3 Hours / 70 Marks: Seat No
3 Hours / 70 Marks: Seat No
3 Hours / 70 Marks: Seat No
22215
3 Hours / 70 Marks Seat No.
Marks
(i) Permeability
(ii) Reluctance
(c) State the relationship between line and phase value for 3 phase star
connection.
[1 of 4] P.T.O.
22215 [2 of 4]
2. Attempt any THREE of the following : 12
(b) State the concept of lagging and leading phase difference with the help of
waveforms.
(c) Draw a balanced 3-phase star connected load. Show various line and phase
quantities on it.
(a) Explain static and dynamic induced emf with neat diagram.
(b) Draw schematic diagram of dc series and shunt motor. Also give the
application of both motors.
(c) Explain principle of operation of shaded pole motor with neat diagram.
22215 [3 of 4]
(d) Write any two applications of following motor :
(i) Universal motor
(ii) Stepper motor
(b) Three similar coils each of resistance 20 are connected in delta to a 3-phase
415 V, 50 Hz supply. Calculate phase current, phase voltage, line current, line
voltage, total line and phase power.
(b) State meaning of earthing and importance of earthing. Also explain any one
type of earthing used in electrical installation.
(c) Explain with neat diagram, operation of ELCB and two applications.
_______________
P.T.O.
22215 [4 of 4]