Approved 10 Year SWM Plan - Final.2
Approved 10 Year SWM Plan - Final.2
Approved 10 Year SWM Plan - Final.2
2
10-Year Solid Waste Management Plan (2015-2024)
3
10-Year Solid Waste Management Plan (2015-2024)
4
10-Year Solid Waste Management Plan (2015-2024)
5
10-Year Solid Waste Management Plan (2015-2024)
List of Figures
6
10-Year Solid Waste Management Plan (2015-2024)
7
10-Year Solid Waste Management Plan (2015-2024)
8
10-Year Solid Waste Management Plan (2015-2024)
9
10-Year Solid Waste Management Plan (2015-2024)
Alcala Dikildit
Bagtu Dimanpudso
Bangco Diome
Bannawag Florida
Barangay 1 Galintuja
Barangay 2 Kadayakan
Barangay 3 Malasin
Barangay 4 Punglo
Baubo Quirino
Bayanihan Ramada
Bazal San Joaquin
Cabituculan East San Jose
Cabituculan West San Juan
Debucao San Leonardo
Decoliat Sta. Lucia
Detailen Sto. Cristo
Diaat Santo Tomas
Dialatnan Suguit
Diaman Villa Aurora
Dianawan Wenceslao
10
10-Year Solid Waste Management Plan (2015-2024)
11
10-Year Solid Waste Management Plan (2015-2024)
12
10-Year Solid Waste Management Plan (2015-2024)
4. The locality is included in the existing tourism spots under the “Its More
Fun in the Philippines” program by the Department of Tourism. The
most popular of these are the following: Aurora Memorial National
Park, Balete Ecological Park, and the Dimasalan Falls. Also identified
potential tourist spots are the St. Vincent Ferrer Parish Church,
Angara- Silvestre Hill, Jeyahsoon Hot Spring in Brgy. Alcala, a man-
made lake in Brgy. San Juan, Bazal-Baubo, Diaat, and Pacugao
Watersheds. With these resources, an inflow of manpower and
services will be needed.
13
10-Year Solid Waste Management Plan (2015-2024)
14
The following data may be the continuing factors in the steady increase in the
population of Maria Aurora:
Cottage 51
Bakery 11
Ricemill 20
Concrete Products 6
TOTAL 88
Land Uses
Currently, there are more or less 50 bus units passing through Maria
Aurora with a route from Baler to Cabanatuan City and Metro Manila and vice
versa. Public utility vehicles like van is also an alternative transportation
vehicle especially during night time.
Fig. 3. Transportation Route Map
Climate
Low elevation of less than 100 meters covers about one fourth of the
municipality comprising of 10,011.0 hectares. Upland/hilly land areas (100-
500 m above sea level), on the other hand, comprises about half of the total
municipal land or 20,285 hectares while low elevation highland areas found
within 500-1,000 meters above sea level covers 10,224 hectares.
Hydrology
Soil Condition
There are three types of soil that can be found in the municipality of
Maria Aurora namely; lowland soil, upland soil, and hill and mountain soil as
shown in Fig. 5.
Hill and mountain soil includes Annam clay loam and Annam silt loam
type found in upland and mountainous areas of the municipality.
Fig. 4. Hydrology Map
Sangguniang Bayan
- Institutionalize the appointment of MENRO
- Adopts and legitimizes the revision of 10-year SWM Plan
- Amends Municipal Ordinances
Tourism
- Promotes Maria Aurora as ESWM-compliant
- Provides technical assistance and IEC
Maria Aurora Police Station (MAPS)
- Provides assistance to the MLGU/BLGU in the enforcement of RA
9003 and Municipal Ordinances
Department of Education (District of Maria Aurora)
- Provides assistance in IEC and cooperates in the Search for Best
School Implementing Best SWM Practices
Staff
3.4. Collection
Composting
WASTE CHARACTERISTICS
Table 11 shows the sampling plan used in the actual WACS. Household
sample size was determined by using Slovin’s Formula while 10% of the total non-
household by category (food establishments, industrial, agricultural, public market,
and recreational) was also taken as sample size.
NON-HOUSEHOLD
HOUSEHOLD
Sample
Population
SUB TOTAL
LIVESTCK
Barangay
MILLS
INST
MFG
CON
PM
GS
RC
HC
SC
FE
FL
URBAN
BRGY. 3 873 3 1 1 1 1 4 7
BRGY. 4 2,465 16 1 8 4 1 1 15 31
SAMPLE SIZE
TOTAL SAMPLE
NON-HOUSEHOLD
HOUSEHOLD
Sample
Population
SUB TOTAL
LIVESTCK
Barangay
MILLS
INST
MFG
CON
PM
GS
RC
HC
SC
FE
FL
FLORIDA 1,635 9 3 1 1 5 14
SAN JOAQUIN 1,634 8 2 1 3 11
QUIRINO 1,584 9 3 1 4 13
SUB-TOTAL 8,191 45 2 17 0 7 0 1 2 0 1 1 0 0 31 76
RURAL
ALCALA 521 2 1 1 2 4
BAGTU 748 2 1 1 3
BANGCO 636 2 1 1 3
BAZAL 1,274 5 3 1 4 9
CAB WEST 493 1 1 1 2
DETAILEN 793 3 2 1 3 6
DIAMAN 239 1 1 1 2
DIKILDIT 908 4 2 2 6
DIOME 760 3 2 2 5
KADAYACAN 1,261 5 1 1 6
RAMADA 1,134 5 1 2 1 4 9
SAN JUAN 891 3 1 2 1 1 5 8
STA. LUCIA 541 1 1 1 2 3
STO. CRISTO 755 2 2 2 4
WENCESLAO 1,266 6 3 3 9
SUB-TOTAL 12,220 45 3 21 0 3 2 0 0 0 1 1 1 2 34 79
TOTAL 20,411 90 5 38 0 10 2 1 2 0 2 2 1 2 65 155
Table 12. Waste Generation and Composition Per Source the Municipality
of Maria Aurora
WASTE COMPOSITION AND GENERATION
RESIDENTIAL
Urban 3542.18 32.77 2141.54 430.41 139.54 136.29 175.17 125.67 576.67 201.34 778.01 192.22
Rural 4881.86 45.17 3170.45 590.73 180.35 159.20 259.18 40.59 639.32 276.58 915.90 204.78
Subtotal 8424.04 77.94 5311.99 1021.14 319.89 295.49 434.35 166.26 1215.99 477.92 1693.91 397.00
