Philippine Port Authority

Contracts Awarded for CY 2018

Head Office
Amount of Date of Date of
Project Contractor
Project NOA Contract

Extension of RC Pier and Construction of Back-up Area with RoRo - Ramp on Fill, Port of Sultan Naga WTG Construction and Dev't. Corporation Mindanao
204,301,400.87 21-Dec-18 13-Mar-19
Dimaporo, Lanao Del Norte Rock / JV
Khan Kon Chi Construction and Dev't Corp,/ Great Swiss
Construction of Coastal Access Road, Port of Calapan, Calapan City, Oriental Mindoro 140,810,163.43 21-Dec-18 11-Mar-19
Metal Builders Corporation / JV

Construction of Back-Up Area, Port of Esperanza, Esperanza, Masbate MGB Construction and Trading 140,195,806.36 21-Dec-18 16-Apr-19

Construction of RC Pier and Continuous RoRo Ramp, POrt of Benoni, Mahinog, Camiguin JEJOR'S Construction Corporation 88,305,110.00 21-Dec-18 26-Feb-19

Extension of RC Wharf and Construction of Back-Up Area, Port of Cawit, Boac Marinduque MARRA Builders, Inc. 124,555,007.01 21-Dec-18 13-Feb-19

Repair and Re-Painting of Seven (7) Pontoon Barges, Installation of Floating Barriers, Sanding and
PIER 44 Shipyard and Development Corporation 16,509,870.32 21-Dec-18 13-Feb-19
Painting of Boat House and Coast Guard Station (CGS) Boat Landing at Malacañang, Manila

Supply, Delivery, Installation, Testing and Commissioning of a Storage Solution Infostorage Corporation 8,978,858.00 21-Dec-18 08-Feb-19
Construction and Offshore Installation of Aids to Marine Navigation at Ports of Iloilo and Dumangas, DALEBO CONSTRUCTION AND GENERAL
232,404,691.57 21-Dec-18 20-Feb-19
Iloilo Province MERCHANDISE/ JARZOE BUILDERS, INC/JV

Construction of Back-Up Area and Port Operations Building, Port of Mauban, Quezon RT Crisman Builders and Construction Supply 135,606,952.10 07-Dec-18 19-Mar-19
Viga Port Development Project, Brgy. Tambongan, Viga, Catanduanes 3CA Builders 8,824,094.48 16-Oct-18 21-Feb-19
Proposed Codon Port Development Project, Port of Codon, San Andres, Catanduanes EDTAHA Builders, Inc. 17,880,943.24 25-Oct-18 08-Feb-19
Proposed Constrution and Offshore Installation of Aids to Marine Navigation at Ports of Ozamiz, DALEBO CONSTRUCTION AND GENERAL
280,934,523.65 07-Dec-18 07-Jan-19
Jimenez and Plaridel, Misamis Occidental MERCHANDISE/ JARZOE BUILDERS, INCJJV
Expansion of Back-up Area and RC Wharf, Port of Cagayan de Oro, Cagayan de Oro City UKC Builders, Inc. 521,898,767.92 19-Nov-18 08-Feb-19
JFAP CONSTRUCTION/RT CRISMAN BUILDERS AND
Construction of RC Pier, Port of Ubay, Bohol 95,897,552.51 19-Nov-18 19-Feb-19
CONSTRUCTION/JV
Brgy. U-Og Port Development Project, Brgy. U-Og, Inabanga, Bohol Khan Kon Chi Construction and Dev't Corp, 44,578,616.78 19-Nov-18
Construction of Back-up Area for Motorpool, Office Storage and Ticketing Office, Port of Tagbilaran,
JFAP Construction 25,250,792.17 25-Oct-18 16-Jan-19
Bohol
MAMSAR Construction & Industrial Corporation / Silver
Proposed Banago Port Expansion Project, Port of Banago, Bacolod City, Negros Occidental Dragon Construction and Lumber and Glass Supply, Inc. 362,698,606.45 16-Oct-18 22-Jan-19
/ JV
Proposed Construction and Offhsore Installation of Aids to Marine Navigation at Port of Dumaguete,
Dalebo Construction & General Merchandise 167,756,549.88 16-Oct-18 16-Nov-18
Tandayag, Larena and Siquijor, PMO-Negros Oriental/Siquijor, Negros Oriental and Siquijor Province
Consultancy Service for the Determination of Actual Appraised Value of the PPA Dredging Vessel (D-
1, D-2, D-3, D-4, D-5 and D-6), Two (2) Attendant Supply Boats, Two (2) Survey Boats, One (1) Speed Claimsmen Adjustment Corporation 450,000.00 20-Sep-18
Boat and Seven (7) Containers of Various Spare Parts Subject foe Disposal
Construction of Port Operations Building, Port of Abra de Ilog, Occidental Mindoro Monolithic Construction & Concrete Products, Inc. 79,829,538.96 04-Oct-18 14-Dec-18

Technical services for the conduct of soil investigation at Davila port, Davila, Pasuquin, Ilocos Norte R.S. Jardin & Associates 950,000.00 02-Oct-18 18-Dec-18

Technical Services for the conduct of soil investigation at basilisa port, Basilisa, Dinagat Island,
R.S. Jardin & Associates 950,000.00 02-Oct-18 18-Dec-18
Surigao
Extension of RC Pier, Port of Sindangan, Zamboanga Del Norte Vicente T. Lao Construction 66,378,098.05 04-Oct-18 07-Jan-19

Widening of Access Trestle and Construction of RoRo Ramp with Platform, Port of Estancia, Iloilo J.S. Layson & Co. Inc 35,900,947.00 04-Oct-18 19-Feb-19

Construction of Back-up Area & Port Operations Building, Port of Coron, Palawan BCT Trading and Construction 267,817,495.21 04-Oct-18 18-Jan-19
Installation of Additional Reservoir at Trestle-2 Port of Iligan, Lanao Del Norte MAMSAR Construction & Industrial Corporation 9,987,027.00 19-Sep-18 17-Jan-19
Supply and Delivery of Office Supplies FNB Educational, Incorporated 10,970,075.00 26-Sep-18 14-Nov-18
Supply and Delivery of Uniforms for PPA Personnel DELS Apparel Corportion 5,685,300.00 26-Sep-18 08-Nov-18
Proposed Rehabilitation and Upgrading of Existing Berth and Back-up Area, Pier 18, Vitas, Tondo,
MRBII Construction Corporation 298,988,736.73 19-Sep-18 07-Nov-18
Manila
Borac Port Development Project, Brgy. Borac, Coron, Palawan HG-III Construction & Development Corporation 319,888,388.49 19-Sep-18 30-Nov-18

Proposed Widening of Wharf Phase-2 (South Bank) TMO Pasig, Pasig River, South Harbor, Manila Multi-System Construction & Development Corp. 96,866,078.77 19-Sep-18 10-Dec-18

Procurement of Technical Services for the Conduct of Soil Investigation at Selected Ports (Package 9) R.S. Jardin & Associates 23,565,100.75 11-Sep-18 18-Dec-18

