Upendra Kumar
Upendra Kumar
Upendra Kumar
3 DEC
MEENA SIR
KUMAR SIR
ME specifications
GE specifications
Refrigeration cycle
Meat room temperature not maintaining
-How to charge oil in crankcase of ref
Compressor specifications
Compressor efficiency drop
Clo unit 5 non flow alarm came what to do
Centrifugal pump overhauling checks
Kumar
Meena sir asked :
1.Type of ship
2.Types of tankers
3.Types of oil tankers
8.MOB actions. How you will raise alarm if there is no walkie and no one else on deck
except you. What is the provision.
9. Safematic system
Answered all but Meena sir wanted more in each
10. MSB safeties
11. Alternator Maintenance
ME scavenge inspection
Main bearing clearance
Boiler water tests
Limits
ER crane maintenance
Steering gear safematic
Types of crankshaft
Boiler trips
Me trips
ME slowdown alarms
Easing gear
HT water tests
Result: COC
Thank you
Lakshay sir
Ashish sir
Pankaj sir
@Saheem khan for this wonderful group and material.
MMD Noida
Internal: Gauri Lal Meena
External: Upendra Kumar
Function 3 Safety
Fire Fighting Requirements for Engine Room
Ovailty checks
Auxiliary engine trip(not in electronic way)
Ae overspeed test
Boiler test
Boiler
Me
Ae trips
Tappet cleareance
Why two springs are provided in ex and inlet valve
Boiler
Me
Ae trips
Tappet cleareance
Ae overhaul
What overahul u do in drydock
Mmd mumbai 20/12/2021
Subbaro
Kumar
MEP
C/c inspection checks
Purifier maintenance
Tappet clearence
Purifier not getting rpm
C rod Ovality check
Lub oil checks and test bunker preparation
Type of crankshaft
Crankshaft deflection
Ae trips
Me trips
Boiler trips
Blow down procedure
Refer oil charging
Boiler safety valves
MMD MUMBAI
23/12/2021
Int. Rama Subbarao Sir
Ext. Upendra Kumar Sir
Pass
23/12/21
Mumbai
Keel plate
Sheer strake
Rise of floor
Reserve buoyancy
Freeboard
Why tanker hav lessfreeboard.
Certificates statutory
Plimsol marking.
ORB entries
Types of lifeboats
Which type of vessels have freefall lifeboat.
Why bulk carrier have freefal
Safties in co2 system
Fun5
MSB safties
Parametre of paralleling
Types of starters
Fun5 repeat
Thank you everyone & saheem bhai especially.
23/12/2021
Internal - Subbarao sir
Boiler trips
Safematic system
Why Engine not starting on air
Why Engine not starting on fuel
Crankcase explosion
Safties in crankcase
Regulation of air reservoir
Tappet clearance and it's purpose
23-12-2021
Int.Subbarao sir
Ext.upendra kuamr sir
MEP
Welding defect
How C.i welded
Purifier over flow
Purifier not getting rpm
Purifier maintenance
Purifier checks
Alarms purifier
Air comp maintenance,checks, unloader
Refer cycle
Meat room not getting cold reason
Maintenance on refer,checks
Tev valve
Charging of refer oil
Both methods
Boiler maintenance
Checks
Blowdown procedure
Boiler Trips
Genny trips
Maintenance,checks
Centrifugal pump o/h
Checks on impeller,shaft,wear and casing ring
Primining of cen. P/p
Got mep
Specially samant sir,onkar sir and faculty of hatc.thank you saheem bhai and team
28/12/21
Int: Majhi
Ext: Upendra Kumar
MMD Mumbaj
Safety
-ISPS
-PSC and flag state relation
-Objectives of ISM
Pass
28/12/21
Int: Majhi
Ext: Upendra Kumar
MMD Mumbaj
motor MEP
- types of crankshaft
- duty of 4th engineer
- watch taking over
- purifier start but didn't pick speed same reason
MEP clear
Motor repeat
Mumbai MMD
Date- 30/12/2021
Internal—Subbarao sir
Vessel—LPG carrier
Function 3
Tumblehome
Lifeboat lowering and what you will check as the incharge of lifeboat