% 49.15 9.45 2.96 2.73 4.02 1.54 11.25 4.42 15.67 3.67
COMMERCIAL
Food 17.77 0.16 9.31 3.03 0.23 2.24 2.06 0.03 4.56 0.45 5.01 0.42
Establishme
WASTE COMPOSITION AND GENERATION
nt
General
Stores 641.40 5.93 135.79 332.00 23.90 72.97 55.20 16.00 168.07 3.11 171.18 2.43
Public
Market 384.78 3.56 228.03 88.15 12.47 30.30 9.14 5.81 57.72 6.59 64.31 4.29
Service
Centers 29.31 0.27 10.80 7.64 3.21 1.50 3.12 0.68 8.51 1.47 9.98 0.89
Recreation
Centers 0.78 0.01 0.74 0.02 0.01 0.01 0.00 0.00 0.02 0.00 0.02 0.00
Subtotal 1074.04 9.94 384.67 430.84 39.82 107.02 69.52 22.52 238.88 11.62 250.50 8.03
% 3.56 3.99 0.37 0.99 0.64 0.21 2.21 0.11 2.32 0.07
INSTITUTIONAL
School 673.92 6.24 164.80 172.72 44.76 32.52 56.04 4.56 137.88 22.64 160.52 175.88
Offices 71.85 0.66 22.66 11.47 1.08 1.62 1.49 0.64 4.83 13.92 18.75 18.97
Health Care 385.57 3.57 110.21 83.68 7.14 10.23 11.05 1.76 30.18 160.86 191.04 0.64
Subtotal 1131.34 10.47 297.67 267.87 52.98 44.37 68.58 6.96 172.89 197.42 370.31 195.49
% 2.75 2.48 0.49 0.41 0.63 0.06 1.60 1.83 3.43 1.81
INDUSTRIAL
Manufacturi
ng 72.22 0.67 33.62 11.47 3.05 1.56 17.59 0.03 22.23 4.90 27.13 0.00
Mills 84.99 0.79 50.31 2.62 0.28 0.52 0.60 0.77 2.17 12.65 14.82 17.24
Concrete 13.38 0.12 1.44 11.31 0.01 0.27 0.17 0.17 0.62 0.00 0.62 0.01
Subtotal 170.59 1.58 85.37 25.40 3.34 2.35 18.36 0.97 25.02 17.55 42.57 17.25
% 0.79 0.24 0.03 0.02 0.17 0.01 0.23 0.16 0.39 0.16
AGRICULTURAL
Livestock 8.16 0.08 6.85 0.64 0.22 0.17 0.10 0.00 0.49 0.00 0.49 0.18
Subtotal 8.16 0.08 6.85 0.64 0.22 0.17 0.10 0.00 0.49 0.00 0.49 0.18
% 0.06 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 10808.17 6086.55 1745.89 416.25 449.40 590.91 196.71 1653.27 704.51 2357.78 617.95
% 100.00 56.31 16.15 3.85 4.16 5.47 1.82 15.30 6.52 21.81 5.72
RESIDUAL SPECIAL
DISPOSED IN WASTE TOTAL
SLF (broken glass, DISPOSED
(kg/day) etc.) (kg/day)
(kg/day)
12 Barangays
(residential &
non residential) 211.35 185.39 396.74
Out of the total waste generated for the entire Maria Aurora, which is
10,808.17 kg/per day, 56.31% are biodegradable materials followed by
residual wastes with 2,357.78 kg/day or 21.81%. However, out of the total
residual wastes, 1,653.27 kg / day or 15.30% has a potential for diversion.
Recyclables has 1,745.89 kg/day and special wastes has 617.95 kg/ day.
URBAN
Barangay 1 322.32 326.64 330.72 335.04 339.36 343.68 348.24 352.56 357.12 361.92
Barangay 2 479.52 485.76 492.00 498.24 504.72 511.20 517.92 524.64 531.36 538.08
Barangay 3 223.44 226.32 229.20 232.08 235.20 238.08 241.20 244.32 247.44 250.80
Barangay 4 630.72 638.88 647.04 655.44 663.84 672.48 681.12 690.00 698.88 708.00
Florida 418.32 423.84 429.12 434.88 440.40 446.16 451.92 457.68 463.44 469.44
San Jose 373.68 378.48 383.28 388.32 393.36 398.40 403.44 408.72 414.00 419.28
San Joaquin 418.08 423.60 428.88 434.40 440.16 445.68 451.44 457.44 463.20 469.20
Dimanpudso 331.68 336.00 340.32 344.64 348.96 353.52 358.08 362.64 367.44 372.24
Quirino 405.36 410.64 415.92 421.20 426.72 432.24 437.76 443.28 449.04 454.80
4,043.7
SUB-TOTAL 3,603.12 3,650.16 3,696.48 3,744.24 3,792.72 3,841.44 3,891.12 3,941.28 3,991.92
6
RURAL
Alcala 133.20 135.12 136.80 138.48 140.40 142.08 144.00 145.92 147.60 149.52
Bagtu 191.52 193.92 196.32 198.96 201.36 204.00 206.64 209.28 212.16 214.80
Bangco 162.72 164.88 167.04 169.20 171.36 173.52 175.68 178.08 180.24 182.64
Bannawag 126.00 127.44 129.12 130.80 132.48 134.16 135.84 137.76 139.44 141.36
Baubo 162.24 164.40 166.56 168.48 170.88 173.04 175.20 177.36 179.76 182.16
Bayanihan 339.12 343.44 347.76 352.32 356.88 361.44 366.24 370.80 375.60 380.40
Bazal 325.92 330.24 334.56 338.88 343.20 347.52 352.08 356.64 361.20 365.76
Cab. East 169.92 172.08 174.24 176.64 178.80 181.20 183.60 185.76 188.16 190.80
Cab. West 126.24 127.68 129.36 131.04 132.72 134.40 136.32 138.00 139.68 141.60
Debucao 330.96 335.04 339.36 343.92 348.24 352.80 357.36 361.92 366.48 371.28
Decoliat 116.88 118.56 120.00 121.44 123.12 124.56 126.24 127.92 129.60 131.28
Detailen 202.80 205.44 208.08 210.96 213.60 216.24 219.12 222.00 224.88 227.76
Diaat 373.68 378.48 383.28 388.32 393.36 398.40 403.44 408.72 414.00 419.28
Dialatnan 46.80 47.52 48.00 48.72 49.20 49.92 50.64 51.12 51.84 52.56
Diaman 61.20 61.92 62.64 63.60 64.32 65.28 66.00 66.96 67.68 68.64
Dianawan 284.40 288.00 291.60 295.44 299.28 303.12 306.96 311.04 314.88 318.96
Dikildit 232.32 235.44 238.32 241.44 244.56 247.68 250.80 254.16 257.52 260.64
Diome 194.40 197.04 199.44 202.08 204.72 207.36 210.00 212.64 215.52 218.16
Estonilo 193.20 195.60 198.24 200.88 203.28 205.92 208.56 211.44 214.08 216.72
BARANGAY 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Galintuja 153.12 155.04 156.96 159.12 161.04 163.20 165.36 167.28 169.44 171.84
Kadayacan 322.56 326.88 330.96 335.28 339.60 343.92 348.48 353.04 357.60 362.16
Malasin 151.68 153.60 155.76 157.68 159.84 161.76 163.92 166.08 168.24 170.40
Punglo 138.96 140.64 142.56 144.48 146.16 148.08 150.00 151.92 153.84 156.00