Higatangan Port Development Project, Brgy. Libertad, Higatangan Island, Naval, Biliran EDTAHA Builders, Inc. 9,055,855.13 01-Aug-18 05-Nov-18
Procurement of PPA Aircraft Charter INAEC Aviation Corporation 14,560,000.00 30-Aug-18
RT Crisman Builders and Construction Supply / JFAP
Construction of RC Deck Apron, Port of Jagna, Bohol 56,740,016.16 08-Aug-18 17-Oct-18
Construction/ Joint Venture
Proposed Construction of Cruise Ship Port, Port of Jubang, Dapa, Surigao Del Norte MAC Builders/Ulticon Builders, Inc/JV 598,128,007.75 13-Aug-18 16-Oct-18
Extensiont of RC Pier & Provision of RoRo Ramp, Port of Virac, Catanduanes BEMKAR Construction 50,474,887.98 31-Aug-18 24-Sep-18
Proposed Siquijor Port Expansion Project, Port of Siquijor, Province of Siquijor WTG Construction & Dev't. Corporation 167,092,960.79 13-Aug-18 22-Nov-18

Proposed Rehabilitation/Improvement of Wharf Port of Catbalogan, Catbalogan City, Samar J.A. Construction and Trading Corporation 9,902,150.22 01-Aug-18 17-Sep-18

Proposed Construction of Cargo Ship Port, Port of Jubang, Dapa, Surigao Del Norte MAC Builders/Ulticon Builders, Inc/JV 636,800,105.00 08-Aug-18 16-Oct-18
Coastal Port (Hamtic & Bugasong Port), Hamtic and Bugasong, Antique Khan Kon Chi Construction and Dev't Corp, 35,480,135.73 01-Aug-18 25-Sep-18
Proposed Villaba Port Development Project, Port of Villaba, Brgy. Silad, Villaba, Leyte LNR Construction 18,599,572.41 01-Aug-18 21-Sep-18
Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Salomague,
Dalebo Construction & General Merchandise 198,600,840.08 08-Aug-18 04-Oct-18
Ilocos Sur and Currimao, Ilocos Norte, Ilocos Province
Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Talibon, Goldridge Construction and Development Corp. / Jarzoe
329,427,458.86 08-Aug-18 05-Sep-18
Catagbacan, Ubay, Maribojo and Getafe, Bohol (Cluter II), Bohol Province Builders, Inc. / JV
Brgy. 6 Wharf Dapa Port Development Project, Dapa, Surigao Del Norte Jacinto Gerona Construction 18,926,654.20 01-Aug-18 16-Oct-18
Brgy. Dagohoy Port Development Project, Dapa, Surigao Del Norte Jacinto Gerona Construction 4,344,304.29 01-Aug-18 05-Oct-18
Proposed Badoc, Port Development Project, Port of Badoc, Badoc, Ilocos Norte Goldridge Construction and Development Corp. 18,005,671.39 01-Aug-18 05-Nov-18
Construction of Port Operations Building, Port of Currimao, Ilocos Norte JEJOR'S Construction Corporation 118,414,941.47 27-Jul-18

Supply and Delivery of Maintenance Service for Enterprise Storage Array and Related Equipment Infostorage Corporation 2,998,000.00 11-Jul-18 12-Sep-18

Proposed paving of existing back-up areas, Iloilo Commercial Port Complex., Loboc, La Paz, Iloilo City IBC International Builders Corporation 196,799,813.82 23-May-18 26-Jun-18

Proposed Cantilan Port Expansion Project, Brgy. Consuelo, Cantilan, Surigao del Sur EQUI-PArco Construction Company 196,518,314.00 08-Jun-18 28-Aug-18

Proposed Construction of RC Pier Extension, Port of Dapitan, Dapitan City, Zamboanga del Norte Grace Construction Corporation 65,187,677.00 08-Jun-18

Supply and Delivery of Engineering Plotter Functional, Inc. 3,780,000.00 13-Jun-18 09-Aug-18
Proposed PPA head office files storage facilities, south harbor, port area, manila KRBS Construction and Trading 10,254,269.51 08-Jun-18 06-Aug-18
Design, Lay-out, Photography, Manuscript Preparation, Copyediting and Proofreading, and Printing
Ideas for Good Consultancy Group, Inc. 984,500.00 13-Jun-18 23-Jul-18
of CY 2017 PPA Annual Report
Palompon Port Improvement Project, Port of Palompon, Leyte FIAT Construction Services 122,188,000.00 23-May-18

Consultancy Services for the Determination of Actual Appraised Value of PPA Dredging Vessel Claimsmen Adjustment Corporation 450,000.00 25-May-18

Proposed Construction of RC Wharf Extension, Port of Liloy, Lamao, Zamboanga Del Norte RCDG Construction Corporation 62,350,758.84 23-May-18 23-Jul-18

Proposed Dredging of Dapitan, Iligan and Cagayan De Oro Ports, Northern Mindanao Zet Construction 80,134,358.48 23-May-18 17-Jul-18
Construction of Port Operation Building, Port of Babak, Samal, Davao Del Norte Zet Construction 41,852,524.69 23-May-18 18-Jul-18
Proposed Dredging of Surigao and Masao Port, Northern Mindanao Khan Kon Chi Construction and Dev't Corp, 63,989,725.66 23-May-18 17-Jul-18
Proposed Dredging of the Ports of Pio Duran, Castilla, Bulan, Virac, Tabaco and Jose Panganiban,
MAKAPA Corporation 124,001,356.00 23-May-18 18-Jul-18
Bicol Region
Proposed Construction of Port Operations Building, Port of Dumaguete, Dumaguete City, Negros
A5R Dynamics Construction Corp. 110,545,812.42 23-May-18 19-Jun-18
Oriental
Procurement of Twenty Five(25) units of Bagage, X-ray Machines for PPA Management Offices Defense and Protection Systems Philippines, Inc. 189,888,000.00 05-Apr-18 18-May-18

Procurement of Technical Services for the Conduct of Soil Investigation at Selected Ports (PACKAGE
R.S. Jardin & Associates 33,196,771.22 28-Feb-18 20-Apr-18
8)
Science & Vision for Technology, Inc. / Synconsult,
Consultancy Services for the Feasibility Study and Formulation of Master Plan at Selected Ports 22,481,356.00 28-Feb-18 11-Apr-18
Incorporated / JV
Procurement of Twelve (12) Units of Body Scanner Machines Boson Home Incorporated 167,760,000.00 23-Feb-18 10-Apr-18
Goldridge Construction and Development Corp./
Construction and Offshore Installation of Aids to Marine Navigation at Ports of Tagbilaran, Tubigon,
Dalebo Construction & General Merchandise/ JARZOE 328,983,990.44 23-Feb-18
Tapal and Jagna, Bohol (Phase 1)
Builders, Incorporated/ JV

Procurement of Six (6) Units of Vehicle X-rays Machines for RoRo Ports S & S Enterprises, Inc. / TEC SEN Company LTD./ JV 748,488,000.00 28-Feb-18 02-Apr-18

