Masisa S.A.

PLANTA MAPAL CONCEPTION


MAINTENANCE REPORT DYNASTEAM
Customer MASISA S.A.

Project 21IP349 DYNASTEAM UPGRADE


Place PLANTA MAPAL CONCEPCION
Line MDF
Date From 29/08/2022 to 08/09/2022
Report written by BIGHI LUCA
Copy of report to Imal Mr. Roberto Manfredini
Mr. Salvatore Russo
Mr. Giovanni Garrubba
Mr. Maurizio Malferrari
Report
Copy of report to Mr. CLAUDIO PARRA
MEDITE
Reason for visit --- DYNASTEAM CHECK---
--- DYNASTEAM UPGRADE---
Technicians on site Mr. BIGHI LUCA

1) Installation new heated rounded bar roller support of Dynasteam


Activities carried out 2) Installation new heated plate of Dynasteam
3) Installation compressed air device for belt cleaning top & Bottom
4) Installation of new Belt Top & Bottom
5) Dynasteam Check
DYNASTEAM – Steam Injection Masisa Mapal
Dynasteam - Conveyor Sistem
Dynasteam – Principal Components
DYNASTEAM CHECK

1. Make sure the slots on the top steam box are clean CLEAN OK 
2. Check belt wear/make sure belt is clean INST. NEW BELT ☒
3. Check fixed rolling knife edge/rolls for signs of wear SEE REPORT 
TO POINT A
4. Check rubber-coated drive roll for signs of wear SEE REPORT 
TO POINT B
5. Check displacement sensor paddle for signs of wear CARRIE OUT 
6. Check wear and position of belt cleaning brush SEE REPORT ☒
TO POINT C
Make sure the machine is level by taking the
7.
measurements on the 4 jacks
SEE REPORT ☒
TO POINT D
8. Lubricate generally and with automatic cartridges SEE REPORT TO ☒
MANTENANCE
SCHEDULE BELOW
Inspect the bottom steam box inside with an
9.
endoscope
SEE REPORT 
TO POINT E
INTERMEDIATE CONVEYOR CHECK

Make sure the slots on the bottom steam box are 


1. CLEAN OK
clean
2. Check belt wear/make sure belt is clean INST. NEW BELT ☒
3. Check fixed rolling knife edge/rolls for signs of wear SEE REPORT 
TO POINT A
4. Check rubber-coated drive roll for signs of wear SEE REPORT ☒
TO POINT B
5. Check displacement sensor paddle for signs of wear CARRIED OUT 
6.
Check wear and position of belt cleaning brush
SEE REPORT 
TO POINT C
7. Lubricate generally and with automatic cartridges SEE REPORT TO 
MAINTENANCE
SCHEDULE
BELOW
Inspect the top steam box inside with an endoscope
8. SEE REPORT ☒
TO POINT E
Rolling Knife Edge replaced with new ones on the
Dynasteam and Intermediate Conveyor
POINT A

Life time more or less 4-6 months


RUBBER ROLL HARDNESS CHECK
POINT B

SUGGESTION: To resume the initial hardness values, the surface


should be scraped with sandpaper.
This would extend the grip of the roller by a few months

SHORE A 70
Check wear and position of belt cleaning Brush Done
POINT C
CONDITION O F THE CLEANING BRUSH AT CHECK TIME
We check the machine is level
by taking the measurements on the 4 jacks Done
POINT D

At The Check time we did not have


The possibility to check the measurement
at the minimum height position,i suggest
to check, and follow the istruction below
In the maintenance schedule.
CONSIDERATIONS REGARDING THE CONTROL OF THE STEAM BOX SECTORS

The chemical components that are used to treat the steam generator water are
starting to attack the internal parts and pipes.
The lower box still had residues of condensation water, from when it cooled
down, after switching off. I suggest keeping the steam in the heating circuit open
for at least an hour before closing it so as to better dry the condensation that
forms in the last sections of the pipe.