Ramada 290.16 294.00 297.60 301.44 305.52 309.36 313.44 317.52 321.60 325.68
San Juan 228.00 230.88 234.00 236.88 240.00 243.12 246.24 249.36 252.72 255.84
San Leonardo 121.44 123.12 124.80 126.24 127.92 129.60 131.28 132.96 134.64 136.32
Sta. Lucia 138.48 140.16 142.08 143.76 145.68 147.60 149.52 151.44 153.36 155.28
Sto. Tomas 174.96 177.36 179.52 181.92 184.32 186.72 189.12 191.52 193.92 196.32
Suguit 144.24 146.16 148.08 150.00 151.92 153.84 155.76 157.92 159.84 162.00
Villa Aurora 192.24 194.64 197.04 199.68 202.32 204.96 207.60 210.24 212.88 215.76
Wenceslao 324.00 328.08 332.40 336.72 341.04 345.36 349.92 354.24 359.04 363.60
Some related laws and ordinances were also enacted as support in the
implementation of Municipal Ordinance No. 2, Series of 2006 as shown in
Table 17.
LAWS AND
REGULATION / TITLE RELEVANT PROVISIONS
ORDINANCES
LAWS AND
REGULATION / TITLE RELEVANT PROVISIONS
ORDINANCES
Executive Order Creation of Task Force / Composition of members who
No. 2013-16 TWG/ Oversight Committee in will undertake the pre-
the implementation of implementation activities like
Municipal Ordinance No. 4 IEC campaign, review
provisions, recommend
modifications and
amendments of the
Ordinance
Executive Order Authorizing Punong Barangay Allowing Punong Barangay
No. 001-2014 as Auxiliary Enforcers to deputized as Auxiliary
issue sanitation citation ticket Enforcers to issue sanitation
to apprehended violators in citation ticket
their respective barangay in
violation of Municipal
Ordinances No. 02, Series of
2006 and No. 04, Series of
2013
Executive Order Creation of Technical Composition of members who
No. 2014-08 Working Group (TWG) for the will initiate and facilitate
revision / updating of the 10 -revision / updating of 10-Year
Year SWM Plan SWM Plan of Maria Aurora,
Aurora
Executive Order Creation of enforcement team Composition of members who
No. 2014-11 relative to the Implementation will act as Enforcers
of Municipal Ordinance No.
02, Series of 2006 and
Municipal Ordinance No. 04,
Series of 2013 in the
Municipality of Maria Aurora,
Aurora
5.2 .Roles
5. Review every two years, or as the need arises, the Ecological Solid
Waste Management Plan for purposes of ensuring its sustainability,
viability, effectiveness and relevance in relation to local and
international developments in the field of solid waste management;
5.2.2 Municipality
5.2.3 Barangay
SCHEDULE OF
BARANGAY
MEETING
Alcala Quarterly
Bagtu Quarterly
Bangco Quarterly
Bannawag Quarterly
Brgy. 01 Quarterly
Brgy. 02 Quarterly
Brgy. 03 Quarterly
Brgy. 04 Quarterly
Baubo Quarterly
Bazal Quarterly
Cab. East Quarterly
Cab.West Quarterly
Debucao Quarterly
Decoliat Quarterly
Detailen Quarterly
Diaat Quarterly
Dianawan Quarterly
Dikildit Quarterly
Dimanpudso Quarterly
Diome Quarterly
Florida Quarterly
Galintuja Quarterly
Kadayacan Quarterly
Malasin Quarterly
Quirino Quarterly
Ramada Quarterly
San Joaquin Quarterly
San Jose Quarterly
San Juan Quarterly
Sta. Lucia Quarterly
Sto. Cristo Quarterly
Sto. Tomas Quarterly
Wenceslao Quarterly
Villa Aurora Quarterly
PLAN STRATEGY
The plannned revision was done through the conduct of meetings, workshops,
cross visit and actual WACS conducted by ESWM-TWG followed by close coaching
and mentoring of DENR-EMB Technical Staff during actual writeshop.
Guided by the waste stream flow intervention option as well as the mandatory
requirements of the law, specific engineering option were identified and evaluated in
each functional element of the ESWM-waste segregation, minimization at source,
collection and transport/transfer, materials recovery and processing/diversion and
disposal management. This resulted in the identification of specific activities and cost
items relevant to the engineering component.
On the Policy component, it looked into the policy and ordinance requirements
of the plan, based on RA 9003 and its Implementing Rules and Regulations (IRR).
With an analysis of existing policies and ordinances and the recommended
interventions as bases, the LGU were able to develop its priority policy support
agenda and worked out an effective enforcement strategy for SWM.
6.2 Targets
Table 21 shows the diversion and disposal targets for each year in the
10-year planning period.
Table 21. Diversion and Disposal Target, 2015-2024
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Diversion 87.76 87.76 87.76 87.76 90.26 92.76 92.76 92.76 92.76 92.76
Disposal 12.24 12.24 12.24 12.24 9.74 7.24 7.24 7.24 7.24 7.24
Maria Aurora’s diversion target is already 87.76% based on the WACS. Its
per capita generation rate has also decreased from 0.35 in 2005 to 0.24 in
2014.
6.3 Strategies
The Municipal LGU will continue its collection services for residual and
special wastes within the present service areas specifically Barangays I, II, III,
IV, San Jose, Florida, Alcala, Dimanpudso, San Joaquin, Bazal, Quirino, and
Bangco. By 2018, the regular service area will be expanded to Barangays
Malasin, Ramada, Cabituculan West, Cabituculan East, Sto. Cristo, Sta.