Procurement of IT Resources (LOT 5 - 136 Column 24 Pin Dot Matrix Printer) Link Network Solutions, Incorporated 4,785,000.00 30-Jan-18 07-Mar-18
Procurement of IT Resources (Lot 4 - Laser Printer with Wireless LAN) Link Network Solutions, Incorporated 1,269,152.00 30-Jan-18 07-Mar-18
Procurement of IT Resources (Lot 2-OEM Branded Laptop Computers) Columbia Technologies, Inc 57,001,120.00 30-Jan-18 13-Mar-18
Consultancy Services for the Proposed Port with Integrated Shipyard Facility Syconsult Incorporated 24,722,640.00 30-Jan-18 08-Mar-18
Construction of Passenger Terminal Building Port of Tagbilaran, Bohol Rex E. Morales Construction 68,988,264.86 30-Jan-18 10-Apr-18
Construction of Passenger Terminal Building, Port of Catagbacan, Bohol JFAP Construction 14,465,598.41 30-Jan-18 10-Apr-18
Procurement of IT Resources (Lot 1) - OEM Branded Laptop Computers (A) S1 Technologies, Incorporated 4,275,000.00 17-Jan-18 08-Mar-18
Consultancy Services for the Conduct of Feasibility Study for the Proposed Panguil-Pagadian Science & Vision for Technology, Inc. / Synconsult,
37,790,640.00 30-Jan-18 08-Mar-18
Waterway Project Incorporated / JV
Filipinas Tectonic Saftey System Corp. / Mirait
Procurement of Integrated Seismic Accelerograph 106,895,040.00 23-Jan-18 06-Mar-18
Philippines, Inc. / JV
Proposed Dredging of Bauan Port, Bauan, Batangas PERRC Construction and Dev't. Corporation 28,977,189.92 16-Jan-18 20-Apr-18

Proposed Dredging of Calatagan Port, Calatagan, Batangas Hi-Tone Construction & Development Corporation 125,016,273.36 23-Jan-18 20-Apr-18

Procurement of IT Resources (LOT 8) - Inkjet Function Printer (Refillable Ink) Integrated Computer Systems, Incorporated 2,015,750.00 17-Jan-18
Procurement of IT Resources (LOT 6) - 80 Column 24 Pin DOT Matrix Printer Integrated Computer Systems, Incorporated 1,987,634.00 17-Jan-18

Procurement of IT Resources (Lot 3) - Uninterruptible Power Supply (UPS) for Network Equipment Integrated Computer Systems, Incorporated 948,150.00 17-Jan-18

Lease and Maintenance of Copying Machines U-Bix Corporation 2,592,000.00 16-Jan-18


Procurement of Corporate Anti-Virus With Content Security Solution American Technologies, Incorporated 1,638,500.00 17-Jan-18 09-Mar-18

Procurement of IT Resources (Lot 9 - 76 Units High Speed Scanner with Automatic Document Feeder) American Technologies, Incorporated 10,512,016.00 16-Jan-18 09-Mar-18

Ormoc Port Expansion Project, Port of Ormoc, Leyte Premium Megastructures, Inc. 260,181,700.00 16-Jan-18 06-Mar-18
Proposed Construction of Port Operations and Multi Purpose Bulidings, Port of Balingoan, Misamis
ASR Dynamics Construction Corp. 123,568,382.60 16-Jan-18 08-Mar-18
Oriental
Proposed Ozamiz Port Improvement Project, Port of Ozamiz, Ozamiz City, Misamis Occidental Grace Construction Corporation 177,954,409.04 19-Dec-17

Proposed Dredging of Capinpin Port, Orion, Bataan Luck-Well Construction 19,246,832.12 29-Dec-17 21-Feb-18
Proposed Iligan Port Improvement Project, Port of Iligan, Iligan city, Lanao Del Norte MAMSAR Construction & Industrial Corporation 129,988,867.00 29-Dec-17 21-Feb-18
Proposed Construction of T-Head Pier Extension and Back-Up Area, Port of Zamboanga, Zamboanga
MRBII Construction Corporation 88,958,000.56 19-Dec-17
City
Premium Megastructures, Inc./ Ulticon Builders, Inc. /
Proposed Maribojoc Port Improvement Project, Port of Maribojoc, Maribojoc, Bohol 480,948,770.01 29-Dec-17 06-Mar-18
JV

Provision of General Support Services for PPA Head Office Cy 2017 LBP Service Corporation 26,983,452.12 13-Dec-17 22-Feb-18
F. Gurrea Construction Incorporated / Grace
Proposed Isabela Port Improvement Project, Port of Isabela, Isabela City, Basilan 361,068,041.92 24-Nov-17 22-Jan-18
Construction Corporation / JV
Coron Port Expansion Project, Port of Coron, Palawan BCT Trading and Construction 158,612,594.00 24-Nov-17 08-Jan-18

Proposed Dredging of Ozamiz Port, Ozamiz City, Misamis Occidental Hi-Tone Construction & Development Corporation 124,148,237.60 24-Nov-17 23-Jan-18

Engagement of Services of a Certification Body for the Quality Management System of PPA Certification International Philippines, Inc. 3,133,760.00 20-Nov-17 22-Jan-18

Construction of Gate Complex, Port of Cagayan de Oro, Misamis Oriental JEJOR's Construction Corporation 31,960,530.96 26-Oct-17 30-Jan-18
Procurement of Server to be used for the revised chart ot accounts Trends and Technologies, Inc. 11,000,498.00 18-Oct-17 22-Jan-18

PMO Agusan
Amount of Date of Date of
Project Contractor
Project NOA Contract
Repair of Terminal Manager's Office and Comfort Room Abada Construction and Supply 92,500.00 29-Nov-18 03-Dec-18
RR & B Finest Construction & Development / B3 & R
Repair of Entrance/Exit Gates and Widening of Access Road at Masao Port 24,999,460.56 14-Sep-18 27-Sep-18
Constuction-JV
Repair/Renovation of PMO Agusan Admin Building to One Stop Shop/Multi Purpose Hall at TMO
Abada Construction and Supply 5,799,176.93 13-Dec-18 14-Dec-18
Butuan
RR & B Finest Construction & Development / B3 & R
Repair of Entrance/Exit Gates and Widening of Acces Roads at the Port of Masao, PMO Agusan 24,999,460.56 14-Sep-18
Constuction-JV
Contruction of Plant Boxes at the Port of Nasipit BN Builders and Construction Supplies 152,000.00 24-Jul-18 27-Jul-18
Rehabilitation of Power Supply System at the Port of Nasipit Maxter Resources, Inc. 215,000.00 24-Jul-18 27-Jul-18
Repair of Lighting System at the Port of Masao BN Builders and Construction Supplies 9,321,794.50 10-Jul-18 12-Jul-18
Repair of RC Wharf and Replacement of Fendering System EDANNA Construction 25,072,951.44 22-Jun-18 13-Jul-18

Supply of Janitorial Services Including Janitorial Supplies and Equipment for PPA, PMO Agusan United Field Sea Watchmen & Checkers Agency 743,749.44 21-Jun-18 27-Jun-18

Replacement of Fendering System and Repair of Butuan Ferry Terminal Landing, PMO Agusan Zet Construction 18,361,238.66 10-Jul-18 13-Jul-18

Repainting of Concrete Curbs and Gutter, at the Port of Masao BN Builders and Construction Supplies 295,000.00 11-Jun-18 13-Jul-18
Repair of Clearing Office One Stop Shop, at the Port of Masao BN Builders and Construction Supplies 1,750,212.89 10-Jul-18 11-Jul-18
Repair of Roofing and Steel Sliding Doors at Cargo Shed, at the Port of Masao BN Builders and Construction Supplies 6,082,305.86 26-Jun-18 09-Jul-18

Repair of RC Wharf and Replacement of Fendering System at the Port of Masao, PMO Agusan EDANNA Construction 25,072,951.44 22-Jun-18

Provision of Temporary Administrative and Technical Support Personnel for PPA, PMO Agusan DBP Service Corporation 3,650,156.10 21-Jun-18 27-Jun-18

