Bill of quantity(BOQ) S_boom small scale irri
Description
22.5 M dam construction
excavation and earth work
site clearnce
bulk excavation for ordinary soil to depth of 0.5 m
pit excation for clay core at the center of dam working sapce 0.5
cart away of surplus material
clay core filling and compaction
summary
masonary work (shell)
lean under masonary
construct masonary shell with 1:3 cement mortar filling
plastering of masonary shell at intake side
copping on top of masonary
pointing both side of masonary shell
summary
spill way gate
provide steel spilway locckable gate 2Mx1.5M including all accesoray
summary
river diversion
excavate 3Mx3M length of 100 m existing river
summary
small scale irrigation dam Rate
Unit Amount
1.00 --

M2 778 100 77,800.00


M3 276 200 55,200.00
M3 472.5 300 141,750.00
M3 748.5 150 112,275.00
M3 754 500 377,000.00
764,025.00

M2 315 500 157500


M3 371 8500 3153500
M2 176.35 700 123445
M2 112.5 700 78750
M2 285.75 500 142875
3,498,570.00

pc 1 35000 35000
35000

M3 900 300 270000


270000

total sum 4,567,595.00


vat 15% 685,139.25
grand summary 5,252,734.25
Resource and equipment for construction of 22.5 m dam
local materials
sand M3
stone masonary m3
clat core M3

industrial materials
cement quantal
steel gate pc

personl resorce
site engineer
forman
surveyer
store keper
manson
carpenter
daily laborers

equipments and machinary


excavator
dump truck
commpactor
water pump
pick axle
shovel
tion of 22.5 m dam
qty
400
371
754

300
1

1
1
1 -
1
4
4
30

1
2
1
2
50
50
No.

1
1.01
1.02
1.03
1.04
1.05
2
2.01
2.02
2.03
2.04
2.05
3
3.01
4
4.01
TIME SCHEDULE FOR CONSTRUCTION OF 22.5
Description
22.5 M dam construction
excavation and earth work
site clearnce
bulk excavation for ordinary soil to depth of 0.5 m
pit excation for clay core at the center of dam working sapce 0.5
cart away of surplus material
clay core filling and compaction
masonary work (shell)
lean under masonary
construct masonary shell with 1:3 cement mortar filling
plastering of masonary shell at intake side
copping on top of masonary
pointing both side of masonary shell
spill way gate
provide steel spilway locckable gate 2Mx1.5M including all accesoray
river diversion
excavate 3Mx3M length of 100 m existing river

tot
STRUCTION OF 22.5 M DAM
Unit
1.00 duration in days

M2 778 3days
M3 276 5days
M3 472.5 15 days
M3 748.5 10 days
M3 754 10 days

M2 315 3 days
M3 371 30 days
M2 176.35 15 days
M2 112.5 5days
M2 285.75 15 days

pc 1 3 days

M3 900 20 days

total calender days 134 days