s600 User Manual v2
s600 User Manual v2
s600 User Manual v2
User Manual
S600D,3x1,10-20kVA
UNINTERRUPTIBLE POWER SUPPLY
USER MANUAL
504902039028– rev. 0
S600D
S600D may differ from the model displayed on the front cover.
2
S600D
Special Declaration
Safety of Personnel
1. This product must be installed by qualified professionals, engineers appointed by the manufacturer or an
authorized agent. Failure to observe this condition may result in product malfunction, and compromise the safety of
personnel.
2. Take the time to read this product manual and the safety precautions thoroughly before installing and
commissioning this product. Failure to observe this condition may result in product malfunction, and compromise
the safety of personnel.
3. This product is not intended for use with life support systems
4. Never attempt to dispose of the internal and external batteries in fire as they may explode, leading to serious
injuries, or even death.
Product Safety
1. If the product is to be stored or unused for extended periods, place the equipment in a clean, dry environment
within the specified temperature range
2. This product should be used in an appropriate operating environment. Consult the Site Preparation section for
information about the ideal operating and maintenance environment for this product
3. This product is not designed for use in conditions and/or environments where:
⚫ The temperature and relative humidity are outside the specified limits
⚫ It is subject to vibration or shocks
⚫ It is exposed to the presence of conductive dust, corrosive gases, salts, or inflammable gases
⚫ It is exposed to heat sources or strong electro-magnetic interference
Disclaimer
VERTIV may not be held accountable or responsible for defects and malfunctions arising for the following reasons:
⚫ Application range or operating environment outside the specified limits
⚫ Unauthorized modification, incorrect installation or operation
⚫ Force majeure
⚫ Other actions not in compliance with the instructions in this manual
3
S600D
Safety Precautions
Used to alert the user to the risk of death or severe injury should the unit be used improperly.
Used to alert the user to the risk of injury or damage to the equipment should the unit be used improperly.
Used for instructions that the user must read carefully and observe, even if failure to do so may not result in damage.
This manual contains information concerning the installation and operation of single UPS modules and parallel
systems of the Vertiv S600D 10kVA-20kVA UPS.
Read this manual thoroughly before installing, using and servicing the UPS.
This UPS has been designed for use in commercial and industrial environments. Installation restrictions or additional measures
may be required to prevent disturbances.
The unit must be connected to earth before it is connected to its AC mains input and battery power supplies. This
equipment is fitted with an EMC filter.
The earth leakage current ranges from 0 to 1000 mA.
Transient and steady state earth leakage currents, which may occur when the equipment is started, should be taken into
account when se4lecting the instantaneous RCCB or RCD devices.
RCCB devices that are sensitive to unidirectional DC pulses (Class A) and immune to transient state current pulses must be
selected.
It is also necessary to take into account that the load earth leakage currents will be borne by the RCCB or RCD.
The equipment must be earthed in compliance with the local electrical code of practice.
When selecting the UPS system upstream distribution protection devices, ensure that comply with the specifications
indicated in 3.1.4 , and with the local electrical regulations.
This UPS is fitted with a dry contact for use with an external automatic disconnecting device (not supplied) in order to prevent
the UPS voltage from being fed back to the input terminals through the rectifier or bypass static switch circuit. A label must be
placed on or near the all external primary input supply disconnecting devices to warn service personnel that the circuit is
connected to a UPS. The text of the label must have the following meaning: Risk of voltage backfeed! Isolate the UPS, then
check for hazardous voltages between all terminals, including the protective earth, before working on this circuit.
S600D
Like other types of large power equipment, the UPS and battery circuit breaker box/battery cabinet contain high voltages.
This equipment meets the IP20 standard, and other safety panels are fitted inside the equipment.
The UPS may be operated in complete safety, provided the general instructions and the steps recommended in this manual
are followed.
This UPS system receives power from more than one source. All DC and AC power sources must be disconnected before
servicing.
This UPS includes several circuits that are energized by high AC as well as DC voltages. Check for voltage with both AC and
DC voltmeters before working inside the UPS.
All equipment maintenance and servicing procedures involving internal access require the use of a tool and should be carried
out by trained personnel only. There are no user-serviceable parts behind the covers that require a /key for removal.
All battery maintenance and servicing procedures require the use of tools and should be carried out by trained personnel only.
Take special care when working with the batteries associated with this UPS. When connected together, the battery terminal
voltage will exceed 320Vdc and is potentially lethal.
Battery manufacturers supply details of the necessary precautions to be observed when working on, or in the vicinity of, a
large bank of battery cells. These precautions should be followed scrupulously at all times. Special attention should be paid to
the recommendations concerning local environmental conditions and the provision of protective clo thing, first aid and fire-
fighting facilities.
When the internal fuse of the UPS is damaged, it must be replaced with fuse having the same electric parameters by qualified
personnel.
The area housing the communication board contains static sensitive components, therefore it is necessary to adopt all the
appropriate ESD-proof measures before accessing this area.
In order to satisfy the conditional short circuit current rating, Icc at 10kA symmetrical rms, the specified upstream breakers
must comply with an IEC 60947 series standard.
The UPS is unable to automatically isolate the neutral connection, ensure to have 4P breaker upstream and downstream the
UPS in case of IT distribution.
S600D
Product Model
Liebert S600D 10kVA (Standrad UPS)
Liebert S600D 20kVA (Standard UPS)
S600D
Contents
7
S600D
6.7 Battery Installation and Connections .............................................................................................................................................. 69
6.8 Designing the Battery Room ..............................................................................................................................................................70
6.9 Battery Maintenance ....................................................................................................................................................................... 70
6.10 Disconnecting or Connecting Internal Battery Terminals ............................................................................................................. 71
6.11 Disposal of Used Batteries ................................................................................................................................................................72
Chapter 10 Specifications............................................................................................................................................. 94
8
S600D
Chapter 1 Overview
This section provides a short introduction to the Liebert S600D 10kVA - 20kVA UPS (hereafter referred to as “the
UPS”), covering features, design concept, parallel system, operating mode, battery management and battery
protection.
1.1 Features
The UPS is connected between a critical load (e.g. a computer) and the mains power supply to provide high quality
power for the loads. The UPS provides the following advantages:
⚫ Increased power quality
The UPS protects its output against the variations in the input power supply by means of the intelligent controller.
⚫ Improved noise rejection
Due to the use of AC-DC-AC conversion, noise on the input power supply is effectively filtered, so that the load is
provided with a “clean” power supply.
⚫ Mains failure protection
If the input power fails, the UPS switches to battery operating mode so that the power supply to the loads is not
interrupted.
⚫ Compatible with two output modes
3-in 3-out (factory default) and 3-in 1-out (by installing an optional 3-in 1-out copper bar kit). Only authorized
personnel are permitted to change the wiring method and modify the corresponding parameters using the VERTIV
setting software.
System Design
This section introduces the working principle of the single UPS module. The UPS adopts AC-DC-AC conversion (as
shown in Figure 1-1). The first stage conversion (AC-DC) uses a three-phase, high frequency rectifier to convert the
three-phase input voltage into a stable DC bus voltage.
9
S600D
Input Output
Figure 1-1 Block diagram illustrating the working principle of a UPS single module
The UPS has its own battery charger and adopts advanced temperature compensation technology to effectively
prolong the battery service life. The inverter is principally based on the use of large power IGBTs, and adopts
advanced SVPWM control technology to reconvert the DC bus voltage to AC voltage.
When the mains is normal, the rectifier and inverter work together to supply the loads and charge the battery.
When the mains is outside normal limits, the rectifier stops working, and the battery supplies power to the loads
through the inverter. If the battery voltage falls to end of discharge (EOD) voltage and the mains has not yet
returned within the normal limits, the UPS will shut down (if the system uses split bypass configuration and the
bypass is normal, the system will transfer to bypass). The battery EOD voltage is pre-set. When the mains is
abnormal, the battery will continue to supply the UPS until the battery voltage reaches to EOD level, whereupon the
UPS shuts down; this period is known as the 'Backup Time'. The duration of the backup time depends on the battery
capacity and the loads.
Bypass
Thanks to the intelligent control function provided by the ‘Static Switch’ module (as shown in Figure 1-1), which
includes the controllable electronic switch, the loads may be supplied either by the inverter or the bypass. Under
normal operating conditions, the loads are supplied by the inverter, in which case the automatic inverter switch on
the inverter side is closed. In the event of an overload (after the overload delay period has elapsed) or inverter
failure, the inverter switch is opened, and the 'Static Switch' module transfers the loads automatically to the bypass.
In normal operating state, in order to guarantee the uninterrupted transfer between inverter and bypass, the inverter
output must be synchronized with the bypass.
Therefore, when the bypass frequency is within the synchronization range, the inverter control circuit will
synchronize the inverter output frequency with the bypass frequency and phase.
The UPS is also equipped with a manual maintenance bypass switch that can be used to shut the UPS down during
maintenance. In this condition, the bypass will supply the critical loads directly via the maintenance bypass.
When the load is supplied by the bypass or maintenance bypass, the power quality & availability will be unregulated.
10
S600D
System Control Principle
Normal operation
Normal mode: In this condition, the UPS mains input supply is within normal limits, the rectifier and inverter operate
normally, the load is supplied by the inverter, the battery circuit breaker is closed, and the battery is in the stable
floating charge state.
(Parallel System) Note: As the individual UPS module outputs are connected in parallel, the system checks that the
inverter control circuits are perfectly synchronized with one another and with the bypass in terms of both frequency
and phase, and that the output voltages are the same. The current supplied to the load is automatically divided
among the UPS units. A warning message appears while synchronization is in progress.
Mains abnormal
When the mains fails or is abnormal, the rectifier will stop working automatically, and the system will transfer to
battery output (through the inverter). The length of the operation time in battery mode depends on the load and the
battery capacity. During this period, if the battery voltage falls to the EOD level before the mains supply has
returned within normal limits, the inverter will stop working automatically, and the UPS operator control and display
panel will display the corresponding alarm messages. If the system uses split bypass configuration and the bypass is
normal, the system will transfer to bypass.
Mains recovery
When the mains returns within normal limits within the permissible time, the rectifier will start automatically (at this
point its output power will increase gradually) and supply the load and charge the battery again. This means that
the power supply to the load will not be interrupted.
Disconnecting the battery
To disconnect the external battery from the UPS system during maintenance, use the external isolation device. In
this condition, the battery backup function will not be available in the event of a mains failure, but none of the other
UPS functions and performance will be affected.
UPS module failure
In the event of an inverter failure, automatic inverter switch failure, or if the output fuse blows, the load will
automatically transfer to the bypass, and the output power supply will not be interrupted. Should this condition
occur, please contact your local VERTIV customer service centre for technical support.
(Parallel System) In the event of a fault on a UPS module, it will automatically exit the parallel system. If the system
is still capable of providing the power required by the load, the remaining modules will continue to supply the load
without interruptions. If the remaining modules are no longer capable of fulfilling the power requirements, the load
will automatically transfer to the bypass.
