049a AHU Checklist Template
049a AHU Checklist Template
049a AHU Checklist Template
Checklist
*As air handling units can incorporate different components, depending on the
configurat ion within t he project, the ch eck list will cover each section.
This checkl ist should be used a nd completed throug hout the pr oject and it s
different stages, delivery, storage, instal lation & pre-comm issi oning, prior to the
functio nal testing taking place.
Project Name:
Date:
Equipment ID.
Contents
Contents .............................. ...................... ...................... ...................... ..... 1
He at ing Co il . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . 18
Re t urn A ir Fa n . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . 26
Co nt ro ls . . . . . .. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . 29
2 AHU C he c k l i s t
Delivery Inspection
Once the Air Ha ndling Unit arriv es at site, usually delivered by a transpor t
company, and before being acc epted into storage, the following shou ld be
checke d with the driver.
3 AHU C he c k l i s t
Ref Inspection/T ask Yes/No Notes
/[n/a]
10 Pipework connect ions are
undamaged
11 All pipework handing’s are corr ect
12 All duct ing connect ions are
correct siz e
13 All duct ing connect ions are
correct siz e
14 All anci llaries [va lves, actuators,
dampers, filters] are inc luded in
delivery as per the order and
delivery note
4 AHU C he c k l i s t
Storage Inspection
Storage Area
If the equipment is t o be placed into stor a ge on s ite prior to i nstalla t ion there w ill
be an inspection com pleted check ing the following.
5 AHU C he c k l i s t
Storage of Air Handling Unit
Prior to the units being placed into storage the follow ing should b e checked.
6 AHU C he c k l i s t
Pre-Installation Inspection
Prior to the units being in stalle d the following shoul d be c hec ked.
7 AHU C he c k l i s t
Ref Inspection/T ask Yes/No Notes
/[n/a]
Best pract ice is to install self -
support ing brackets prior to the
connection of the unit
9 Ensure that all ac cess doors are
clear and not blocke d from
brackets or ot her services.
10 Chec k to ensure that all
connections k its containing -
gaskets, bolts, cleat s, screws are
available to allow bo lting up of th e
equipment.
8 AHU C he c k l i s t
Maintenance/Acces s
Ref Inspection/T ask Yes/No Notes
/[n/a]
1 There is enough space allowe d
around and a bove the unit o nce
installed to perform m aintenanc e
and r emove c omponents.
9 AHU C he c k l i s t
Pre-Commissioning Inspection
Once the equipme nt has been i nsta lled and prior to functiona l testing and
commiss ioning phase taking place t he following will be c hecked.
General
Ref Inspection/T ask Yes/No Notes
/[n/a]
1 Document the information of the
unit from it s name plates and
cross referenc e with the spec ified
informat ion to ensur e correct.
2 Ensure unit is level.
3 Ensure all gaskets a re insta lled
and sealed.
4 Ensure that all c leat s are inst alle d
as per m anufacturer’ s
instruct ions.
5 All acc ess doors can be ope n and
clos ed w ith no gaps or leak age.
6 Chec k that all transport bolts and
feet are removed.
7 Roof canopy, if being used, is
installed and fixed.
8 All v ibrat ion mounts installed
9 Seismic restraints, where
required, installed .
10 Unit and al l compon ents including
valves and controls are labe led in
line w ith the project namin g
convention.
10 AHU C he c k l i s t