DTX Link Taiba - Ics - Fass - Boye
DTX Link Taiba - Ics - Fass - Boye
DTX Link Taiba - Ics - Fass - Boye
Demandeur Nokia
chef de projeÉtienne Gueye
team leader Ibrahima Niang
DénominatioInstallation
Travaux demSwaps & New 2+2 SD XPIC
date début 30/04/2024
date fin 11/01/2023
Nombre de
jours - 475
prévus
Installations
Situations Swap
QC
Dépenses 0
Bon de Livraison de Matériel N°
FASS BOYE
Ant int UBT 4ft 6GHz DP 3CC56934AA 2
AIM-T-O U6GHz 340MHz SB1 3DB28625AA 2
kit 250 km/h 4ft var D UXA>10GHz + SB 1AF30206AAAA 2
UBT-T 6GHz 3DB29205AA 2
EAC - Ethernet Access Card 3DB19417AA 2
coax cable 50ohms 6,85mm per m. 1AC041350001 160
fiber cord MM LC-LC UBT-UBT 20m 3CC52211BC 1
fiber cord MM LC-LC for UBT 80m 3CC52210BE 2
grounding kit for coax cable 6,85mm 1AD040130004 6
QMA connector for 6,85mm cable 1AB357780003 2
CABLE-POWER 1 126X0.4MM 16MM2 PVC 1AC001060084 10M
Consumable kit 2 installation sites 3CC06503AAAA 1
Opt SFP 1000Base-SX 2.5 Gbps ATOP 3CC50386AA 6
OCTIS connector housing for fibers 1AB235300005 4
OCTIS connector housing for powering 1AB235300007 2
Consumable kit 2 installation sites 3CC06503AAAA 1
ANTENNAS SUPPORT 2
transmission
Package number
Date Dénomination User Montant
total 0