Shop Drawing Log

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Shop Drawings - ( SDW )

PROJECT NAME: CONSTRUCTION OF 24-SMALL FACTORIES (JEDDAH-01)


Code A : Approved Code B : Approved As Noted
Review Codes: Code C: Revise & Resubmit Code D : Rejected
Rev.00 Rev.01 Rev.02 Rev.03 Rev.04 Rev.05 Final Stauts

Received Time Received Time Received Time Received Time Received Time Received Time Current Final
S.N Drawing Submission Reference Discipline Drawing Title Drawing Number Date
Issued Date
Laps Date
Issued Date
Laps Date
Issued Date
Laps Date
Issued Date
Laps Date
Issued Date
Laps Date
Issued Date
Laps
Examination End Date
Status
Checked By
Code

1 JDH1-05-04-ZAS-TS9-1-ARC-SDW-0001-00 AR SITE MOBILIZATION DRAWING JDH1-05-004-ZAS-TS9-1-ARC-SDW-0001-00 10-May-23 10-May-23 16-May-23 CLOSED MO C


2 JDH1-05-04-ZAS-TS9-1-GEN-SDW-0002-00 GEN SIGN BOARD ELEVATION DRAWING JDH1-05-004-ZAS-TS9-1-GEN-SDW-0002-00 11-May-23 11-May-23 16-May-23 CLOSED MO C
3 JDH1-05-04-ZAS-TS9-1-RD-SDW-003-00 RD SIGN BOARD ELEVATION DRAWING JDH1-05-004-ZAS-TS9-1-RD-SDW-0003-00 16-May-23 16-May-23 17-May-23 CLOSED MO C
FOUNDATION LAYOUT ST-SDW-0101
4 JDH1-05-04-ZAS-TS9-1-ST-SDW-0004-00 ST 16-May-23 16-May-23 06-Jun-23 04-Jun-23 05-Jul-23 22-Jun-23 12-Jul-23 12-Jul-23 12-Jul-23 CLOSED MO B
FOUNDATION LAYOUT DETAILED ST-SDW-0102
COLUMNS AND AXIS LAYOUTBLOCK - B1 & B2
COLUMNS AND AXIS LAYOUT
ENLARGED BLOCK-B1,PART - 1,(SHEET 01 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0103
COLUMNS AND AXIS LAYOUT JDH1-05-004-ZAS-TS9-1-ST-SDW-0104A
ENLARGED BLOCK-B1,PART - 2,(SHEET 02 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0104B
5 JDH1-05-04-ZAS-TS9-1-ST-SDW-0005-00 ST 16-May-23 16-May-23 06-Jun-23 04-Jun-23 08-Jul-23 22-Jun-23 28-Aug-23 28-Aug-23 28-Aug-23 CLOSED MO B
COLUMNS AND AXIS LAYOUT JDH1-05-004-ZAS-TS9-1-ST-SDW-0104C
ENLARGED BLOCK-B2,PART - 3,(SHEET 03 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0104D
COLUMNS AND AXIS LAYOUT
ENLARGED BLOCK-B2,PART - 4,(SHEET 04 OF 04)
GRADE BEAM LAYOUT (CONCRETE DIM) JDH1-05-004-ZAS-TS9-1-ST-SDW-105-01
GRADE BEAM LAYOUT (CONCRETE DIM) ENLARGED PART 1, (SHEET 01-OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-106A
GRADE BEAM LAYOUT (CONCRETE DIM) ENLARGED PART 2, (SHEET 02-OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-106B
6 JDH1-05-04-ZAS-TS9-1-ST-SDW-0006 ST 25-May-23 25-May-23 12-Aug-23 12-Aug-23 14-Aug-23 CLOSED MO B
GRADE BEAM LAYOUT (CONCRETE DIM) ENLARGED PART 3, (SHEET 03-OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-106C
GRADE BEAM LAYOUT (CONCRETE DIM) ENLARGED PART 4, (SHEET 04-OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-106D
TOILET ROOF SLAB FRAMING LAYOUT
JDH1-05-004-ZAS-TS9-1-ST-SDW-0109
TOILET ROOF SLAB FRAMING LAYOUT ENLARGED BLOCK-B1, PART - 1, (SHEET 01 OF 04)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0110A
TOILET ROOF SLAB FRAMING LAYOUT ENLARGED BLOCK-B1,PART - 2,(SHEET 02 OF 04)
7 JDH1-05-04-ZAS-TS9-1-ST-SDW-0007 ST JDH1-05-004-ZAS-TS9-1-ST-SDW-0110B 25-May-23 25-May-23 25-Jun-23 24-Jun-23 06-Jul-23 26-Jun-23 01-Oct-23 28-Sep-23 01-Oct-23 CLOSED MO B
TOILET ROOF SLAB FRAMING LAYOUT ENLARGED BLOCK-B2,PART - 3,(SHEET 03 OF 04)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0110C
TOILET ROOF SLAB FRAMING LAYOUT ENLARGED BLOCK-B2,PART - 4,(SHEET 04 OF 04)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0110D
JDH1-05-04-ZAS-TS9-1-ST-SDW-0008-00 ST FOOTING AND BEAM SCHEDULE JDH1-05-04-ZAS-TS9-1-ST-SDW-0117 25-May-23 25-May-23 09-Jul-23 02-Jul-23 13-Aug-23 13-Aug-23 05-Oct-23 04-Oct-23 05-Oct-23 CLOSED MO B
9 JDH1-05-04-ZAS-TS9-1-GEN-SDW-0009-01 GEN EXCAVATION LAYOUT WITH SECTIONAL DETAIL GEN-SDW-0013 27-May-23 27-May-23 04-Jul-23 26-Jun-23 4-May-23 CLOSED MO B
FRONT ELEVATION BLCOK- B2
GROUND FLOOR PLAN BLCOK-B1 & BLCOK-B2 SHEET 1 OF 5
GROUND FLOOR PLAN BLCOK- B1 (ENLARGED) SHEET 2 OF 5
10 JDH1-05-04-ZAS-TS9-1-ARC-SDW-0010-01 AR GROUND FLOOR PLAN BLCOK- B1 (ENLARGED) SHEET 3 OF 5 JDH1-05-004-ZAS-TS9-1-AR-SDW-0201-02JDH1-05-004-ZAS-TS9-1-AR-SDW-0101-02
3-Jun-23 3-Jun-23 18-Jun-23 17-Jun-23 06-Aug-23 23-Jul-23 6-Aug-23 CLOSED MO B
GROUND FLOOR PLAN BLCOK- B1 (ENLARGED) SHEET 4 OF 5
GROUND FLOOR PLAN BLCOK- B1 (ENLARGED) SHEET 5 OF 5

LIST OF DRAWINGS JDH1-01-016-DAR-ST5-ST-DWG-0002


11 JDH1-05-04-ZAS-TS9-1-ST-SDW-0011 ST 31-May-23 31-May-23 8-Jun-23 CLOSED MO B
GENERAL NOTES, LEGEND, AND ABBREVIATIONS JDH1-01-016-DAR-ST5-ST-DWG-0003
STRUCTURAL TYPICAL DETAILS (SHEET 01 OF 03) JDH1-05-004-ZAS-TS9-1-ST-SDW-0004
12 JDH1-05-004-ZAS-TS9-1-ST-SDW-0012-01 ST STRUCTURAL TYPICAL DETAILS (SHEET 02 OF 03) JDH1-05-004-ZAS-TS9-1-ST-SDW-0005 31-May-23 31-May-23 11-Jul-23 22-Jun-23 11-Jul-23 CLOSED MO C
STRUCTURAL TYPICAL
SLAB ON GRADE DETAILS (SHEET 03 OF 03)
LAYOUT JDH1-05-004-ZAS-TS9-1-ST-SDW-0006
GRADE SLAB LAYOUT ENLARGED PART 1,
(SHEET 01 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0107
GRADE SLAB LAYOUT ENLARGED PART 2, JDH1-05-004-ZAS-TS9-1-ST-SDW-0108A
(SHEET 02 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0108B
13 JDH1-05-04-ZAS-TS9-1-ST-SDW-0013-00 ST 31-May-23 31-May-23 20-Aug-23 20-Aug-23 20-Aug-23 CLOSED MO B
GRADE SLAB LAYOUT ENLARGED PART 3, JDH1-05-004-ZAS-TS9-1-ST-SDW-0108C
(SHEET 03 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0108D
GRADE SLAB LAYOUT ENLARGED PART 4,
(SHEET 04 OF 04)

C JDH1-05-04-ZAS-TS9-1-ST-SDW-0014-02 ST BOX CULVERT DETAILS JDH1-05-004-ZAS-TS9-1-ST-SDW-0118 31-May-23 31-May-23 25-Jun-23 22-Jun-23 11-Jul-23 02-Jul-23 11-Jul-23 CLOSED MO C
ROOF RRAMING GENERAL LAYOUT JDH1-05-004-ZAS-TS9-1-ST-SDW-0111
ROOF FRAMING GENERAL LAYOUT (DETAILED) JDH1-05-004-ZAS-TS9-1-ST-SDW-0112A
ROOF FRAMING GENERAL LAYOUT (DETAILED) JDH1-05-004-ZAS-TS9-1-ST-SDW-0112B
15 JDH1-05-04-ZAS-TS9-1-ST-SDW-0015-02 ST ROOF FRAMING GENERAL LAYOUT (DETAILED) JDH1-05-004-ZAS-TS9-1-ST-SDW-0112C 31-May-23 31-May-23 11-Jul-23 22-Jun-23 08-Oct-23 04-Oct-23 08-Oct-23 CLOSED MO B
ROOF FRAMING GENERAL LAYOUT (DETAILED) JDH1-05-004-ZAS-TS9-1-ST-SDW-0112D

