - 2024
Bu - 08 - 05 - 2024
Bu - 08 - 05 - 2024
D-1 Total Feed Coking Thermal Production Availability Utilization Feed Rate Coke yield Total Yield Up Time Ply ASH COKE Thermal Ash Moisture Coke
Plan: 68 000 t 11 696 t 12 716 t 24 412 t 97% 86% 3 400 t 17% 36% 20,0h BTA5 Target Done Target Done Target Done
Actual: 55 906 t 9 368 t 8 978 t 18 346 t 70% 89% 3 748 t 17% 33% 14,9h BTA5 10,5% 11,1% 32,0% 31,1% 13,0% 14,6%
CHPP Performance
(Up time) 0:00h 6:00h 12:00h 18:00h 23:59h
% Impacts by Sector
Mechanics 67%
Electrical 3%
Vulcanization 7%
Operation 21%
Mine 1%
Instrumentation 2%
TOP 5 WASH PLANT IMPACTS D-1 TIME KPI (Key Performance Indicator)
Modular Preventive Maintenance 19:55h Availability
High level on reject bin 10CBN01 and on overflow pile 5:16h Utilization
Blockage of reflux delivery line and desliming cyclones due to damaged sideliner on secondary crusher 02DSC01 3:55h Availability
D-1 Total Feed Coking Thermal Production Availability Utilization Feed Rate Coke yield Total Yield Up Time Ply
C1 Performance
Plan: 17 000 t 2 924 t 3 179 t 6 103 t 97% 86% 850 t 17% 36% 20,0h BTA5
(Up time)
0:00h 6:00h 12:00h 18:00h 23:59h
Actual: 19 006 t 3 185 t 3 052 t 6 237 t 94% 93% 904 t 17% 33% 21,0h BTA5
Vulcanization 39%
Operation 51%
Mine 3%
% Impacts by Sector
Instrumentation 7%
0%
0%
0%
0%
0%
0%
0%
0%
TOP 3 WASH PLANT IMPACTS D-1 TIME KPI (Key Performance Indicator)
High level on reject bin 10CBN01 and on overflow pile 1:07h Utilization
Low density on dense medium circuit (02:01h) ; Low coal supply due to maintenance of PE4601 (00:50h) 3:41h Feed rate
MODULE C2
D-1 Total Feed Coking Thermal Production Availability Utilization Feed Rate Coke yield Total Yield Up Time Ply
C2 Performance
Plan: 17 000 t 2 924 t 3 179 t 6 103 t 97% 86% 850 t 17% 36% 20,0h BTA5
(Up time)
0:00h 6:00h 12:00h 18:00h 23:59h
Actual: 18 988 t 3 182 t 3 049 t 6 231 t 97% 86% 952 t 17% 33% 20,0h BTA5
Mechanics 11%
Operation 78%
Mine 2%
% Impacts by Sector
Vulcanization 3%
Instrumentation 6%
0%
0%
0%
0%
0%
0%
0%
TOP 3 WASH PLANT IMPACTS D-1 TIME KPI (Key Performance Indicator)
Cleaning and calibration of reflux classifier 5CRX201 1:41h Utilization
High level on reject bin 10CBN01 and on overflow pile 1:11h Utilization
Damaged panel and stringer on coarse reject screen 4CSC204 0:26h Availability
High level on reject bin 10CBN01 and on overflow pile (01:23h) ; Low coal supply due to maintenance of PE4601 (00:47h) 2:16h Feed rate
MODULE D1
D-1 Total Feed Coking Thermal Production Availability Utilization Feed Rate Coke yield Total Yield Up Time Ply
D1 Performance
Plan: 17 000 t 2 924 t 3 179 t 6 103 t 97% 86% 850 t 17% 36% 20,0h BTA5
(Up time)
0:00h 6:00h 12:00h 18:00h 23:59h
Actual: 2 260 t 379 t 363 t 742 t 17% 64% 869 t 17% 33% 2,6h BTA5
Mechanics 93%
Operation 7%
0%
% Impacts by Sector
0%
0%
0%
0%
0%
0%
0%
0%
0%
High level on reject bin 10CBN01 and on overflow pile 1:28h Utilization
Low density on dense medium circuit (00:29h) ; (h) 0:29h Feed rate
MODULE D2
D-1 Total Feed Coking Thermal Production Availability Utilization Feed Rate Coke yield Total Yield Up Time Ply
D2 Performance
Plan: 17 000 t 2 924 t 3 179 t 6 103 t 97% 86% 850 t 17% 36% 20,0h BTA5
(Up time)
0:00h 6:00h 12:00h 18:00h 23:59h
Actual: 15 652 t 2 623 t 2 514 t 5 136 t 73% 92% 972 t 17% 33% 16,1h BTA5
Electrical 13%
Vulcanization 5%
% Impacts by Sector
Mechanics 18%
Operation 7%
Mine 0%
Instrumentation 1%
0%
0%
0%
0%
0%
0%
High level on reject bin 10CBN01 and on overflow pile 1:28h Utilization
High level on reject bin 10CBN01 and on overflow pile (00:27h) ; Inspection (00:08h) 0:35h Feed rate
PRODUCTION BUILD UP
COKING THERMAL