Overload
If the inverter is overloaded or the inverter current remains outside the specifications (refer to Table 10-6) longer
than the specified time, the load will automatically transfer to the bypass without any interruption in the power
supply to the load. If both the overload and the current are reduced to a level within the specified range, then the
load will be re-transferred to the inverter. In the event of an output short circuit, the load will be transferred to the
bypass, and the inverter will shut down. The transfer is determined primarily by the characteristics of the system
protection device.
In both the situations listed above, the UPS operator control and display panel will display the corresponding alarm
messages.
(Parallel System) The control logic system constantly monitors load requirements and controls the power supplied
by each UPS module. If an overload condition persists for longer than a pre-set period and the number of active
modules is unable to satisfy load requirements, the load will transfer to the bypass. The load is re-transferred to the
inverter if the power is reduced to a value that can be sustained by the number of active modules in the system.
11
S600D
Maintenance bypass
The UPS is equipped with a second bypass circuit, known as the maintenance bypass, which provides a safe
working environment for the engineers to carry out regular maintenance or repair the UPS system, while providing
unregulated mains supply to the loads. The maintenance bypass can be activated manually selected by closing the
maintenance bypass switch, and disconnected by setting the switch to OFF.
If the UPS system consists of two or more UPS modules, and the load capacity exceeds the single module capacity, do not
use the internal maintenance bypass switch.
Figure 1-2 illustrates the block diagram of the UPS module. The UPS may be connected in split bypass (where the
bypass is supplied by a separate mains input source) or common input configuration. In the split bypass
configuration, the static bypass and maintenance bypass share the same independent bypass power supply. Where
a separate power source is not available, the input supply connections of the bypass input switch (Q2) and rectifier
input switch (Q1) should be linked together (these terminals are linked before delivery) so that the bypass input and
rectifier input use mains power from the same source.
During the normal UPS operation, all switches should be closed, with the exception of the maintenance bypass
switch Q3.
The external battery shall be connected to the UPS via the BCB. The BCB box is an option that must be installed
close to the battery.
12
S600D
Parallel System Features
1. The hardware and software of a parallel system are identical to those of the individual modules. The parallel
system is configured by modifying the respective settings in the configuration software or via the control panel.
2. Parallel cables are connected in a ring, providing both system reliability and redundancy. LBS cables are
connected between any two UPS modules of each bus. The intelligent parallel logic provides the user with maximum
flexibility. For example, the UPS modules in a parallel system can be shut down or started up in any order. Transfers
between normal mode and bypass mode of operation are seamless and self-recoverable, i.e, when the overload is
cleared the system will revert automatically to its original operating mode.
3. The total load of the parallel system can be queried from the LCD screen on each UPS module.
A group of paralleled modules behave as if it were one large UPS with the advantage of providing increased
reliability. To ensure that all modules are utilised equally and to comply with relevant wiring rules, the following
requirements apply:
1. All UPS modules must be of the same rating and must be connected to the same bypass source.
2. The bypass and rectifier input sources must be connected to the same neutral line input terminal.
3. If any RCD devices are installed they must be set-up appropriately and located upstream of the common neutral
line input terminal. Alternatively, the device must monitor the protective earth current of the system. Refer to
Warning: high earth leakage current before Contents.
1.The UPS is composed of mains input (main and bypass), rectifier/PFC, charger, inverter, bypass, battery, DSP controller,
isolation transformer, contactor and final output.
2. When the mains is normal, the rectifier will start, and the charger will charge the battery string. Before turning on the UPS, the
output voltage is bypass voltage, and the mains supplies power to the load through the bypass. After turning on the UPS, the
electronic transfer switch connects the inverter output to the load, and the mains supplies DC power to the inverter through the
rectifier/PFC circuit. The inverter then converts DC power into pure sine wave AC power and supplies the AC power to the load
through electronic transfer switch. Isolation Transformer is connected at the output side for 3X1,Refer figure 1.4 for the position
of Output Isolation Transformer. Output is fed to Load through Contactor because of Transformer at Output side.
13
S600D
The UPS features the following operating modes:
⚫ Normal mode
⚫ Battery mode
⚫ Bypass mode
⚫ Maintenance mode
⚫ ECO mode
⚫ Parallel redundancy mode (system expansion)
⚫ LBS system mode
⚫ Common battery string mode
Normal mode
As shown in Figure 1-3, the mains is rectified by the UPS rectifier and then inverted by the inverter to supply
uninterrupted AC power to the loads. At the same time, the charger will charge the battery.
Rectifier Inverter Automatic inverter switch
Mains input UPS output
14
S600D
Battery mode
As shown in Figure 1-4, the operating mode where the battery provides the backup power supply to the loads
through the rectifier and inverter is called battery mode. In the event of a mains failure, the system will transfer
automatically to battery mode with no interruption in the power supply to the load. When the mains power supply is
restored, the system will re-transfer automatically to normal operating mode without any manual intervention, and
with no interruption in the power supply to the load.
Rectifier Inverter Automatic inverter switch UPS
output
Battery
The battery cold start function may be used to switch the UPS on in Battery (charged) mode directly during mains failure.
This means that the battery power supply can be used independently to improve the availability of the UPS.
Bypass mode
As shown in Figure 1-5, in normal mode, in the event of an inverter failure, inverter overload or inverter manual shut
down, the static switch will transfer the load from the inverter side to bypass side, with no interruption in the power
supply to the load. In this case, if the inverter and bypass are not synchronized, there will be a transitory interruption
in the power supply to the load (not exceeding 20ms).
Static switch
UPS output
Bypass input
Bypass input switch Output switch
As shown in Figure 1-6, if it is necessary to service the UPS or carry out maintenance work on it, you may use the
manual maintenance bypass switch to transfer the load to maintenance bypass, with no interruption in the power
supply to the load. This maintenance bypass switch is fitted in all UPS modules and rated for full load of one module.
If ECO mode is selected, all the power switches and the BCB are closed, and the system selects the bypass as the
preferred source of power for the load, in order to save energy. When the bypass supply frequency and voltage are
within normal limits (adjustable), the load is powered by the bypass, with the inverter on stand-by; when the bypass
voltage and/or frequency is outside these pre-defined and adjustable limits, the system will transfer to the inverter
output. In this mode, the system can charge the battery normally.
15
S600D
Bypass Static switch
input
Rectifier Inverter
Mains input UPS output
Rectifier input switch Output switch
The load is not protected against distortion on the mains voltage waveform in ECO mode.
Never use batteries having different brands, type or capacities in the same system. Common battery string mode is suitable
for parallel systems only, and is not compatible with LBS mode.
Normal Function
16
S600D
This charging method is used for maintaining the battery at full capacity. The float charge voltage is generally low.
This function can be used to compensate for capacity loss due to battery self-discharging, and to recover battery
capacity.
In the case of VRLA batteries, the float charge voltage should be between 2.2V/cell and 2.3V/cell.
4. Automatic transfer to float charge
When the charge current is less than the 'Threshold of Equalize Charge to Float Charge’ value, the charger will
automatically transfer from boost charge to float charge. When the boost charge time exceeds the 'Equalize Charge
Protect Time Limit', the charger will be forcibly transferred to float charge in order to protect the battery.
5. Float charge temperature compensation (optional)
This function must be used together with the battery temperature detection device. The VERTIV battery
temperature sensor is a standard option designed to satisfy your requirements.
6. EOD protection
When the battery voltage falls to the EOD level, the the battery converter shuts down automatically and the battery
is disconnected in order to avoid further battery discharge. The EOD voltage may be set to between 1.6V/cell and
1.85V/cell (VRLA).
7. Battery low pre-warning time
The battery low pre-warning time may be set to between 2min and 30min. The default setting is 2min.
8. Maximum battery discharge time
When the battery is discharged at low current levels for extended periods, it will result in excessive discharge and
may even cause irreparable damage, for this reason it is essential to set-up a maximum battery discharge time in
order to protect it. This limit value is set-up by the service engineer using the VERTIV setting software.
9. Maximum boost charge protection time
To protect against the battery overcharge damage caused by long time boost charge, it is essential to set-up a
protection time a protect time limit This limit value is set-up by the service engineer using the VERTIV setting
software.
The UPS system also features a battery charge temperature compensation function. When the ambient temperature
is increased, the DC bus voltage (which charges the battery) will be reduced correspondingly to provide optimal
charging voltage for the battery, thus prolonging the battery service life time. This function must be used together
with the VERTIV battery temperature detection device (standard option).
17
S600D
2.1 Precautions
This section describes the environmental and mechanical requirements and mechanical considerations that must be
taken into account when planning the positioning and cabling of the UPS equipment.
Because no two sites are the same, this section does not provide the detailed installation procedures, and is only
intended to act as a guide for the general procedures and practices that should be carried out by the installing
engineer, so that they can handle the specific situation at the site correctly.
1. Do not dismantle the packaging without the permission of an authorised service engineer.
2. The UPS should be installed by an authorised engineer in accordance with the information provided in this section.
Take special care when installing batteries. When connecting batteries, the battery terminal voltage will reach 320Vdc,
which is fatal to human beings.
1. Always wear safety glasses to protect the eyes from being damaged by arcing.
2. Remove all the metal items, including finger rings, watch, etc.
3. Use tools with insulated handles.
4. Wear rubber gloves.
5. If batteries are damaged or leak electrolyte they must be replaced. Place the battery into the container that can withstand
sulphuric acid and dispose of it according to the local regulations.
6. In the event of contact with electrolyte, wash the affected are with abundant clean water immediately.
2.2 Transportation
Rail and sea shipping are the recommended transportation methods. If road transportation is unavoidable, choose
roads that are less bumpy in order to protect the equipment.
The UPS cabinet is heavy (see Table 10-3 for the weight). We recommend using mechanical equipment such as an
electric forklift to unload and move the equipment to the place closest to the installation site.
18
S600D
2.3 Tools
1. For reasons of safety, all installation tools used on live components must be insulated.
2. The tools listed in Table 2-1 are for reference only; please adapt to the actual requirements for on-site installation and
connection.
Stepladder Forklift
19
S600D
2.4 Unpacking
Unpack the UPS and battery packages under the supervision of an authorized service engineer.
Proceed as follows:
1. Remove the carton.
Remove the packing strap and lift the whole carton upwards, as shown in Figure 2-1.
2. Remove the fixing structural parts from the bottom pallet (see Figure 2-2), do not throw them away. Next, use the
forklift (inserting the forks at the points illustrated in Figure 2-2) to move the cabinet close the installation site.
20
S600D
3. After moving the cabinet to the installation site, you raise the adjustable feet and use the castors to move the
cabinet to its final installation position, finally, rotate the adjustable feet until they are in contact with the floor. See
Figure 2-3 for the finished installation.
