Nothing Special   »   [go: up one dir, main page]

MOS-0570-5685619-00 Combined

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

Test Package For

Replacement of Corroded Piping segments of AIR-221019001(With


LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663

Test Package Number: KBR-TP-0570-5685619


TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022
Replacement of Corroded Piping segments of AIR-221019001(With
TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
TABLE OF CONTENTS

1. Test Package Flow Chart……………………………………………

2. Inspection Reports or MOCC…………………….…………………………

3. Method of Statement……..…

4. Drawings & weld maps…………..

5. Daily welding reports (NDE Reports & Material MTC’s)………………...

6. Post Weld Heat Treatment Reports…………………………..………….

7. Hydro Test Reports………………………………………………………….

8. Flanged Connection Torque Record……………………………………

9. Painting Reports……………………………………………………………..

10. Insulation Report If Applicable……………………………………………..

11. Punch List………………………………………………………………

12. Inspection original comments……………………………………………....


TEST PACKAGE NO. TITLE: Replacement of Corroded Piping segments of
AIR-221019001(With LP Steam Jacketed Line) for 221-
KBR-TP-0570-5685619 Rev 00
J-0001B Based on IREP-22-00663

TEST PACKAGE FLOW CHART


TEST PACKAGE
PREPARATION &
REVIEW for
KBR-AY QA/QC KBR-AY QA/QC MANAGER

REVIEW OF TEST PACKAGE


BY SATORP
SATORP MAINTENANCE SATORP INSPECTION

JOINT PREAPRATION,
FABRICATION,WELDING,
OF THE JOINTS KBR-AY MAINTENANCE KBR-AY QA/QC
AS PER THE PROCEDURE;
N.D.T & PUNCH LIST

INSPECT THE WELD JOINTS


WITNESS BY SATORP
KBR-AY QA/QC SATORP INSPECTION

FINAL PRESSURE TESTING


KBR-AY MAINTENANCE KBR-AY QA/QC SATORP INSPECTION / OPERATION *

REINSTATEMENT
BOLTING & TORQUING
KBR-AY MAINTENANCE KBR-AY QA/QC SATORP MAINTENANCE

PAINTING
KBR-AY MAINTENANCE KBR-AY QA/QC SATORP OPERATION

INSULATION
KBR-AY MAINTENANCE KBR-AY QA/QC SATORP OPERATION

* Service test will be signed by Satorp Operations.


TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00
SCOPE

Fabrication, testing, coating of jacketed spools and replace the existing corroded spools as per
IREP-22-00663 and further instruction from Inspection based on visual or penetrant inspection
of flanges and other existing components

Note: Slip on flanges of Jacketed piping should be as per JERES-L-315 requirements

AREA

Area -3, UNIT- 221

REFERENCE DRAWINGS

ISO NO : ID-AIR-22109001-08,09,10

P & ID NO : 221-PID-0021-020

LINE CLASS : 101CS1J (10” Jacket pipe), 101CS4V (8” Process pipe)

WELDING PROCEDURE

WPS No: 1-1-A-21-1 Rev.00 ER 70S-2 + E 7018 8” Process & 10 “Jacket pipe

WPS No: 1-8-A-21-3-A Rev.00 ER NiCr-3 - SS Reinforcement Plate /SS Baffle

WPS-No: 1-1-A-2-2 Rev No 08. ER 70S2 1” Jumper line, Baffle

MATERIAL DESCRIPTION

Base material is Carbon Steel (A 106 Gr B, A234-WPB, A105N) for Jacket pipe -101CS1J.

Base material is Carbon Steel (A 106 Gr B, A234-WPB, A105N) for process pipe -101CS4V

WELD MAP

As attached

Page 1 of 8
TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00
Abbreviations.

(SB-Shop Butt, SF-Shop Fillet, SE-Shop External Attachment, SBR-Shop Branch, SS-Shop Socket)

