Nothing Special   »   [go: up one dir, main page]

SCK-F-02 Contract Review

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

SCK CERTIFICATIONS PRIVATE LIMITED Format No.

SCK-F-02
Rev. No. 00
CLIENT CONTRACT REVIEW Date 01.09.2020

Application Number: DATE:


Organization Name
Permanent Address
Scope
IAF/EA Code
Standard (s) applicable as mentioned below

Sites information (if multi- Temporary Site


site do sampling as per IAF-
MD-1): NA
Virtual Site-

Management System Detail QMS/EMS/OHSMS Manual Date:


Last MRM Date:
Last Internal Audit Date:
No. of Employee Single Site (*Attach no. of Workers of Each Site if Applicable)
A B C

Worker performing similar Job in Shifts


Total Staff
Calculation of Effective Strength (as per IAF-
MD-5:2019 & IAF-MD-22:2018 attach
calculation detail)
Man-days Required (Initial Certification) Stage-1 : Stage-2 : Total-
Lead Auditor Auditor Technical Experts
Proposed Audit Team

ISO Clauses Exclusion with Justification

Risk and Complexity Assessment Acceptable Not Acceptable


Approved By Authorized Signatory Reviewed By Competent Application reviewer

Designation Designation
Date: Date:
SCK CERTIFICATIONS PRIVATE LIMITED Format No. SCK-F-02
Rev. No. 00
CLIENT CONTRACT REVIEW Date 01.09.2020

CONTRACT REVIEW FORM FOR QUALITY MANAGEMENT SYSTEM:

ISO 9001

RISK CATEGORY

Low Medium High

Contract Review Form For Environment Management System:

ISO 14001

Complexity Category

Low Medium High Limited Special Cases NA

Contract Review Form For Occupational Health & Safety Management System:

ISO 45001

Complexity Category

Low Medium High

CONTRACT REVIEW FORM FOR INTEGRATED MANAGEMENT SYSTEM:

ISO 9001 ISO 14001 ISO 45001


SCK CERTIFICATIONS PRIVATE LIMITED Format No. SCK-F-02
Rev. No. 00
CLIENT CONTRACT REVIEW Date 01.09.2020

Man-Days calculation for specific Standards:

Sl. Standard name Applicability IAF Code NACE Code Complexity/Risk Man-Days
No. Level

1 Man-Days for ISO 9001

2 Man-Days for ISO 14001

3 Man-Days for ISO 45001

Total Man-Days Calculated for all standards

CALCULATION OF EFFECTIVE STRENGTH:

1. Calculate No. of staff of each


shift

2. Convert part time staff into


full time employees

3. Count Square Root of staff


doing repetitive/similar work

Calculated Effective Strength

Standard audit duration

FACTOR INCREASING AUDIT DURATION (Increase by 10% for each factors)

Status of Applicant organization % Audit duration Increases

1. Complicated logistic involving more than


one building or location where work is
carried out or very large dispersed audit
area/temporary site

2. Use of Interpreter

3. High degree of regulation, multiple


unique process (eg. Food, Drug, defence,
multi-speciality hospitals)

Audit duration after considering increment factor


SCK CERTIFICATIONS PRIVATE LIMITED Format No. SCK-F-02
Rev. No. 00
CLIENT CONTRACT REVIEW Date 01.09.2020

FACTOR REDUCING DURING AUDIT STANDARD (Reduce by 10% for each factors)

Status of Applicant organization %Audit duration Reduces

1. Design & Development process is


excluded

2. Maturity of the client


Management system (such as
transfer case, already certified
by SCK other standard for same
scope)

3. Trading organisation/ service or


manufacturing process involve in
single service/product

Audit duration after considering reduction factors

Audit duration after considering Increment & reduction factors

Reduction as per IAF MD11 in case of Integrated Management System


{Write Proper Justification of Reduction for IMS}

Calculation of Audit duration

Effective No. of Audit duration in man- Audit Duration Stage-1 Audit Duration Stage-2
personnel days for initial
certification (Stage-1+
Stage-2)

Audit duration in man-days for 1st Surveillance audit


(1/3 of initial certification audit)

Audit duration in man-days for 2nd Surveillance audit


(1/3 of initial certification audit)
SCK CERTIFICATIONS PRIVATE LIMITED Format No. SCK-F-02
Rev. No. 00
CLIENT CONTRACT REVIEW Date 01.09.2020

Audit duration in man-days for re-certification audit

(2/3 of initial certification audit)

Note:

1. Audit Man-days always consider as 8 working hours. To reduce audit days, audit hours in single day should never
be extended beyond 8 audit hours.

2. Virtual Site: Virtual location where a client organization performs work or provides a service using an on-line
environment allowing persons irrespective of physical locations to execute processes.

3. Temporary Site- Location (physical or virtual) where a client organization (1.2) performs specific work or
provides a service for a finite period of time and which is not intended to become a permanent site

You might also like