1. It is not necessary to install the fastening structural parts of the bottom pallet in the case of UPS with side cabinet
21
S600D
2. In the case of UPS , simply secure the fastening structural parts removed in step 2 to the cabinet bottom (See
right drawing); in the case of UPS , install the fastening structure parts to both the left and right hand sides (See
left drawing) based on the right drawing to avoid tipping.
The UPS should be located in a cool, dry, clean-air indoor environment with adequate ventilation, and should be
located on concrete or other non-flammable, flat surfaces. The surrounding environment should be free from
conductive powders (such as metallic powder, sulphide, sulphur dioxide, graphite, carbon fibre, conductive fibre,
etc.), acid mist or other conductive media (strongly ionized substances). The environmental specifications should
comply with relevant international standard & specifications and the operating range (see Table 10-2) specified in
this manual.
The UPS uses forced cooling by internal fans. Cooling air enters the UPS through the ventilation grills at the front of
the cabinet and is expelled through the ventilation grills at the back of the cabinet. Do not obstruct the ventilation
holes (ventilation grills). The rear of the UPS should be kept a distance at least 200mm from the wall to avoid
blocking the UPS heat dissipation, thus reducing the UPS internal temperature and improving the UPS life.
If necessary, install indoor extractor fans to aid cooling-air flow and avoid temperature build-up in the installation
area.
Note 1: When the battery cabinet is installed near the UPS, the maximum allowable ambient temperature is dependent on
the battery rather than the UPS.
Note 2: If the UPS is operating in ECO mode, the power consumption will be less than in Normal mode. A proper air
conditioning system shall be selected according to the normal operating mode.
Batteries generate a certain amount of hydrogen and oxygen at the end of the charging cycle, so the fresh air
volume of the battery installation environment must meet the EN50272-2001 requirements.
The ambient temperature is the main factor that affects the battery capacity and life. The normal operating
temperature of the battery is 20°C. If the ambient temperature is higher than 20°C, the battery life will be reduced. If
it is lower than 20°C, the battery capacity will be reduced. Under normal operating conditions, the acceptable
ambient temperature for the battery is 15°C to 25°C. The ambient temperature of the battery must be maintained
constant, and the battery must be kept away from heat sources and air outlets.
The battery may be installed inside the dedicated battery cabinet, which shall be positioned close to the UPS. If the
battery is placed on the raised floor, brackets shall be installed under the floor, just as for the UPS. In the case of
rack-mounted batteries or batteries that are installed remotely from the UPS, the battery circuit breaker shall be
installed close to the battery, and the cable lengths shall be kept to a minimum.
Storage
Should the UPS not be installed immediately, it must be stored in its original packaging in a location where it is
protected against excessive humidity and heat sources (see Table 10-2). The battery must be stored in a dry and
cool place with good ventilation. The most suitable storage temperature is between 20°C and 25°C.
23
S600D
Recharge the battery at regular intervals during storage in accordance with the manufacturer’s instructions. During the
charge process, connect the UPS temporarily to the mains and activate the battery by recharging it.
1. Ensure that the load capacity of the lifting equipment used to move the UPS cabinet is sufficient.
2. The UPS is fitted with castors. When removing the UPS from the shipping pallet, take care to prevent it from sliding.
Ensure that sufficient personnel and lifting equipment are available when removing the shipping pallet.
3. Due to the weight of the UPS cabinet, the castors may only be suitable for use on flat surfaces.
4. The centre of gravity of the UPS cabinet is high, take care to prevent it tipping over when moving it
5. The cabinet must never be suspended vertically.
Take special care when moving the battery cabinet with the batteries installed, making sure that each battery string has
been secured and keeping movements to a minimum.
Ensure that the UPS weight does not exceed the load capacity of the lifting equipment. For information about the
weight of the UPS, refer to Table 10-3.
The UPS may be moved using a forklift truck or similar lifting equipment.
The castors may be used when it is necessary to move it over short distances.
Clearance
Because the UPS is not fitted with lateral grilles, there is no special clearance requirement on either side.
In addition to any local regulations, in order provide sufficient space for routine operations, such as tightening the
power terminals inside the UPS, it is recommended that clearance around the front of the UPS should be sufficient
to enable free passage of personnel with the door fully open. In addition, it is necessary to leave a clearance of at
least 200 mm at the rear of the cabinet in order to permit adequate circulation of the hot air expelled by the UPS.
24
S600D
Side View
Front View
Bottom View
25
S600D
1. Do not switch the UPS on before the authorised service engineer arrives.
2. The UPS should be routed by an authorised engineer in accordance with the information provided in this section.
System Configuration
The system power cable dimensions shall meet the following requirements:
UPS input cable
The UPS input cable dimension differs depending on the UPS power ratings and input AC voltages, provided that it
meets the requirement of maximum input current, including the maximum battery charge current, see Table 3-1.
UPS bypass and output cable
The UPS bypass and output cable size differs depending on the UPS power rating and output AC voltages, provided
that it meets the requirement of nominal output or bypass current, as shown in Table 3-1.
Battery cable
Each UPS is connected to the respective battery positive pole, negative pole and neutral line by three cables . The
battery cable dimension differs depending on the UPS power ratings, provided that it meets the battery discharge
current requirement when the battery voltage nears the EOD level, as shown in Table 3-1.
The power cable must be selected according to the current and voltage values indicated in Table 3-1, as well as the
local wiring regulations, as well as taking environmental conditions (temperature and physical media) into
consideration; refer to Table 3B in IEC 60950-1.
Table 3-1 Max. steady state AC and DC currents
Bus stud bolt/nut
Rated current (A)
specification
UPS power Output/bypass current2 Input/batte
Battery discharge Recommende
(kVA) Max. input at full load ry/output/
current (+, -, N) at d torque
current1,2 bypass
220V 230V 240V min. battery voltage (N.m)
cable
10 (3-in 1-out ) 20 46 44 42 58 M6 3
20 (3-in 1-out ) 44 91 88 85 58 M6 3
When selecting the battery cables, a max. volt drop of 4Vdc is permissible at the current ratings given in Table 3-1. Avoid coiling
the cables as this would increase the electromagnetic interference (EMI).
1. Input mains current for rectifier and bypass.
26
S600D
2. Non-linear load (like switch power) affects the design of output and bypass neutral line. The neutral line current may exceed
the rated phase current, at most 1.5 times of the rated phase current.
When the system is in common input configuration and in 3-in 1-out mode, because phase A powers the load, the input cable of
phase A must be selected according to Table 3-2. Input cables of phase B and phase C may refer to Table 3-2.
Lugs for Input, Output, Common / Split Bypass, Battery connections MUST be of Ring type cross-section, suited for Cables and
Currents in use.
Table 3-3 indicates the recommended UPS I/O switch capacity, the user may select it as required.
Table 3-3 Selecting the UPS I/O switch
External
Model Input port External input switch BCB Output port
output switch
10
Terminal block 32A (3P) 63A Terminal block 63A (2P)
(3-in 1-out )
20
Terminal block 63A (3P) 80A Terminal block 125A (2P)
(3-in 1-out )
Notes
The following points are provided for general guidance only. If there are corresponding local regulations, such
regulations shall prevail.
27
S600D
1. The protective earth cable dimension shall be selected according to the AC power failure level, cable length and
protection type. The grounding wire connection must use the shortest possible connection route.
2. In the case of cables that are required to handle large current, it may be easier to use multiple smaller cables in
parallel.
3. When selecting the battery cable dimension, it is important to take the current value in Table 3-1 into account and
bear in mind that the maximum permissible voltage drop is 4 Vdc.
4. Avoid coiling the cables as this would increase the electromagnetic interference (EMI).
The rectifier input, bypass input, output and battery power cables are connected to the corresponding terminals, as
shown in Figure 3-2.
Protective Earth
The protective earth cable must be connected securely to the PE input terminal (see Figure 3-2) using the fastening
bolt. All the cabinets and cable troughs shall be earthed according to the local regulations. The earthing wires shall
be secured in order to prevent them coming loose from the fastening screws if they are pulled.
Failure to earth the various elements as directed may result in EMI, electric shock or fire risk.
To ensure safety, it is necessary to install external circuit breakers on the UPS input and battery lines. Because no
two installations are the same, this section is only intended to provide general practical guidelines for installation
engineers. Qualified installation engineers should be aware of the local wiring regulations and any other related
information
Rectifier and bypass input power supply
1. Input overcurrent and short circuit protection
Install suitable protective devices on the mains input supply distribution line. The protective devices should provide
functions such as overcurrent protection, short circuit protection, isolation protection and tripping upon backfeed.
When selecting the protective devices, consider the power cable current-carrying capacity, system overload
capacity (see Table 10-6 and Table 10-7) and the short circuit capacity of the upstream power distribution.
2. Split bypass configuration
If the UPS adopts the split bypass configuration, independent protective device shall be installed on both the
rectifier input and bypass input distribution lines.
1. The rectifier input and bypass input must use the same neutral line.
2. In the case of IT grid systems, a 4-pole protective device must be installed on the UPS external power distribution line.
28
S600D
The UPS is fitted with an internal EMC filter, therefore the protective earth cable leakage current is 0 - 1000mA. We
recommend confirming the RCD sensitivity of the upstream input power distribution and downstream power
distribution (to the load) lines.
External battery
The BCB must be installed in order to protect external battery. The UPS requires an optional BCB box to provide
overcurrent protection, short circuit protection and automatic tripping functions for the external battery. The rated
voltage of the BCB is 500Vdc.
This BCB is extremely important for the battery maintenance, and is generally installed close to the battery.
System output
The UPS output distribution line must be fitted with a protective device. The protective device must be different
from the input distribution protection switch and be able to provide overload protection (refer to Table 10-6 and
Table 10-7).
1. Open the appropriate holes on the rear protective cover before routing the power cables. Install cable guards around the
rims of the hole to protect power cables against cutting.
2. Feed the power cables through the holes, then connect them to the corresponding terminals.
29
S600D
1. Before connecting the cables, make sure that all the external and internal UPS power switches are set to OFF, and post the
appropriate warning signs to prevent inadvertent operation of the switches.
2. Measure the voltages between the UPS terminals, and the voltages between the terminals and earth.
1. The earth cables and neutral line must be connected in accordance with local and national codes of practice.
2. Failure to observe this condition may result in electric shock or fire risk.
30
S600D
Note
Note that the common input copper shorting bars are fitted before delivery.
Figure 3-4 3-in 1-out, common input configuration cable connection (factory default)
31
S600D
output copper shorting bars (oA-oB-oC), oN and the load. Refer to Table 3-1 for the tightening torque values. Make
sure that the phase rotation is correct.
Prior to the service engineer's visit, if the load is not ready to be connected to the power supply, it is important to ensure the
terminals of the output cables are insulated safely
After connection, take appropriate measures to seal the cable entry holes.
Overview
Depending on the specific on-site needs, the UPS requires auxiliary connections to manage the battery system
(including the external battery circuit breaker), communicate with a PC, provide alarm signals for external devices,
enable a remote EPO and/or the bypass back feed circuit breaker signal, and for parallel communication functions.
