SHEET 04 Comment
SHEET 04 Comment
SHEET 04 Comment
oad
Wall
Road
ain R
sphalt
Asphalt
Pipe Culvert
Wide A
adi M
No of Pipe : 3
Dia :600mm
ide
Pipe Top: 871.054
30.0m
7.0m W
Pipe Bottom: 870.234
Mag
Nala Bottom: 869.854
Size = 11.8 x 6.8
B9
B10
5
C1 .454
4
87
6
C1 .354
3 Lake inside Bajaj Land
8 7
B1
d
alt Roa
h
ide Asp
7.0m W
Wall
d Drain
B2
Covere
B3
B8
Fence
Ullal
7
C1 .454
7 2
8
Change the hatch
check the levels NOTE:
1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN METERS.
2. REFER SEPARATE DRAWINGS FOR CIVIL, ELECTRICAL DETAILS.
check the levels 3. STAIRCASE DETAILS SHALL BE AS PER CIVIL DRAWING.
4. FORCED VENTILATION WILL BE PROVIDED AS PER VENDOR DETAILS
AND ALSO VENTILATION CALCULATION WILL BE SUBMITTED.
8 mm thk chequered plate and its supporting beams are on HOLD
5. MECHANICAL EQUIPMENT AND FOUNDATION DETAILS ARE UNDER HOLD.
150 thk slab 6. ROOF DRAIN SHALL BE SHOWN IN CIVIL GA DRAWING.
7. PRECAST SLAB DESIGN AND DIMENSIONS WILL BE FINALIZED IN
CIVIL GA DRAWING.
8. CO-ORDINATES SHALL BE FOLLOWED AS PER MECHANICAL GA
DRAWING AND SAME WILL BE UPDATED IN PLANT LAYOUT LATER.
LEGEND:
WL - WATER LEVEL
RL - REDUCED LEVEL
TL - TOP LEVEL
IL - INVERT LEVEL
BOP- BOTTOM OF PIPE
FGL- FINISHED GROUND LEVEL
W7 TOW- TOP OF WEIR
W6 PBS- PUSH BUTTON STATION
300 thick wall
BOO- BOTTOM OF OPENING
EGL- EXISTING GROUND LEVEL
BL- BOTTEM LEVEL
300 thk base slab FFL- FINISH FLOOR LEVEL
BOB- BOTTOM OF BEAM
CLIENT:
BANGALORE WATER SUPPLY
AND SEWERAGE BOARD (BWSSB)
Not required
TITLE : 0.5 MLD ISPS AT HEROHALLI
MECHANICAL GA DRAWING OF RECEIVING CHAMBER
AND COARSE SCREEN , WET WELL AND PUMPING
STATION & FLOWMETER CHAMBER
(SHEET-03 OF 05)
CONTRACTOR: PROJECT: CONSULTANTS:
KBR-AIPPL-JV Sewerage Facilities to 110 Villages: Design, Engineering, Construction
Oriental Consultants Global Co. Ltd., DOC.NO : BWSSP III/27/RRN/ISPS/HER/ME/DG/3201
(M/s KBR Infratech Limited and M/s Ayyappa and Commissioning of Sewage Treatment Plants and Intermediate OC GLOBAL
02 31.01.2024 Revised as per Client Comments
SR SW KNV KBRR
Infra Projects Private Ltd.) Sewage Pumping Stations with Operation & Maintenance thereof for NJS NJS Engineers India Pvt. Ltd.,
SIZE SCALE DATE REV.
Revised due to change in incoming No.1, 1st Floor, 8th Cross Seven Years [Works - A] and
01 31.01.2024 SR SW KNV AIP A1 1:50 19.11.2022
Sewer Levels & Client Comments Tatanagar, Balaji Layout, 02
Procurement and Construction of Main Sewers including Manholes in TATA Consulting Engineers Ltd.,
00 19.11.2022 SR SW KNV Submitted for approval RMV Extenstion, 2nd Stage, This drawing is the property of KBR-AIPPL-JV and must not be passed on to any person
Bengaluru- 560 094. Dasarahalli and R R Nagar Zones (V Valley Catchment) [Works – B] or body not authorised by us to receive it nor be copied or otherwise made use either in
REV DATE PREPARED BY CHECKED BY VALIDATED BY DESCRIPTION
In Association With Black & Veatch
(Contract Package – BWSSP (III) /JICA/CP-27) full or in part by such person or body without our prior permission in writing.