Lucia, Detailen, Dikildit, Bagtu, and Bannawag. By 2021, collection services
will be extended further to Barangays Debucao, San Leonardo, Diaat,
Kadayacan, Bayanihan, Baubo, Diome, Sto. Tomas, and Wenceslao. By
2024, the same services will be catered by the remaining Barangays of
Diaman, Punglo, Suguit, Dialatnan, Villa Aurora, Dianawan, Galintuja, San
Juan, and Decoliat.
Dianawan, Galintuja, San Juan, and Decoliat will be clustered for the
proposed satellite eco-park and may negotiate to nearest existing landfill for
final waste disposal due to geographical location.
The Municipal LGU will only collect residual and special waste. To
sustain the operational expenses of the Municipal LGU in the collection and
transport of solid waste, payment of monthly environmental fee shall be
continuously imposed subject to existing municipal ordinance.
Disposal Management
CHAPTER 7
SWM SYSTEM
Chapter 7 describes the detail of Solid Waste Management programs to be
implemented in the municipality to attain the objectives and targets of the plan.
- Strict implementation of
Mun. Ordinances No. 02,
Series of 1998,Mun. Operators,
Transport
Ordinance No. 2, Series of On going Drivers and
Groups
2006 and Mun. Ordinance passengers
No. 4
The targeted yearly waste diversion rates will be achieved with the help
of strict implementation of enacted Ordinances. Based on WACS, source
reduction of sando bags (3.85%), composites (4.16%), PPs (5.47%), and
others (1.82%) will achieve a 15.30% diversion. Maximization of the potential
use of biodegradable waste (56.31%) and recyclable waste (16.15%) will
greatly increase the diversion rates and will help in achieving the projected
diversion rates.
7.2. Collection
Table 23. List of Barangays, types of waste to be collected and schedule of collection
SCHEDULE SCHEDULE OF
TYPES OF WASTE TO
BARANGAY OF DAILY
BE COLLECTED
COLLECTION COLLECTION
Barangay 1 Residual / Special Wastes On-going Tuesdays
Barangay 2 Residual / Special Wastes On-going Tuesdays
San Joaquin Residual / Special Wastes On-going Tuesdays
San Jose Residual / Special Wastes On-going Tuesdays
Dimanpudso Residual / Special Wastes On-going Thursdays
Florida Residual / Special Wastes On-going Thursdays
Alcala Residual / Special Wastes On-going Thursdays
Brgy. 3 Residual / Special Wastes On-going Thursdays
Brgy. 4 Residual / Special Wastes On-going Thursdays
Bangco Residual / Special Wastes On-going Bi-monthly
Quirino Residual / Special Wastes On-going Bi-monthly
Bazal Residual / Special Wastes On-going Bi-monthly
Malasin Residual / Special Wastes 2018 To be scheduled
Ramada Residual / Special Wastes 2018 To be scheduled
Cabituculan West Residual / Special Wastes 2018 To be scheduled
Cabituculan East Residual / Special Wastes 2018 To be scheduled
Sto. Cristo Residual / Special Wastes 2018 To be scheduled
Sta. Lucia Residual / Special Wastes 2018 To be scheduled
Detailen Residual / Special Wastes 2018 To be scheduled
Dikildit Residual / Special Wastes 2018 To be scheduled
Bagtu Residual / Special Wastes 2018 To be scheduled
Bannawag Residual / Special Wastes 2018 To be scheduled
Debucao Residual / Special Wastes 2021 To be scheduled
San Leonardo Residual / Special Wastes 2021 To be scheduled
Diaat Residual / Special Wastes 2021 To be scheduled
Kadayacan Residual / Special Wastes 2021 To be scheduled
Bayanihan Residual / Special Wastes 2021 To be scheduled
Baubo Residual / Special Wastes 2021 To be scheduled
Diome Residual / Special Wastes 2021 To be scheduled
Sto. Tomas Residual / Special Wastes 2021 To be scheduled
Wenceslao Residual / Special Wastes 2021 To be scheduled
Diaman Residual / Special Wastes 2024 To be scheduled
Punglo Residual / Special Wastes 2024 To be scheduled
Dialatnan Residual / Special Wastes 2024 To be scheduled
Suguit Residual / Special Wastes 2024 To be scheduled
Villa Aurora Residual / Special Wastes 2024 To be scheduled
Dianawan Residual / Special Wastes 2024 To be scheduled
Galintuja Residual / Special Wastes 2024 To be scheduled
Decoliat Residual / Special Wastes 2024 To be scheduled
San Juan Residual / Special Wastes 2024 To be scheduled
7.2.1 Overview
All barangays in the municipality shall designate a separate
compartment as Residual Containment Box within their Materials
Recovery Facility (MRF) as collection point. Compostable wastes left
in every waste source shall be converted in composts / organic
fertilizer. Recyclable materials shall be directly sold to junkshops or
ambulant buyers by waste source generators as additional source of
income. Municipal Collection Team shall collect only residual and
special wastes in the Residual Containment Box within the Barangay
MRF. Hazardous wastes from hospitals and clinics shall be
responsibility of said establishments and shall be placed in a sealed
container or toxic vault.
Table 24 shows the list of current number of vehicles used and proposed
additional vehicles. It is proposed that the LGU shall procure one garbage truck
each 2017, 2019, 2021, and 2024 to augment or replace the two existing garbage
trucks.
Table 24. List of current number of vehicles & projection of additional vehicles to be
purchased by year
NO. OF For Acquisition
TYPE OF
EXISTING REMARKS
VEHICLES
VEHICLES 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Utility 1 For
Vehicle monitoring,
evaluation,
enforcement
and IEC
Fig. 12. Present Garbage Collection Trucks
Collection vehicles covered with nets are the only vehicles allowed to
transport waste from the collection area to the MAEF site. It should be properly
netted in order to minimize hazard resulting from aerial discharge of unwanted
particles into the air and into the built-up areas where these vehicles will pass
through.
A driver and two collection laborers will man the current garbage collection
truck. They shall be provided with the necessary training to ensure proper
handling and management of waste from the collection to the municipal MRF
and down to the disposal facility.
Collection and transport crew shall also be equipped with the basic
protective gears such as gloves, masks, and safety boots. This is to ensure
safety and avoid unnecessary contact with the waste during their work to
minimize health hazard posed by handling solid waste. They should as well go
through regular medical check-up.