Suffix P – Welding to Process Line

Suffix J – Welding to Jacket Line

Page 2 of 8
TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00

FABRICATION & WELDING OF PROCESS PIPE – 8” CS -A106-B

1. Obtain necessary permits and actual site measurements to be followed prior to start of
fabrication.
2. MTC for all new materials to be verified and submitted to Satorp prior to start of job
3. If any re use of non defective components from existing spool shall be verified and accepted
by Satorp Inspection followed by cut surface Penetrant test
4. First complete the fabrication of process pipe as per actual site dimensions with new/ re-
usable material and same specifications of attached isometric material list.
5. Flow conveyor baffle plate and reinforcing plate(A240-316L / A 106 Gr.B) as per attached
drawing dimensions to be welded at ‘SE’ locations of weld map, prior to flange welding.
Page 3 of 8
TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00
6. Jacket pipe 10” to be kept installed without fit up prior to welding of Reducing Slip-On
Flanges (10”x8”, A105N, Cl 150,Max 125 AARH) to Process pipe
7. GTAW+SMAW welding will be performed for ‘SB&SF’(excluding SF-9P) joints of weld map
with ER 70S-2 + E 7018 based on the approved WPS 1-1-A-21-1 Rev.00 parameters through
company approved welder
8. GTAW welding will be performed for ‘SE’ joint of weld map (for baffle plate/CS Reinforcement
plate - intermittent weld as per diagram of JERES-L-315), SF-9P,all SBR and SS joints with
ER 70S-2 based on the approved WPS 1-1-A-2-2 Rev No 08 parameters through company
approved welder
9. GTAW welding will be performed for ‘SE’ joint of weld map (for SS Reinforcement plate-
intermittent weld as per diagram of JERES-L-315) with ER NiCr-3 based on the approved
WPS 1-8-A-21-3-A Rev.00 parameters through company approved welder
(SE-8P1, SE-17P1, SE-28P1,SE-39P,SE-39P1 – Belongs to Dissimilar weld. Item number
24&25 of BOM Reinforcement Plate of SS 316L weld with A106-B Process pipe)
10. Visual inspection and 10% radiography to be completed for the final butt welds (process pipe)
11. 100% DPT to be performed for all completed Fillet joints (Pipe to Flange)
12. Perform hydro test at 11.62 bars for 30 minutes of process pipe (8”) to check the integrity of
system, prior to jacket pipe fit up and welding

Joint & Weld Details- Process Pipe


Joint No Size Weld Type Components Electrode /Filler
SF-1P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SBR-3P 3/4" Branch weld Half Coupling-8"Pipe ER 70S-2
SS-3P1 3/4" Socket weld Half Coupling-3/4"Pipe ER 70S-2
SE-8P Baffle Fillet stitch SS/CS plate -3/4" Pipe ERNicr-3
SE-8P1 Reinforce SS Fillet stitch SS 316 plate- 3/4" Pipe ERNicr-3
SF-9P 3/4" Fillet weld Red SORF Flange-3/4"Pipe ER 70S-2
SB-11P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-12P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-13P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-14P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SF-15P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SF-16P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SE-17P Baffle Fillet weld SS/CS plate -8" Pipe ERNicr-3
Page 4 of 8
TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00
SE-17P1 Reinforce SS Fillet weld SS 316 plate- 8" Pipe ERNicr-3
SF-18P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SF-19P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SB-21P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-22P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-23P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-24P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SF-25P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SF-26P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SE-28P Baffle Fillet weld SS/CS plate -8" Pipe ERNicr-3
SE-28P1 Reinforce SS Fillet weld SS 316 plate- 8" Pipe ERNicr-3
SF-29P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SF-30P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SB-33P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-34P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-35P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SB-36P 8" Butt weld Cross Tee -8" Pipe ER 70S-2& E7018
SF-37P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SF-38P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018
SE-39P Baffle Fillet weld SS/CS plate -8" Pipe ERNicr-3
SE-39P1 Reinforce SS Fillet weld SS 316 plate- 8" Pipe ERNicr-3
SF-40P 8" Fillet weld Red SORF Flange-8"Pipe ER 70S-2& E7018

FABRICATION & WELDING OF JACKET PIPE – 10” CS – A 106 Gr.B

13. After acceptance hydro test of process pipe, proceed with fit up and welding of jacket pipe
with new/re-usable material and same specifications of attached isometric material list.
14. MTC for all new materials to be verified and submitted to Satorp prior to start of job
15. If any re use of non-defective components from existing spool shall be verified and accepted
by Satorp Inspection followed by cut surface Penetrant test
16. GTAW+SMAW welding will be performed for ‘SB&SF’ joints (Excluding SB-6J&SB-7J) and
Support (SE-27J&SE-32J) of weld map with ER 70S-2 + E 7018 based on the approved
WPS 1-1-A-21-1 Rev.00 parameters through company approved welder
17. GTAW welding will be performed for ‘SBR’ & ‘SS’ and (SB-6J, SB-7J,SF-9J) joints of weld
map with ER 70S-2 based on the approved WPS 1-1-A-2-2 Rev No 08. parameters through
company approved welder