PUMP ROOM SHED & GRP WATER TANK


C JDH1-05-04-ZAS-TS9-1-ST-SDW-0016 ST JDH1-05-004-ZAS-TS9-1-ST-SDW-0201 31-May-23 31-May-23 16-Sep-23 16-Sep-23 19-Sep-23 CLOSED MO B
FOUNDATION STRUCTURAL DETAILS
SHOP DRAWING TITLE BLOCK JDH1-05-004-ZAS-TS9-1-EL-SDW-0001-A
SHOP DRAWING COVER PAGE JDH1-05-004-ZAS-TS9-1-EL-SDW-0001-B
17 JDH1-05-04-ZAS-TS9-1-ELE-SDW-0017 EL 31-May-23 31-May-23 8-Jun-23 CLOSED MO B
LIST OF DRAWINGS JDH1-05-004-ZAS-TS9-1-EL-SDW-0002
GENERAL NOTES JDH1-05-004-ZAS-TS9-1-EL-SDW-0003
SHOP DRAWING COVER PAGE JDH1-05-004-ZAS-TS9-1-AR-SDW-0001
18 JDH1-05-04-ZAS-TS9-1-AR-SDW-0018-00 AR LIST OF DRAWINGS JDH1-05-004-ZAS-TS9-1-AR-SDW-0002 4-Jun-23 4-Jun-23 CLOSED MO D
GENERAL NOTES JDH1-05-004-ZAS-TS9-1-AR-SDW-0003
OVERALL SITE LOCATION PLAN JDH1-05-004-ZAS-TS9-1-AR-SDW-0004
19 JDH1-05-04-ZAS-TS9-1-AR-SDW-0019-00 AR SCOPE OF WORK JDH1-05-004-ZAS-TS9-1-AR-SDW-0005 4-Jun-23 4-Jun-23 27-Aug-23 23-Jul-23 27-Aug-23 CLOSED MO B
SITE PLAN JDH1-05-004-ZAS-TS9-1-AR-SDW-0006
20 JDH1-05-004-ZAS-TS9-1-ST-SDW-0020-0 ST FOUNDATION BARS BENDING DETAILS FOR BLOCK- B1 ,B2 JDH1-05-004-ZAS-TS9-1-ST-SDW-0119 5-Jun-23 5-Jun-23 11-Jul-23 22-Jun-23 12-Jul-23 12-Jul-23 11-Jul-23 CLOSED MO B
BLOCK - B1, FOOTING EDGE ALIGN CORNERS AND BLDG CORNERS CO-ORDINATE
21 JDH1-05-004-ZAS-TS9-1-SUR-SDW-0021-00 SUR JDH1-05-004-ZAS-TS9-1-SUR-SDW-0021B1-00 5-Jun-23 5-Jun-23 6-Jun-23 CLOSED MO B
BLOCK - 2, FOOTING EDGE ALIGN CORNERS AND BLDG CORNERS CO-ORDINATE
JDH1-05-004-ZAS-TS9-1-MEC-SDW-0001 JDH1-05-004-ZAS-TS9-1-MEC-
COVER PAGE , LIST OF DRAWINGS,GENERAL INSTRUMENTATION AND CONTROL,GENERAL MISCELANEOUS DETAIL-HVAC
SDW-0002 JDH1-05-004-ZAS-TS9-1-MEC-SDW-0003 JDH1-05-004-ZAS-
22 JDH1-05-004-ZAS-TS9-1-MEC-SDW-0022-00 ME ,GENERAL MISCELANEOUS DETAIL-PLUMBING AND FIRE FIGHTING,SCHEDULE OF EQUIPMENT PLUMBING AND FIRE 5-Jul-23 5-Jul-23 6-Jul-23 CLOSED MO B
TS9-1-MEC-SDW-0004 JDH1-05-004-ZAS-TS9-1-MEC-SDW-0005 JDH1-05-
FIGHTING
SMALL FACTORY BUILDING PLUMBING DRAINAGE -ENLARGE TOILET PLAN 004-ZAS-TS9-1-MEC-SDW-0009 JDH1-05-004-ZAS-TS9-1-MEC-SDW-0010
SMALL FACTORY BUILDING PLUMBING DRAINAGE -ENLARGE TOILET PLAN JDH1-01-016-DAR-ST5-ME-DWG-0102-00
23 JDH1-05-004-ZAS-TS9-1-MEC-SDW-0023-00 ME 6-Jul-23 6-Jul-23 20-Jul-23 18-Jul-23 06-Aug-23 2-Aug-23 06-Aug-23 CLOSED MO A
JDH1-01-016-DAR-ST5-ME-DWG-0102-00A

JDH1-05-004-ZAS-TS9-1-ST-SDW-0126A-R00
JDH1-05-004-ZAS-TS9-1-ST-SDW-0126B-R00
JDH1-05-004-ZAS-TS9-1-ST-SDW-0126C-R00
24 JDH1-05-004-ZAS-TS9-1-ST-SDW-0024 ST 12-07-2023 12-07-2023 12-07-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-ST-SDW-0126D-R00
JDH1-05-004-ZAS-TS9-1-ST-SDW-0126E-R00
COLUMN - C1, DETAIL (BLOCK -2) FROM EL.+17.70 TO +15.25SHEET 01 OF 05COLUMN – C2, DETAIL (BLOCK -2) FROM EL.+17.70 TO +15.25
JDH1-05-004-ZAS-TS9-1-ST-SDW-0125A-R00
JDH1-05-004-ZAS-TS9-1-ST-SDW-0125B-R00
JDH1-05-004-ZAS-TS9-1-ST-SDW-0125C-R00
25 JDH1-05-004-ZAS-TS9-1-ST-SDW-0025 ST 12-07-2023 12-07-2023 12-07-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-ST-SDW-0125D-R00
JDH1-05-004-ZAS-TS9-1-ST-SDW-0125E-R00
COLUMN - C1, DETAIL (BLOCK -1) FROM EL.+17.40 TO +14.95SHEET 01 OF 05COLUMN – C2, DETAIL (BLOCK -1) FROM EL.+17.40 TO +14.95
JDH1-01-016-DAR-ST5-ME-DWG-0101-00
JDH1-01-016-DAR-ST5-ME-DWG-0103-00
26 JDH1-05-004-ZAS-TS9-1-ME-SDW-0026 ME JDH1-01-016-DAR-ST5-ME-DWG-0104-00 12-07-2023 12-07-2023 03-Aug-23 03-Aug-23 03-Aug-23 CLOSED MO B
JDH1-01-016-DAR-ST5-ME-DWG-0203-00
SMALL FACTORY BUILDING PLUMBING DRAINAGE-GROUND FLOOR LAYOUTSMALL FACTORY BUILDING PLUMBING DRAINAGE-ROOF FLOOR PLAN
JDH1-05-004-ZAS-TS9-1-ST-SDW-0127A-00
JDH1-05-004-ZAS-TS9-1-ST-SDW-0127B-00
27 JDH1-05-004-ZAS-TS9-1-ST-SDW-0027 ST JDH1-05-004-ZAS-TS9-1-ST-SDW-0127C-00 15-07-2023 15-07-2023 18-07-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-ST-SDW-0127D-00
SECTION - " K " _ AT AXIS " 1 "(PLAN & REINFORCEMENT DETAIL)SHEET 01 OF 04SECTION - " K " _ AT AXIS " 1 "(REINFORCEMENT DETAIL)
28 JDH1-05-004-ZAS-TS9-1-ST-SDW-0028 ST RETAINING WALL SECTIONS AND REINFORCEMENT DETAILS JDH1-05-004-ZAS-TS9-1-ST-SDW-0121-00 15-Jul-23 15-Jul-23 18-07-2023 CLOSED MO B