Manoverboard actions
Deadweight,Lightweight,Displacement
Archimedes principle
Freeboard
Function 4b
Compressor requirement
Crankcase explosion reasons and how
Accumulation test
-( I said it’s requirement for water tube boiler to not exceed 10% of working pressure
in 7 minutes he said anything else .-I said to ensure safety by preparing safety valve
lift at the required pressure, he said anything more ……)
Few more
Decider
Cleared both
Mumbai MMD
Date- 30/12/2021
Tappet Clearance
MAC Routines
Checks and clearances on Centrifugal pumps
Boiler Alarms
Lambda Controller
Accumulation pr test
Cleared both
30 Dec 2021
Safety
LBP
Aft Perpendicular
Fwd Perpendicular
Camber
Shear
Keel plate
Shear starke
LB lowering procedure
Bulwark
Electrical
Types of starter
Preferential trip
Sequential start
Magnetic reluctance
Where it is used
Cleared Both
Coc
And bhai seriously your question bank and notes helped a lot
30 Dec 2021
Safety
LOA
LBP
Aft Perpendicular
Fwd Perpendicular
Camber
LB davit safeties
Bulwark
What is freeboard
Angle of lol
Lightweight displacement
Deadweight
Electrical
Msb safeties
Transformer losses
Types of starter
Preferential trip
Sequential start
Magnetic reluctance
Where it is used
Cleared Both
Coc
Mumbai
30/12/2021
Internal - Subbarao
External - Upendra
Safety
Type of ship
Camber
Sheer
Bulwark
Rise of floor
Sheer strake
Dead weight
Light weight
Displacement
Angle of loll
Solas certificate
Davit safety
Objectives of ISM
ISPS, levels in ISPS , who sets the level at sea and at port
Electrical
Star vs delta
MSB safety
Starter types
Air gap
Sequencial start
Safety clear
manhji
upendra kumar
03/01/2022
garboard streak
shear strake
bullwork
margine line
dead weight
lightweight
wht is ur action after co2 flooding?
how to do ventilation of engine room?
is the fan for engine room are same or different?
RESULT PASS
THANKS saheem bhai
Today's questions:
Function 4b and 6
Subbarao SIR
UPENDRA kumar SIR
4 Jan
Mumbai
both repeat..
4 jan
Mumbai
Internal: Subbarao sir
4. Main engine not starting on Air (i explained about the interlocks and automatic air start
valve)
4. Regulations for main air bottle.
5. Generators 500 hours routine.
6. Generator is designed for 1000kw but able to take load more than 400kw. Give me 5
reasons.
7. LO and FO mixing, test, how will you know.
8. LO sample points.
9 bunkering calculations and safeties. (Explained in detail)
10. Boiler accumulation test, why and when do we do it. Significance.
11. Boiler water level floats.
4. Case hardening.
5. Meat, veg, fish temperatures?
6. What is the reason why only meat is +4°C rest are fine. (Give me 5 reasons)
7. Refer gas charging process.
4 Jan
Ext: upendra kumar sir
Int: rao sir
Fnx:3
Inclining Experiment
Annex 6 - nox requirements
Methods to compliance with nox tire 3 standards
Nox ECA
Marpol certificates
Ism Objectives
Ballast Water Management standards
Pv valve pv breaker
Lifeboat Markings
Lifeboat lowering Procedure
Critical equipment
****************
Fxn 5
Motor safeties
Alternator safeties
Reverse power trip explain
Msb safeties
Isolation Transformer
Auto transformer working
Prefrential trip
Battery room regulations
Q7. LOW LOW WATER LEVEL OF BOILER HOW DO YOU TEST ( 2 METHODS )
Q8. NCR OF ENGINE
MEP PASS
THANK SHAHEEM BHAI AND ALL MY FRIENDS FROM THE VARIOUS GROUPS.
Noida
5 jan
manjhi sir
Upendra kumar
Fucntion 4b
Omd expalin?
Puncture valve?
Propeller overhauling ?
How to check shaft alignment?
