Lifting Plan Rev.1
Lifting Plan Rev.1
Lifting Plan Rev.1
0M GATE NORTH
°
.00
123
MAKKAH
TO
SE
OUTF
ALL
10.00
PARTITION WALL
PARTITION WALL
FE FE FE
13
TOILETS ROOM ROOM ROOM
THIS DRAWING
3.1
1 2 3 4 5 6 TEA
ROOM
ARE
ROOM
RE
ROOM
7 8 9 10 11 12 14
3.1 RC
MEETING
ROOM
KEYPLAN
NOTES
CRANE
1 10.00
TRAILER TRUCK
4.0M GATE
PARKING AREA PARKING AREA PARKING AREA REVIEW STATUS
1 WORK MAY PROCEED 3 REVISE AND RESUBMIT, WORK
SHALL NOT PROCEED
4-SLIING BELT
.0
CRANE
(CAP. 50 TONS)
ED
ED
D
D
ED
WE
NE
ITT
OV
N
K
SIG
AW
VIE
BM
EC
PR
REV.No. DATE ISSUED FOR
DR
CH
RE
SU
DE
AP
HOOK POINT DETAILS Drawing ISSUED FOR REVIEW
SEE HOOK POINT PORTA CABIN Status
4-SLIING BELT
CAP. 4 TONS 6 METERS
JOB No. 027-T10 م10 د-027 قر ما ادو
3.10
10.00 10.00
D-SHACKLE DETAILS CONTRACT No.
SCALE:
12E-C01
DRAWING No.
01 ا2خ212 مقر معاار
REV.
LIFTING DETAILS NTS 12E-035-22UP-SD-CE-007 A