7.3.1 Segregation
7.3.2 Recycling
Materials To Be Recycled
Implementation Schedule
Materials To Be Composted
Implementation Schedule
7.3.4 Marketing
Table 28. Estimated prices for recovered materials and average selling
price
Recovered
Average selling price/ average price
materials
Tin P4.00/kg
Aluminum P12.00/kg
Bottle P1.00/pc
Iron P12.00/kg
Clear Plastic Bottle P13.00kg
Carton P4.00/kg
Paper P2.00/kg
7.4 Transfer
Maria Aurora and its barangays currently use their respective Materials
Recovery Facility as transfer stations and temporary storage. No plan yet for
transfer facility.
Also, the municipality may link with other LGUs implementing the same
technology for other designs or products derived from shredded plastic
materials.
7.6 Disposal
Cell No. 1 operated for almost three years and based on the average
disposed waste, waste received by Cell No. 1 exceeded its expected life.
This may be due to higher recovery rate and the strict disposal of only
residual waste as special waste which has its own storage or toxic vault.
7.8.1 Introduction
Thus, the Municipal Government shall involve all sectors for the
proper dissemination of proper solid waste management through
various mediums such as seminars and meetings, school advocacies
and orientations. This will be conducted in all levels from the municipal
level down to the barangay and puroks, and also in schools.
Information Education Campaign on RA 9003 will serve as the
springboard of the total implementation of the program and its
components.
LGU Maria Aurora has been doing various IEC activities and
materials. This plan shall conduct continuous and strengthened IEC
strategies until all stakeholders and visitors are well-informed and
disciplined in terms of proper solid waste management.
7.8.3. Approach
To ensure that all core messages are properly delivered and planned
IEC activities to be successful, several approaches shall be conducted;
The existing Municipal ESWM TWG & ESWM Board shall spearhead
this activity. To enhance IEC implementation, the team shall be provided
with capacity building support including communication equipment and
resources. A full time IEC Coordinator will be assigned from the team to
oversee plan implementation, including materials development and
dissemination.
Stories on SWM Best Practices not only in Maria Aurora, but also in
model LGUs including important provisions of RA 9003 shall be published
through the local newspaper.
At the end of each year of planning period, the results of the campaign
shall be evaluated, lessons learned and best practices will be properly
documented, and a corresponding report will be prepared.
To a more strengthened SWM program, the TWG, SWM Board and IEC
Team shall forge an alliance with various stakeholders to encourage their
active participation. Local officials as well as potential partners shall be
asked to sign a covenant of commitment as a testament to their unequivocal
support to the program. Aside from tapping them as SWM champions, they
shall also be involved in monitoring and evaluation activities. The municipal
government, in collaboration with civic and other groups, will also organize
regular seminars, dialogues, meetings with key sectors, and will make use
of public gatherings to make important announcements. Aside from
establishment of call centers, feed backing sessions will be conducted with
partners to ensure transparency, accountability and participatory process in
SWM implementation
Table 33. SWM Programs / Activities, Strategies, and Implementation Schedules
PROGRAM/ ACTIVITY STRATEGIES 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Production of IEC
materials (posters,
2. Conduct of IEC campaign brochures, leaflets)
Intensified and
1. Waste Collection expanded waste
collection to other
barangays
Production of compost
Production and
marketing of recycled
2. Waste Diversion materials
Enactment of ordinance
for mandatory
establishment of MRF in
every businesses,
institutions and offices
Livelihood training on
recycled materials
IV. Engineering
Formulation /
1. Safe Closure of Cell # 1 implementation of safe
closure plan
Construction of new cell
2. Opening/ construction of
(Cell #2) as final
Cell # 2
disposal area
3. Establishment of Eco-Park Procurement and
in Canili Area establishment of eco-
park that will serve as
final disposal site for
residual and special
waste
STRATEGIES 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
PROGRAM/ ACTIVITY
STRATEGIES 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
PROGRAM/ ACTIVITY
Quarterly earth-filling
15.Road Maintenance and drainage canal
maintenance
Leachate collection,
16. Leachate Treatment treatment and disposal
V. ORGANIZATION AND
MANAGEMENT
Quarterly meeting of
1. SWM Board Meetings SWM Board
Hiring of regular
2. Staffing Pattern personnel at the Office
of the MENRO
Capability building of
3. Trainings/ Seminars SWM personnel
Purchase of equipment,
4. Provision of office equipment
supplies and materials
and supplies
for operation
PROGRAM/
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 TOTAL
ACTIVITY
I. Education
1.Strengthening of
IEC Team
20 20 20
& BSWM 60
Committees
2. IEC campaign
CHAPTER 8
IMPLEMENTATION STRATEGY
Fig. 15. Framework
Based on the result of WACS, Table 35. shows the types and percentage of
materials for diversion including those residuals with potential for diversion. At the
start of the planning period (2015), the diversion rate is 87%. This rate was based
on the municipality’s waste diversion strategies like composting of all
biodegradable waste collected from public market, alternative technology like
production of foot pavers and hollow blocks mixed with shredded plastic materials,
and efficient recovery of recyclable materials, sold at accredited junkshops.
2015 0.240 40,652 9,756.48 87.76 8,562.29 12.24 1,194.19 5,493.87 1,575.67 1,492.74
2016 0.245 41,179 10,080.62 87.76 8,846.75 12.24 1,233.87 5,676.40 1,628.02 1,542.33
2017 0.250 41,704 10,413.32 87.76 9,138.73 12.24 1,274.59 5,863.74 1,681.75 1,593.24
2018 0.255 42,246 10,759.63 87.76 9,442.65 12.24 1,316.98 6,058.75 1,737.68 1,646.22
2019 0.260 42,791 11,116.41 90.26 10,033.67 9.74 1,082.34 6,259.65 1,795.30 1,700.81 635.86
2020 0.265 43,340 11,484.21 92.76 10,652.75 7.24 831.46 6,466.76 1,854.70 1,757.08 656.90
2021 0.270 43,902 11,865.79 92.76 11,006.70 7.24 859.08 6,681.63 1,916.32 1,815.47 678.72
2022 0.276 44,468 12,259.14 92.76 11,371.58 7.24 887.56 6,903.12 1,979.85 1,875.65 701.22
2023 0.281 45,039 12,664.89 92.76 11,747.95 7.24 916.94 7,131.60 2,045.38 1,937.73 724.43
2024 0.287 45,622 13,085.40 92.76 12,138.02 7.24 947.38 7,368.39 2,113.29 2,002.07 748.49
The findings and recommendations of the team shall also be submitted to the
SWM Board in a form of report and be made available to the public.