5 JAN
NOIDA
MANJHI SIR
UPENDRA KUMAR SIR
MOTOR
Scavenging Types
MC and ME differences
BHP of engine
SFOC
Which engine has less SFOC
Scavenge Fire reasons, indications, actions Which fixed fire fiting system there
Why piston Rings Types of piston rings
Thanks bhai cleared both mep and motor. Special Thanks to you
Mumbai
17 jan
Fn3 -
Majhi sir
Upendra kumar sir
Pounding
Pv and pv breaker
Pump room safeties
Launching of LB
Manjhi sir
Upendra kumar sir
safety
Pv valve & breaker location
Painting pounding
Co2 safety
Cargo pump safety as per new rule
Pump. Room new regulations after 2004
Upendra kumar
manjhi sir
motor mep
Purifier not picking the rpm what are the Reasons for that
Boi
Motor mep questions
External :-PURNA MAJHI
Fuction 4
-Maine engine type
-Main bearing lubrication
-how exhaust, v/v fuel injector, and starting (want to listen HPS system
- reversing in ME Engine
-Interlocks in reversing
Was very happy and said to manjhi he is prepared very well i like to give him both
Result :- cleared both THANK YOU GUYS AND SPECIALLY TO SAHIM BHAI FOR
HIS EFFORTS
Mumbai
17 Jan 2021
Int - Manjhi sir
-Pv valve & breaker location n purpose and their operating values...
-what is Painting & pounding
-How to release fixed CO2 system
-Cargo pump room safety
Pump
-EEDI & EEXI
- Portable DCP 5 yr maintenance... ( I told 5 yrs to sir i have nt ready anywhere. max its 3
yrs, to bolta h wahi batao)
-Enclosed Space Entry Procedure
-What is SSAS system and purose of its installation.
Result - PASS
Answered all questions and both wer laughing and taking oral
17/01/2022
Mumbai MMD
Int : Purna Majhi
Ext : Upendra Kumar
All questions asked by Internal
Function 4b MEOL
-hydrostatic and hydrodynamic lubrication difference
- ME all units exhaust temp rising,. What are reasons and your actions?
- crankshaft deflection? (Too much cross questions)
Then i requested them to give atleast 1 function because i answered almost all questions
only got stuck in some cross questions, but they started laughing and said "nahi, aise nahi
hota hai...u have to repeat both function"
The end.🥲
Big thanks to saheem khan, saurya shankar and my GME batchmates for helping.
18 jan
mumbai
Manjhi sir
Upendra kumar
Func 4 and 6
Lo system
Crankcase safeties
Omd working
Crankcase inspection
Exh v/v temp rises during manouevring and action
Purifier rpm not picking up
Tools in workshop
Crankshaft deflection
Boiler burner flame failure
Pilot burner not working
Types of burner and turn down ratio
Pupose of hotwell
Safety valve setting
Why reciprocating pump for bilge well
Centrifugal overhaul checks
Welding defects
Generator mountings
Func 4 given
Func 6 repeat
mumbai
18 jan
Manjhi sir
Upendra sir
Function 4b and 6
Type of ship
Type of engine
Dead weight
Explain ME LO system starting from LO sump
Crankcase inspection
OMD working
Difference between boiler accumulation test and pressure test
Why boiler water treatment
Upendra sir
Function 4b and 6
Type of ship
Type of engine
Dead weight
Explain ME LO system starting from LO sump
Crankcase inspection
OMD working
AE full decarb
Liner , con rod ovality test
Purifier rpm not increasing why ?
Draw welding defects on paper
Gopinanadan sir
Upendra kumar air
Pump room safeties
IG system alarms and trips
PV valve PV breaker, Difference, Setting values, Which one is primary and which one is
secondary
Working of PV breaker, how it is capable to work in sub zero temperatures
Fixed fire fighting systems in ER
Marpol annex 4
What is EEDI and EEXI, units in which they are measured
How to reduce CO2 emissions in ships. What measures you will take when the ship is in
drydock
Name 5 certificates that ships have to always carry according to SOLAS not including
tonnage and loadline
Garboard strake
Sheer strake
Panting
Pounding
What measures are taken for pounding?
And many more...
Coc
Strake
Eedi
Pump room safety
Pv valve
Breaker
Lifeboat launching procedure
ACB
Alternator safety
Alternator maintenance
Battery maintenance
Battery room safety
Brushless alternator principle
Electrical - pass
Safety - repeat
Upendra kumar:-
Safety:-
Types of starters.
