Asset Care Program

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

May 28 2016 | Logged in as : 2806750

Asset Care Program Introduction

Welcome to the assessment for Asset Care Program Introduction certification.


All assessments are timed. Look at the timer at the top of the page.
Questions with multiple choices are indicated by
Questions with multiple answers are indicated by
Some of these questions require you to enter TRUE or FALSE
You need to score at least 85% to pass
1 of 16
Which stage should the asset return to, having been in SHORT or LONG TERM
STORAGE?

Incoming

Outgoing

Base Check

Spot and Rig Up

2 of 16
Who is responsible for performing and completing the checks in Asset Care Program Service
Level- 0 (SL-0)?

Operations personnel are responsible, with assistance from the Maintenance department
when required or dictated by local procedure.

Maintenance personnel are responsible, with assistance from Operations personnel when
required or dictated by local procedure.

3 of 16
When the asset has completed the ________ stage, the red tags can then be removed and asset
green tagged.

Incoming
Base Check

Outgoing

Rig Down

4 of 16
Checks and inspections in the RUN/TREATMENT stage should be performed
______________

During and in between runs

After rig down

Once arrived at location

5 of 16
If an asset requires a minor repair (unit can be operated and safely complete the job), which
color tag should be attached to the unit?

Green Tag

Yellow Tag

Red Tag

6 of 16
When should the RIG DOWN stage be completed?

Once the final run has been made and PCE removed from well head (standby)

Once the asset arrives at base

Before the 1st run

Before the asset goes into Storage


7 of 16
If the asset is expected to be at the base for more than 30 days, which stage does it enter?

Long Term Storage

Short Term Storage

Outgoing

Base Check

8 of 16
If an asset requires a major repair (unit cannot be operated and cannot safely complete the
job), which tag should be attached to the unit?

Green Tag

Yellow Tag

Red Tag

9 of 16
If the asset is expected to be at the base for more than 180 days, which stage does it enter?

Long Term Storage

Short Term Storage

Outgoing

Base Check

10 of 16
When should you perform the Spot and Rig Up stage?

Upon completion of the last run on well/pad/rig

On arrival at a new well/pad/rig or after standby


On arrival at base from well/pad/rig

Before asset leaves base for a job

11 of 16
When should you perform the Incoming stage?

Upon completion of the last run on well/pad/rig

On arrival at a new well/pad/rig or after standby

On arrival at base from well/pad/rig or from Short/Long Term Storage

Before asset leaves base for a job

12 of 16
When should you perform the Outgoing stage?

Upon completion of the last run on well/pad/rig

On arrival at a new well/pad/rig or after standby

On arrival at base from well/pad/rig

Before asset leaves the base for a job

13 of 16
If you encounter a deficiency while performing a check, you should ___________

Check the “Needs Work” column

Check the “Deficiency Corrected” column

Check the “Needs Work” column and note the deficiency in the “Deficiencies / Corrective
Actions / Parts Used / Comments” column
Check the “OK” column

14 of 16
Why is there a change from STEM process to Asset Care Program?

The STEM process is too long

With the STEM program there are gaps left in the asset cycle (e.g. during transportation
and when an asset is in storage at a base), leading to premature equipment failures and
reliability issues

STEM checklists are hard to understand

All of the above

15 of 16
Pick all elements in the BASE checklist.

Incoming

Outgoing

Run/Treatment

Spot and Rig Up

Storage

Base Check

Rig Down

16 of 16
Pick all elements in the WELLSITE checklist.

Incoming
Outgoing

Run/Treatment

Spot and Rig Up

Storage

Base Check

Rig Down

Submit