Sustain the current Search for Best Barangays, Schools and Business
Establishments Practicing Solid Waste Management Program.
Being the host barangay of the Maria Aurora Ecological Farm (MAEF),
Barangay San Joaquin (households/non- households) shall have the
privilege for free garbage collection services.
CHAPTER 9
INSTITUTIONAL ASPECTS
9.1 Roles
The MENRO together with SWM Board shall closely coordinate with the
barangay SWM committees, SWM multi-sectoral groups, national agencies, municipal
LGU officers, and civil society/ non- governmental organizations for specific activities
related to solid waste implementation.
The Municipal SWMB shall meet regularly to discuss issues, programs, plans
and activities to further strengthen the implementation of ecological solid waste
management in the municipality.
The barangay SWM committees with the technical assistance of the TWG shall
formulate suitable arrangements for the collection and transport of the residual and
special waste from their area of jurisdiction.
Multi-Sectoral Bodies
Multi-Sectoral Monitoring and Evaluation Team. The team shall assess the
performance of the implementation of the SWM Plan and will be provided
also by the LGU an orientation and logistical support.
NGOs and other civic organizations are expected to sponsor any SWM-
related activities;
National Agencies
PNP -Maria Aurora Headquarters for the full assistance in the implementation
of this plan.
Sanggunian Bayan Office for the enactment of potential laws and ordinances
supporting the SWM program in accordance with this plan, and
Municipal ENRO for the full implementation of the ESWM Plan and enacted
ordinances.
9.2 Legal
OFFICE OF THE
MAYOR
MENRO
As shown in Fig. 16, ESWM Program is under the Office of the Mayor as one of
the priority programs in maintaining the orderliness and cleanliness of the municipality.
He also chairs the Municipal Solid Waste Management Board (MSWMB) that serves as
policy-making body in the implementation of the SWM Plan and its programs and
activities. The ESWM Technical Working Group on the other hand, serves as planning
body in the revision and updating of the 10-Year SWM Plan and oversight committee of
enacted SWM-related ordinances and policies.
The municipality appointed MENRO last 2012 and acted as frontliner in
implementing and supervising SWM Program. He is manned with Job Order employees
as SWM personnel. The MENRO also acts as SWM coordinator which has the
following functions:
Conduct necessary studies (e.g., time and motion study of collection routes,
feasibility studies and environmental impact assessment) related to collection,
MRF, composting and disposal facility;
Provide technical assistance, logical and training support to barangays and
communities to help them formulate SWM strategies and to plan, implement,
monitor, and evaluate SWM projects;
Formulate, review, and improve procedures for SWM operations and
enforcement, including coordination with groups and sectors providing support to
the SWM program;
Formulate, review, improve incentives and command and control systems to
reinforce the proper practice of SWM;
Conduct IEC campaigns;
Provide technical and logical support to enforcers, multi-sectoral M& E team and
other groups/task forces organized to help implement the SWM plan;
Periodically monitor actual implementation of specific SWM initiatives;
Periodically prepare reports on the performance status and analysis of
implementation and enforcement of SWM ordinances; and
Prepare annual and financial plans.
The Office of the MENRO shall be divided into three sections: Forest
Resources Management, Environmental Management, and Information,
Research and Development. Under Environmental Management Section, a
SWM Coordinator (Environmental Management Specialist II) shall be appointed
to monitor and supervise day to day operation of SWM Program; the Forest
Resources Management Section shall directly implement various programs,
projects, and activities pertaining to forest management; while Information,
Research and Development Section shall be tasked to implement IEC strategies.
MENRO
9.2.2. Zoning
CHAPTER 10
Negative
Positive
10.2.1 Environmental aspects of the proposed solid waste system and review
requirements
4. The compost products that are intended for commercial distribution must
conform to the Standards of the Department of Agriculture for organic
fertilizers. Compost products shall be free from hazardous or toxic
material above permissible levels, samples of which shall undergo
Toxicity Characteristic and Leaching Procedures (TCLP) test provided
that such result in the presence of toxic chemicals regulated under
Republic Act (RA) 6969 or the Toxic Substances and Hazardous and
Nuclear Wastes Control Act of 1990 shall be placed in approved
containers and transported to DENR accredited Treatment, Storage and
Disposal Facility;
11. The proponent shall allow the spot inspection or monitoring of the project
by this Office anytime and/or in coordination with the concerned groups;
This chapter describes the corresponding budget allocation needed to sustain the
program incorporated in the plan all through the planning period.
Table 36 shows the cost estimates per activity from 2015-2024 divided into
different program components like IEC, Enforcement, Project Management,
Engineering and Organization and Management. The total cost of all SWM activities for
the 10-year planning period shall be P 55,830,000.00.