RR & B Fineest Const. & Dev. corp. / B3 & R


Rental of Equipment for Hauling/Disposal of Used Paving Blocks, Nasipit Port 134,000.00 20-Apr-18
Construction Corp. - JV
Construction of Covered Walk at Nasipit Port, Nasipit, Agusan Del Norte BN Builders and Construction Supplies 8,082,980.29 12-Dec-17
RR & B Finest Const. & Dev. Corp./ B3 & R Construction
Repair of Pavement and Replacement of Catch Basin Covers at TMO Nasipit, PPA PMO Agusan 29,709,563.01 20-Dec-17
Corp. - JV
Supply, Delivery, Installation, Testing and Commissioning of One Unit 600 KVA Generator Set with
Fil Power Group & Marketing Corporation 8,298,000.00 11-Dec-17
Automatic Transfer Switch (ATS) for PPA PMO Agusan
Supply, Delivery, Installation, Testing and Commissioning of One Unit 250 KVA Generator Set With
Fil Power Group & Marketing Corporation 4,145,000.00 27-Dec-17
Automatic Transfer Switch (ATS) for TMO Nasipit

PMO Bataan / Aurora


Amount of Date of Date of
Project Contractor
Project NOA Contract
Clearing/Cleaning of Green Belt Zone at Port of Lamao, Limay, Bataan FPF Construction 166,320.10 14-Sep-18 19-Sep-18
Minor Repair/Repartitioning of PM's Quarters at Port of Lamao, Limay, Bataan JAY-DEL Construction 386,905.68 20-Sep-18 21-Sep-18

Repair of Damaged Electrical wire of two (2) high mast tower at port of Capinpin, Orion Bataan Argealis Construction 308,244.24 20-Sep-18 25-Sep-18

Repair of Damaged floor tiles of DMCT Building, Port of Capinpin, Orion, Bataan Argealis Construction 613,165.01 17-Sep-18 20-Sep-18
Repair of Covered walk, Fences and Gates at Port of Capinpin, Orion, Bataan Argealis Construction 2,166,129.82 25-Sep-18 21-Sep-18
Repair/Replacement of Damaged/Unserviceable truck tire and rubber dock fenders including its
Multi-System Construction & Development Corp. 7,465,883.04 16-Aug-18 29-Aug-18
accesories at port of lamao, limay, Bataan
Various Repairs of Port Facilities at Port of Dingalan, Aurora Multi-System Construction & Development Corp. 2,950,188.93 16-Aug-18 29-Aug-18

Repair of R.C. Pier at Port of Lamao, Limay Bataan FPF Construction 28,125,976.36 08-Aug-18 16-Aug-18

Underwater Investigation, Photography and Video of Reinforced Concrete Piles Foundation, Deck
NY Construction and Supply 5,423,999.49 22-Jun-18
Slab and R.C. Sheet Piles, Port of Lamao, Port of Capinpin, Bataan and Port of Casiguran, Aurora

PMO Batangas
Amount of Date of Date of
Project Contractor
Project NOA Contract
Repair/Repainting of Damaged Port Facilities, Port of Nasugbu, Batangas R. Calingasan Construction 10,291,948.45 31-Oct-18 19-Nov-18
Repair of Damaged Rock Causeway Caused By Typhoon "Nina", Port Lobo, Batangas Sta. Cruz Construction and General Services 16,726,625.18 31-Oct-18 09-Nov-18
Repair/Repainting of Facilties, Port of Calatagan, Batangas VRM Construction and Marketing Corporation 24,883,296.51 09-Oct-18 16-Oct-18
Repair of Service Road/Sidewalk and Lighting System of Port Access Road Along Turning Basin, Port
Shamara Builder & Construction Supply Inc. 15,472,352.27 09-Oct-18 19-Oct-18
of Batangas, Batangas City
Repair of Damaged Facilities Port of Talagam Mabini, Batangas Vicmar Construction, Inc. 29,545,167.47 09-Oct-18 12-Oct-18

Repair of R.C. Wharf (Right Side Portion) Including Covered Walkway, Port of Romblon, Romblon Sta. Cruz Construction and General Services 28,768,309.58 02-Oct-18 11-Oct-18

Underdeck and Underwater Survey/Investigation of R.C. Pier and Wharf, Port of Tablas Romblon and
Vicmar Construction, Inc. 2,034,781.50 19-Nov-18 26-Nov-18
Ambulong, Romblon
Repair/Repainting of Navigational Aids Sta. Cruz Construction and General Services 29,613,539.20 12-Oct-18 29-Oct-18
Repair of Street Solar Lighting System, Port of Batangas, Batangas City Sta. Cruz Construction and General Services 17,422,586.31 27-Jul-18 06-Aug-18

Construction of Additional Parking Shed/Covered Walkway at New Admin. Bldg. and Perimeter Fence Vicmar Construction, Inc./Shamara Builder and
21,998,883.26 16-May-18 21-May-18
at Port Monument Including Solar Powered Lighting, Port of Batangas, Batangas City Construction Supply, Inc. Joint Venture

Preventive Maintenance of Fire Detection Alarm System and Prinkler System Intalled at PPA
DMB Fire and Safety Enterprise Int'l Inc. 296,702.00 16-Jul-18 01-Aug-18
Adminstration Building

PMO Davao
Amount of Date of Date of
Project Contractor
Project NOA Contract

Supply of Labor, Materials and Equipment for the Installation of Fiber Optic and Cabling System, Sasa
Unicenter Communications 1,596,438.00 28-Dec-18 28-Dec-18
Port, Davao City
Reconstruction of RoRo Ramp (Phase-3) Babak Port, IGACOS, Davao Del Norte Khan Kon Chi Construction and Dev't Corp, 29,937,189.72 17-Dec-18 17-Dec-18

Repair of Scattered Damaged Portland Cement Concrete Pavement (PCCP) at Sasa Port, Davao City Khan Kon Chi Construction and Dev't Corp, 23,320,105.78 28-Nov-18 11-Dec-18

Repair of Damaged Street Lightings at Ports of Babak, Mati, Maco and Tagpopongan (Babak-IGACOS,
Khan Kon Chi Construction and Dev't Corp, 14,711,695.24 28-Nov-18 11-Dec-18
Mati-Davao Oriental, Maco-Compostela Valley, and Tagpopongan-IGACOS)

Supply of Labor and Materials of Landscapping Works of Passenger Terminal Area, Sasa Port, Davao
Carmelitos Garden 297,500.00 05-Nov-18 15-Nov-18
City
Emergency Repair of Damaged Portland Cement Concrete Pavement (PCCP), Concrete Gutter and
C.T. Leoncio Construction & Trading 25,407,977.94 23-Oct-18 05-Nov-18
Drainage Manhole Cover at Sasa Port, Davao City
Repair/Replacement of Light Tower HPS with LED Lamps at Sasa Port, Davao City Hi-Tone Construction & Development Corporation 11,820,054.40 23-Oct-18 05-Nov-18

Proposed Retrofitting of Mati Port, Mati City, Davao Oriental EC Structural Composites, Inc. 27,423,767.83 23-Oct-18 05-Nov-18
Repair of Modular Shed Including Fabrication of Covered Walkway Connecting to Passenger Terminal
JECEL Construction Supply 960,290.34 22-Oct-18
Building Port of Sasa, Davao City
Repair of Existing Security Building, Km. 10, Sasa Port Area, Davao City JECEL Construction Supply 534,990.20 18-Sep-18 01-Oct-18
Survey Services for the Proposed, Hydrographic and Topographic Survey of Lupon Port, Lupon, Davao
PARROCHA Surveying and Engineering Services 190,000.00 17-Sep-18
Oriental
Survey Works for the Proposed Hydrohraphic, Topographic and Port Zone Delineation Survey of
PARROCHA Surveying and Engineering Services 250,000.00 17-Sep-18 01-Oct-18
Pacific International Terminal Services, Inc. (PACINTER), Bayawa, Panabo City, Davao del Norte