From our experience, the average life of Steam boxes is around 5-6 years. It is
advisable to keep the box monitored, close and open the lateral sectors

checking if the width of the blowing steam is reduced or not


IMPORTANT UPGRADE SUGGESTED

I suggest to implement the automatic tare function of the load cells.


it involves a very small electrical change, in the local panel , and the software
modification. With this modification it is certain that when the Dynasteam comes into
Contact with the mattress it displays the real weight of the machine in contact
and there are no accumulations of kg. both to the right and to the left, which would
give an alarm and cause the Dynasteam to rise to the maximum position at the top.
Operators will no longer have to open the local panel in order to be able to
tare the DT800 amplifiers. This modification need more ore less 4 hours time
that we can’t use the Dynasteam in production
IMPORTANT UPGRADE SUGGESTED

I highly recommend installing


two pneumatic valves, easily to be
menaged, by connecting them
with a 6mm air hose, in the existing
panel, in the available solenoid
valves, and controlled by the HMI
through Software modification.
Time needed more ore less 4hours
Without Dynasteam Production.
these valves open,
when the steam is turned off,
to reduce the condensation
and pressure in the Steam Box
TOP AND BOTTOM
I highly recommend in the bottom
steam box, because as you can see
from the photos above, a lot of
condensation forms inside when
the steam closes
CHECK SUGGESTED: INCLINATION SENSOR

I noticed, when installing the Dynasteam update, that the device, the inclination sensor,
has some problems, and that the operators put the Dynasteam into production by
activating the angle tracking, in manual mode, it is a little bit dangerous,
some productions could be damaged on the surface.
I recommend the purchase of an inclination sensor, in stock it is always useful to have
a spare inclination sensor (now Masisa has two of Dynasteam) and to make an
accurate software control, which was not possible to do remotely.
CONDENSATE WATER IN COMPRESSED AIR CIRCUITS

There is condensation water in the


compressed air circuit that feeds the
Proportional Valves in the DYNASTEAM
steam panel, it is recommended to
drain the water, which creates
malfunction of the Pneumatic Valve
Actuator
Dynasteam and Transferbelt - Mantenance Schedule 1/9

CLEAN THE SURROUNDING AREA ONCE A WEEK

INSPECT STEAM CIRCUIT PIPING (CHECK AND REPAIRE LEAKAGE) EVERY 2 WEEKS
Dynasteam and Transferbelt - Mantenance Schedule 2/9
CLEAN THE STEAM FILTER

ONCE EVERY 5 WEEKS


Dynasteam and Transferbelt - Mantenance Schedule 3/9

CLEAN THE HIGHT SENSOR SISTEM LASER DEVICE ONCE A WEEK


Dynasteam and Transferbelt - Mantenance Schedule 4/9
CHECK AND CLEAN THE STEAM BOX SLOTS ONCE EVERY 3 WEEKS
Dynasteam and Transferbelt - Mantenance Schedule 5/9
CHECK TRAVELING NUT WEAR FOR THE LIFTING JACKS ONCE EWERY 4 MONTH

The maximum admissible wear is 2.25 mm and


consequently distance (A) must be 15.75 mm
at the most. If the wear goes beyond this,
the bronze helical crown with the internal
travelling nut will need to be changed .
Dynasteam and Transferbelt - Mantenance Schedule 6/9
INSPECT GREASE CARTRIDGES EVERY 4 MONTS - CHANGE AFTER 6 MONTHS
Dynasteam and Transferbelt - Mantenance Schedule 7/9
WEST AND EAST SIDE
RE-LUBRICATE BEARINGS ONCE EVERY 4 MONTHS

DYNASTEAM
TRANSFERBELT
Dynasteam and Transferbelt - Mantenance Schedule 8/9

CHECK OIL LEVEL IN THE GEARBOXES ONCE EVERY 6 MONTHS

CHANGE OIL IN GEARBOXES ONCE EVERY 3 YEARS


Dynasteam and Transferbelt - Mantenance Schedule 9/9
CHECK ROLLS AND/OR REPLACE ROLLING KNIFE EDGE ONCE EVERY 4 MONTHS