Up to Date: 10/31/2023 1 of Document Control Center


SECTION - " L " _ AT AXIS " 1 "
(PLAN & REINFORCEMENT DETAIL)
SHEET 01 OF 04
SECTION - " L " _ AT AXIS " 1 "
(REINFORCEMENT DETAIL)
SHEET 02 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0128A-00
SECTION - " L " _ AT AXIS " 1 " JDH1-05-004-ZAS-TS9-1-ST-SDW-0128B-00
29 JDH1-05-004-ZAS-TS9-1-ST-SDW-0029 ST RETAINING WALL (REINFORCEMENT CUT AND JDH1-05-004-ZAS-TS9-1-ST-SDW-0128C-00 15-Jul-23 15-Jul-23 18-07-2023 CLOSED MO B
BEND ENLARGED DETAIL) JDH1-05-004-ZAS-TS9-1-ST-SDW-0128D-00
SHEET 03 OF 04
SECTION - " L " _ AT AXIS " 1 "
FOUNDATION (REINFORCEMENT CUT AND
BEND ENLARGED DETAIL)
SHEET 04 OF 04
SMALL FACTORY BUILDING GROUNDING SYSTEM LAYOUT JDH1-05-004-ZAS-TS9-1-EL-SDW-5002-00
30 JDH1-05-004-ZAS-TS9-1-ELE-SDW-0030 EL SAMLL FACTORY BUILDING GROUNDING SYSTEM INSTALLATION DETAIL JDH1-05-004-ZAS-TS9-1-EL-SDW-5002A-00 15-Jul-23 15-Jul-23 02-08-2023 26-Jul-23 02-08-2023 CLOSED MO B

BOX CULVERT PLAN SHEET 01 OF 02


31 JDH1-05-004-ZAS-TS9-1-ST-SDW-0031 ST BOX CULVERT LAYOUT (ENLARGED)SHEET 02 OF 02 JDH1-05-004-ZAS-TS9-1-ST-SDW-0123A-00JDH1-05-004-ZAS-TS9-1-ST-SDW-0123B-00
16-Jul-23 16-Jul-23 06-Aug-23 31-Jul-23 06-08-2023 CLOSED MO B

32 JDH1-05-004-ZAS-TS9-1-EL-SDW-0032 EL STREET LIGHTING LAYOUT JDH1-05-004-ZAS-TS9-1-EL-SDW-3000 18-Jul-23 18-Jul-23 02-Aug-23 02-Aug-23 08-08-2023 CLOSED MO B
SMALL FACTORY BUILDING LIGHTING SYSTEM LAYOUT
SMALL FACTORY BUILDING LIGHTING INSTALLATION DETAIL
33 JDH1-05-004-ZAS-TS9-1-EL-SDW-0033 EL JDH1-05-004-ZAS-TS9-1-EL-SDW-5001JDH1-05-004-ZAS-TS9-1-EL-SDW-5001 A18-Jul-23 18-Jul-23 04-Aug-23 02-Aug-23 04-Aug-23 CLOSED MO B

34 JDH1-05-004-ZAS-TS9-1-ENV-SDW-0034-00 ENV SMALL FACTORY BUILDINGCOMPOSITE PIPING LAYOUT JDH1-05-004-ZAS-TS9-1-ENV-SDW-0101 18-Jul-23 18-Jul-23 08-Aug-23 08-Aug-23 9-Aug-23 CLOSED MO B
SMALL FACTORY BUILDING SEWAGE PIPING LAYOUT
SMALL FACTORY BUILDING SEWAGE PIPING PROFILE JDH1-05-004-ZAS-TS9-1-ME-SDW-0101-01
35 JDH1-05-004-ZAS-TS9-1-ME-SDW-0035 ME JDH1-05-004-ZAS-TS9-1-ME-SDW-0102-01 18-Jul-23 18-Jul-23 08-Aug-23 03-Aug-23 8-Aug-23 CLOSED MO B

SMALL FACTORY BUILDING PLUMBING WATER -ENLARGED TOILET PLAN


SMALL FACTORY BUILDING PLUMBING WATER -ENLARGED TOILET PLAN JDH1-05-004-ZAS-TS9-1-ME-SDW-0201-01
36 JDH1-05-004-ZAS-TS9-1-ME-SDW-0036 ME JDH1-05-004-ZAS-TS9-1-ME-SDW-0201A 18-Jul-23 18-Jul-23 06-Aug-23 03-Aug-23 6-Aug-23 CLOSED MO B

SMALL FACTORY BUILDING


37 JDH1-05-004-ZAS-TS9-1-ME-SDW-0037 ME POTABLE WATER PIPING LAYOUT DH1-05-004-ZAS-TS9-1-PW-SDW-0301 18-Jul-23 18-Jul-23 06-Aug-23 03-Aug-23 17-Aug-23 17-Aug-23 23-Aug-23 23-Aug-23 28-Aug-23 CLOSED MO B

SMALL FACTORY BUILDING STORM DRAINAGE LAYOUT DH1-05-004-ZAS-TS9-1-ME-SDW-0201


38 JDH1-05-004-ZAS-TS9-1-ME-SDW-0038 ME SMALL FACTORY BUILDING STORM DRAINAGE PROFILE DH1-05-004-ZAS-TS9-1-ME-SDW-0202 18-Jul-23 18-Jul-23 06-Aug-23 02-Aug-23 6-Aug-23 CLOSED MO B

39 JDH1-05-004-ZAS-TS9-1-MEP-SDW-0039 MEP SMALL FACTORY BUILDING MEP LAYOUTSMALL FACTORY BUILDING MEP LAYOUT 18-Jul-23
DH1-05-004-ZAS-TS9-1-MEP-SDW-0108DH1-05-004-ZAS-TS9-1-MEP-SDW-0108A 18-Jul-23 09-Aug-23 09-Aug-23 27-Sep-23 18-Sep-23 24-Oct-23 27-Sep-23 CLOSED MO
LOW VOLTAGE NETWORK LAYOUT
40 JDH1-05-004-ZAS-TS9-1-EL-SDW-0040 EL LOW VOLTAGE NETWORK DETAIL LAYOUT 18-Jul-23
DH1-05-004-ZAS-TS9-1-EL-SDW-2000JDH1-05-004-ZAS-TS9-1-EL-SDW-2000A 18-Jul-23 05-Aug-23 02-Aug-23 05-Aug-23 CLOSED MO c

41 JDH1-05-004-ZAS-TS9-1-ME-SDW-0041 ME SMALL FACTORY BUILDIINGFIRE FIGHTING-GROUND FLOOR LAYOUT DH1-05-004-ZAS-TS9-1-ME-SDW-0301 19-Jul-23 19-Jul-23 06-Aug-23 05-Aug-23 6-Aug-23 CLOSED MO C
SMALL FACTORY BUILDING POWER SYSTEM LAYOUT DH1-05-004-ZAS-TS9-1-EL-SDW-5000
42 JDH1-05-004-ZAS-TS9-1-EL-SDW-0042-00 EL SMALL FACTORY BUILDING POWER SYSTEM DETAIL LAYOUT DH1-05-004-ZAS-TS9-1-EL-SDW-5000 A 23-Jul-23 23-Jul-23 17-Sep-23 13-Sep-23 17-Sep-23 CLOSED MO B

SMALL FACTORY BUILDING FIRE ALARAM SYSTEM LAYOUT DH1-05-004-ZAS-TS9-1-EL-SDW-5003


43 JDH1-05-04-ZAS-TS9-1-EL-SDW-0043 EL SMALL FACTORY BUILDING FIRE ALARAM SYSTEM DETAIL LAYOUT DH1-05-004-ZAS-TS9-1-EL-SDW-5003 A 23-Jul-23 23-Jul-23 16-Aug-23 16-Aug-23 13-Sep-23 13-Sep-23 05-Oct-23 05-Oct-23 05-Oct-23 CLOSED MO B

SMALL FACTORY BUILDING DATA & TELECOM LAYOUT DH1-05-004-ZAS-TS9-1-EL-SDW-5005


44 JDH1-05-04-ZAS-TS9-1-EL-SDW-0044-00 EL SMALL FACTORY BUILDING DATA & TELECOM DETAIL LAYOUT DH1-05-004-ZAS-TS9-1-EL-SDW-5005 A 23-Jul-23 23-Jul-23 13-Sep-23 13-Sep-23 17-Sep-23 CLOSED MO B

