Customer Name: Bengal Shriram Hi Tech City Pvt Ltd REF No: M25 Fluidic
Site Address : Uttarpara , Hooghly
DATE : 08.12.2021
GRADE OF CONCRETE M25 TYPE OF CONCRETE : R.C.C
MAXIMUM SIZE OF AGGREGATE ( mm ) 10 CONCRETE CONFIRMS TO : IS 456-2000 & IS 10262:2019
SLUMP FLOW OF CONCRETE ( mm ) 700 + 50 METHOD OF PLACEMENT : PUMP
TYPE OF EXPOSURE Moderate Design Mix Serial No : KOL 1 /2021 / 214
MIN.CEMENTITIOUS CONTENT REQUIRED(Kg/Cum) 340 MAXIMUM FREE W/C RATIO PERMITTED 0.50
( As per IS 456:2000,Table-5 )
Data on Ingredients
Material
Ingredients Type of material Source of materials Average Specific Water Percentage
Gravity Absorption % used
Cement OPC 53 RAMCO 3.14
Note -The per cum content mentioned in Kg may vary during production , for Cement upto (+/- 2%) and for other materials upto (+/- 3%)
as per IS 4926 : 2003 (Annex E , Clause no 9.1.2 & 9.1.3 )without prior information to the customer and without effecting the actual
character of the product. Redosing of admixture up to 0.25% can be done at site if workability is found lower than requirement.
Subhra Sarkar
Head - QMS
The information contained within this document is the property of firstchoice ready mix and should not be copied and freely distributed without prior approval by firstchoice
readymix
Design Mix Report
4. Absolute volume of
Cement = [ 330 / 3.14 ] X [ 1/1000 ] = 0.105 Cum
Mineral admixture 1 Fly Ash = [ 200 / 2.20 ] X [ 1/1000 ] = 0.091 Cum
Water = [ 196 / 1.00 ] X [ 1/1000 ] = 0.196 Cum
Admixture ( @ 0.50% by wt of Cement ) = [ 2.65 / 1.12 ] X [ 1/1000 ] = 0.002 Cum
Absolute volume of cementitious material + water = = 0.394 Cum
Quantity of :-
Coarse aggregate 1 10 mm = 1620 x 47% = 761 Kg/m3
Fine aggregate 1 River Sand = 1620 x 53% = 858 Kg/m3
Adjustment for absorption by aggregates:
1.Free water to be used in one cubic meter of concrete
a) Absorption by coarse aggregates
10 mm = 761 x 0.89% = 7 Kg
River Sand = 858 x 1.28% = 11 Kg
18 Kg
2.Total water to be used including absorbed water = 196 + 18 = 214 Kg/m3
Dry Mix Design
Cement = 330 = 330 Kg/m3
Fly Ash = 200 = 200 Kg/m3
Coarse aggregate 1 10 mm = 761 - 7 = 755 Kg/m3
Fine aggregate 1 River Sand = 858 - 11 = 847 Kg/m3
Total Water = 196 + 18 = 214 Kg/m3
Admixture = 2.65 = 2.65 Kg/m3
Total wt = 2349 Kg/m3
Note -The per cum content mentioned in Kg may vary during production , for Cement upto (+/- 2%) and for other materials upto (+/- 3%) as per IS 4926 : 2003
(Annex E , Clause no 9.1.2 & 9.1.3 )without prior information to the customer and without effecting the actual character of the product. Redosing of admixture up
to 0.25% can be done at site if workability is found lower than requirement.
( Subhra Sarkar )
Head - QMS
The information contained within this document is the property of firstchoice ready mix and should not be copied and freely distributed without prior approval by firstchoice readymix
Trial Mix Report
Initial V0 Remarks
V Funnel Test after 150 min ( Confirms to V - Funnel flow time V 2 Class
- 12.6 sec
sec ) ( 8 s - 25 s )mm as per IS 10262 : 2019
28 days 785 761 793 780 34.65 7.960 8.060 8.050 8.023
The observations & test results mentioned above are based on a Lab trial conducted at firstchoice readymix Plant Lab. The results may vary in
actual situation. However the test results of actual concrete will conform to the requirements of IS or as specified
(Subhra Sarkar )
Head - QMS
The information contained within this document is the property of firstchoice readymix and should not be copied and freely distributed without prior
approval by firstchoice readymix