STRUCTURAL STEEL
PART 1 GENERAL
A. Provide all labour, materials, plant and equipment to complete the structural steel
work indicated on the drawings and specified herein.
B. Grouting under base plates.
1.3 References
A. BS 5950
G. ASTM A123 - Zinc (Hot Dipped Galvanized) Coatings on Iron and Steel Products.
H. ASTM A153 - Zinc Coating (Hot Dip) on Iron and Steel Hardware.
N. ASTM A490 - Quenched and Tempered Alloy Steel Bolts for Structural Steel Joints.
P. ASTM A500 - Cold-Formed Welded and Seamless Carbon Steel Structural Tubing
in Round and Shapes.
Q. ASTM A501 - Hot-Formed Welded and Seamless Carbon Steel Structural Tubing.
T. ASTM A529/A529M - Structural Steel With 42 KSI (290 MPa) Minimum Yield Point
(1/2 in. (12.7 mm) Maximum Thickness).
B. Shop Drawings:
1. Indicate profiles, sizes, spacing, locations of structural members, openings,
attachments, and fasteners.
2. Connections not detailed.
3. Cambers, and loads.
4. Indicate welded connections with AWS A2.0 welding symbols. Indicate net weld
lengths.
B. Mill Test Reports: Submit indicating structural strength, destructive and non-
destructive test analysis.
E. Erector: Company specializing in performing the work of this section and approved
by the Engineer.
A. The p
protection treatment chosen should be able to p
provide two coats : one coat of
primer epoxy
p p yp paint “100 micron” for all members. And one coat of finish epoxy paint
“100 micron” for all members.
2.1 Materials
F. Bolts, Nuts, and Washers: B.S3692, ASTM A307, ASTM A325 bolts, ASTM A563
nuts, galvanized to ASTM A123, A153 for galvanized structural members.
K. Welding Materials: AWS D1.1; type required for materials being welded.
2.2 Fabrication
C. Fabricate connections for bolt, nut, and washer connectors, or for rivetting.
2.3 Finish
- Sand blast to SA 2 ½
- Epoxy paint
PART 3 EXECUTION
3.1 Examination
3.2 Erection
A. Allow for erection loads, and for sufficient temporary bracing to maintain structure
safe, plumb, and in true alignment until completion of erection and installation of
permanent bracing.
E. After erection, prime welds, abrasions, and surfaces not shop primed, except
surfaces to be in contact with concrete.
F. Grout under base plates. Trowel grouted surface smooth, splay neatly to 45
degrees.
A. Visual Inspection:
1. As a minimum carry out visual inspection of all shop and field welds in
accordance with AISC or BS standard.
END OF SECTION