45 JDH1-05-004-ZAS-TS9-1-SUR-SDW-0045-00 SUR PURPOSE SITE FINISHING LEVEL DH1-05-004-ZAS-TS9-1-SUR-SDW-0042-00 23-Jul-23 23-Jul-23 09-Aug-23 09-Aug-23 09-Aug-23 CLOSED MO B
46 JDH1-05-004-ZAS-TS9-1-AR-SDW-0046-00 AR REAR SIDE ELEVATION (BLOCK-B2) DH1-05-004-ZAS-TS9-1-AR-SDW-202-00 23-Jul-23 23-Jul-23 27-07-2023 CLOSED MO B
47 JDH1-05-004-ZAS-TS9-1-AR-SDW-0047-00 AR RIGHT AND LEFT SIDE ELEVATION BLCOK- B2 DH1-05-004-ZAS-TS9-1-AR-SDW-203-00 23-Jul-23 23-Jul-23 27-Jul-23 CLOSED MO B
48 JDH1-05-004-ZAS-TS9-1-EL-SDW-0048 EL ELECTRICAL DETAILS (SHEET 01 OF 07) DH1-05-004-ZAS-TS9-1-EL-SDW-7000 24-Jul-23 24-Jul-23 27-07-2023 CLOSED MO B
49 JDH1-05-004-ZAS-TS9-1-EL-SDW-0049 EL ELECTRICAL DETAILS (SHEET 02 OF 07) DH1-05-004-ZAS-TS9-1-EL-SDW-7001 24-Jul-23 24-Jul-23 27-07-2023 CLOSED MO B
50 JDH1-05-004-ZAS-TS9-1-EL-SDW-0050 EL ELECTRICAL DETAILS (SHEET 03 OF 07) DH1-05-004-ZAS-TS9-1-EL-SDW-7002 24-Jul-23 24-Jul-23 12-Aug-23 02-Aug-23 12-08-2023 CLOSED MO B
51 JDH1-05-004-ZAS-TS9-1-EL-SDW-0051 EL ELECTRICAL DETAILS (SHEET 04 OF 07) DH1-05-004-ZAS-TS9-1-EL-SDW-7003 24-Jul-23 24-Jul-23 27-07-2023 CLOSED MO B
52 JDH1-05-004-ZAS-TS9-1-EL-SDW-0052 EL ELECTRICAL DETAILS (SHEET 05 OF 07) DH1-05-004-ZAS-TS9-1-EL-SDW-7004 24-Jul-23 24-Jul-23 27-07-2023 CLOSED MO B
53 JDH1-05-004-ZAS-TS9-1-EL-SDW-0053 EL ELECTRICAL DETAILS (SHEET 06 OF 07) DH1-05-004-ZAS-TS9-1-EL-SDW-7005 24-Jul-23 24-Jul-23 27-07-2023 CLOSED MO B
54 JDH1-05-004-ZAS-TS9-1-EL-SDW-0054 EL ELECTRICAL DETAILS (SHEET 07 OF 07) DH1-05-004-ZAS-TS9-1-EL-SDW-7006 24-Jul-23 24-Jul-23 27-07-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-AR-SDW-0302A-00 JDH1-05-004-ZAS-
55 JDH1-05-004-ZAS-TS9-1-AR-SDW-0055 AR SECTION-A (BLOCK - B2) SECTION-B (BLOCK - B2) 26-Jul-23 26-Jul-23 27-Jul-23 CLOSED MO B
TS9-1-AR-SDW-0302B-00
SECTION-A (BLOCK – B1) JDH1-05-004-ZAS-TS9-1-AR-SDW-0301A
56 JDH1-05-004-ZAS-TS9-1-AR-SDW-0056 AR SECTION-B (BLOCK – B1) JDH1-05-004-ZAS-TS9-1-AR-SDW-0301B 26-Jul-23 26-Jul-23 27-Jul-23 CLOSED MO B

FIRE STRATEGY PLAN SHEET 01 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0105-00


ENLARGED FIRE STRATEGY PLAN BLOCK - B1(PART-1), SHEET 02 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0105A-00
ENLARGED FIRE STRATEGY PLAN BLOCK - B1(PART-2), SHEET 03 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0105B-00
57 JDH1-05-004-ZAS-TS9-1-AR-SDW-0057 AR 20-Jul-23 20-Jul-23 23-Jul-23 CLOSED MO B
ENLARGED FIRE STRATEGY PLAN BLOCK - B2 (PART-1), SHEET 04 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0105C-00
ENLARGED FIRE STRATEGY PLAN BLOCK - B2 (PART-2), SHEET 05 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0105D-00
ACOUSTICS PLAN SHEET 01 OF 05
ENLARGED ACOUSTICS PLAN BLOCK - B1 (PART-1) SHEET 02 OF 05
ENLARGED ACOUSTICS PLAN BLOCK - B1 (PART-2)
58 JDH1-05-004-ZAS-TS9-1-AR-SDW-0058 AR JDH1-05-004-ZAS-TS9-1-AR-SDW-0106-00JDH1-05-004-ZAS-TS9-1-AR-SDW-0106A-00
26-Jul-23 26-Jul-23 27-Jul-23 CLOSED MO B
SHEET 03 OF 05 ENLARGED ACOUSTICS PLAN BLOCK - B2 (PART-1) SHEET 04 OF 05
ENLARGED ACOUSTICS PLAN BLOCK - B2 (PART-2) SHEET 05 OF 05

BOX CULVERT REINFORCEMENT DETAIL - "A" JDH1-05-004-ZAS-TS9-1-ST-SDW-0122A-00


BOX CULVERT REINFORCEMENT DETAIL - "A JDH1-05-004-ZAS-TS9-1-ST-SDW-0122B-00
59 JDH1-05-004-ZAS-TS9-1-ST-SDW-0059 ST 31-Jul-23 31-Jul-23 6-Aug-23 CLOSED MO B
EXISTING TO NEW BOX CULVERTCONNECTING DETAILS JDH1-05-004-ZAS-TS9-1-ST-SDW-0122C-00

BOX CULVERT PLAN (CONCRETE DIMENSIONS) ENLARGED, SHEET 01 OF 03 JDH1-05-004-ZAS-TS9-1-ST-SDW-0129A-00


CROSS SECTION " A " & " B " (CONCRETE DIMENSIONS) ENLARGED, SHEET 02 OF 02 JDH1-05-004-ZAS-TS9-1-ST-SDW-0129B-00
60 JDH1-05-004-ZAS-TS9-1-ST-SDW-0060 ST 31-Jul-23 31-Jul-23 6-Aug-23 CLOSED MO B
BOX CULVERT LONGITUDINAL SECTION " C" (CONCRETE DIMENSIONS) ENLARGED, SHEET 03 OF 03 JDH1-05-004-ZAS-TS9-1-ST-SDW-0129C-R00
BOX CULVERT WALL REINFORCEMENT DETAIL( ENLARGED ), SHEET 01 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130A
BOX CULVERT WALL REINFORCEMENT DETAIL( ENLARGED ), SHEET 02 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130B
BOX CULVERT WALL REINFORCEMENT DETAIL ( ENLARGED ), SHEET 03 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130C
BOX CULVERT WALL REINFORCEMENT DETAIL( ENLARGED ), SHEET 04 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130D
61 JDH1-05-004-ZAS-TS9-1-ST-SDW-0061 ST BOX CULVERT WALL REINFORCEMENT DETAIL( ENLARGED ), SHEET 05 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130E 31-Jul-23 31-Jul-23 6-Aug-23 CLOSED MO B
BOX CULVERT WALL REINFORCEMENT DETAIL ( ENLARGED ), SHEET 06 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130F
BOX CULVERT WALL REINFORCEMENT DETAIL( ENLARGED ), SHEET 07 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130G
BOX CULVERT WALL REINFORCEMENT DETAIL( ENLARGED ), SHEET 08 OF 08 JDH1-05-004-ZAS-TS9-1-ST-SDW-0130H
BOX CULVERT FLOOR SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 01 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0131A
BOX CULVERT FLOOR SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 02 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0131B
62 JDH1-05-004-ZAS-TS9-1-ST-SDW-0062 ST BOX CULVERT FLOOR SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 03 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0131C 31-Jul-23 31-Jul-23 6-Aug-23 CLOSED MO B
BOX CULVERT FLOOR SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 04 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0131D

BOX CULVERT ROOF SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 01 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0132A


BOX CULVERT ROOF SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 02 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0132B
63 JDH1-05-004-ZAS-TS9-1-ST-SDW-0063 ST BOX CULVERT ROOF SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 03 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0132C 31-Jul-23 31-Jul-23 6-Aug-23 CLOSED MO B
BOX CULVERT ROOF SLAB REINFORCEMENT DETAIL (ENLARGED), SHEET 04 OF 04 JDH1-05-004-ZAS-TS9-1-ST-SDW-0132D

FRONT ELEVATION (BLOCK - B1) JDH1-05-004-ZAS-TS9-1-AR-SDW-0204


REAR SIDE ELEVATION (BLOCK - B1) JDH1-05-004-ZAS-TS9-1-AR-SDW-0205
64 JDH1-05-004-ZAS-TS9-1-AR-SDW-0064-00 AR 03-Aug-23 03-Aug-23 06-08-2023 CLOSED MO B
RIGHT SIDE AND LEFT SIDE ELEVATION (BLOCK - B1) JDH1-05-004-ZAS-TS9-1-AR-SDW-0206
ROOF PLAN BLOCK-B1 & BLOCK-B2 SHEET 01 OF 06 JDH1-05-004-ZAS-TS9-1-AR-SDW-0102
ENLARGED ROOF PLAN BLOCK - B1 (PART-1) SHEET 02 OF 06 JDH1-05-004-ZAS-TS9-1-AR-SDW-0102A
ENLARGED ROOF PLAN BLOCK - B1 (PART-2) SHEET 03 OF 06 JDH1-05-004-ZAS-TS9-1-AR-SDW-0102B
65 JDH1-05-004-ZAS-TS9-1-AR-SDW-0065-00 AR ENLARGED ROOF PLAN BLOCK - B2 (PART-1) SHEET 04 OF 06 JDH1-05-004-ZAS-TS9-1-AR-SDW-0102C 03-Aug-23 03-Aug-23 06-08-2023 CLOSED MO B
ENLARGED ROOF PLAN BLOCK - B2 (PART-2) SHEET 05 OF 06 JDH1-05-004-ZAS-TS9-1-AR-SDW-0102D
ROOF DETAIL BLOCK-B1 & BLOCK-B2 SHEET 06 OF 06 JDH1-05-004-ZAS-TS9-1-AR-SDW-0102E

