CH18 Geotech Instrument

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

24-Nov-20

Geotechnical Instrumentation and Monitoring


• Review geotechnical engineering – in, on, or with earth
materials.
• Earth Materials (Soil and Rock) VS Other construction
materials.
 Isotropic ?
 Homogeneous?
 Linear?
• Excavation in soils or rocks is subject to a variety of
uncertainties.
• Soil or rock’s properties change from place to place
horizontally and vertically. Sometimes change with time.
• The data are never completed and are sometimes not
accurate due to sampling and testing. In the worst case,
it is extremely difficult or may be impossible to do
investigation.

Reasons for Installing Instrumentation


Site Investigations : Instruments are used to characterize
initial site conditions. Common parameters of interest in
a site investigation are pore-water pressure, permeability
of earth materials
Design Verification: Instruments are used to verify design
assumptions and to check that performance is as
predicted. Instrument data from the initial phase of a
project may reveal the need (or the opportunity) to modify
the design in later phases.
Construction Control: Instruments are used to monitor the
effects of construction. Instrument data can help the
engineer determine how fast construction can proceed
without the risk of failure.

1
24-Nov-20

Reasons for Installing Instrumentation (cont.)


Quality Control: Instrumentation can be used both to
enforce the quality of workmanship on a project and to
document that work was done to specifications.
Safety: Instruments can provide early warning of
impending failures, allowing time for safe evacuation of
the area and time to implement remedial action. Safety
monitoring requires quick retrieval, processing, and
presentation of data, so that decisions can be made
promptly.
Legal Protection: Instrument data can provide evidence
for a legal defense of designers and contractors should
owners of adjacent properties claim that construction
has caused damage.

Reasons for Installing Instrumentation (cont.)


Performance: Instruments are used to monitor the in-
service performance of a structure. For example,
monitoring parameters such as leakage, pore-water
pressure, and deformation can provide an indication of
the performance of a dam. Monitoring loads on tiebacks
or rock bolts and movements within a slope can provide
an indication of the performance of a drainage system
installed in a stabilized slope.

2
24-Nov-20

Choosing Instrumentation

Choosing Instrumentation(cont.)

3
24-Nov-20

Choosing Instrumentation(cont.)

Choosing Instrumentation(cont.)

4
24-Nov-20

Applications

Applications(cont.)

5
24-Nov-20

Applications(cont.)

Monitoring Pore-Water Pressure

6
24-Nov-20

Monitoring Pore-Water Pressure

Monitoring Pore-Water Pressure

7
24-Nov-20

Monitoring Pore-Water Pressure

Monitoring Pore-Water Pressure

8
24-Nov-20

Monitoring Pore-Water Pressure

Monitoring Pore-Water Pressure

9
24-Nov-20

Monitoring Pore-Water Pressure

Monitoring Pore-Water Pressure

10
24-Nov-20

Monitoring Pore-Water Pressure

Monitoring Pore-Water Pressure

11
24-Nov-20

Monitoring Pore-Water Pressure

Monitoring Pore-Water Pressure

12
24-Nov-20

Monitoring Lateral Deformation

Monitoring Lateral Deformation

13
24-Nov-20

Monitoring Lateral Deformation

Monitoring Lateral Deformation

14
24-Nov-20

Monitoring Lateral Deformation

Monitoring Lateral Deformation

15
24-Nov-20

Monitoring Lateral Deformation

Monitoring Lateral Deformation

16
24-Nov-20

Monitoring Lateral Deformation

Monitoring Lateral Deformation

17
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

18
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

19
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

20
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

21
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

22
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

23
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

24
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

25
24-Nov-20

Monitoring Vertical Deformation

Monitoring Vertical Deformation

26