Survey Works for Port Zone Delineation of Eight(8) Ports Under the Jurisdiction of PMO-Davao PARROCHA Surveying and Engineering Services 700,000.00 13-Aug-18 24-Aug-18

Installation of Signage at the Entrance Gate, Port of Babak, Island Garden City of Samal Tipicon Engineering Innovations 315,000.00 26-Jul-18 31-Jul-18
Repair of Babak Port Concrete Deck and Curtain Wall for Passenger Boat Docking Along Coast Guard
Office and Provision of Fenders, Bollards Including Double Arm Light Post at Babak Port, Island Zet Construction 13,593,297.55 20-Jul-18 30-Jul-18
Garden City of Samal, Davao Del Norte
Supply and Installation of Individual Kilowatt-Hour Meter for Various PPA Building at Sasa Port RAYSE Electrical Supply 238,500.00 13-Jun-18 25-Jun-18

Supply and Installation of Individual Kilowatt-Hour Meter for Various PPA Building at Sasa Port RAYSE Electrical Supply 238,500.00 13-Jun-18

Materials/Equipment for Fabrication and Installation of Access Point Signages at Sasa Port, Davao
Tipicon Engineering Innovations 177,000.00 04-May-18 10-May-18
City
Supply of Materials, Labor and Equipment for the Temporary Removal of Three (3) Units Port
Lighting Including Reinstallation/Erection for the Visit of his Execellency Rodrigo Roa Duterte at the KKC Construction and Development Corporation 90,000.00 04-May-18
Port of Babak, IGACOS, Davao del Norte
Reconfiguration at Port Police Division building consistent with PMO-Davao Port Security Plan at Sasa
Zet Construction 790,000 30-Apr-18
Port, Davao City
Conduct Service for the Preparation of Environmental Performance Report and Monitoring Plan for Aqua Prisms Technology and Environmental Services
565,000.00 28-Mar-18 12-Apr-18
the Issuance of Environmental Compliance Certification (ECC) for Development of Babak Port Inc.

Repainting of Centerline, Edge Line, Pedestrian Lane, Restricted and Controlled Line, Sasa Port,
Tipicon Engineering Innovations 496,500.00 26-Feb-18
Davao City
Repair and Maintenance of Portland Cement Concrete Pavement (PCCP) along GM Baclig Avenue
from Gate Complex to GM Solis Drive (Phase-2) and other Damaged Scattered PCCP, Port of Sasa, C.T. Leoncio Construction & Trading 21,107,217.77 22-Jan-18
Davao City
Repair and Maintenance of Thirty One(31) Units Rubber Dock Fenders at Sasa Port Area, Davao City KKC Construction and Development Corporation 25,808,231.34 22-Jan-18

Repair of Covered Walkway Railings for PPA Port Users, Sasa Port, Davao City Zet Construction 5,494,086.70 22-Jan-18 30-Jan-18

Repair of Back-Up Area at Berth No. 10 (Phase-3), Sasa Wharf, Davao City Hi-Tone Construction & Development Corporation 25,342,558.92 22-Jan-18 30-Jan-18

Provision of Protective Cover for Security Guard Outpost and Repair of One (1) Unit Existing Guard
Tipicon Engineering Innovations 177,400.00 22-Dec-17
Outpost at Terminal Operations Compound, Sasa Port, Davao City
Structural Survey Services of Maco Port Compostela Valley Province Parrocha Surveying and Engineering Services 50,000.00 03-Jan-18

PMO Eastern Leyte / Samar


Amount of Date of Date of
Project Contractor
Project NOA Contract

Repair of Depressed Damaged Concrete Paving Blocks at Berth 4 & 5, Port of Tacloban City EDTAHA Builders, Inc. 10,449,918.71 19-Nov-18 07-Dec-18

Repair of Damaged Rubber Dock Fenders at Terminal Ports of Catbalogan, Borongan, San Jose, San
LNR Construction 17,007,024.29 12-Nov-18 27-Nov-18
Isidro and Guiuan, Samar
Repainting of Port Facilities at Ferry Terminal Ports of Liloan and San Ricardo Southern Leyte R.V. Construction 655,757.33 03-Sep-18

Additional of Perimeter Fence, Port of Sogod, Southern Leyte R.V. Construction 531,559.92 03-Sep-18
Repair of Various Port Facilities, San Isidro Ferry Terminal, San Isidro, Northern Samar B. Vicencio Builders., Inc. 19-Jul-18

Repair of Damaged RORO Ramp No. 1 Port of Manguino-o, Brgy. Manguino-o, Calbayog City, Samar B. Vicencio Builders., Inc. 8,785,681.24 19-Jul-18

Repair of Damaged Portion of Reclamation due to Typhoon "PAOLO" Last October 21, 2017 Port of
Goldridge Construction and Development Corp. 6,970,371.41 20-Sep-18 13-Nov-18
Manguino-o, Manguino-o, Calbayog, Samar
Repair of Admin, and Cashiers Offices at PPA-ELS Port of Tacloban, Tacloban City Limar Construction 950,436.30 14-Jun-18
Repair of Damaged Slope Protection at the Tip of Causeway Caused by Typhoon "PAOLO", Port of
RB Sabido Construction, and Supply 191,200.00 22-Feb-18
San Vicente, San Vicente, Northern Samar
PMO Lanao Del Norte / Iligan
Amount of Date of Date of
Project Contractor
Project NOA Contract

Repair of Water Reservoir and Pump-house, Port of Iligan J.C. Dela Vega Construction and Supply 15,246,926.00 30-Oct-18 13-Nov-18

Repair of Perimeter Fence, Port of Kolambugan, Lanao Del Norte / Iligan Nurben General Engineering and Building Contractor 18,737,909.42 30-Oct-18 14-Nov-18

Repair of Pavement and Back-up Area, Port of Kolambugan, Lanao Del Norte MRBII Construction Corporation 25,320,465..5 30-Oct-18 13-Nov-18
Repair of Passenger Canopy along Breather-3, Port of Iligan R. DE MESA Construction 6,952,570.25 31-Oct-18 14-Nov-18
Repair of Lighting Facility at New Passenger Terminal Complex, Port of Iligan EDTAHA Builders, Inc. 13,686,126.00 30-Oct-18 12-Nov-18
Repair of Electrical System and Switchgear, Port of Iligan JMT Construction 27,340,875.90 30-Oct-18 12-Nov-18
Repair of Fire Hydrants and Water Lines, Port of Iligan BRIMA Construction and Enterprises 28,416,262.64 30-Oct-18 14-Nov-18
Repair of Drainage System and Evacuation Area, Port of Iligan LAJ Trucking and Building, Inc 29,960,962.31 29-Oct-18 08-Nov-18

Upkeeping and Maintenance of the Port Physical Facilities for the Twelve (12) Months, Port of Iligan BRIMA Construction and Enterprises 2,215,000.00 13-Mar-18 16-Mar-18