66 JDH1-05-004-ZAS-TS9-1-ENV-SDW-0066-00 ENV SMALL FACTORY BUILDING FIRE FIGHTING PIPING LAYOUT JDH1-05-004-ZAS-TS9-1-ENV-SDW-0401 -00 03-Aug-23 03-Aug-23 06-08-2023 CLOSED MO B
67 JDH1-05-004-ZAS-TS9-1-EL-SDW-0067-00 EL LOW VOLTAGE SINGLE LINEDIAGRAM SUBSTATION#01 JDH1-05-004-ZAS-TS9-1-EL-SDW-2001-00 05-Aug-23 05-Aug-23 31-Aug-23 31-Aug-23 02-09-2023 CLOSED MO B
68 JDH1-05-004-ZAS-TS9-1-EL-SDW-0068-00 EL LOW VOLTAGE SINGLE LINEDIAGRAM SUBSTATION#02 JDH1-05-004-ZAS-TS9-1-EL-SDW-2002-00 05-Aug-23 05-Aug-23 31-Aug-23 31-Aug-23 02-09-2023 CLOSED MO B
69 JDH1-05-004-ZAS-TS9-1-EL-SDW-0069-00 EL SMALL FACTORY BUILDINGSINGLE LINE DIAGRAM JDH1-05-004-ZAS-TS9-1-EL-SDW-3001-00 05-Aug-23 05-Aug-23 08-Aug-23 CLOSED MO C
70 JDH1-05-004-ZAS-TS9-1-EL-SDW-0070-00 EL STREET LIGHTING PANEL BOARD SCHEDULE DH1-05-004-ZAS-TS9-1-EL-SDW-3002-00 05-Aug-23 05-Aug-23 08-Aug-23 CLOSED MO C

Up to Date: 10/31/2023 2 of Document Control Center


71 JDH1-05-004-ZAS-TS9-1-EL-SDW-0071-00 EL SMALL FACTORY BUILDINGTYPICAL FIRE ALARMSCHEMATIC DIAGRAM JDH1-05-004-ZAS-TS9-1-EL-SDW-5004-00 05-Aug-23 05-Aug-23 17-Sep-23 13-Sep-23 10-Oct-23 05-Oct-23 10-Oct-23 CLOSED MO B
72 JDH1-05-004-ZAS-TS9-1-EL-SDW-0072-00 EL SMALL FACTORY BUILDINGTYPICAL DATA & TELECOM SCHEMATIC DIAGRAM JDH1-05-004-ZAS-TS9-1-EL-SDW-5006-00 05-Aug-23 05-Aug-23 10-Oct-23 05-Oct-23 10-Oct-23 CLOSED MO B
TOILET & ADMIN AREA REFLECTED CEILING LAYOUT BLOCK-B1 & BLOCK-B2 SHEET 01 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0702-00
TOILET & ADMIN AREA REFLECTED CEILING LAYOUT BLOCK - B1 (PART-1) SHEET 02 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0702A-00
TOILET & ADMIN AREA REFLECTED CEILING LAYOUT BLOCK - B1 (PART-2) SHEET 03 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0702B-00
73 JDH1-05-004-ZAS-TS9-1-AR-SDW-0073-00 AR 05-Aug-23 05-Aug-23 06-Aug-23 CLOSED MO B
TOILET & ADMIN AREA REFLECTED CEILING LAYOUT BLOCK - B2 (PART-1) SHEET 04 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0702C-00
TOILET & ADMIN AREA REFLECTED CEILING LAYOUT BLOCK - B2 (PART-2) SHEET 05 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0702D-00

74 JDH1-05-004-ZAS-TS9-1-ME-SDW-0074-00 ME SMALL FACTORY BUILDINGFIRE FIGHTING-SCHEMATIC RISER DIAGRAM JDH1-01-016-DAR-ST5-ME-DWG-0302-00 05-Aug-23 05-Aug-23 06-Aug-23 CLOSED MO B
75 JDH1-05-004-ZAS-TS9-1-ME-SDW-0075-00 ME SMALL FACTORY BUILDING HVAC-ENLARGE PLAN JDH1-01-016-DAR-ST5-ME-DWG-0402-00 05-Aug-23 05-Aug-23 21-Sep-23 18-Sep-23 21-Sep-23 CLOSED MO B
SMALL FACTORY BUILDING HVAC-GROUND
76 JDH1-05-004-ZAS-TS9-1-ME-SDW-0076-00 ME FLOOR LAYOUT JDH1-01-016-DAR-ST5-ME-DWG-0401-00 05-Aug-23 05-Aug-23 23-Aug-23 23-Aug-23 28-Aug-23 CLOSED MO C

77 JDH1-05-004-ZAS-TS9-1-ME-SDW-0077-00 ME SMALL FACTORY BUILDING HVAC-ROOF FLOOR PLAN JDH1-01-016-DAR-ST5-ME-DWG-0403-00 05-Aug-23 05-Aug-23 23-Aug-23 23-Aug-23 28-Aug-23 CLOSED MO C
78 JDH1-05-04-ZAS-TS9-1-ME-SDW-0078-00 ME GENERAL MISCELLANEOUS DETAIL FIRE FIGHTING JDH1-05-004-ZAS-TS9-1-ME-SDW-0006-00 05-Aug-23 05-Aug-23 06-Aug-23 CLOSED MO C
79 JDH1-05-04-ZAS-TS9-1-ME-SDW-0079-00 ME GENERAL MISCELLANEOUS DETAILS-FIRE FIGHTING JDH1-05-004-ZAS-TS9-1-ME-SDW-0007-00 06-Aug-23 06-Aug-23 06-Aug-23 CLOSED MO C
80 JDH1-05-04-ZAS-TS9-1-ME-SDW-0080-00 ME GENERAL MISCELLANEOUS DETAIL-PLUMBING JDH1-05-004-ZAS-TS9-1-ME-SDW-0008-00 06-Aug-23 06-Aug-23 06-Aug-23 CLOSED MO C
FINISHING LAYOUT BLOCK-B1 & BLOCK-B2 SHEET 01 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0903
ENLARGE FINISHING LAYOUT BLOCK - B1 (PART-1) SHEET 02 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0903A
ENLARGE FINISHING LAYOUT BLOCK - B1 (PART-2) SHEET 03 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0903B
81 JDH1-05-004-ZAS-TS9-1-AR-SDW-0081-00 AR 07-Aug-23 07-Aug-23 08-08-2023 CLOSED MO B
ENLARGE FINISHING LAYOUT BLOCK - B2 (PART-1) SHEET 04 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0903C
ENLARGE FINISHING LAYOUT BLOCK - B2 (PART-2) SHEET 05 OF 05 JDH1-05-004-ZAS-TS9-1-AR-SDW-0903D

MISCELLANEOUS DETAILS -1
JDH1-05-004-ZAS-TS9-1-AR-SDW-0801
MISCELLANEOUS DETAILS -2
82 JDH1-05-004-ZAS-TS9-1-AR-SDW-0082-00 AR JDH1-05-004-ZAS-TS9-1-AR-SDW-0802 13-Aug-23 08-Aug-23 13-08-2023 CLOSED MO B

83 JDH1-05-004-ZAS-TS9-1-AR-SDW-0083-00 AR WINDOWS DETAIL & SCHEDULE JDH1-05-004-ZAS-TS9-1-AR-SDW-0902 08-Aug-23 08-Aug-23 13-08-2023 CLOSED C
84 JDH1-05-004-ZAS-TS9-1-ME-SDW-0084-00 ME STANDARD DETAILS JDH1-05-004-ZAS-TS9-1-SW-SDW-0103 09-Aug-23 09-Aug-23 09-Aug-23 CLOSED MO B
85 JDH1-05-004-ZAS-TS9-1-ME-SDW-0085-00 ME TRENCH DETAILS JDH1-05-004-ZAS-TS9-1-PW-SDW-0303-00 09-Aug-23 09-Aug-23 23-Aug-23 23-Aug-23 09-Aug-23 CLOSED D
MISCELLANEOUS DETAILS -1
86 JDH1-05-004-ZAS-TS9-1-ME-SDW-0086-00 ME JDH1-05-004-ZAS-TS9-1-PW-SDW-0304-00 09-Aug-23 09-Aug-23 09-Aug-23 CLOSED MO B

