Work Construction Progress Comment
Work Construction Progress Comment
Work Construction Progress Comment
Facility ID Activity
W206 W207 Progress Cumm Status
Plan / QTY % QTY % Qty %
W-207 REVIEW UoM QUANTITY
Actual
Facility 1
Activity W-207 as per Construction COMMENTS 1.1 I Alumina Plant
Code
Progress Calculation Sheet 1.1.1 Facility Bauxite Stockyard
Alumina Plant (%) (%) Plan Completed Completed Completed Completed Completed 100,00%
2P01 Piling Piles 316.00
-Check Formula Error in Row of Plan (please see the Actual 0.0% 0.0% 316.00 100.00% FINISH
2P01 Bauxite Stockyard 87.62% 87.62%
column J & error on yellow colour) Plan Completed Completed Completed Completed Completed 100,00%
2P01 Excavation m³ 15000.00
Actual 0.0% 0.0% 9250.00 61.67% IN PROGRESS
2P04(02) Digestion 100% 100% -Check Formula Error in Row of Plan
Plan - #DIV/0! - #DIV/0! 101.25 56.25%
2P01 Lean Concrete m³ 180.00
2P07 Integrated Filtration 98.26% 98.26% -Check Formula Error in Row of Plan Actual 0.0% 0.0% 180.00 100.00% FINISH
Plan - #DIV/0! - #DIV/0! 130.00 67.01%
D01 - Power Distribution System of 2P01 Rebar Fabrication ton 194.00
2P15(01)
Alumina Plan
100% 100% Included with the 2P16(06) Actual 0.0% 0.0% 194.00 100.00% FINISH
-Progress not yet 100%, as per the presentation slide Plan 0.57 #DIV/0! 0.57 #DIV/0! 37.57 19.37%
2P01 Rebar Installation ton 194.00
S01 - Power Substation System of 7.2% 0.5%
2P16(01) 98.03% 98.03% EPC shown 100% progress achieved, EPC to check Actual 14.00 1.00 190.00 97.94% IN PROGRESS
Alumina Plant
and clarify. Plan - #DIV/0! - #DIV/0! 1000.00 13.33%
2P01 Formwork Installation ㎡ 7500.00
Actual 250.00 3.3% 200.00 2.7% 7250.00 96.67% IN PROGRESS
Thermal Power Plant
Plan 122.43 #DIV/0! 122.43 #DIV/0! 432.43 15.44%
Coal Gas Plant 2P01 Concrete Pouring m³ 2800.00
Actual 40.00 1.4% 11.00 0.4% 1943.00 69.39% IN PROGRESS
Utilities
71.61 #DIV/0! 71.61 #DIV/0! 71.61 4.35%
-Progress not yet 100%, as per the presentation slide 2P01 Steel Structure ton 1647.00
Plan
0.0% 0.0%
2U03 Water Purification Plant 99.27% 99.27% EPC shown 100% progress achieved, EPC to check Actual 0.00 0.00% NOT START
and clarify.
-Progress not yet 100%, as per the presentation slide
Circulating Water of the Alumina
2U05(01)
Plan OF Bauxite Grinding
97.55% 97.55% EPC shown 100% progress achieved, EPC to check
and clarify.
-Progress not yet 100%, as per the presentation slide
Circulating Water of the Alumina
2U05(07) 98.18% 98.18% EPC shown 100% progress achieved, EPC to check
Plan of Calcination
and clarify.
-Progress not yet 100%, as per the presentation slide
Circulating Water of the Alumina
2U05(08)
Plan of Compres Air Station
93.07% 93.07% EPC shown 100% progress achieved, EPC to check
and clarify.
Fence and Gate and Guard 60.62% 60.62% -No Excel File for 2U13-Roads
Comprehensive Repair Workshop 100.00% 100.00% -No Excel File for 2U15-Spare Part Storage
Tailing System
Circulating Water for Red Mud
Pressure Filtration
0.00% 0.00% -No Excel File for 2T06-Return water regulating pond
ENGINEERING OUTSIDE PLANT
General Layout, Vertical Planning
and Roads of Plant
15.90% 15.90% -No Excel File for 2E03-Roads outside plant