PMO Marquez
Amount of Date of Date of
Project Contractor
Project NOA Contract
Repair of R.C. Wharf and Platform, Port of Cawit, BOAC, Marinduque INFRA Builders & Sellers, Phils. 29,518,398.00 17-Jul-18 19-Jul-18
Garbage Collection and Disposal Including Sweeping of Pavement and Watering of Plants, Port of
JEFF Enterprises 5,347,125.00 26-Jun-18 28-Jun-18
Lucena, Lucena City

PMO Mindoro
Amount of Date of Date of
Project Contractor
Project NOA Contract

Proposed Banago Port Expansion Project, Port of Banago, Bacolod City, Negros Occidental 362,698,606.45 16-Oct-18

PMO Misamis Oriental / Cagayan De Oro


Amount of Date of Date of
Project Contractor
Project NOA Contract

Proposed Repair of Underground Water Tank & Rainwater Collection System, Port of Cagayan de Oro ALGAMON Construction 399,388.50 19-Dec-18 20-Dec-18

Proposed Repair of Passenger Holding Area and Parking, Port of Cagayan de Oro ALGAMON Construction 989,112.10 19-Dec-18 20-Dec-18
Proposed Repair of Water leaks at Berth No.2 Port of Cagayan de Oro LGC Trucking and Construction 83,562.00 10-Oct-18 29-Oct-18
Rewiring of Streetlights, Port of Cagayan de Oro JMT Construction 8,577,516.32 16-Oct-18 18-Oct-18
Proposed Repair of Damaged PCCP at Poriton of 4th Street, Port of Cagayan de Oro LGC Trucking and Construction 16,294,507.20 16-Oct-18 18-Oct-18
Repair & Replacement of Damaged Steel Drainage Gratings at Area "A" and Repair of Water Hydrant
JMT Construction 22,020,045.24 31-Aug-18 04-Sep-18
Covers, Port of Cagayan de Oro, Port of Cagayan de Oro
Replacement of Dilapidated V-Type and M-Type Rubber Dock Fenders, Port of Cagayan de Oro LAJ Trucking and Builders, Incorporated 24,383,959.90 28-Jun-18 02-Jul-18

Repair of Damaged Concrete Pavement at Portion of Area "I" Port of Cagayan de Oro JMT Construction 28,486,744.64 28-Jun-18 02-Jul-18
Repair/Replacement of 70T Mooring Bollard Port of Cagayan de Oro EDANNA Construction 7,666,187.35 28-Jun-18 02-Jul-18
Provision of Technical and Administrative Support Personnel for PMO-Misamis Oriental / Cagayan de
Workers Vision Manpower Services, Inc. 6,898,550.64 29-May-18 21-Sep-18
Oro

PMO NCR North


Amount of Date of Date of
Project Contractor
Project NOA Contract
Procurement of Janitorial Services for PMO-NCR North DEARJOHN Services, Inc. 1,920,000.00 25-Jun-18 28-Jun-18

Repair of the Offices at PMO-NCR North Administration Building, North Harbor, Tondo, Manila JAY-DEL Construction 11,318,763.24 25-Jan-18 05-Feb-18

Repair of Pavement, Drainage System, Lighting Facilities and Concrete Fence at Collector Road inside
Hi-Tone Construction & Development Corporation 16,217,429.44 28-Dec-17 05-Jan-18
PMO Compound, North Harbor, Tondo, Manila

PMO NCR South


Amount of Date of Date of
Project Contractor
Project NOA Contract
Repair/Improvement of Roadway and drainage system at Railroad St., south Harbor, Port Area,
Multi-System Construction & Development Corp. 29,670,447.84 22-Dec-17 28-Dec-17
Manila
Construction of Two-Storey PAssenger Terminal Building at TMO-Pasig River, South Harbor, Port
RT Crisman Builders and Construction Supply 11,455,928.74 04-Dec-17 15-Dec-17
Area, Manila
E.M. Cuerpo, Inc./Multi-System Conts. & Devt. Corp.
Demolition of Former BIR Bldg., at Anda Circle, Bonifacio Drive, South Harbor, Port Area, Manila 25,986,767.40 29-Sep-17 12-Oct-17
(JV)
Repair/Improvement of roadway pavement and drainage system at 20th st., South Harbor, Port
MRBII Construction Corporation 11,469,947.95 11-Dec-17 22-Dec-17
Area, Manila
Repair/Improvement of 16th st., South Harbor Port Area Manila R.M. Pajimna Builders 14,573,589.50 21-Nov-17 06-Dec-17

PMO Negros Occidental / Bacolod / Banago Bredco


Amount of Date of Date of
Project Contractor
Project NOA Contract
Repair/Retrofitting of PMO Administration Building Underdeck, Port of Banago, Bacolod City, Negros
EC Structural Composites, Inc. 29,561,383.67 15-Nov-18 29-Nov-18
Occidental
Repair of RoRo Ramp at Berth D, Port of Banago, Bacolod City, Negros Occidental Goldridge Construction and Development Corp. 26,018,127.19 17-Sep-18 27-Sep-18
Repair/Rehabilitation of Two (2) Stockrooms, Port of Pulupandan, Pulupandan, Negros Occidental to
JFJ Construction & Supply, Inc. 972,748.00 27-Sep-18
PPA, PMO-Negros Occidental
Repair / Replacement of No. 4 V-element Rubber Dock Fender, Port of Pulupandan, Pulupandan,
Goldridge Construction and Development Corp. 7,514,325.00 24-Aug-18 06-Sep-18
Negros Occidental
Repair/Replacement of V-Type Rubber Dock Fender, Port of San Carlos, San Carlos City, Negros
Goldridge Construction and Development Corp. 101,031,760.72 24-Aug-18 06-Sep-18
Occidental
Repair / Asphalt Averlay in Exisitng Concrete Pavement, Port of Banago, Bacolod City, Negros
Goldridge Construction and Development Corp. 17,459,614.90 13-Aug-18 27-Aug-18
Occidental
Repair of Riprap at the South Portion of the Port, Port of San Carlos, San Carlos City, Negros
Micro-Asia Buliders Corporation 4,294,707.60 13-Aug-18
Occidental
Repair of Pavement of Back-up Area (Phase 3), Port of San Carlos, San Carlos City, Negros Occidental Goldridge Construction and Development Corp. 24,881,195.91 13-Aug-18

Repair / Replacement of Streetlights Lamp Post, Port of Banago, Bacolod City, Negros Occidental JFJ Contruction & Supply Inc. 3,069,235.01 13-Aug-18 24-Aug-18

Repair of TMO-Building, Port of Pulupandan, Pulupandan, Negros Occidental RJL Construction 2,840,210.66 05-Jul-18 11-Jul-18
Refurbising of TMO-Building, Port of San Carlos, San Carlos City, Negros Occidental HHH Developer and Construction 3,000,102.66 21-Jun-18 05-Jul-18

Repair / Improvement of Water System, Port of Banago, Bacolod City, Negros Occidental JFJ Contruction & Supply Inc. 1,050,910.00 21-Jun-18 04-Jul-18

Repair/Replacement of Electrical System Port of San Carlos, San Carlos City, Negros Occidental Goldridge Construction and Development Corp. 3,020,472.00 21-Jun-18 05-Jul-18

Pull-Out of Generating Set, Port of Banago, Bacolod City to PPA. PMO-Negros Occidental RJL Construction 361,795.39 10-May-18

