Kadiwa Stalls

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

A B C D E F G H

30000.00

2000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00

1 4000.00

1 FLOOR PLAN
A 1 SCALE 1 : 100 METERS

A B C D E F G H
30000.00

2000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00

APEX LINE OF ROOF


1200.00

0.40mm THK.
CORRUGATED GI SHEET
TOP OF COLUMN
FASCIA BOARD
4200.00

2850.00

150mm THK. CHB PLAIN


PLASTER (PAINT FINISH)
150.00

FINISHED FLOOR LINE


NATURAL GROUND LINE

2 FRONT ELEVATION
A 1 SCALE 1 : 100 METERS

PROJECT TITLE: SHEET CONTENTS: PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.:
REPAIR/MAINTENANCE OF BIUAG & MALANA
ECO-PARK AS SHOWN 1
ENGR. CHINNEE M. DAQUIOAG ENGR. RODERICK L. TALAY ATTY. JOEL A. RUMA
LOCATION: ENGINEER I MUNICIPAL ENGINEER MUNICIPAL MAYOR A-1
BRGY. DUNGAN, RIZAL, CAGAYAN
2 1 1 2

1500.00 4000.00 4000.00 1500.00

APEX LINE OF ROOF APEX LINE OF ROOF


0.40mm THK.

1200.00

1200.00
CORRUGATED GI SHEET
0.40mm THK.
CORRUGATED GI SHEET
TOP OF COLUMN TOP OF COLUMN 150mm x 50mm TOP & BOT
CHORD - LUMBER

4200.00

4200.00
2850.00

2850.00
150mm THK. CHB PLAIN 150mm THK. CHB PLAIN
PLASTER (PAINT FINISH) PLASTER (PAINT FINISH)
150.00

150.00
FINISHED FLOOR LINE FINISHED FLOOR LINE
NATURAL GROUND LINE NATURAL GROUND LINE

1 RIGHT SIDE ELEVATION 2 LEFT SIDE ELEVATION


A 2 SCALE 1 : 100 METERS A 2 SCALE 1 : 100 METERS

H G F E D C B A
30000.00

4000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00 2000.00

APEX LINE OF ROOF


1200.00

0.40mm THK.
CORRUGATED GI SHEET
TOP OF COLUMN
4200.00

2850.00

150mm THK. CHB PLAIN


PLASTER (PAINT FINISH)
150.00

FINISHED FLOOR LINE


NATURAL GROUND LINE

3 REAR ELEVATION
A 2 SCALE 1 : 100 METERS

PROJECT TITLE: SHEET CONTENTS: PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.:
REPAIR/MAINTENANCE OF BIUAG & MALANA
ECO-PARK AS SHOWN 2
ENGR. CHINNEE M. DAQUIOAG ENGR. RODERICK L. TALAY ATTY. JOEL A. RUMA
LOCATION: ENGINEER I MUNICIPAL ENGINEER MUNICIPAL MAYOR A-2
BRGY. DUNGAN, RIZAL, CAGAYAN
A B C D E F G H
30000.00

2000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00

1 4200.00

0.40mm THK.
CORRUGATED GI SHEET

FASCIA BOARD

2
1700.00

1 ROOF PLAN
S 1 SCALE 1 : 100 METERS

A B C D E F G H
30000.00

2000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00 4000.00

C1/F1 C1/F1 C1/F1 C1/F1 C1/F1 C1/F1 C1/F1 C1/F1


1
4000.00

150mm THK. CONCRETE


SLAB W/ 10mmØ TEMP. BARS
SPCD @600mm O.C.B.W.

C1/F1 C1/F1 C1/F1 C1/F1 C1/F1 C1/F1 C1/F1 C1/F1


2

2 FOUNDATION PLAN
S 1 SCALE 1 : 100 METERS

PROJECT TITLE: SHEET CONTENTS: PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.:
REPAIR/MAINTENANCE OF BIUAG & MALANA
ECO-PARK AS SHOWN 3
ENGR. CHINNEE M. DAQUIOAG ENGR. RODERICK L. TALAY ATTY. JOEL A. RUMA
LOCATION: ENGINEER I MUNICIPAL ENGINEER MUNICIPAL MAYOR S-1
BRGY. DUNGAN, RIZAL, CAGAYAN
DIMENSION (mm)
MARK MAIN REINFORCEMENTS & SPACING
Bx By Tf

800 800 200 F1 5 - 12mmØ SPACED EQUALLY ON CENTER BOTHWAYS

1 SCHEDULE OF FOOTING
S 2 N. T. S.
250.00

150mm THK. CONCRETE SLAB W/


800.00 (Bx)
10mm RSB TEMP. BARS SPACED
150.00 250.00 150.00 @ 600mm O.C.B.W.

F.F.L.
N.G.L.
5-12mmØ
150.00

5-12mmØ

4-12mm RSB MAIN BARS W/

600.00
4 - 12mmØ
800.00 (By)

10mm RSB TIES SPACED @


250.00

VERTICAL BAR
3-50mm, 3-100mm, 3-150mm &
REST SPACED @ 200mm O.C.
150.00

200.00 (Tf)
5-12mm RSB MATTING O.C.B.W.

10mm THK. GRAVEL BEDDING


PLAN 800.00

ELEVATION
2 F1/C1 DETAILS
S 2 N. T. S.

PROJECT TITLE: SHEET CONTENTS: PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.:
REPAIR/MAINTENANCE OF BIUAG & MALANA
ECO-PARK AS SHOWN 4
ENGR. CHINNEE M. DAQUIOAG ENGR. RODERICK L. TALAY ATTY. JOEL A. RUMA
LOCATION: ENGINEER I MUNICIPAL ENGINEER MUNICIPAL MAYOR S-2
BRGY. DUNGAN, RIZAL, CAGAYAN
A B C D E F G H
30000.00

2000.00 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85 2153.85

1
4200.00

150mm x 50mm LUMBER


RAFTER w/ 75mm x 50mm
LUMBER PURLINS spaced
@ 600mm O.C.

2
1700.00

1 ROOF FRAMING PLAN


S 3 N. T. S.

75mm x 50mm LUMBER


PURLINS spaced @ 600mm O.C.
4400.0
0
0
0.0
2 20
1200.00

1200.00 4000.00

150mm x 50mm TOP &


BOTTOM LUMBER CHORD

2 TRUSS DETAIL
S 3 SCALE 1 : 100 METERS

PROJECT TITLE: SHEET CONTENTS: PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.:
REPAIR/MAINTENANCE OF BIUAG & MALANA
ECO-PARK AS SHOWN 5
ENGR. CHINNEE M. DAQUIOAG ENGR. RODERICK L. TALAY ATTY. JOEL A. RUMA
LOCATION: ENGINEER I MUNICIPAL ENGINEER MUNICIPAL MAYOR S-3
BRGY. DUNGAN, RIZAL, CAGAYAN