These functions are performed by the communication box in the UPS cabinet. As shown in Figure 3-6, the
communication box provides the following ports:
1. Intellislot port
2. Dry contact port
3. RS232 port
4. Ethernet port (not used)
5. Parallel/LBS port
6. REPO port
7. USB port
8. Multifunctional port
32
S600D
Dry Contact Port
The UPS provides five dry contact ports. The silkprints of the five dry contact ports are 1 - 12. The pin layout of each
dry contact port is shown in Figure 3-7, and the port description is shown in Table 3-5.
Note
33
S600D
Activating the UPS EPO will deactivate the rectifier, inverter and static bypass, but does not disconnect the UPS from the
mains input. If you wish to disconnect the UPS completely, it is also necessary to open the input MCB installed upstream of
the UPS when activating the EPO.
In the event of an emergency, close the REPO switch (supplied and installed by the user) in order to shut down the
rectifier and inverter, and switch the UPS off. Under normal conditions, the REPO switch cannot be used to isolate
the UPS from the mains input power. If an electronically controlled circuit breaker function is installed at the UPS
input, the REPO switch can be used to trip this breaker, thus cutting off the UPS mains input power. The position of
the REPO switch is shown in Figure 3-6, and the REPO cable connection is shown in Figure 3-8.
1. We recommend using 0.82mm2 - 0.33mm2 copper core cable ( 18AWG - 33AWG signal cable).
2. If the REPO has been configured to trip an electronically controlled circuit breaker switch, after the REPO has been
activated it will be necessary to re-arm the switch before restarting the UPS.
34
S600D
After connecting the cable, it is necessary to install the USB drive program on the installation disk.
Intellislot Port
The position of this port is shown in Figure 3-6. The Intellislot port is used for installing optional cards, including the
SIC card, UNITY card, etc. The Intellislot port can be used together with other ports.
Multifunction port
The multifunction port uses the standard RJ45 port, which supports the Modbus/Jbus protocol and can be used to
connect the VERTIV temperature & humidity sensor. The user can enable Modbus/Jbus protocol function or sensor
function via the 'Settings' on the LCD.
Route the power and signal cables respectively. The signal cable shielding sheath must be earthed securely.
Rear cable access mode is available. See Figure 3-10 for a detailed description of the wiring method.
To Corresponding
Terminals
35
S600D
4.1 Introduction
The operator and display panel is located on the front panel of the UPS. The operator and display panel allows the
user operate and monitor the UPS, and view the UPS parameters, Ups and battery status information and any alarm
messages.
As shown in Figure 4-1, the operator and display panel includes an LCD screen, menu keys, and LED indicators (run
indicator and alarm indicator).
The device includes a gravity sensor function, so that the LCD display direction will adapt to the device layout mode.
LED Indicators
The LED indicators consist of the run indicator and alarm indicator. Table 4-1 provides a description of these
indicators.
36
S600D
Table 4-1 Description of LED indicators
Indicator Colour State Meaning
On UPS output present
Run indicator Green Blinking Inverter is starting
Off UPS output not present, inverter is starting
Yellow On Alarm active
Alarm indicator Red On Fault present
/ Off No alarms, no faults
UPS operation is accompanied with the following two different kinds of audible alarms, as described in Table 4 -2.
Table 4-2 Description of audible alarm
Sound Meaning
This sound is generated in the event of a UPS fault condition, such as a fuse or hardware
Continuous beep
failure
This sound is generated in the event of a critical UPS alarm condition, such as an
One beep every 0.5 seconds
Inverter overload
This sound is generated in the event of a critical UPS alarm condition, such as low
One beep every second
battery voltage
One beep every 3.3 seconds This sound is generated in the event of a general UPS alarm condition
The operator and display panel includes five function keys, the respective functions are described in Table 4-3.
Table 4-3 Description of control buttons
Function key Silkscreen Description
37
S600D
The LCD includes a user-friendly interface and a 320 × 240 dot matrix image display. Thanks to the user-friendly,
menu-oriented LCD it is possible to browse easily through the UPS input, output, load and battery parameters,
obtain information about the current UPS status and alarm messages, as well as performing functional setting and
control operations. The LCD also stores historical alarm records that can be retrieved for reference and diagnosis.
When the UPS is the initial start-up phase, the interface shown in Figure 4-3 will appear to guide the user through
the basic UPS parameter setting procedure.
Welcome page
Click Next to start the guide procedure.
Language, date and time page
On this page, you can set-up the language, date and time as required.
38
S600D
On this page, you can set-up the battery cell number and total Ah.
The available settings are 24, 32 and 40. See the right hand diagram in Figure 4-5.
If there is an external battery module, the 'Local battery total Ah' will not appear, see Figure 4-6.
Output page
39
S600D
In the case of the output page, the REPO terminal (forcible output shut-down) must be unplugged when carrying out the
settings, otherwise the interface shown in Figure 4-8 will appear.
End page
The interface shown in Figure 4-9 will appear. This means that the function keys and LCD are invalid; the user
cannot continue with the operation. Please switch the UPS off based on the prompt shown in Figure 4-10, confirm
that the actual wiring method applied to the output terminal is consistent with the method selected during the set-
up procedure, and then switch the UPS on again.
After start-up the user will be able top operate the UPS normally.
40
S600D
Start Screen
When the UPS is started up it performs a system self-test, during which the Start Screen is displayed for
approximately 10 seconds, as shown in Figure 4-11.
Flow Screen
Once the UPS self-test is complete, the flow screen shown in Figure 4-12 will appear.
The flow screen provides a total status overview of the UPS, including the input, bypass, rectifier, battery, inverter
and output, etc. Operating modes are displayed in colour, while invalid are displayed in grey.
41
S600D
Press the key on the flow page to access the primary screen.
The main menu screen consists of six icons: Status, Settings, Control, Log, About, Maintain. As shown in Figure 4-13.
Press the key on the main menu screen to return to the flow screen. Press the or key to move the
cursor and select the required sub-menu, then press the key to confirm it.
Sub-menu Screen
The sub-menu screen contains the UPS parameters and item settings.
After accessing the sub-menu screen, if there is a tab control, just move the cursor to the tab. At this point, you can
press the or key to switch the tab. Press the key to move the cursor to a specific item.
After accessing the sub-menu screen, if there is no tab control, the cursor will stop on a certain Item.
42
S600D
Settings page
The Settings page can be used to access the Output, Battery, Parallel, Monitor, System, and Outlet settings. For
details about the setting up the parameters, refer to Appendix 1 .
See below:
43
S600D
44
S600D
Control page
The Control page may be used to access the Turn ON/OFF/to BYPASS, Manual battery test, etc. functions. See
below:
Log page
The Log page can be used to access a list of current and historical UPS events. See below:
About page
The About page contains information about the Product, Network, and Efficiency. See below:
45
S600D
Maintain page
The Maintain page is password protected and reserved for use by VERTIV service engineers only.
Default Screen
During the UPS operation, if there is no alarms for two minutes, the display will revert to the default as shown in
Figure 4-14. While the Default screen is displayed, if there are no alarm or fault conditions active, the Flow screen
shown in Figure 4-12 will be displayed if the user presses any key.
46
S600D
47
S600D
48
S600D
49
S600D
If the alarm is generated as the result of a software value set-up by an authorised VERTIV engineer, and you wish to
modify the setting, please get in touch with your local VERTIV customer service centre.
50
S600D
Precautions
The user may only carry out the operations described in this section once the authorised service engineer has switched the
UPS on for the first time and completed the commissioning tests
1. No user serviceable parts are located behind the protective covers that can only be removed by using tools. Only qualified
service personnel are authorized to remove such covers.
2. Hazardous voltages may be present on the UPS AC input and output terminals at any time. If the cabinet is equipped with an
EMC filter, hazardous voltages may be present on the filter.
1. For information about the control keys and LCD related to all the operating steps, refer to Chapter 4 .
2. During operation, the buzzer alarm may be activated at any time. Press the key for 3s to silence the audible
alarm.
3. When the UPS is equipped with traditional lead-acid batteries, the system provides the optional boost charge
function. If lead-acid batteries are used, when the mains returns after an extended mains failure, the battery
charging voltage will be higher than the normal charging voltage, this is normal, and the charging voltage will return
to its normal value after a few hours.
Power Switch
Open the front door of the UPS cabinet to access the power switches, as listed below, (see Figure 5-1):
Q1: Rectifier input switch - connects the UPS to the main power supply.
Q2: Bypass input switch - connects the UPS to the bypass power supply.
Q3: Maintenance bypass switch(lockable) - supplies power to the load when UPS is being serviced.
If the UPS system consists of more than 2 UPS modules in parallel, do not use the internal maintenance bypass switch
51
S600D
Q5
Q3
Q2
Q1
1. Check and confirm that the UPS and POD power distribution mode (if configured) is correct, that the power and
signal cables are connected correctly, and there are no short circuits.
2. Check that the batteries have been installed properly, the cable have been connected correctly, and that the
positive and negative battery poles are correct.
3. Measure the mains voltage and frequency, and verify that they are correct.
4. The UPS and POD (if configured) output terminals are energised when the UPS is switched on. If the load is
already connected to the output terminals, make sure that it is safe to apply power to it.
Start-up Interface
The first time the system is started up, mains input mode only may be used, and the LCD screen will display the
start-up interface, see Figure 5-2.
52
S600D
1. These procedures result in mains voltage being applied to the UPS output terminals.
2. If any loads are connected to the UPS output terminals, check with the user that it is safe to apply power. If the load is not
ready to receive power, please disconnect the downstream load switch, and apply a warning label at the load connection point.
Use the following procedures to switch the UPS on when it is in the fully switched off state.
1. Ensure that the internal maintenance bypass switch Q3 is off, and that the input cables and PE terminals are
connected securely.
2. Close the UPS bypass input switch Q2, rectifier input switch Q1, output switch Q5 and all external output isolating
switches (if any) in that order. The rectifier runs in normal state for about 30 seconds, after which the rectifier start-
up phase is complete.
3. Finish setting up the single UPS parameters and check them.
a) Access the main menu screen, press the or key to select 'Settings', and press the key to access
the interface shown in Figure 5-3.
b) Press the or key to select and set-up corresponding parameters (taking 'Output' as an example). As
shown in Figure 5-4.
53
S600D
4. After setting up the corresponding parameters, press the power button for two seconds so that the dialogue box
shown in Figure 5-5 appears on the LCD screen.
After selecting 'YES', the run indicator (green) blinks, the inverter starts, and the run indicator switches on.
5. Measure the inverter output voltage and verify whether it is within normal limits.
6. If the battery is not connected, the alarm indicator will be coloured yellow. If the battery is connected, the alarm
indicator will be extinguished.
