REF: KEP / 761 / 2024 Date: 29/04/2024

CLIENT : M/s Al Bonian FM


SITE : The Meydan Hotel,
LOCATION : Dubai
REVISION : 0

Kind Attn : Mr. Shijil


Mail ID : Shijil.s@albonian.fm

Project:

Parking Shed Works @ Meydan grandstand, Dubai, UAE.

Subject:

Quotation for Roof Rectification Work @ Meydan grandstand, Dubai, UAE.

Greetings from Kepler Technical Service Est.

Thank you for giving us the opportunity,


We are pleased to submit the best competitive price for your kind evaluation and consideration.

Hope this quotation meets your requirements; awaiting a positive and prompt response from
your end to proceed with the work by assuring the best quality on time.

For any further clarifications and concerns please feel free to contact us. We can assure you the
best service at a reasonable value in the set time frame.

+971 54 2799224 keplerdubai@outlook.com Page 1


SCOPE OF WORK:

SL NO DESCRIPTION QTY UNIT RATE TOTAL

PRELIMINARIES

1 Site mobilization, De-mobilization works. 1 Lsm 5500 5500


Supply scaffolding for high-level tasks
2 1 Lsm 8000 8000
according to the site's specifications.

BOAT HOUSE - GLASS ROOF WATER PROOFING WORKS


Supply and application of waterproofing
1 silicone sealant on the glass frame joints 60 Sq.Mt 115 6900
from upper and lower levels
Supply and application of waterproofing
sealant on the glass and block wall joints
2 all sides, 60 Sq.Mt 115 6900

BRAND: WURTH - color - White


WATER PROOFING WORKS - DUCT ROOMS
Supply and application of waterproofing
sealants in the open pipes and sleaves.
3 12 No's 150 1800
(fire rated type PU foam and Silicone will
be used)
Supply and application of two coats of
acrylic modified cementitious
4 waterproofing inside the duct room with 40 Sq.Mt 180 7200
skirting height of 25cms with
reinforcement mesh
BOAT HOUSE - GLASS ROOF WATER PROOFING WORKS
Removal of Existing raised floor panel
5 completely & Keeping it safe and Refixing 170 Sq.Mt 95 16150
the panels after the waterproofing works
Existing screeding removal up to the
6 ceiling slab and throw the debris from the 170 Sq.Mt 85 14450
site to Dubai municipality

+971 54 2799224 keplerdubai@outlook.com Page 2


Surface preparation including regrouting
7 the drain pipes, crack repairing and 170 Sq.Mt 25 4250
cleaning.
Supply and application of oe coat water
8 based bituminous primer. 170 Sq.Mt 101 17170
MATERIAL : HENKEL POLYBIT
Supply & application of two layers of 4mm
thick SBS membrane with a skirting height
of 30cm.
9 170 Sq.Mt 175 29750
MATERIAL: HENKEL POLYBIT - BITUPLUS
E4180

10 Water Test (48 Hours) 1 Lsm 2000 2000

Supply & application of aluminum flashing


11 170 Sq.Mt 6500 6500
of the skirting termination
Supply and application of waterproofing
12 1 Lsm 3500 3500
sealants on the aluminum flashing joints.
Provide 30cm screeding after the
13 170 Sq.Mt 101 17170
waterproofing was approved

SANDWITCH PANEL ROOFING WORKS


Supply & installation of sand with panel
roofing with proper leg support with
14 adequate slope as per the site condition 72 Sq.Mt 645 46440
and client on the top of glass roof for
avoiding the rain water.

DAMAGED GYPSUM CEILING RECTIFICATION WORKS

Rectification works for damaged gypsum


14 50 Sq.Mt 110 5500
ceiling & proper joint taping works

supply & apply 2 coat primer and 2 coat


15 white painting works as per the site 50 Sq.Mt 45 2250
condition.

+971 54 2799224 keplerdubai@outlook.com Page 3


AED
TOTAL
201,430.00
AED
VAT @ 5%
10,071.50
AED
Final Total
211,501.50

Payment Terms:

➢ 70% of advance against the contract value.

➢ 10% of progress payment,

➢ 20% of Payment after the work completion

➢ Quotation Validity is 15 Days only,

➢ Payment should be CDC.

➢ We reserve the right to suspend the work on Site, if the payment is not honored as per
the agreement.

Notes & Exclusions:

➢ Any Local Authority Approval/Charge Excluded.


(RCD/FEWA / TRAKEES/DU/ETISALAT/DCD/RTA/MUNICIPALITY etc.)

➢ If any other additional works other than the above scope shall be treated with additional
cost.

➢ Entry Site Access/Passes, permit from authority, any approvals, Permission to enter the
site will be by Client.

➢ Any Civil, Electrical, Fire Protection, IT, DATA, Emergency Lighting and Music System
related work excluded.

➢ Annual Maintenance Contract was Excluded,

➢ Any variation in size, specification & quantity from our above quote will induce price
revision.

➢ All measurements and quantities are subject to verification.

➢ In case the Order/PO is cancelled after it is confirmed, the Advance Payment will not be
refunded Pro rate service charges will be applied and deducted from the Advance
Payment

+971 54 2799224 keplerdubai@outlook.com Page 4


➢ We need Complete access & provisions to shift the steel Materials from the ground level
to the site.

➢ The prices are based on Normal working hours during daytime.

➢ Schedule of Work: 30 to 45 working days from the date of order confirmation, advance payment,
and approved shop drawings.

➢ Crane, Scaffolding, and any other required machinery to deliver & install the material on
site is Excluded.

➢ Our offer is based upon the dimensions and details as per the given drawing. If the
details, design, dimension, specification, quantities, or type of material changes, we
reserve the right to revise our price.

Thanks & Regards

Authorized Signatory,