Explain auto transformer starter in detail.
Int: Majhi Sir
Fun 6
AE 500 hrs Maintenence
AE crankcase inspection
ME scavenge space inspection
Engine room flooding arrangement
Emergency bilge suction
Rest forgot
Result: Pass
Coc
MROL FUNCTION6
External :upendra Kumar
Internal majhi
Types of transformer
Transformer regulation
How to check open ckt and closed
Ckt in transformr?
Battery room checks?
Preferential trip, complete operations?
Types of starter?
Explain soft starter?
Brushless excitation?
Synchronous condenser?
Ext:upendra kumar
Safety
Gt dwt nrt
Harmonised survey system
Co2 10 yr maintenance
Portable pressure testing
Ig system safety
24 feb 2022
Ext upendra
Int meena
Fun3
Inclining experiment
Collision bulkhead
Shell expansion plan
Margin plate
Co2 safeties
Floor rising
Bulwark aur strake
Nox regulations
Life boat launching procedures
Fun5
CT and VT
Alternator maintenance
Msb safeties
Single phasing
- motor got submerged in sea water during flooded detail procedure for recovering
-AVR it purpose and function
-Brushless alternator
-what is static electricity
- battery room safety
-Wht is scr how gate control voltage and its applictaion onboard
- induction motor working
25/02
Type of ship
Engine make /model
GT, NT , DRAFT, FRESHWATER ALLOWANCE OF MY VESSEL
Angle of loll
Safety in ig plant
Noida MMD
02-March-2022
Function-5 Electrical
Internal- Meena sir
External – Upendra sir
1. Preferential trip
2. Dashpot Timer
3. Single phasing protection on motor ( Told many but at
Last i told MCB after which he said good)
4. Winch protection
5. Drop test
6. Slip Clutch
7. synchronous vs induction motor
8. Types of AVR
Result-COC
Special thanks to Aditya sir, Viren and Saheem bhai.
[3/22, 2:48 PM] Ms: Mumbai mmd 22-03-22
Internal- majhi
External-upendra Kumar(not sure)
Motor-
Cavitation
Stern tube sealing types
Checks on centrifugal pumps after overhauling
[3/22, 3:35 PM] Ms: Mumbai
22-03-2021
Internal – p maji
External – Upendra kumar
Time – 45min
Safety
Type of ship ( mine chemical)
Difference between oil and chemical tanker
Margin plate
Inclination exp ( cross question)
When to do –
4 sister ship ( sab ke liye karna hai experiment) he told kuch condition pe nahi karege
Class A machinery space
Widas
Ssas ( location) (cross question)
Annex 6 certificate
Eedi and eexi ( difference and unit)
And more
Electrical
Precaution to enter battery room
Maintenance of battery
Types of charging
Difference between quick and trickle charging
Full charge sg
Full discharge sg
IP of motor
Deck motor ip ( cross q)
How to do reverse power trip ( cross question)
And more
Bahut pucha
G*nd hi mardi
Safety
Electrical
Meena
Type of engine
Main Lo system
Tie rod fn
Boiler Accumulation test
Pressure test
Compressor take too much time to fill reasons?
M/E interlocks
Funnel fire. Action?
Alcap purifier
Anneling and normalising
Scavenge inspection
Why a/e is running at low load even if it is designed for high load.?
1.Engine type
2.aux eng 500 hrs routine
3.tappet clearance full procedure.
4.me scavenge space inspection.
5. Me jcw treatment
6.aux eng connecting rod checks.
7.how u know ref gas is less.
8.anneling and normalizing.
Result- COC
Result : fail
[3/30, 4:48 PM] Ms: 30-3-2021
Upendra Kumar🥲
Mahji
Pranay
Safety
Type of ship
Elect
Autotransformer
Dol starting current
Alternator working
Alternator safety
Motor
Reversing
Interlocks
Specifications of mE
How to test boiler low level alarm
Accumulation test
Mep
Lube oil coming on blowthrough
Exhaust valve leaslkage during manuovering
How safety valve of compressor check for working