Table 36. Cost Estimates of Activities (in thousand pesos)
PROGRAM/
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 TOTAL
ACTIVITY
I. Education
1.Strengthening of
IEC Team
20 20 20
& BSWM 60
Committees
2. IEC campaign
II. Enforcement
1. Re-training of
150 150
Enforcers
2. Production of
50 50
Citation Ticket
PROGRAM/
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 TOTAL
ACTIVITY
III. Project
Management
1.Waste Collection
- Diesel, oil, & 400 400 400 400 400 450 450 450 500 500 4,350
lubricants
2. Waste Diversion
- Production of 2 2 2 2 2 5 5 5 5 5 35
compost
- Production and 10 10 10 10 10 10 10 10 10 10 100
marketing of
recycled
materials
- Livelihood 100 100
training
SUBTOTAL 412 512 412 412 412 465 465 465 515 515 4,585
IV. Engineering
1. Safe closure of
50
Cell #1 50
2. Opening/
construction of 100
100
Cell #2
3. Establishment of
Eco- Park in 100 200 300
Canili Area
4. Installation of SLF
100 50 150
Power Lines
5. Construction of
50 100 150
special waste vault
6.Construction of
windrows/ 50 100 150
compost box
7.Repair/
construction of 20 50 70
Municipal MRF
8.Safe closure of
100 100
MAEF
9.Purchase and
establishment of 2,000 1,000 1,000 4,000
new MAEF
10.Provision of
1,000 1,200 1,500 1,500 5,200
garbage trucks
PROGRAM/
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 TOTAL
ACTIVITY
11. Provision of
3,000 3,000
backhoe
12. Provision of
1,000 1,000
utility vehicle
13. Provision of
shredding 500 500
machine
14. Provision of
decorticating 1,000 1,000
machine
15. Provision of 400 400
glass
shredder/pulverizer
16. Construction of
fence of MAEF 100 100
and Cell # 2
17. Provision of
PPEs 100 100 100 100 100 100 100 100 100 100 1,000
18.Road
10 10 10 10 10 10 10 10 10 10 100
maintenance
19. Leachate
treatment 10 10 20
SUBTOTAL 580 3,420 1,610 3,210 2,710 1,410 2,620 110 110 1,610 17,390
V. Organization
and
Management
1. SWM Board
10 10 10 10 10 10 10 10 10 10 100
Meetings
2. Hiring of MENRO
500 500 500 1,500
Personnel
3. Trainings/
50 50 50 150
Seminars
4. Provision of office
equipment and 100 100 100 100 100 100 100 100 100 100 1,000
supplies
5. Hiring of SWM
2,300 2,500 2,500 2,500 2,500 2,750 2,750 2,750 3,000 3,000 26,550
Personnel
6. Search for Best
Barangays, Schools,
250 250 250 250 250 250 250 250 250
and Business Estab. 250 2,500
Practicing Proper
SWM
SUBTOTAL 2,660 2,910 3,360 3,360 3,410 3,110 3,110 3,160 3,660 3,660 32,400
GRAND TOTAL 3,842 6,922 5,542 7,072 6,712 5,240 6,380 3,810 4,440 5,870 55,830
11.1 Investment Cost
Table 36 also shows the planned Investment of the Municipality for the
10-Year period which shall address the engineering component of the solid
waste management which encompasses collection and equipment, transfer
station or storage and composting including planned establishment of new
MAEF once the existing MAEF will no longer accommodate waste with an
equivalent cost of Php17,390,000.00.
Also, Table 36 shows the Annual Cost for the 10-year planning period
with an equivalent cost of Php 38,440,000.00. Maria Aurora undertakes SWM
Management operation and no major involvement for private contractors and
entities except for their mandated responsibility in RA 9003. No amortization
and loan repayment since all components in solid waste management
operations are all calendared out from municipality’s resources.
In terms of annual cost, labor and operation and maintenance costs got
the highest allocation and salaries of Job Order employees hired as SWM
personnel and daily consumption of diesel, oil, and lubricants.
The main source of funds that will support the implementation of the
SWM program will be the municipality’s General Fund and 20% Development
Fund which are both mainly derived from IRA; an average annual increase in
IRA of 11.9%and projections up to 2024.
In the first year (2015) of the implementation of the revised plan, only
3.33% of the IRA was allocated with an equivalent cost of P 3,860335.80. The
highest proportion of SWM Cost to IRA is 5.90% in 2016 due to the provision
of backhoe to be used in disposal operation. The proportion will decrease by
respective percentage towards the end of the implementation period.
Considering that revenue can be generated also in the implementation of the
SWM plan, it is therefore expected that the municipality may sustain the
implementation and operation of the ISWM plan. The projected IRA of the
municipality is considered to be insufficient to finance the implementation of
the 10-year SWM Plan.
A. Environmental Fees
The collection crew will manage the municipal MRF. It will have
a capacity for storage and processing for recyclable materials that
will be collected from the business district. The limited income that
could be derived from its materials recovery activities will be plowed
back for the operation and maintenance of the facility.
Composts or organic fertilizers shall also be a potential source
of revenue. Biodegradable waste generated and collected from the
Public Market are shredded and converted into composts.
Commercial 153,570.00 153,570.00 153,570.00 180,093.00 180,093.00 180,093.00 205,746.30 205,746.30 205,746.30 236,538.06 1,854,765.96
Institution 15,300.00 15,300.00 15,300.00 21,532.50 21,532.50 21,532.50 29,366.70 29,638.95 29,638.95 52,348.23 251,490.33
Industrial 8,880.00 8,880.00 8,880.00 10,329.00 10,329.00 10,329.00 13,431.00 13,431.00 13,431.00 15,053.61 112,973.61
Table 37A. Revenues generated from environmental fees (Household) - Weekly Collection
Name of
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 TOTAL
Barangay
Brgy 1 77,445.37 78,229.81 79,022.20 87,804.88 88,694.26 89,592.64 99,550.14 100,558.48 101,577.04 112,883.46 915,358.28
Brgy 2 111,684.71 113,958.68 116,278.95 118,646.46 121,062.17 123,527.07 126,042.15 128,608.45 131,226.99 133,898.85 1,224,934.48
Brgy 3 81,225.25 82,879.04 84,566.51 86,288.33 88,045.21 89,837.87 91,667.02 93,533.42 95,437.81 97,380.98 890,861.44
Brgy 4 110,918.44 113,176.80 115,481.15 117,832.42 120,231.55 122,679.54 125,177.37 127,726.05 130,326.63 132,980.16 1,216,530.12
Florida 239,318.59 244,191.26 249,163.14 254,236.25 259,412.65 264,694.44 270,083.78 275,582.85 281,193.88 286,919.15 2,624,795.97
San Jose 129,372.57 132,006.67 134,694.41 137,436.86 140,235.16 143,090.43 146,003.84 148,976.56 152,009.82 155,104.83 1,418,931.15
San Joaquin 120,899.81 123,361.40 125,873.11 128,435.96 131,050.99 133,719.27 136,441.88 139,219.91 142,054.51 144,946.83 1,326,003.67