1. In the case of UPS with internal batteries, simply press the power button on the UPS front panel for two seconds;
in the case of UPS with external batteries, close the BCB first, and then press the power button on the UPS front
panel for two seconds, at this point the LCD displays the start-up screen. The alarm indicator will be coloured yellow
and the buzzer will beep continuously after the rectifier completes the start-up phase.
2. Press the power button for two seconds so that the dialogue box shown in Figure 5-6 appears on the LCD screen.
54
S600D
After selecting 'YES', the inverter starts, and the run indicator (green) is illuminated.
The Inverter operating modes include Normal mode and Battery mode.
When the mains supply is interrupted, the UPS will transfer to Battery mode. If you wish to transfer the UPS from
Battery mode to Normal mode, wait few seconds for the mains input to recover. After about ten seconds, the
rectifier will restart automatically, and the inverter will restore the power.
In stand-by mode, press and hold the power button. If the rectifier and inverter are normal, the interface shown in
Figure 5-7 will appear, select 'YES' to switch the UPS on.
In Inverter mode, press and hold the power button. If the bypass is normal, the interface shown in Figure 5-8 will
appear. Select 'To Bypass' and click OK to transfer the UPS to Bypass mode; select 'Turn off UPS' and click OK to
turn switch the UPS off.
55
S600D
In Inverter mode, press and hold the power button. If the bypass is abnormal, then the interface shown in Figure 5-9
will appear, select 'YES' to shut down the UPS output.
Note
In Bypass mode, the load is directly fed by the mains power instead of the pure AC power from the inverter.
For detailed information about Normal mode, Bypass mode, and Battery and Maintenance Bypass mode, please refer
to 1.4 .
56
S600D
Select 'Turn on UPS' and click OK to transfer to Inverter mode, see Figure 5-11.
Select 'Turn off UPS' and click OK to shut down the UPS output.
If ECO mode is enabled, the interface shown in Figure 5-12 will appear. Select 'YES' to shut down the UPS output.
57
S600D
When the UPS is running in Normal mode, you can use this procedure to transfer the load from inverter output to
maintenance bypass.
Before performing this procedure, you should check the LCD information first, and make sure the bypass is normal and
synchronized with the inverter. Failure to do so may result in a brief interruption in the power supply to the load.
1. Remove the maintenance bypass switch baffle retaining screws, rotate the baffle upwards until it is locked in
position, and then fasten the retaining screws. As shown in Figure 5-13.
At this point, the system Interlock function has been activated and the UPS will transfer to internal bypass mode;
you should confirm that the UPS has been transferred to internal bypass mode.
2. After confirming, close the maintenance bypass switch Q3.
3. Disconnect the output switch Q4.
When the UPS is in maintenance bypass mode, the load is not protected against abnormalities in the mains power supply.
4. Unplugging the REPO terminal deactivates the rectifier, inverter, static switch and battery, but does not affect the
maintenance bypass power supply to the load.
In maintenance mode, the load is fed directly by the mains power instead, of the pure AC power from the inverter.
5. Disconnect the rectifier input switch Q1 and bypass input switch Q2. At this point, all the internal power supplies
are deactivated and the LCD screen is switched off.
6. If the UPS is equipped with internal batteries, make sure that that they have been isolated from the UPS before
carrying out maintenance work on it. Refer to 6.10 for details.
Following UPS maintenance operations, the following procedures may be used to transfer the load from the
maintenance bypass to the inverter.
1. If the UPS is equipped with internal batteries, simply connect the UPS and internal batteries when you finish
servicing the UPS. Refer to 6.10 for details.
2. Close the output switch Q4.
3. Close the bypass input switch Q2.
4. Following the LCD start-up, ensure that the system is operating in Bypass mode.
Warning
58
S600D
It is important to close the bypass switch (Q2) before opening the maintenance bypass switch; otherwise the power supply to
the load will be interrupted.
5. Set internal maintenance bypass switch Q3 to off. Return the Q3 baffle to its original position, then fasten the
retaining screws.
6. Close the rectifier input switch Q1, wait for the rectifier to start-up.
7. Press the power button on the operator and display panel of the UP so that the UPS transfers to Inverter mode.
At this point, the load has transferred to UPS normal mode.
In order to shut the UPS down completely and disconnect the power supply to the load, proceed as follows: All
power switches, isolating switches and breakers are switched to off, and the UPS no longer supplies power to the
load.
The following procedures will interrupt the power supply to the load, switching it off.
1. Press the power button on the display panel, the UPS will transfer to Bypass mode.
2. Unplug the REPO terminal at rear of the UPS to deactivate the rectifier, inverter, static switch and battery.
3. If the UPS is equipped with an external battery, set the corresponding external battery switch to off.
4. Set the rectifier input switch Q1 and bypass input switch Q5 to off. At this point, all the internal power supplies are
deactivated and the LCD screen is switched off.
1. Post a label on the AC input distribution line (generally at a distance from the UPS) to alert personnel that UPS
maintenance is in progress.
2. Wait 10 minutes for the internal DC bus capacitors to discharge. Then the UPS is completely shut down.
Hazardous voltages are still present on the battery terminals, even after the UPS has been shut down.
Neutral not disconnected. Parts of the equipment might remain energized, representing a hazard during servicing.
Procedures Shutting Down the UPS Completely While Maintaining Power To Load
The following procedures may be used to shut the UPS down completely are applicable for completely, while
maintaining the power supply to the load. Refer to the procedures in 5.3.4 .
5.5 REPO
The REPO port, located at rear of the UPS, is designed to switch off the UPS in the event of an emergency (such as
fire, flood). After unplugging the REPO terminal, the system will switch off the rectifier and inverter, and interrupt
the power supply to the load immediately (inverter and bypass output included), while the battery will stop charging
or discharging.
59
S600D
After EPO, if the mains input is present, the UPS control circuit will remain active; however, the output is interrupted.
To completely remove all mains power from the UPS, first disconnect the UPS external mains switches, and then
disconnect the battery terminals.
1. Access the main menu screen and press the or key to switch the cursor to select 'Settings', then press
the key to confirm. See Figure 5-14.
2. Press the key to move the cursor to 'Monitor', see Figure 5-15.
60
S600D
4. Press the or key to select your required language, then press the key to confirm. At this point
the LCD information will be displayed in your selected language. See Figure 5-17.
5. Press the key several times to return to the main menu screen.
1. Access the main menu screen and press the or key to switch the cursor to select 'Settings', then press the
key to confirm. See Figure 5-18.
2. Press the key to move the cursor to 'Monitor', see Figure 5-19.
61
S600D
3. Press the key, followed by the or key to highlight the date and time, see Figure 5-20.
4. Press the key, move the cursor and press the or key to change the date and time as required.
See Figure 5-21.
5. Press the key to confirm, and then press the key several times to return to the main menu screen.
1. After switching the UPS on, access the main menu screen and press the or key to move the cursor to
select 'Settings'. See Figure 5-22.
62
S600D
2. Press the key, the interface shown in Figure 5-23 will appear.
1. Press the key to move the cursor to the 'Monitor’ page, see Figure 5-24.
2. Press the key, then press the key to select 'Change settings password', see Figure 5-25.
63
S600D
3. Press the key, the interface shown in Figure 5-26 will appear.
4. Enter the current password and press the key to confirm; at this point requests the user to enter a new
password. See Figure 5-27.
5. After entering the new password, press the key to confirm; at this point the system requests the user to
confirm the new password by entering it again, see Figure 5-28.
64
S600D
6. After the confirming the new password, press the key; at this point a system prompt appears indicating that
the password has been changed successfully, see Figure 5-29.
7. Press the key several times to return to the main menu screen.
In order to access the UPS parameters it is necessary to enter the correct password (default:111111)
65
S600D
Chapter 6 Battery
This section introduces the battery, providing information about safety, installation and maintenance, and the
battery protection function.
6.1 Introduction
The UPS battery string consists of a number of batteries connected in series, and provides rated DC input voltage
for the UPS inverter. The required battery backup time (i.e. The length of time the battery is able to supply the load
for following a mains failure) depends on the ampere-hour value of the battery. Under certain conditions, it may be
necessary to connect several battery strings in parallel.
For ease of installation, the battery is generally placed in the specially designed battery rack or a dedicated battery
room.
During the maintenance or repair, the battery must be disconnected from the UPS. This may be achieved by using a
suitably rated battery circuit breaker. This circuit breaker must be located as close as possible to the battery
connection terminals, while the length of the power and signal cables connected to the UPS must be kept to a
minimum.
When several battery strings are connected in parallel in order to increase the battery backup time, each string must
be fitted with its own disconnecting device, so that, when it is necessary to carry out maintenance work on an
individual battery string, the normal operation of the other strings is not affected.
6.2 Safety
Take special care when working with the batteries associated with this UPS. When all the blocks are connected, the
battery string voltage can reach 540Vdc. This is potentially lethal. Please follow the precautions for working with
high voltages.
Only qualified personnel may install and service the battery. To ensure safety, the external batteries must be
installed inside a lockable cabinet or in a purpose-designed, dedicated battery room, so that they are only
accessible to qualified service personnel.
Confirm that the battery switch has been set to off before carrying out battery maintenance operations.
66
S600D
1. No user-serviceable parts are located behind the protective covers that can only be removed by using tools. Only qualified service
personnel are authorized to remove such covers.
2. Before working on the copper bars connected to the external battery, please ensure they are disconnected from all power supplies.
Battery damaged during handling or shipping After a week of normal charge/discharge cycle testing
c) Batteries are very heavy. Please use the proper procedures when moving and lifting batteries in order to prevent injury and avoid
damaging battery terminals. Severe damage to the battery may cause fire.
d) The battery connecting terminal must not be subject to any force, such as pulling twisting forces exerted by the cables, otherwise,
the internal battery connections may be damaged. Severe damage to the battery may cause fire.
e) The battery must be installed and stored in a clean, cool and dry environment. Do not install the battery in a sealed battery chamber
or a sealed room. The battery room ventilation shall at least meet the requirement of EN50272-2001. Otherwise, battery bulging, fire or
even human injury may be caused.
f) Batteries must be installed away from heat sources (e.g. Transformers) and kept away from sources of fire, in addition, they must not
be burnt or heated in a fire. Otherwise, battery leakage, bulging, fire or explosion may be caused.
g) Do not connect conductors directly between the positive and negative terminals of the battery. Remove the rings, watches,
necklaces, bracelets and other metal items before working on batteries, and always used insulated tools (e.g. wrenches). Otherwise,
battery burning, human death/injury or explosion may be caused.
h) Do not attempt to disassemble, modify or demolish batteries. Otherwise, battery short circuit, liquid leakage or even human injury
67
S600D
may be caused.
i) Clean the battery enclosure with a damp cloth. To avoid any static or arcing, do not use dry cloths or dusters to clean the batteries.