Pull-out of Generating Set, Port of Banago, Bacolod City to PPA PMO - Negros
RJL Construction 361,795.39 10-May-18
Occidental/Bacolod/Banago-BREDCO
Powerhouse Extension, Port of Banago, Bacolod City RJL Cons 854,375.76 09-Mar-18
Repair/De-clogging of Water Supply from BACIWA, Port of Banago, Bacolod City JFJ Contruction & Supply Inc. 124,020.00 09-Mar-18
Repair of RC Sheet Pile Walling, Port of San Carlos, San Carlos City, Negros Occidental Goldridge Construction and Development Corp. 5,998,288.84 15-Jan-18 24-Jan-18
Repair / Replacement of Solar Port Lighting System, Port of Pulupandan and San Carlos, Negros
RJL Construction 928,001.50 22-Nov-17
Occidental
Provision for Accessibility of Port Facilities for PWDs and Persons with Special needs with Signages,
RJL Construction 360,080.56 15-Dec-17
Port of Banago, Pulupandan and Danao, Escalante City, Negros Occidental
PMO Palawan
Amount of Date of Date of
Project Contractor
Project NOA Contract

Procurement of Office Furniture, Fixture and Equipment under Annual Procurement Program LJM Industrial Safety Products 303,571.43 07-Dec-18 13-Dec-18

Procurement of Office Furniture, Fixture and Equipment under Annual Procurement Program Lily Hill Trading 704.013.39 07-Dec-18 12-Dec-18

Various Maintenance of Port Physical Facilities, Port of Puerto Princesa, Palawan Goldridge Construction and Development Corp. 4,465,157.07 17-Sep-18

Replacement of Damaged Rubber Dock Fenders, Port of Brooke's Point, Brooke's Point, Palawan Orient Star Constuction, Inc. 3,992,210.88 19-Oct-18 26-Oct-18

Repair of Damaged RoRo Ramp and R.C. Platform, Port of Puerto Princesa, Palawan J.C. Piñon Construction Inc. 17,577,608.29 17-Sep-18
Repair of R.C. Wharf, Mooring and Fendering System and Back-up Area, Port of Coron, Coron,
BCT Trading and Construction 27,283,448.91 11-Oct-18 15-Oct-18
Palawan
Provision of Movable Covered Walk, Port of Coron, Coron, Palawan CMCS Builders 3,531,597.96 19-Oct-18 26-Oct-18

Provision of Temporary Administrative and Technical Support Personnel of PPA, PMO Palawan DBP Service Corporation 4,983,192.48 08-Oct-18 01-Jul-18

Provision of Movable Covered Walk, Port of Coron, Coron, Palawan CMCS Builders 3,531,597.36 26-Oct-18

Repair of Passenger Assistance Service System (P.A.S.S.) Building, Port of Puerto Princesa, Palawan Goldridge Construction and Development Corp. 4,891,776.93 14-Aug-18 24-Aug-18

Provision of Janitorial Services for Philippine Ports Authority, Port Management Office of Palawan for
The Perfect Cleaners Janitorial Sales & Services 1,145,292.00 27-Jul-18 01-Aug-18
the Contract Period August 1, 2018 to December 31, 2018
Repair of Passenger Terminal/ TMO Building Including Perimeter Steel Matting Fences, Gates and
Orient Star Constuction, Inc. 4,970,161.14 14-Aug-18 28-Aug-18
Welcome Arch Gate, Port of Culion, Culion, Palawan

PMO Socsksargen
Amount of Date of Date of
Project Contractor
Project NOA Contract

Proposed Construction of Port Enclosure Perimeter Fence, Port of Glan, Glan, Sarangani Province MICAH Construction and Supply 10,857,068.68 11-Dec-18 28-Dec-18

Proposed Patching of Holes and Cracks of Concrete Pavement Along the Extent of the Wharf (Eastern
MONTPHIL Construction Corp. 10,833,216.70 05-Dec-18 28-Dec-18
Wharf & Portion of New Wharf Expansion), Port of General Santos, Makar Wharf, General Santos City

CONSOLIDATED REPAIR AND MAINTENANCE OF PORT PHYSICAL FACILITIES PROJECT: 1.) REPAINTING
OF CYCLONE FENCE NEAR NORTH GATE & CY IV, PM'S QUARTER PERIMETER FENCE, AND STEEL
GRATING AND MANHOLE; 2.) SUPPLY, FABRICATION, AND INSTALLATION OF PPA LOGO; 3.) REPAIR RIEZL Landcare and Construction 2,400,782.58 14-Nov-18 10-Dec-18
OF DAMAGED CHB FENCE NEAR KENRAM OIL DEPOT; 4.) RENOVATION OF PM'S KITCHEN AND
COMFORT ROOM, PORT OF GENERAL SANTOS, MAKAR WHARF, GENERAL SANTOS CITY
Repair of Ship-To-Shore Facility, Installation of Electrical Room near Transit Shed 1, Installation of
Electrical Ductlines and Manholes, and Modification of Concrete Curb near the Metering Sation, Port MONTPHIL Construction Corp. 9,904,192.38 13-Nov-18 07-Dec-18
of General Santos, Makar Wharf, General Santos City
Repair / Rehabilitation of Port Water Pipelines at Port of General Santos, Makar Wharf, General
YSL Builders 22,377,301.30 22-Oct-18 12-Nov-18
Santos City
Repair of Drainage System to Provide Box Culvert, Port of General Santos, Makar Wharf, General
A.I.YU Builders and Enterprises 8,330,011.61 05-Oct-18 23-Oct-18
Santos City
Repair of Drainage System to Provide Box Culvert, Port of General Santos, Makar Wharf, General
AIYU Builders & Enterprises 8,330,140.56 05-Oct-18
Santos City
Proposed Soundproofing at New Powerhouse Building, Replacement of 500KVA PCB Transformer to
NON PCB 333KVA Transformer, Installation of Cabling of 3 Units Floodlight Poles at Western Wharf,
Upgrading of 30 Units 220V to 440V Reefer Outlets at CY3, Repair of Metering Station and
MICAH Construction and Supply 11,406,311.86 18-Sep-18 03-Oct-18
Installation of 2 Units 175 KVA Transformer, Repair of the Panel Board of the 8 units High Mast
Tower, and Installation of Lighting Arrester and Obstruction Light for the 8 units High Mast Towers,
Port of General Santos Makar Wharf, General Santos City
Repiar of Damaged Paving Blocks at Container Yard 2 Phase 1, Port of General Santos, Makar Wharf,
AIYU Builders & Enterprises 24,173,555.48 08-Aug-18 30-Aug-18
General Santos City
Repair of Drainage System to Provide Box Culvert, Port of General Santos, Makar Wharf, General
DEZMAR Construction and Development Corp. 7,878,386.51 08-Aug-18
Santos City
Procurement of Outsourcing of Temporary Support Personnel thru Manpower Service provider of
LBP Service Corporation 4,970,344.86 11-Jun-18 30-Jun-18
PMO-SOCSARGEN
Repair of damaged paving blocks at container yeard 3 phase 2, Port of General Santos, Makar Wharf,
Zet Construction 18,926,284.78 27-Jun-18 06-Jul-18
General Santos City
Routine Maintenance of Port Physical Facilities Project Package MICAH Construction and Supply 2,496,517,89 14-Jun-18 28-Jun-18

PMO Surigao
Amount of Date of Date of
Project Contractor
Project NOA Contract

Repair/Improvement of RoRo landing at berth 4, Port of Surigao, Surigao City, Surigao Del Norte B3 & R Construction Corporation 4,149,835.55 24-Oct-18