87 JDH1-05-004-ZAS-TS9-1-ME-SDW-0087-00 ME WASHOUT & AIR RELEASE VALVE CHAMBER DETAILS JDH1-05-004-ZAS-TS9-1-PW-SDW-0305 09-Aug-23 09-Aug-23 09-Aug-23 CLOSED MO B
88 JDH1-05-004-ZAS-TS9-1-ME-SDW-0088-00 ME TRENCH DETAILS JDH1-05-004-ZAS-TS9-1-PW-SDW-0302-00 09-Aug-23 09-Aug-23 23-Aug-23 23-Aug-23 28-08-2023 CLOSED MO B
GRADE BEAM REINFORCEMENT DETAIL (ENLARGED ) AT AXIS - H & P SHEET 01 OF 07 (BLOCK-02)
GRADE BEAM REINFORCEMENT DETAIL ( ENLARGED ) ATAXIS - H & P SHEET 02 OF 07 (BLOCK-02)
GRADE BEAM REINFORCEMENT DETAIL ( ENLARGED ) AT AXIS - H & P SHEET 03 OF 07 (BLOCK-02 ) JDH1-05-004-ZAS-TS9-1-ST-SDW-0137A-00
GRADE BEAM REINFORCEMENT DETAIL ( ENLARGED ) JDH1-05-004-ZAS-TS9-1-ST-SDW-0137B-00
AT AXIS - H & P SHEET 04 OF 07 (BLOCK-02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0137C-00
GRADE BEAM REINFORCEMENT DETAIL ( ENLARGED ) JDH1-05-004-ZAS-TS9-1-ST-SDW-0137D-00
89 JDH1-05-004-ZAS-TS9-1-ST-SDW-0089-00 ST 12-Aug-23 12-Aug-23 21-08-2023 CLOSED MO B
AT AXIS - H & P SHEET 05 OF 07 (BLOCK-02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0137E-00
GRADE BEAM REINFORCEMENT DETAIL ( ENLARGED ) JDH1-05-004-ZAS-TS9-1-ST-SDW-0137F-00
AT AXIS - H & P SHEET 06 OF 07 (BLOCK-02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0137G-00
GRADE BEAM REINFORCEMENT DETAIL ( ENLARGED )
AT AXIS - H & P SHEET 07 OF 07 (BLOCK-02)
SECTION - B, GRADE BEAM
REINFORCEMENT DETAIL ( ENLARGED )
90 JDH1-05-004-ZAS-TS9-1-ST-SDW-0090-00 ST JDH1-05-004-ZAS-TS9-1-ST-SDW-0138-00 12-Aug-23 12-Aug-23 20-08-2023 CLOSED MO B
BLOCK - B2
SECTION - G, GRADE BEAM REINFORCEMENT DETAIL
( ENLARGED )SHEET 01 OF 07 (BLOCK - 2)
SECTION - G, GRADE BEAM REINFORCEMENT DETAIL
( ENLARGED )SHEET 02 OF 07 (BLOCK - 2)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0139A
SECTION - G, GRADE BEAM REINFORCEMENT DETAIL
JDH1-05-004-ZAS-TS9-1-ST-SDW-0139B
( ENLARGED ) SHEET 03 OF 07 (BLOCK - 2)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0139C
SECTION - G, GRADE BEAMREINFORCEMENT DETAIL
JDH1-05-004-ZAS-TS9-1-ST-SDW-0139D
91 JDH1-05-004-ZAS-TS9-1-ST-SDW-0091-00 ST ( ENLARGED )SHEET 04 OF 07 (BLOCK - 2) 12-Aug-23 12-Aug-23 19-08-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-ST-SDW-0139E
SECTION - G, GRADE BEAM REINFORCEMENT DETAIL
JDH1-05-004-ZAS-TS9-1-ST-SDW-0139F
( ENLARGED )SHEET 05 OF 07 (BLOCK - 2)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0139G
SECTION - G, GRADE BEAM REINFORCEMENT DETAIL
( ENLARGED )SHEET 06 OF 07 (BLOCK - 2)
SECTION - G, GRADE BEAM REINFORCEMENT DETAIL
( ENLARGED )SHEET 07 OF 07 (BLOCK - 2)
SECTION - H, GRADE BEAM REINFORCEMENT DETAIL
( ENLARGED ) SHEET 01 OF 04 (BLOCK-02)
SECTION - H, GRADE BEAM REINFORCEMENT DETAIL
( ENLARGED ) SHEET 02 OF 04 (BLOCK-02)
92 JDH1-05-004-ZAS-TS9-1-ST-SDW-0092-00 ST SECTION - H, GRADE BEAM REINFORCEMENT DETAIL 12-Aug-23 12-Aug-23 19-08-2023 CLOSED MO B
( ENLARGED ) SHEET 03 OF 04 (BLOCK-02)
SECTION - H, GRADE BEAM REINFORCEMENT DETAIL
( ENLARGED ) SHEET 04 OF 04 (BLOCK-02)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0140AJDH1-05-004-ZAS-TS9-1-ST-SDW-0140B
SECTION-D , GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 01 OF 04)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0136A
SECTION-D , GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 02 OF 04)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0136B
SECTION-D , GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 03 OF 04)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0136C
93 JDH1-05-004-ZAS-TS9-1-ST-SDW-0093-00 ST SECTION-D , GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 04 OF 04) 12-Aug-23 12-Aug-23 23-08-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-ST-SDW-0136D

GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 01 OF 07) JDH1-05-004-ZAS-TS9-1-ST-SDW-0133A


GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 02 OF 07) JDH1-05-004-ZAS-TS9-1-ST-SDW-0133B
GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 03 OF 07) JDH1-05-004-ZAS-TS9-1-ST-SDW-0133C
GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 04 OF 07) JDH1-05-004-ZAS-TS9-1-ST-SDW-0133D
94 JDH1-05-004-ZAS-TS9-1-ST-SDW-0094-00 ST 12-Aug-23 12-Aug-23 22-08-2023 CLOSED MO B
GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 05 OF 07) JDH1-05-004-ZAS-TS9-1-ST-SDW-0133E
GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 06 OF 07) JDH1-05-004-ZAS-TS9-1-ST-SDW-0133F
GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 07 OF 07) JDH1-05-004-ZAS-TS9-1-ST-SDW-0133F

95 JDH1-05-004-ZAS-TS9-1-ST-SDW-0095-00 ST SECTION –C, GRADE BEAM REINFORCEMENT DETAIL(ENLARGED SHEET 01 OF 07)SECTION –C GRADE BEAM REINFORCEMENT 12-Aug-23
JDH1-05-004-ZAS-TS9-1-ST-SDW-0135AJDH1-05-004-ZAS-TS9-1-ST-SDW-0135B
DETAIL(ENLARGED SHEET 02 OF 07) 12-Aug-23 23-08-2023 CLOSED MO B
96 JDH1-05-004-ZAS-TS9-1-ST-SDW-0096-00 ST FALSE COLUMN DETAIL- K, ENLARGED) & REINFORCEMENT DETAIL JDH1-05-004-ZAS-TS9-1-ST-SDW-0141-00 12-Aug-23 12-Aug-23 01-Oct-23 30-Sep-23 12-Oct-23 11-Oct-23 12-Oct-23 CLOSED MO B
97 JDH1-05-004-ZAS-TS9-1-ST-SDW-0097-00 ST SECTION B-B GRADE BEAM REINFORCEMENT DETAIL(ENLARGED) JDH1-05-004-ZAS-TS9-1-ST-SDW-0134-00 12-Aug-23 12-Aug-23 20-08-2023 CLOSED MO B
PIPE SLEEVES AT GRADE BEAM LAYOUT
PIPE SLEEVES AT GRADE BEAM LAYOUT
ENLARGED PART 1, (SHEET 01 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0144-00
PIPE SLEEVES AT GRADE BEAM LAYOUT JDH1-05-004-ZAS-TS9-1-ST-SDW-0145A-00
ENLARGED PART 2, (SHEET 02 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0145B-00
98 JDH1-05-004-ZAS-TS9-1-ST-SDW-0098-00 ST 16-Aug-23 16-Aug-23 20-08-2023 CLOSED MO B
PIPE SLEEVES AT GRADE BEAM LAYOUT JDH1-05-004-ZAS-TS9-1-ST-SDW-0145C-00
ENLARGED PART 3, (SHEET 03 OF 04) JDH1-05-004-ZAS-TS9-1-ST-SDW-0145D-00
PIPE SLEEVES AT GRADE BEAM LAYOUT
ENLARGED PART 4, (SHEET 04 OF 04)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0142-00
99 JDH1-05-004-ZAS-TS9-1-ST-SDW-0099-00 ST GRADE SLAB SECTION DETAIL (BLOCK – B1) 20-Aug-23 20-Aug-23 22-08-2023 CLOSED MO B

JDH1-05-004-ZAS-TS9-1-ST-SDW-0143-00
100 JDH1-05-004-ZAS-TS9-1-ST-SDW-0100-00 ST GRADE SLAB SECTION DETAIL (BLOCK – B2) 28-Aug-23 20-Aug-23 28-08-2023 CLOSED MO B

TOILET DETAIL SMALL FACTORY-P1 BLOCK - 1 JDH1-05-004-ZAS-TS9-1-AR-SDW-0701A-00


TOILET DETAIL SMALL FACTORY-P2 BLOCK - 1 JDH1-05-004-ZAS-TS9-1-AR-SDW-0701B-00
101 JDH1-05-004-ZAS-TS9-1-AR-SDW-0101-00 ST TOILET DETAIL SMALL FACTORY- P1 BLOCK - 2 JDH1-05-004-ZAS-TS9-1-AR-SDW-0703A-00 20-Aug-23 20-Aug-23 28-08-2023 CLOSED MO B
TOILET DETAIL SMALL FACTORY- P2 BLOCK - 2 JDH1-05-004-ZAS-TS9-1-AR-SDW-0703B-00