Do not use the organic solvents (such as thinners, gasoline, volatile oil) to clean the batteries. Otherwise, the battery enclosure may be
cracked. In the worst case this may even result in fires.
j) The batteries contain diluted sulphuric acid. In normal use, the diluted sulphuric acid will be absorbed by the battery baffle and polar
plate. However, if the battery is damaged, it may leak acid. Therefore, personal protective equipment (e.g., protective glasses, rubber
gloves and apron) must be used when working with batteries. Failure to observe the above may result in blindness, if the sulphuric acid
comes into contact with the eyes, or burns, if it comes into contact with the skin.
k) batteries may be a affected by short circuits, electrolyte dry-up or positive pole erosion failure at the end of their service life.
Continued use it this state may result in thermal runaway, bulging or liquid leakage. Please replace the batteries before they reach this
state.
l) Before connecting or disconnecting the battery connection cables, please isolate them from the battery charger terminals.
m) Check whether the battery has been unexpectedly earthed. If so, remove the earth connection. Contact with any part of the earthed
battery may result in an electric shock.
68
S600D
1. The precautions that must be applied when installing, using and servicing the batteries are described in the respective
battery manual provided by the battery manufacturer.
2. The safety precautions described in this section include important matters that must be taken into account when designing
the installation.
3. The design results may vary according to the local situation.
Installation Environment
The higher the temperature, the shorter the battery service life. At low temperatures, the charge/discharge
performance of the battery will be significantly reduced.
The battery must be installed in a cool and dry environment where the relative humidity is less than 90%, and must
be protected from heat sources and direct sunlight.
The ambient temperature, ventilation, space, float/boost charge voltage and ripple current will all affect the battery
temperature. Uneven temperature among the battery strings will cause uneven voltage distribution and thus
compromise performance. Therefore, it is very important to maintain a balanced temperature along the entire length
of the battery string, and to ensure that the temperature difference between batteries on different layers does not
exceed 3°C. Valve-regulated batteries are very sensitive to the temperature, therefore the working temperature
should be maintained between 15°C and 25°C. If the battery cabinet is installed near the UPS, the maximum design
ambient temperature shall be determined according to the battery rather than the UPS. This means that, if valve-
regulated batteries are used, the indoor ambient temperature shall be 15°C - 25°C rather than the operating
temperature range of the UPS modules. Provided the average temperature remains below 25°C, brief excursions in
excess of this value are permitted.
69
S600D
Number Of Batteries
The number of batteries, EOD voltage, and float charging voltage must be consistent with the voltage selection
(220V/230V/240V), as shown in Table 6-2.
Table 6-2 Number of batteries
Parameter 220V/230V/240V
Number of cells (standard) 192, 240
EOD voltage 1.60Vdc/Cell - 1.85Vdc/Cell, 1.62V/cell recommended
Float charging voltage 2.2Vdc/Cell - 2.3Vdc/Cell, 2.27V/cell recommended
To avoid risks, we recommend using a VERTIV BCB for your external battery.
The external battery must be connected to the UPS via the BCB. The BCB can be closed manually and is equipped
with an electronic tripping device controlled by the UPS control circuit. In the case of rack-mounted batteries (or
batteries that are installed at a distance from the UPS cabinet), the BCB must be installed as close to the battery as
possible, and the length of the power and signal cables connected to the UPS must be kept to minimum.
The UPS provides the following advantages:
⚫ Safe, reliable battery isolation
⚫ Short circuit protection
⚫ If the inverter is locked because of battery under-voltage, the circuit breaker will be opened
⚫ automatically in order to avoid over-discharging the battery.
⚫ If the remote EPO button is installed, the EPO button can be used to open the circuit breaker
⚫ Protection against misuse
To obtain the required backup time, the batteries may be connected in parallel. In this case, the BCB must be
installed downstream of the battery parallel connection point.
Only trained personnel may operate and service the battery circuit breaker.
Battery Installation
1. Before installation, check the batteries for damage, inspect and count the accessories, and carefully read this
manual and the user manual or installation instructions provided by the battery manufacturer.
2. There must be a vertical gap of at least 10 mm between the batteries in order to ensure the free circulation of the
ambient air between the batteries.
3. A certain amount of clearance shall be maintained between the top of the batteries and the next layer in order to
facilitate battery monitoring and service operations.
4. Install the batteries starting from the bottom layer and working upwards, in order to avoid creating a high centre
of gravity. The battery shall be properly installed and protected against vibration and/or impacts.
70
S600D
Battery Connections
1. All the battery cabinets or battery racks must be connected and properly grounded.
2. When multiple battery strings are used, they shall be connected first in series and then in parallel. Before
switching the UPS on and connecting it to the load, check that the total voltage of the batteries is as specified. The
negative and positive poles of the batteries must be connected to the negative and positive battery terminals of the
UPS, in accordance with the labels on the battery and UPS. If the battery connections are inverted it can cause fires
or explosions, and may result in battery and UPS damage or even human injury.
3. When the battery cable connection procedure is complete, install insulating shields on the terminals.
4. When connecting the cable between battery terminal and BCB, the BCB terminal must be connected first.
5. The bending radius of the cable shall be larger than 10D, wherein D is the outer diameter of the cable.
6. When the battery cable is connected, it is prohibited to pull on the battery cable or the cable terminal.
7. Do not cross the battery cables when connecting them, and do not tie the battery cables together.
8. See 8.2.1 Internal Battery Kit for details about the battery connections.
BCB
The BCB is normally installed in a wall-mounted box close to the battery.
For the battery maintenance and maintenance precautions, refer to IEEE-Std-1188-2005 and the relevant
manuals provided by the battery manufacturer.
1. Check the battery connection screws at regular intervals. If any loose screws are found, re-tighten them immediately.
71
S600D
2. Make sure that all the safety devices are present, in good condition and that they function correctly, and make sure that the
battery management parameter settings are correct
3. Measure and log the air temperature in the battery room.
4. Check to the battery terminals for damage or signs of heating, and that the battery enclosure and terminal shields are
intact.
1. If you need to service the UPS, please be sure to disconnect cable connections between the UPS and batteries. Failure to
observe this condition may result in electric shock or battery arc risk.
2. Batteries may only be service by qualified personnel and the appropriate protective equipment and clothing must be used
at all times.
When the UPS has been fully shut down, if it is equipped with internal batteries the internal battery terminals will
remain live because there is no switch between the UPS and its internal batteries.
Use the appropriate tools to open the front cover of the battery compartment, and then disconnect the connection
between the UPS and its internal batteries. Refer to Figure 8-1 and Figure 8-3 for details. Wear arc protective gloves
and arc protective clothing when disconnecting the cabinet battery terminals and internal battery terminals. To
disconnect the internal batteries in the standard UPS, simply open the connection terminals between W101 and
W107, W102 and W106, W103 and W108; to disconnect the internal batteries in the UPS with side cabinet, simply
open the connection terminals between W101 and W107, W102 and W106, W103 and W108 first, and then open the
connection terminals between W201 and W207, W202 and W206, W203 and W208. Refer to Figure 6-2 for
instructions on disconnecting the terminals.
Once the above operations are complete, the UPS is no longer connected to its internal batteries. At
this point it is safe to carry out maintenance work on the UPS since the battery terminals are completely de-
energized.
72
S600D
Once the maintenance work is complete, please wear arc protective gloves and arc protective clothing when
reconnecting the cabinet battery terminals and internal battery terminals. To reconnect the internal batteries in the
standard UPS, simply restore the connection terminals between W101 and W107, W102 and W106, W103 and W108; to
reconnect the internal batteries in the UPS with side cabinet, simply restore the connection terminals between W101
and W107, W102 and W106, W103 and W108 first, and then the connection terminals between W201 and W207, W202
and W206, W203 and W208.
Use a multimeter to check and ensure that the cabinet internal battery terminal poles are correct. Finally, replace
the front cover of battery compartment.
1. If maintenance is required, wait 10 minutes for the internal DC bus capacitors to discharge.
2. Hazardous voltages may be present on some parts of the UPS, even when the rectifier input switch, bypass input switch
and battery switch are disconnected. Therefore, UPS maintenance should be carried out by qualified personnel only.
73
S600D
7.1 General
The parallel system may include up to four UPS modules of the same power rating and connected in parallel, without
the need for a centralized mains static bypass device. The bypass static switches of the individual UPS modules
share the load when the system transfers to the mains bypass supply.
From a 'power' viewpoint, each module is internally identical to the 'single module' configuration. A parallel system
requires inter-module control signals to manage load sharing, synchronizing and bypass switching. The control
signals are connected by means of the parallel cables, which are multi-way ribbon cables connected between the
units of the system to form a ring.
Preliminary Checks
Make sure that correct parallel cable option has been selected, and that the module ratings, model, and software
and hardware releases are consistent.
To achieve coordinated operation of the modules in the parallel system, each module must be configured separately using
the VERTIV setting software. This must be done by VERTIV service personnel.
Cabinet Installation
Place the UPS modules side by side and interconnect them as shown in Figure 7-1. The output distribution mode
(Q1EXT, Q2EXT must be configured) shown in Figure 7-1 is recommended to facilitate maintenance and system
testing.
74
S600D
Figure 7-1 Circuit diagram of typical parallel system (with common input, separate batteries and output)
Power Cables
The power cable wiring is similar to that of the UPS module. Refer to 3.1 .
The bypass and rectifier input supplies must be use the same neutral line input terminal. If the input is fitted with a
current leakage protection device, the device must be fitted upstream of the neutral line input terminal.
The power cables (including the bypass input cables and UPS output cables) of each UPS module should be of the same
length and specifications to facilitate load sharing.
Parallel cables
Shielded and double-insulated parallel cables must be interconnected in a ring configuration between the UPS
modules, as shown in Figure 7-2. Method: connect a parallel cable between the PARA1 port on one module and the
PARA2 port on the next module. Repeat this step for all the other parallel cables.
The ring connection ensures the reliability of the control of the parallel system. Be sure to verify that the cables are
connected securely before starting up the system!
75
S600D
Note
Warning
Proceed one step at a time, and only move on to the next time when the current operation has been completed for
all the UPS modules in the system.
These procedures are used to start the UPS starting from the fully switched off condition, which means that neither
the UPS or the maintenance bypass switch have supplied power to the load before. Make sure UPS has been
completely installed and commissioned by the engineer, and the external power supply switch is in the off position
76
S600D
1. These procedures result in mains voltage being applied to the UPS output terminals.
2. If any loads are connected to the UPS output terminals, check with the user that it is safe to apply power. If the load is not
ready to receive power, please disconnect the downstream load switch, and apply a warning label at the load connection point.
Use the following procedures to switch the UPS on when it is in the fully switched off state.
1. Confirm that all the external maintenance bypass switches are in the off position. Ensure that the internal
maintenance bypass switch Q3 is in the off position, and that the input cables and copper bars and the parallel
cables are connected securely.
To avoid generating spurious fault messages, whenever it is necessary to switch the maintenance bypass switch to the on or off
position, the operation must be completed within three seconds.
If the UPS system consists of more then 2 UPS modules in parallel, and the load capacity exceeds the single module capacity,
do not use the internal maintenance bypass switch.