PMO Western Leyte / Biliran


Amount of Date of Date of
Project Contractor
Project NOA Contract
Restoration of Damaged Port Facilities Port of Maripipi, Maripipi Island, Biliran LNR Construction 20,726,848.02 02-Aug-18
Repair of Damaged RoRo Ramp, PTB, Access Road, Repainting of Building and Fences, and Installation
LNR Construction 29,435,239.23 01-Jun-18
of Fendering System, Port of Maasin, Southern Leyte

PMO Zamboanga
Amount of Date of Date of
Project Contractor
Project NOA Contract
Repair of Port Lighting System Harnessing Solar Power Energy, Port of Margosatubig, Zamboanga Del
Alraf Construction and Enterprises 7,486,476.98 15-Nov-18 19-Nov-18
Sur

Repair/Rewiring and Repainting of Six (6) Units High Mast Tower, Port of Zamboanga, Zamboanga
Alraf Construction and Enterprises 9,363,766.03 19-Nov-18 22-Nov-18
City
One (1) Lot Supply, Delivery and Installation of Conference System-Wired for, PPA, PMO-Zamboanga JVS Audio System 129,600.00 19-Dec-18

One (1) Lot Supply and Delivery of Twenty -five (25) units Printer, Eight (8) units Monochrome and
Phone Patch Marketing 278,600.00 19-Dec-18
Seventeen (17) Units Colored with Scanner (3 in 1) for PPA, PMO Zamboanga

One (1) Lot Supply and Delivery of Twenty-five (25) Units Passenger Trolley for Traveler's Hub, PPA,
ALFO Marketing 487,500.00 19-Dec-18
PMO-Zamboanga
Repair of Container Freight Station (CFS) Building, Port of Zamboanga, Zamboanga ZET Construction 22,864,839.29 12-Sep-18 08-Oct-18
One (1) Lot Supply of Labor, Materials and Equipment for Procurement of Air Emission sampling of
Berkman System, Inc. 100,800.00 23-Aug-18
One(1) unit 500 KVA Diesel Generator Set at Powerhouse, Zamboanga City
One (1) Lot Supply and Delivery of Six (6) Units Spine Board with spider strap, Size 48 x 7 x 186cm,
Neomed Marketing 51,000.00 05-Dec-18
color orange for PPA, PMO Zamboanga
One (1) Lot Supply and Materials for the Fabrication of Two (2) Units Wooden Cabinet, made of hard
Z.C. Filipinas Furniture 80,000.00 23-Nov-18
wood for ESD, PPA, PMO-Zamboanga
One (1) Lot Supply and Delivery of Two (2) Units Map and Plan Cabinet, heavy duty made of steel for
Z.C. Filipinas Furniture 90,000.00 23-Nov-18
ESD, PPA, PMO-Zamboanga
One (1) Lot Supply and delivery of Eight (8) Units Swivel Chair, High Back, Color Black, Leather, Heavy
Duty and Thirty (30) Units Junior Executive Swivel Chair, Low Back, Color Black with mesh and heavy Z.C. Filipinas Furniture 521,600.00 23-Nov-18
duty for PPA, PMO-Zamboanga
One (1) Lot Supply and Delivery of Various paints and other hardware materials for use in the
maintenance of Port Facilities at the Port of Zamboanga, Isabela, Ipil, Malangas, Pagadian and Asiatic Trading Corporation 60,849.00 24-Oct-18
Margosatubig
One (1) Lot Supply and Delivery of Uninterruptible Power Supply (UPS) five (5) units 1 KVA and
Octagon Computer Super Store 78,400.00 24-Oct-18
twenty (20) units 650VA for PPA, PMO-Zamboanga
Supply and Delivery of Ten (10) Units Monitor for PPA, PMO-Zamboanga Copier Solutions Specialist 86,500.00 24-Oct-18
One (1) Lot Supply and Delivery of Six (6) Units 10 steps Extension Ladder, Fiber for PPA, PMO-
Asiatic Trading Corporation 70,800.00 24-Oct-18
Zamboanga
One (1) Lot Supply and Delivery of Eight (8) Units Cabinet, Steel Mobile for PPA, PMO-Zamboanga Z.C. Filipinas Furniture 31,600.00 24-Oct-18

Repair of Drainage Sysem (along Perimeter Fence Market Side) and Fence, Port of Zamboanga,
RR & B Finest Construction & Development Corporation 18,982,179.70 15-Aug-18 24-Aug-18
Zamboanga City
One (1) lot supply of labor and materials for the provision of various service such as photocopy, blue
and white print, binding, duplo, auto cad printing/cad plotting and tarpaulin printing of PPA, PMO- Copier Solutions Specialist 173,484.00 29-Jun-18
Zamoboanga
Supply and Delivery of Three (3) units smart television set, 55-inch, 4k for PPA, PMO Zamboanga Phone Patch Marketing 155,700.00 23-Aug-18

One (1) lot supply and delivery of purified drinking water of PPA, PMO-Zamboanga ZC Ultra Pi Water Refilling 53,500.00 28-Aug-18 31-Aug-18

One (1) lot supply, delivery and installation of one (1) unit photocopier for PPA, PMO-Zamboanga Philicopy Corporation 106,000.00 13-Jun-18

One (1) lot supply of labor and materials for the minor repair and maintenance service of motor
La Hermosa Pit Stop Shop & General Merchandise, Inc. 79,500.00 29-Jun-18 29-Aug-18
vehicles of PPA, PMO-Zamboanga
One (1) lot supply and delivery of various electrical and other hardware supplies and materials for
Victorious General Merchandise & Services 271,226.00 23-Aug-18
PPA, PMO-Zamboanga
(1) Lote Supply, Delivery and Installation of One(1) Unit Air Conditioner, Floor Mounted, 3-tonner
EMCOR Incorporated 107,695.00 27-Jun-18
with Inverter for PMO-Zamboanga
Repair of Grouted Riprap Including Repair of Potholes and Fence at Road Approach, Port of Ipil, TMO-
Zet Construction 20,136,122.05 09-Jul-18 23-Jul-18
Zamboanga Sibagay
Repair of Existing Windows and Doors and Dilapidated Ceiling Eaves at Ground Floor PPA
Shieham Construction & Enterprises 334,708.86 02-Jul-18
Administration Building, Port of Zamboanga, Zamboanga City
Supply, Installation, Placement and Testing of Electric KWH Meters, Port of Zamboanga, Zamboanga
Shieham Construction & Enterprises 985,830.23 02-Jul-18
City
Provision of General Support Service for PPA, PMO-Zamboanga for CY 2018 LBP Service Corporation 4,058,256.78 25-Jun-18 07-Jun-18

PMO Zamboanga Del Norte


Amount of Date of Date of
Project Contractor
Project NOA Contract
Replacement of RDF Bolt, RIP-RAP and pavement, Bulkhead and Entrance/Exit Gate, Port of
Shieham Construction and Enterprises 27,936,255.34 23-Oct-18 19-Nov-18
Sindangan, ZDN
Procurement of ECC Application for the Proposed Extension of RC Pier and all other Future
Alterra Geomatics & Construction 593,000.00 11-Dec-18 13-Dec-18
Infrastructure Projects in the Port of Sindangan
Procurement of WIFI Facility with Wired Internet Connectivity of PMO Zambo.del Norte/Dapitan for
PLDT Inc. 2,956,800.00 27-Dec-18 28-Dec-18