JDH1-05-004-ZAS-TS9-1-ST-SDW-0146-00
102 JDH1-05-004-ZAS-TS9-1-ST-SDW-0102-00 ST TRENCH PLAN AND DETAIL 20-Aug-23 20-Aug-23 02-Oct-23 26-Sep-23 02-Oct-23 CLOSED MO B

JDH1-05-004-ZAS-TS9-1-EL-SDW-6000-00 JDH1-05-004-ZAS-TS9-1-EL-
103 JDH1-05-004-ZAS-TS9-1-EL-SDW-0103-00 EL PUMP ROOM TYPICAL PANEL BOARD SCHEDULE, SINGLE LINE DIAGRAM AND PUMP SCHEDULE 22-Aug-23 22-Aug-23 02-Sep-23 02-Sep-23 02-09-2023 CLOSED MO B
SDW-6000A-00

Up to Date: 10/31/2023 3 of Document Control Center


COLUMN - C1, DETAIL (BLOCK -2) FROM EL.+17.70 TO +23.685
SHEET 01 OF 05
COLUMN - C2, DETAIL (BLOCK -2) FROM EL.+17.70 TO +23.685 JDH1-05-004-ZAS-TS9-1-ST-SDW-0147A
SHEET 02 OF 05 JDH1-05-004-ZAS-TS9-1-ST-SDW-0147B
COLUMN - C2A, DETAIL (BLOCK -2) FROM EL.+17.70 TO +23.685 JDH1-05-004-ZAS-TS9-1-ST-SDW-0147C
104 JDH1-05-004-ZAS-TS9-1-ST-SDW-0104-00 ST 30-Aug-23 28-Aug-23 30-08-2023 CLOSED MO B
SHEET 03 OF 05 JDH1-05-004-ZAS-TS9-1-ST-SDW-0147D
COLUMN - C3, DETAIL (BLOCK -2) FROM EL.+17.70 TO +23.685 JDH1-05-004-ZAS-TS9-1-ST-SDW-0147E
SHEET 04 OF 05
COLUMN - C4, DETAIL (BLOCK -2) FROM EL.+17.70 TO +2070
SHEET 05 OF 05
GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11 REINFORCEMENT DETAIL ( ENLARGED ) SHEET 01 OF 04 (BLOCK-02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0149A
GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11 REINFORCEMENT DETAIL ( ENLARGED ) SHEET 02 OF 04 (BLOCK-02 JDH1-05-004-ZAS-TS9-1-ST-SDW-0149B
105 JDH1-05-004-ZAS-TS9-1-ST-SDW-0105-00 ST GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11 REINFORCEMENT DETAIL ( ENLARGED ) SHEET 03 OF 04 (BLOCK-02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0149C 29-Aug-23 29-Aug-23 30-08-2023 CLOSED MO B
GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11 REINFORCEMENT DETAIL ( ENLARGED ) SHEET 04 OF 04 (BLOCK-02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0149D

106 JDH1-05-004-ZAS-TS9-1-ST-SDW-0106-00 ST BOX CULVERT NECK CONCRETE AND REINFORCEMENT DETAIL JDH1-05-004-ZAS-TS9-1-ST-SDW-0154-00 30-Aug-23 30-Aug-23 02-09-2023 CLOSED MO B
GRADE BEAM SECTION AT AXIS- J & N REINFORCEMENT DETAIL ( ENLARGED ) BLOCK-02 JDH1-05-004-ZAS-TS9-1-ST-SDW-0151
107 JDH1-05-004-ZAS-TS9-1-ST-SDW-0107-00 ST GRADE BEAM SECTION AT AXIS- B & F REINFORCEMENT DETAIL ( ENLARGED ) BLOCK-01 JDH1-05-004-ZAS-TS9-1-ST-SDW-0152 30-Aug-23 30-Aug-23 03-09-2023 CLOSED MO B

108 JDH1-05-004-ZAS-TS9-1-EL-SDW-0108-00 EL LOW VOLTAGE NETWORK ELECTRICAL METER CO-ORDINATE LAYOUT JDH1-05-004-ZAS-TS9-1-EL-SDW-2000B 04-Sep-23 04-Sep-23 06-09-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-MEP-SDW-0501-00
GRADE SLAB SLEEVES LAYOUT
JDH1-05-004-ZAS-TS9-1-MEP-SDW-0501A-00
GRADE SLAB SLEEVES LAYOUT(ENLARGED)
JDH1-05-004-ZAS-TS9-1-MEP-SDW-0501B-00
GRADE SLAB SLEEVES LAYOUT(ENLARGED)
JDH1-05-004-ZAS-TS9-1-MEP-SDW-0501C-00
109 JDH1-05-004-ZAS-TS9-1-MEP-SDW-0109-00 ME GRADE SLAB SLEEVES LAYOUT(ENLARGED) 04-Sep-23 04-Sep-23 17-Sep-23 13-Sep-23 25-Sep-23 24-Sep-23 25-Sep-23 CLOSED MO C
JDH1-05-004-ZAS-TS9-1-MEP-SDW-0501C-00
GRADE SLAB SLEEVES LAYOUT(ENLARGED)
JDH1-05-004-ZAS-TS9-1-MEP-SDW-0501D-00
GRADE SLAB SLEEVES LAYOUT(ENLARGED)

COLUMN - C1, DETAIL (BLOCK -1) FROM EL.+17.40 TO +23.385


SHEET 01 OF 05
COLUMN – C2, DETAIL (BLOCK -1) FROM EL.+17.40 TO +23.385
JDH1-05-004-ZAS-TS9-1-ST-SDW-0148A-00
SHEET 02 OF 05
JDH1-05-004-ZAS-TS9-1-ST-SDW-0148B-00
COLUMN – C2A, DETAIL (BLOCK -1) FROM EL.+17.40 TO +23.385
JDH1-05-004-ZAS-TS9-1-ST-SDW-0148C-00
110 JDH1-05-004-ZAS-TS9-1-ST-SDW-0110-00 ST SHEET 03 OF 05 05-Sep-23 05-Sep-23 07-09-2023 CLOSED MO B
JDH1-05-004-ZAS-TS9-1-ST-SDW-0148D-00
COLUMN – C3, DETAIL (BLOCK -1) FROM EL.+17.40 TO +23.385
JDH1-05-004-ZAS-TS9-1-ST-SDW-0148E-00
SHEET 04 OF 05
COLUMN – C3, DETAIL (BLOCK -1) FROM EL.+17.40 TO +23.385
SHEET 05 OF 05
GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11
REINFORCEMENT DETAIL ( ENLARGED )
SHEET 01 OF 04 (BLOCK-01)
GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11
REINFORCEMENT DETAIL ( ENLARGED ) JDH1-05-004-ZAS-TS9-1-ST-SDW-0153A-00
SHEET 02 OF 04 (BLOCK-01) JDH1-05-004-ZAS-TS9-1-ST-SDW-0153B-00
111 JDH1-05-004-ZAS-TS9-1-ST-SDW-0111-00 ST GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11 JDH1-05-004-ZAS-TS9-1-ST-SDW-0153C-00 09-Sep-23 05-Sep-23 09-09-2023 CLOSED MO B
REINFORCEMENT DETAIL ( ENLARGED ) JDH1-05-004-ZAS-TS9-1-ST-SDW-0153D-00
SHEET 03 OF 04 (BLOCK-01
GRADE BEAM SECTION AT AXIS-3,5,7,9 & 11
REINFORCEMENT DETAIL ( ENLARGED )
SHEET 04 OF 04 (BLOCK-01)
LIST OF DRAWING JDH1-05-004-ZAS-TS9-1-LS-SDW-0002-00
GENEREAL NOTES JDH1-05-004-ZAS-TS9-1-LS-SDW-0003-00
LANDSCAPE FINISH SITE PLAN JDH1-05-004-ZAS-TS9-1-LS-SDW-0101-00
112 JDH1-05-004-ZAS-TS9-1-LS-SDW-0112 LS 18-Sep-23 16-Sep-23 18-Sep-23 CLOSED MO B
SETTING OUT SITE PLAN JDH1-05-004-ZAS-TS9-1-LS-SDW-0102-00
LANDSCAPE GENERAL DETAILS JDH1-05-004-ZAS-TS9-1-LS-SDW-0103-00

113 JDH1-05-004-ZAS-TS9-1-ST-SDW-0113 ST GRP WATER TANK FOUNDATION STRUCTURAL DETAILS JDH1-05-004-ZAS-TS9-1-LS-SDW-0201B 20-Aug-23 19-Aug-23 20-Aug-23 CLOSED MO C
TOILET AREA ROOF BEAM REINFORCEMENT DETAIL (ENLARGED)SHEET 01 OF 03 (BLCOK -02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0155A
TOILET AREA ROOF BEAM REINFORCEMENT DETAIL (ENLARGED)SHEET 02 OF 03 (BLCOK -02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0155B
114 JDH1-05-004-ZAS-TS9-1-ST-SDW-0114 ST 01-Oct-23 28-09-2023. 01-Oct-23 CLOSED MO B
TOILET AREA ROOF BEAM REINFORCEMENT DETAIL (ENLARGED)SHEET 03 OF 03 (BLCOK -02) JDH1-05-004-ZAS-TS9-1-ST-SDW-0155C