This operation will transfer the load from the UPS power supply protection state to direct connection with AC input
bypass state.
Before performing this procedure, you should check the LED information first, and make sure the bypass is normal and
synchronized with the inverter. Failure to do so may result in a brief interruption in the power supply to the load.
1. Remove the maintenance bypass switch baffle retaining screws, rotate the baffle upwards until it is locked in
position, and then fasten the retaining screws. Refer to Figure 5-13.
At this point, the system Interlock function has been activated and the UPS will transfer to internal bypass mode;
you should confirm that the UPS has been transferred to internal bypass mode.
2. After confirming, close the maintenance bypass switch Q3.
3. Disconnect the output switch Q5. At this point the load is powered by the maintenance bypass.
When the UPS is in maintenance bypass mode, the load is not protected against abnormalities in the mains power supply.
4. Unplugging the REPO terminal deactivates the rectifier, inverter, static switch and battery, but does not affect the
maintenance bypass power supply to the load.
In maintenance mode, the load is fed directly by the mains power instead, of the pure AC power from the inverter.
5. If the UPS is equipped with an external battery, set the corresponding external battery switch to the off position
until all the UPS modules have been disconnected from the batteries.
77
S600D
6. Disconnect the rectifier input switch Q1 and bypass input switch Q2. At this point, all the internal power supplies
are deactivated and the LCD screen is switched off.
7. If the UPS is equipped with internal batteries, make sure that that they have been isolated from the UPS before
carrying out maintenance work on it. Refer to 6.10 for details.
1. If maintenance is required, wait 10 minutes for the internal DC bus capacitors to discharge.
2. Hazardous voltages may be present on some parts of the UPS, even when the rectifier input switch, bypass input switch
and battery switch are disconnected. Therefore, UPS maintenance should be carried out by qualified personnel only.
These procedures may only be carried out by VERTIV service personnel, or under their supervision.
Before operation, confirm that the system capacity has sufficient redundancy to avoid system shut down due to overload.
The following procedures apply when it is necessary to isolate one UPS module from the parallel system for repair
due to serious malfunction:
1. Unplugging the REPO terminal deactivates the rectifier, inverter, static switch and battery, while the other UPS
modules in the parallel system continue to supply the load as normal.
2. If the UPS is equipped with an external battery, simply set the corresponding external battery switch to off.
3. Set the rectifier input switch Q1, bypass input switch Q2 and output switch Q4 to off.
At this point, all the internal power supplies are deactivated and the LCD screen is switched off.
4. If the UPS is equipped with internal batteries, make sure that that they have been isolated from the UPS before
carrying out maintenance work on it. Refer to 6.10 .
1. Post a label on the AC input distribution line (generally at a distance from the UPS) to alert personnel that UPS
maintenance is in progress.
2. Wait 10 minutes for the internal DC bus capacitors to discharge. Then the UPS is completely shut down.
These procedures may only be carried out by VERTIV service personnel, or under their supervision.
The following procedures are used to reintegrate a UPS module that has been previously isolated from the parallel
system:
1. If the UPS his equipped with internal batteries, be sure to restore the connection between the UPS and internal
batteries after completing maintenance work on the UPS. Refer to 6.10 for details. Next, close the rectifier input
switch Q1.
At this point, the system is switched on.
2. Close the bypass input switch Q2.
3. Close the output switch Q5, and press the power button for two seconds.
78
S600D
In order to shut the UPS down completely and disconnect the power supply to the load, proceed as follows: All
power switches, isolating switches and breakers are switched to off, and the UPS no longer supplies power to the
load.
The following procedures will interrupt the power supply to the load, switching it off.
1. Unplug the REPO terminal on each UPS to deactivate the rectifier, inverter, static switch and battery.
2. If the UPS is equipped with an external battery, set the corresponding external battery switch to the off position
until all the UPS modules have been disconnected from the batteries.
3. Set the rectifier input switch Q1 and bypass input switch Q2 on each UPS to off. At this point, all the internal
power supplies are deactivated and the LCD screen is switched off.
4. Set the output switch Q5 on each UPS to off.
5. If the UPS his equipped with internal batteries, be sure to open the connection between the UPS and internal
batteries.
1. Post a label on the AC input distribution line (generally at a distance from the UPS) to alert personnel that UPS maintenance
is in progress.
2. Wait 10 minutes for the internal DC bus capacitors to discharge. Then the UPS is completely shut down.
Hazardous voltages are still present on the battery terminals, even after the UPS has been shut down.
Procedures for Shutting Down the UPS Completely While Maintaining Power to the Load
The following procedures may be used to shut the UPS down completely are applicable for completely, while
maintaining the power supply to the load. Refer to the procedures in 7.3.2 .
Cabinet Installation
An LBS system consists of two independent UPS systems, each consisting of two parallel UPS modules, as shown in
Figure 7-3. The LBS system provides high reliability, which makes it suitable for use with loads having multiple input
terminals. In the case of single-input loads, an STS may be installed to power the load.
The system uses the LBS cables to synchronise the outputs of two independent (or parallel) UPS systems.
Place the UPS modules side by side and interconnect the UPS modules according to the following instructions.
79
S600D
Bypass Bypass
To load
Figure 7-3 LBS system (UPS module)
Bypass Bypass
To load
Note
Refer to 3.1.9 .
80
S600D
Power Cables
The power cable of dual-bus power system is similar to that of single system. Refer to 3.1 Connecting the Power
Cables.
LBS Cable
1. The appearance of the LBS port is the same as the parallel port (see Figure 3-6).
2. In the case of dual bus systems consisting of parallel UPS units, we recommend preparing two LBS cables for connecting
any two parallel/LBS ports of the two parallel system, in order to guarantee a secure connection.
UPS1 UPS2
81
S600D
The LBS is the load synchronisation system, and is used to synchronise the output voltage phases of the two
sections of the UPS system. The two sections of the UPS system may consist of two single UPS units, or two UPS
parallel systems.
'Master' and 'Slave' may be set-up manually via the LCD screen.
The UPS selected as the LBS master can send synchronization signals to LBS slave based on its inverter voltage
phase. After the slave receives the synchronization signal sent by the master, it will adjust its inverter voltage phase
so that it is synchronised with the master.
Thanks to this system, it is possible to synchronise the two sections of the UPS system, guaranteeing reliable
transfer between the respective output voltages and the STS, and hence a reliable, uninterrupted power supply to
the load.
82
S600D
Chapter 8 Options
This section lists the UPS options and provides information about installing and configuring the various options, and
their respective functions.
Note
1. No batteries are supplied with the internal battery kit (site installation).
2. Battery cables and battery trays are designed according to the specifications of valve-regulated lead acid batteries 12V-
9Ah. If internal battery kits are required for site installation, please purchase batteries having the same specifications.
Preparation
1. Prepare the installation tools, including a cross head screwdriver, a pair of insulated gloves, a sleeve, an adjustable
spanner, and a multimeter.
2. Check that all installation materials are present and complete, including internal batteries, eight battery trays and
the corresponding battery power cables.
Procedures
1. Shut down the UPS completely.
a) Disconnect the load
b) Refer to 5.6.1 Procedures For Completely Shutting Down the UPS for UPS module shut down, and 7.3.5 for
parallel system shut down.
83
S600D
c) All the LCDS are off, wait five minutes for the internal UPS DC bus capacitors to discharge fully.
2. Install the internal batteries.
Installing standard UPS internal batteries
a) Remove the corresponding panels, as shown in Figure 8-1. Do not throw the screws away
b) Remove the four battery accessory trays and position the batteries on them as shown in Figure 8-2, then connect
The SIC card is a network management card. It may be used to provide network communication capability on
VERTIV designed UPS modules. It can also be connected to the IRM series sensor to provide environment
monitoring functions. When the intelligent device generates an alarm, the SIC card can notify the user by logging
the event, sending captured information, and generating an email message.
Preparation
1. Prepare the installation tools, including a cross head screwdriver.
2. Check that all installation materials are present and complete, including an SIC card.
84
S600D
Procedures
The SIC card is hot pluggable, therefore there is no need to shut the UPS down when installing it.
Some of the electronic components on the SIC card static sensitive, therefore, avoid touching the components or circuit on
the SIC card with bare hands or other conductive materials, so as to protect the SIC card against static shock. When removing
or installing the SIC card, hold the card by its edges.
The SIC card should be installed in the Intellislot port (see Figure 3-6) on the UPS.
Installation procedure:
1. Remove the cover from the Intellislot port. Keep the screws for future use.
2. Insert the SIC card (along two sides of the Intellislot port) into the port position, and then fasten the screws.
For more information about the SIC card, refer to the bSite Interface Web/SNMP Agent Card User Manual, which is
available as an accessory.
Refer to 3.2.8 for information about wiring and routing the signal cables.
Relay Card
The UPS is available with a relay card that enables users to use dry contact signals to monitor the UPS. It is hot
pluggable for easy installation.
The relay card can provide up to four digital relay output signals for connection to remote monitoring devices.
These signals are: UPS on Battery, Battery Low, UPS on Bypass or in Standby, UPS Faulty. Each dry contact signal
output channel provides both normally open and normally closed ports. The relay card can also handle up to three
digital signal inputs, two of which control the UPS switch-on and switch-off functions, while the third is reserved.
Appearance and description of hardware
The appearance of the relay card is shown in Figure 8-9.
DIP switch
DB25 connector
The DIP switch is used to configure the UPS switch-on and switch-off signal input functions on the relay card. The
DB25 connector provides dry contact signal inputs and outputs. For a description of the DB25 connector pins, see
Table 8-3.
85
S600D
Cable options
VERTIV provides three cable options for connections to the DB25 connector of the relay card, depending on the
user’s requirements
Figure 8-10 - Figure 8-12 show the appearance and wiring principle of each cable.
DB25 male (pin-type)
K0_COM
K1_COM
K2_COM
K3_COM
Pin
86
S600D
560 ohm/1W
Note
Some electronic components on the relay card are sensitive to static electricity. To prevent static electricity from damaging
the relay card, do not touch its electronic components or circuits, also make sure that they do not come into contact with
live parts. Please hold the relay card by its edges when handling or installing it.
ON
OFF
1 2 3 4 5 6 7 8
Bits 1 through 7 are designed for use in the factory, the user is not permitted to change their default settings. Bit 8 is
used to configure the UPS switch-on and switch-off signal input function on the relay card, see Table 8-4 for
instructions on how to set it.
87
S600D
Table 8-4 Setting the UPS switch-on and switch-off signal input function
Bit 8 Function
ON UPS switch-on and switch-off signal input function enabled
OFF UPS switch-on and switch-off signal input function disabled
The relay card is hot-pluggable, therefore it may be installed without shutting the UPS down.
a) Remove the Intellislot port cover (see Figure 3-6) on the front panel. Do not throw the screws away.
b) Align the relay card with the Intellislot port, insert the relay card into the port along the grooves on both sides of
the port.
c) Secure the relay card in place through the fixing holes on the relay card panel using the screws from step a).