Page 5 of 8
TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00
(All SBR, SS Joints belongs to 1” interconnecting jump over of jacket line. Existing line will
verify with PT for re -usability or new material according to BOM item 17 to 20)
18. Visual inspection to be completed on all completed welds.
19. 100% DPT to be performed on all Fillet Welds, socket welds and branch welds
20. Perform hydro test at 10.64 bars for 30 minutes of jacket pipe (10”) to check the integrity of
system.
21. Painting system M will be performed after Hydrotest acceptance of jacket piping

Joint & Weld details - Jacket Pipe


Joint No Size Weld Type Components Electrode /Filler
SF-1J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SBR-2J 1" Branch weld Sockolet - 10" Pipe ER 70S-2
SS-2J1 1" Socket weld Sockolet- 1" Pipe ER 70S-2
SBR-3J 3" Branch weld 3"Pipe -10"pipe ER 70S-2
SF-4J 10" Fillet weld CS RF Pad -10"pipe ER 70S-2& E7018
SF-5J 3" Fillet weld CS RF Pad -3"pipe ER 70S-2& E7018
SB-6J 3" Butt Weld Con-Reducer -3"Pipe ER 70S-2
SB-7J 2" Butt Weld Con-Reducer -2"Pipe ER 70S-2
SBR-8J 1/2" Branch weld Sockolet - 2" Pipe ER 70S-2
SS-8J1 1/2" Socket weld Sockolet - 1/2" Pipe ER 70S-2
SF-9J 2" Fillet weld Red SORF Flange-2"Pipe ER 70S-2
SBR-10J 1" Branch weld Sockolet - 10" Pipe ER 70S-2
SS-10J1 1" Socket weld Sockolet - 1" Pipe ER 70S-2
SB-11J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-12J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-13J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-14J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-11J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-12J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-13J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-14J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SF-15J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SF-16J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SBR-17J 1" Branch weld Sockolet - 10" Pipe ER 70S-2
SS-17J1 1" Socket weld Sockolet - 1" Pipe ER 70S-2
SF-18J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SF-19J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SBR-20J 1" Branch weld Sockolet - 10" Pipe ER 70S-2
Page 6 of 8
TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00
SS-20J1 1" Socket weld Sockolet - 1" Pipe ER 70S-2
SB-21J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-22J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-23J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-24J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-21J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-22J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-23J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-24J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SF-25J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SF-26J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SE-27J Support Fillet weld Support - 10"Pipe ER 70S-2& E7018
SBR-28J 1" Branch weld Sockolet - 10" Pipe ER 70S-2
SS-28J1 1" Sockolet weld Sockolet - 1" Pipe ER 70S-2
SF-29J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SF-30J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SBR-31J 1" Branch weld Sockolet - 10" Pipe ER 70S-2
SS-31J1 1" Sockolet weld Sockolet - 1" Pipe ER 70S-2
SE-32J Support Fillet weld Support - 10"Pipe ER 70S-2& E7018
SB-33J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-34J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-35J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-36J 10" Butt weld Cross Tee -10" Pipe ER 70S-2& E7018
SB-33J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-34J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-35J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SB-36J1 Cross tee segment Butt weld 10" Cross tee segments ER 70S-2& E7018
SF-37J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SF-38J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018
SBR-39J 1" Branch weld Sockolet - 10" Pipe ER 70S-2
SS-39J1 1" Sockolet weld Sockolet - 1" Pipe ER 70S-2
SF-40J 10" Fillet weld Red SORF Flange-10"Pipe ER 70S-2& E7018

Page 7 of 8
TEST PACKAGE NO. KBR-TP-0570-5685619
MOCC / WORK ORDER .No 5685619
INSPECTION REPORT IREP-22-00663
EFFECTIVE DATE: 10-Apr-2022

Replacement of Corroded Piping segments of AIR-221019001(With


TITLE:
LP Steam Jacketed Line) for 221-J-0001B Based on IREP-22-00663
Method of Statement Rev 00
HYDRO TEST

1. 11.62 bars for 30 minutes of process pipe (8”)

2. 10.64 bars for 30 minutes of jacket pipe (10”)

PAINTING REQUIREMENTS:

System – M, complying with JERES-H-001 and company procedures on jacket pipe.

INSULATION

Thk 50 mm Complying with JERES-N-001 and company procedures.

Page 8 of 8

You might also like