SCII - TDS - Sealbond PU-108 - Polyurethane Coating
SCII - TDS - Sealbond PU-108 - Polyurethane Coating
SCII - TDS - Sealbond PU-108 - Polyurethane Coating
SEALBOND PU-108
POLYURETHANE COATING
CONCRETE / MASONRY
Processing Data Cure for at least 28 days before application. Remove loose or
Mix Ratio excess mortar, efflorescence, laitance and concrete form
3 Part A: 1 Part B release compounds that reduce adhesion. Etch or abrasive blast
(by volume)
Gel Time at 30 ºC 30 minutes polished or glazed concrete before use on floors.
Coating Min. 2 hours PREVIOUSLY PAINTED SURFACES
Interval Max. 6 hours Scrape loose, scaly, peeling paint and sand the edges smooth.
Full Cured 48 hours If the paint is glossy, sand to dull the surface. Remove any rust
Pot Life 30-45 minutes and scale from ferrous metal. If mildew is present, remove
Shelf Life 12 months at room temperature completely by sterilizing the surface with mildew remover and
detergent. Rinse well and allow to dry before painting.
SEALBOND PU-108
MIXING Health & Safety
Mix three (3) parts of volume A to one (1) part of volume B and stir
well before application. Please wear rubber or plastic gloves to avoid contact with
skin. Please refer to MSDS for other safety information.
APPLICATION
Product is for Professional use only.
Sealbond PU-108 can be applied to variety of applications.
layer All orders are accepted subject to our current terms of sale and delivery. Users
must always refer to the most recent issue of the Product Data Sheet for the
product awareness, copies of which will be supplied on request and is free of
Product is manufactured based on International Environmental charge.
Regulations