3. Connect the cable.
You can select an optional cable according to your needs, or prepare your own, in accordance with Table 8-4 and
Figure 8-10 - Figure 8-12. Connect the cable end with the DB25 male connector to the DB25 connector of the relay
card, and the other end to the user equipment.
The DB25 connector must be connected to a SELV circuit. Failure to observe this could damage the relay card and even
lead to accidents.
Troubleshooting
See Table 8-5 for relay card troubleshooting information.
Table 8-5 Troubleshooting
No. Problems Corrective measures
The dry contact output signal remains the same when Check that the relay card has been inserted into the
1
the UPS status changes Intellislot port correctly
The UPS does not respond to the UPS switch-on dry Verify that bit 8 of the DIP switch of the relay card has been
2
contact input signal set to the 'ON' position
The relay card installation method is the same as for the SIC card, as described in 8.2.3 . Refer to 3.2.8 for
information about wiring and routing the signal cables.
IS-UNITY-DP Card
88
S600D
For a detailed description of the IS-UNITY-DP card, refer to Liebert IntelliSlot Unity Card User Manual–Web, SNMP,
Modbus, BACnet, YDN23, which is available as an accessory.
IS-UNITY-LIFE Card
For a detailed description of the IS-UNITY-LIFE card, refer to Liebert IntelliSlot TM Unity Card User Manual-Web,
SNMP, Modbus, BACnet, YDN23, which is available as an accessory.
89
S600D
Use the following procedures to switch the UPS on when it is in the fully switched off state.
1. Ensure that the internal maintenance bypass switch Q3 is off, and that the input cables and copper bars are
connected securely. Ensure that the input cables and copper bars are connected securely according to the 3-in 1-
out power distribution mode configuration.
To avoid generating spurious fault messages, whenever it is necessary to switch the maintenance bypass switch to the on or off
position, the operation must be completed within three seconds.
2. Before switching the system on, use a multimeter to measure the voltage on the rectifier terminals (mA-mB-mC),
and make sure that there are no circuits; if so, check that the connections are correct.
3. Unplug the REPO terminal at rear of the cabinet, and then close the rectifier input switch Q1, at this point the
system is switched on.
4. Press , and access -> Settings (default password is ‘111111’) -> Output -> Output phase No., then set the
system to ‘1 phase’. After the system is switched off, switch it on again, access this menu once more and confirm
that this setting has been applied.
5. Set the rectifier input switch Q1 to the off position to shut the UPS down completely.
6. Plug-in the REPO terminal, close the UPS bypass input switch Q2 and the rectifier input switch Q1 in that order.
At this point, the system is switched on.
7. After the rectifier starts, close the output switch Q5 and all the external output isolation switches (if any).
8. Press the power button for two seconds to start the inverter.
90
S600D
Protective Devices For Short Circuit Withstand Current
This kit contains three bypass fuses (one fuse for each phase) designed to guarantee the UPS withstand short
circuit at 30kVA. If this kit is installed, please refer to Figure 8-21 for the fuse blow-out curve when choosing the UPS
downstream switch and transformer load.
91
S600D
Never attempt to carry out maintenance on the UPS while it is on line. Ensure that the UPS has been switched off completely
when performing any internal maintenance operations on it.
In order to avoid injury or damaging the device, wait until the fan is completely stationary before inserting fingers or any tools
into it.
The UPS fans are expected to run for 20,000 hours - 40,000 hours in continuous operation. The higher the ambient
temperature, the shorter the fan life.
During the UPS operation, it is important to check the condition of the fans at least once a year by confirming that
they blow air out of the ventilation holes on the rear panel.
The internal UPS battery module houses a sealed, lead-acid, maintenance-free battery. The battery life depends on
the ambient temperature, and charge and discharge times. High ambient temperatures and heavy discharge cycles
will shorten the battery life.
To preserve the battery life, it is necessary to:
Maintain the ambient temperature between 15°C and 25°C
Prevent small current discharge. DO NOT operate the UPS in battery mode for periods in excess of 24 hours.
Charge the battery for at least 12 hours if it hasn't been charged for three months while the ambient temperature
remains within the specified limits, or two months in the event of high ambient temperatures
1. Check the battery connection screws at regular intervals, and re-tighten them if necessary.
2. Make sure that all the safety devices are present, in good condition and that they function correctly, and make sure that the
battery management parameter settings are correct.
3. Measure and log the ambient temperature in the battery room.
4. Check whether the battery terminals are damaged or hot, and check the condition of the cases and the covers.
If any of the batteries are found to be leaking, place them in a suitable container and dispose of them in accordance
with local regulations.
Lead-acid batteries are classified as hazardous waste material. The control of waste battery pollution is a nationally
important issue. Batteries must be stored, transported, used and disposed of in accordance with national and local
legal requirements and all other criteria applicable to the treatment of hazardous waste material and waste battery
pollution prevention.
92
S600D
According to the applicable regulations, waste lead-aid batteries must be recycled, while all other disposal methods
are prohibited. Uncontrolled or random disposal of waste lead-acid batteries, or other improper disposal methods
can result in serious environmental pollution, which will be investigated by the relevant authorities.
As a provider of lead-acid batteries, VERTIV has developed a dedicated service network and waste battery recycling
system to assist users to dispose of waste batteries legally. Contact VERTIV or your nearest service centre for
detailed information about the waste battery the recycling system.
VERTIV may not be held liable for the environmental impact resulting from the failure to comply with the guidelines
set out in this section, or to use the waste battery recycling system offered by VERTIV.
Checking the UPS functions may interrupt the power supply to the load!
93
S600D
Chapter 10 Specifications
This section lists the UPS specifications.
The product standards in this table incorporate relevant compliance clauses with generic IEC and EN standards for safety
(IEC/EN/AS60950), electromagnetic emission and immunity (IEC/EN/AS61000 series) and construction (IEC/EN/AS60146 series
and 60529).
Standard UPS
Item Unit
Dimensions (W × D × H) mm 335x650x1300
Net weight mm 340(Approx)
Gross weight kg 350(Approx)
Colour kg RAL7021
Protection rating, IEC (60529) kg IP20
94
S600D
1. The rectifiers will operate at any of the rated supply voltages and frequencies without the need for any further adjustment.
2. At 305V input mains, the UPS maintains the specified output voltage at rated load without discharging the battery.
1. When the number of battery is 24-block, the maximum output capacity of the UPS is 70% of rated capacity.
95
S600D
Frequency2 Hz 50/60
For linear load requirements:
< 105%, continuous;
Overload % 105 - 125% of rated load, 5min;
125 - 150% of rated load, 1min;
> 150%, 200ms
Non-linear load capacity3 % 100%
±1% for balanced three phase load;
Steady state voltage stability % ±2% for unbalanced load
Transient voltage response4 % ±5% for 100% rated linear load step
2% (100% linear load);
Total harmonic voltage % 5% (100% non-linear load)
Synchronisation window Hz Rated frequency ±0.5, ±1, ±2, ±3 (settable)
Slew rate (max. change rate of
Hz/s Setting range: 0.2, 0.5, 1 (UPS module), 0.2 (parallel system)
synchronisation frequency)
1. Factory set to 220V. 230V or 240V can be selected by service engineer at site.
2. Factory set to 50Hz. 60Hz can be selected by service engineer at site. Note that the system frequency may only be changed
when the UPS is in bypass mode. It is strictly prohibited to change the system frequency when the UPS supplying the load via
the inverter.
3. EN 50091-3 (1.4.58) crest factor 3:1, non-linear load.
4. IEC/EN 62040-3/EN 50091-3 also for 0 - 100% - 0 load transient. Transient recovery time: returns to within 5% of steady state
output voltage within half a cycle.
Based on nominal voltage and rated load current under apparent power:
< 105%, continues;
Overload % 105 - 125% of rated load, 10min;
125 - 150% of rated load, 1min;
> 150%, 200ms
Frequency2 Hz 50/60
Upper limit: +10%, +15% or +20%, default: +20%;
Bypass voltage tolerance %Vac
Lower limit: -10%, -20%, -30% or -40%, default: -40%
Bypass frequency
% ±5% or ±10%, default: ±10%
tolerance
Synchronisation window Hz Rated frequency ±0.5, ±1, ±2, ±3, ±4, ±5 (settable); ±5 by default
96
S600D
97
S600D
Menu Item Setting range Default setting
Sunday, Monday, Tuesday,
Battery test weekday Wednesday, Thursday, Friday, Wednesday
Saturday
Battery test time HH:MM:SS 0:00:00
Battery series 10KVA-12,16,20 16(10KVA)
20KVA-24, 32, 40 32(20KVA)
Discharge protect time 1~4320 (min) 4320
Equal charge enable YES, NO NO
Temperature compensation Enable, Disable Disable
Replace battery Button Button
Appear only when outlet
Turn on outlet
off
Appear only when outlet
Turn off outlet
on
Appear only when outlet
Reboot outlet
on
Turn off when UPS overload on
YES, NO NO
battery
Outlet
Turn off when UPS on battery
0~4320 (min) 2
for
Turn off when backup time less
0~4320 (min) 0
than
Turn off when battery capacity
20~80% 30%
less than
Turn on when power returns
0~4320 (min) 0
for
Language English, Chinese English
Date YYYY-MM-DD 2016-10-01
Time HH:MM:SS 00:00:00
Display orientation Auto-rotate, Horizontal, Vertical Auto-rotate
Audible alarm Enable, Disable Enable
Control port protocol Modbus, Sensor Sensor
Modbus address 1~128 1
Monitor
IPv4 address 192.168.1.10
ddd.ddd.ddd.ddd (where 'd' is a
Subnet mask 255.255.255.0
decimal number)
Gateway address 192.168.1.1
The password may be a numerical
value only and include any
Change settings password 111111
character between 0 and 9. The
password length is 6 characters
98
S600D
Appendix 2 Glossary
AC Alternating current
BCB Battery circuit breaker
CSA Cross sectional area
DC Direct current
EIB External interface board
EMC Electromagnetic compatibility
EMI Electromagnetic interference
EOD End-of-discharge
EPO Emergency power off
I/O Input/output
IGBT Integrated gate bipolar transistor
LBS Load bus synchronizer
LCD Liquid crystal display
LED Light-emitting diode
PC Personal computer
PE Protective earth
RCCB Residual current circuit breaker
RCD Residual current detector
SCR Silicon-controlled rectifier
SNMP Simple network monitoring protocol
STS Static transfer switch
SVPWM Space vector pulse width modulation
UPS Uninterruptible power system
VRLA Valve-regulated lead-acid
99
S600D
100
S600D
Vertiv and the Vertiv logo are registered trademarks or trademarks of Vertiv Co. All other names and logos referred to are trade names, trademarks, or registered trademarks of their respective owners.
© 2017 Vertiv Co. All rights reserved.
101