R SP MFG AS STD Aware+action List 15Feb23-Batam
R SP MFG AS STD Aware+action List 15Feb23-Batam
R SP MFG AS STD Aware+action List 15Feb23-Batam
Re-Schedule the AS9100 training into Wed/ 15 Feb 2023. Thank you.
Date 15 Feb 2023 Hello Team,
Subject: AS 9100 std awareness I would like invite the team to attend the AS9100 Aerospace standard training
by our GT Consultant which plan be held on below schedule.
Please refer to attached training module as our reference.
Date : Wed/ 18-January-2023
Time : 9.30am – 17.00
Venue : PTM Conference Room
For SPM Team, can joint by using below Webex link :
https://spmanufacturingpteltd.my.webex.com/meet/spwebexmeeting20
TAUFIQ SHELIAGUNG
PTE – QA Manager
S/N Topics Remarks
1) 9.45am to 10.40am- Pre- course quiz +class training;
10.40am to 10.55am- morning break;
10.55am to 11.55am- class training;
11.55am to 1.00pm- lunch;
1.00pm to 1.50pm- class training;
1.50pm to 2.00pm- washroom break;
2.00pm to 2.50pm- class training;
3.00pm to 3.15pm- afternoon break;
3.10pm to 4.30pm- class training, quiz of time permits.
2)
9) product configuration-
a. Design;
b. Layout;
c. Revision.
10) AS std does not have a “preventive action”..Where did the “Preventive Action” goes to?
1. Risk management- FMEA; risk plan;
2. Clause 6.1- Risk and opportunity assessment.
11) What is ethical behavior?- act of employee to perform the duty according to the behavior defined in
the handbook, a) cannot take money from customer directly or under table, b)cannot give
confidential information to 3rd parties.
How to control?- signing the declaration of the ethical behavior. And signing of the attendance.
Context diagram;
Internal parties. External parties, business process flow, sequence and interaction.
15) Intergated phases processes.
16)
In APQP file
19) MSA
Rework, repair affects = form fit function, performance/ durability= addition FMEA, approval,
instruction, reinspection.
24)
2) To ask from the customer on the special characteristic requirement, safety, critical, Mr Chiang
special, KC, CI.
3) To ask for any further Customer Specific PPAP Requirements for AS product. Mr Chiang
Mr Suep;
12) BCMS information and report- contingency plan PTE- To provide the
BCMS for the PT SP
QA- Mr mfg, the
Taufiq/ contingency plan
and exercise
Jenny information
Mr Suep;
13) Human factor consideration of the nonconformity and corrective action; Mr Eric/ Error proof
What is the human factors that they are referring to? William/ report-
a. Not following to procedure- errors to the product; Mr Suep;
b. Error proof testing?
24) Product life= to be the life provided to the customer on the product for the duration David to
that the product was shipped out to the customer from the plant. confirm on
the
product life
with the
customer
contract.
25) Repair/ rework requirements to be confirmed. David to
confirm on
the repair
and rework