PUMP ROOM & GRP WATER TANK PLUMBING AND FIR FIGHTING LAYOUT JDH1-05-004-ZAS-TS9-1-ME-SDW-0501
115 JDH1-05-004-ZAS-TS9-1-ME-SDW-0115 ME PUMP ROOM & GRP WATER TANK SECTIONS JDH1-05-004-ZAS-TS9-1-ME-SDW-0502 14-Oct-23 02-Oct-23 14-10-2023 CLOSED MO C

116 JDH1-05-004-ZAS-TS9-1-EL-SDW-0116 EL TELECOM NETWORK LAYOUT JDH1-05-004-ZAS-TS9-1-EL-SDW-4000 05-Oct-23 05-Oct-23 05-Oct-23 CLOSED MO B
DROP BEAM SECTION AT AXIS- 1 & 13
REINFORCEMENT DETAIL (ENLARGED)
SHEET 01 OF 03 (BLOCK-01)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0156A-00
DROP BEAM SECTION AT AXIS- 1 & 13
REINFORCEMENT DETAIL (ENLARGED)
117 JDH1-05-004-ZAS-TS9-1-ST-SDW-0117 ST JDH1-05-004-ZAS-TS9-1-ST-SDW-0156B-00 10-Oct-23 09-Oct-23 10-Oct-23 CLOSED MO B
SHEET 02 OF 03 (BLOCK-01)
JDH1-05-004-ZAS-TS9-1-ST-SDW-0156C-00
DROP BEAM SECTION AT AXIS- 1 & 13
REINFORCEMENT DETAIL (ENLARGED)
SHEET 03 OF 03 (BLOCK-01)
DROP BEAM SECTION AT AXIS- D REINFORCEMENT DETAIL (ENLARGED) SHEET 01 OF 07 (BLOCK-01)
DROP BEAM SECTION AT AXIS- D REINFORCEMENT DETAIL
(ENLARGED) SHEET 02 OF 07 (BLOCK-01)
DROP BEAM SECTION AT AXIS- D REINFORCEMENT DETAIL ST-SDW-0157A
(ENLARGED) SHEET 03 OF 07 (BLOCK-01) ST-SDW-0157B
DROP BEAM SECTION AT AXIS- D REINFORCEMENT DETAIL ST-SDW-0157C
(ENLARGED) SHEET 04 OF 07 (BLOCK-01) ST-SDW-0157D
118 JDH1-05-004-ZAS-TS9-1-ST-SDW-0118 ST 09-Oct-23 09-Oct-23 09-Oct-23 CLOSED MO B
DROP BEAM SECTION AT AXIS- D REINFORCEMENT DETAIL ST-SDW-0157E
(ENLARGED) SHEET 05 OF 07 (BLOCK-01) ST-SDW-0157F
DROP BEAM SECTION AT AXIS- D REINFORCEMENT DETAIL ST-SDW-0157G
(ENLARGED) SHEET 06 OF 07 (BLOCK-01)
DROP BEAM SECTION AT AXIS- D REINFORCEMENT DETAIL
(ENLARGED) SHEET 07 OF 07 (BLOCK-01)
DROP BEAM SECTION AT AXIS- A & G REINFORCEMENT DETAIL
( ENLARGED ) SHEET 01 OF 06 (BLOCK-01)
DROP BEAM SECTION AT AXIS- A & G REINFORCEMENT DETAIL
( ENLARGED ) SHEET 02 OF 06 (BLOCK-01) ST-SDW-0158A
DROP BEAM SECTION AT AXIS- A & G REINFORCEMENT DETAIL ST-SDW-0158B
( ENLARGED ) SHEET 03 OF 06 (BLOCK-01) ST-SDW-0158C
119 JDH1-05-004-ZAS-TS9-1-ST-SDW-0119 ST DROP BEAM SECTION AT AXIS- A & G REINFORCEMENT DETAIL ST-SDW-0158D 10-Oct-23 09-Oct-23 10-Oct-23 CLOSED MO C
( ENLARGED ) SHEET 04 OF 06 (BLOCK-01) ST-SDW-0158E
DROP BEAM SECTION AT AXIS- A & G REINFORCEMENT DETAIL ST-SDW-0158F
( ENLARGED ) SHEET 05 OF 06 (BLOCK-01)
DROP BEAM SECTION AT AXIS- A & G REINFORCEMENT DETAIL
( ENLARGED ) SHEET 06 OF 06 (BLOCK-01)
DROP BEAM SECTION AT AXIS- 1 & 13 REINFORCEMENT DETAIL
(ENLARGED) SHEET 01 OF 03 (BLOCK-02)
ST-SDW-0159A
DROP BEAM SECTION AT AXIS- 1 & 13 REINFORCEMENT DETAIL
ST-SDW-0159B
JDH1-05-004-ZAS-TS9-1-ST-SDW-0120-00 ST (ENLARGED )SHEET 02 OF 03 (BLOCK-02) 11-Sep-23 11-Sep-23 11-Oct-23 CLOSED MO C
ST-SDW-0159C
DROP BEAM SECTION AT AXIS- 1 & 13 REINFORCEMENT DETAIL
(ENLARGED ) SHEET 03 OF 03 (BLOCK-02)
DROP BEAM SECTION AT AXIS- L REINFORCEMENT DETAIL (ENLARGED) SHEET 01 OF 07 (BLOCK-02) ST-SDW-0160A
DROP BEAM SECTION AT AXIS- L REINFORCEMENT DETAIL (ENLARGED) SHEET 02 OF 07 (BLOCK-02) ST-SDW-0160B
DROP BEAM SECTION AT AXIS- L REINFORCEMENT DETAIL (ENLARGED) SHEET 03 OF 07 (BLOCK-02) ST-SDW-0160C
DROP BEAM SECTION AT AXIS- L REINFORCEMENT DETAIL (ENLARGED) SHEET 04 OF 07 (BLOCK-02) ST-SDW-0160D
121 JDH1-05-004-ZAS-TS9-1-ST-SDW-0121 ST 21-Oct-23 11-Oct-23 21-Oct-23 CLOSED MI B
DROP BEAM SECTION AT AXIS- L REINFORCEMENT DETAIL (ENLARGED) SHEET 05 OF 07 (BLOCK-02) ST-SDW-0160E
DROP BEAM SECTION AT AXIS- L REINFORCEMENT DETAIL (ENLARGED) SHEET 06 OF 07 (BLOCK-02) ST-SDW-0160F
DROP BEAM SECTION AT AXIS- L REINFORCEMENT DETAIL (ENLARGED) SHEET 07 OF 07 (BLOCK-02) ST-SDW-0160G

Up to Date: 10/31/2023 4 of Document Control Center


DROP BEAM SECTION AT AXIS- H & P REINFORCEMENT DETAIL
( ENLARGED ) SHEET 01 OF 06 (BLOCK-02)
DROP BEAM SECTION AT AXIS- H & P REINFORCEMENT DETAIL
( ENLARGED ) SHEET 02 OF 06 (BLOCK-02) ST-SDW-0161A
DROP BEAM SECTION AT AXIS- H & P REINFORCEMENT DETAIL ST-SDW-0161B
( ENLARGED ) SHEET 03 OF 06 (BLOCK-02) ST-SDW-0161C
122 JDH1-05-004-ZAS-TS9-1-ST-SDW-0122 ST DROP BEAM SECTION AT AXIS- H & P REINFORCEMENT DETAIL ST-SDW-0161D 11-Sep-23 11-Sep-23 11-Oct-23 CLOSED MO C
( ENLARGED ) SHEET 04 OF 06 (BLOCK-02) ST-SDW-0161E
DROP BEAM SECTION AT AXIS- H & P REINFORCEMENT DETAIL ST-SDW-0161F
( ENLARGED ) SHEET 05 OF 06 (BLOCK-02)
DROP BEAM SECTION AT AXIS- H & P REINFORCEMENT DETAIL
( ENLARGED ) SHEET 06 OF 06 (BLOCK-02)
ST-SDW-0113
123 JDH1-05-004-ZAS-TS9-1-ST-SDW-0123 ST ROOF FRAMING – ADDITIONAL TOP REINFORCEMENT 19-Oct-23 19-Oct-23 19-Oct-23 CLOSED MO B

ROOF FRAMING – ADDITIONAL BOTTOM REINFORCEMENT ST-SDW-0115


124 JDH1-05-004-ZAS-TS9-1-ST-SDW-0124 ST STRUCTURAL SECTIONAL DETAILS ST-SDW-0116F 19-Oct-23 19-Oct-23 19-Oct-23 CLOSED MO B

125 JDH1-05-004-ZAS-TS9-1-AR-SDW-0125 AR ROLL UP SHUTTER DOOR AR-SDW-0125 24-Oct-23 OPEN


126 JDH1-05-004-ZAS-TS9-1-SW-SDW-0126 SW STANDARD DETAILS (SHEET 01 OF 01) SW-SDW-0126 30-Oct-23 OPEN

Up to Date: 10/31/2023 5 of Document Control Center