Dimanpudso 111,243.27 113,508.25 115,819.35 118,177.50 120,583.66 123,038.82 125,543.96 128,100.11 130,708.31 133,369.61 1,220,092.84
Quirino 114,541.59 116,873.73 119,253.34 121,681.41 124,158.92 126,686.87 129,266.29 131,898.23 134,583.76 137,323.96 1,256,268.10
SUB-TOTAL 1,096,649.59 1,118,185.64 1,140,152.15 1,170,540.07 1,193,474.58 1,216,866.95 1,249,776.42 1,274,204.06 1,299,118.74 1,334,807.83 12,093,776.05
Table 37B. Revenues generated from environmental fees (Household) - Bi-monthly Collection
Name of
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 TOTAL
Barangay
Bangco 900.00 900.00 900.00 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 10,140.30
Quirino 900.00 900.00 900.00 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 10,140.30
Bazal 900.00 900.00 900.00 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 10,140.30
Malasin - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Ramada - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Cabituculan East - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Cabituculan
- - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
West
Sto. Cristo - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Sta. Lucia - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Detailen - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Dikildit - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Bagtu - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Bannawag - - - 990.00 990.00 990.00 1,090.80 1,090.80 1,090.80 1,197.90 7,440.30
Debucao - - - - - - 1,090.80 1090.80 1,090.80 1,197.90 4,470.30
San Leonardo - - - - - - 1,090.80 1,090.80 1,090.80 1,197.90 4,470.30
Diaat - - - - - - 1,090.80 1,090.80 1,090.80 1,197.90 4,470.30
Kadayacan - - - - - - 1,090.80 1090.80 1,090.80 1,197.90 4,470.30
Bayanihan - - - - - - 1,090.80 1,090.80 1,090.80 1,197.90 4,470.30
Baubo - - - - - - 1,090.80 1,090.80 1,090.80 1,197.90 4,470.30
Diome - - - - - - 1,090.80 1,090.80 1,090.80 1,197.90 4,470.30
Sto. Tomas - - - - - - 1,090.80 1,090.80 1,090.80 1,197.90 4,470.30
Wenceslao - - - - - - 1,090.80 1,090.80 1,090.80 1,197.90 4,470.30
Diaman - - - - - - - - - 1,197.90 1,197.90
Punglo - - - - - - - - - 1,197.90 1,197.90
Dialatnan - - - - - - - - - 1,197.90 1,197.90
Suguit - - - - - - - - - 1,197.90 1,197.90
Villa Aurora - - - - - - - - - 1,197.90 1,197.90
Dianawan - - - - - - - - - 1,197.90 1,197.90
Galintuja - - - - - - - - - 1,197.90 1,197.90
Decoliat - - - - - - - - - 1,197.90 1,197.90
San Juan - - - - - - - - - 1,197.90 1,197.90
Sub-Total 2,700.00 2,700.00 2,700.00 12870 12,870.00 12,870.00 23,997.60 23,997.60 23,997.60 37,134.90 155,837.70
Grand Total (43A 1,099,349.5 1,120,885. 1,142,852.1 1,183,410.0
1,206,344.58 1,229,736.95 1,273,774.02 1,298,201.66 1,323,116.34 1,371,942.73 12,249,613.75
+43B) 9 64 5 7
Table 38. Summary of revenues from environmental fees
177,750.00 1,277,099.59
2015 1,099,349.59
177,750.00 1,298,635.64
2016 1,120,885.64
177,750.00 1,320,602.15
2017 1,142,852.15
212,185.50 1,395,595.57
2018 1,183,410.07
212,185.50 1,418,530.08
2019 1,206,344.58
212,185.50 1,441,922.45
2020 1,229,736.95
248,798.10 1,522,572.12
2021 1,273,774.02
249,070.35 1,547,272.01
2022 1,298,201.66
249,070.35 1,572,186.69
2023 1,323,116.34
304,219.41 1,676,162.14
2024 1,371,942.73
The municipal government can also foster sisterhood with other LGUs
in the country and in other nations, thereby gaining mutual concern on
common issues. This opportunity may be expected for other incidental
support.
11.3.3 Effective Management of Investments
11.5 Summary
2015
580,000.00 3,262,000.00 1,530,579.59
2016
3,420,000.00 3,502,000.00 1,552,115.64
2017
1,610,000.00 3,932,000.00 1,574,082.15
2018
3,210,000.00 3,862,000.00 1,691,123.57
2019
2,710,000.00 4,002,000.00 1,714,058.08
PLAN IMPLEMENTATION
This chapter describes and highlights the processes and schedules of Solid
Waste Management Plan implementation.
12.2 Milestones
a. Strict implementation of
Municipal Ordinances No. 2,
Series of 2006 and No. 2,
Series of 1998 and Municipal
Ordinance No. 04, Series of
2014
b. Adoption of municipal
ordinance requiring all
business establishments to
secure ESWM Clearance
before securing / renewing
Mayor’s Permit
c. Execution of MOA between
buko traders (coconut hull)
and private entity utilizing
such waste
d. Strengthening the use of
reusable bags or “bayong”
ACTIVITIES 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
i. Conservation on the use of
office supplies
j. Use of double-side
bond/copy paper
2. Collection
a. “Yes Segregation, Yes
Collection”
b. Expansion of service
collection areas
c. Procurement of collection
vehicles and equipment
d. Implementation of LGU
Segregated Collection of
Compostables in Public
Market
3. Segregation, Recycling
and Composting
a. Adoption of Eco-savers
Project (Bring your own
recyclables)
b. Implementation of
“Recyclable Mo, I-Shoot Mo”
Program
c. Strengthening of Recycling
Center
d. Bringing of foods in
reusable containers
e. Bringing of own utensils
f. . Discourage bringing in
foods that are packed in non-
reusable containers
g. Discourage the use of non-
reusable, non-recyclable
packages
h. Establishment of MRF,
composting and residual
containment box
ACTIVITIES
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 1 2 3 4 1 2 3 4 1 2
i.Buying / using of durable or
reusable materials like
glassware and utensils
j. Strengthening of Clean and
Green Program / Urban
Gardening / FAITH Garden
k. Backyard Composting
l. Small Grant Initiative for the
establishment of MRF
(Wenceslao), Compost Box
(Diaat Elementary) and Vermi-
composting (MANHS)
m. Gulayan sa
Paaralan/Komposting sa
Paaralan
n. Training on Alternative
Livelihood for Recyclable
Materials
o. Procurement of shredding
machine
p. Construction of compost
boxes at MAEF
q. Repair of Central MRF
r. Adoption of municipal
ordinance requiring all
households and non-households
to install composting facility
s. Adoption of municipal
ordinance requiring all
subdivisions and housing
projects to establish their own
MRF
ACTIVITIES
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 1 2 3 4 1 2 3 4 1 2
4. Alternative Technologies for
Residual Waste
a. Production / fabrication of foot
pavers and hollow blocks
5. Disposal
a. Installation of SLF power lines
b. Closure of Cell # 1 and
Opening of Cell # 2
c. Purchase of lot and
development for eco-park
d. Purchase of lot and
development of new MAEF
e. Safe closure of MAEF
6. IEC
a. Adoption of municipal
ordinance requiring all applicants
of Marriage License to undergo
ESWM Orientation before
issuance of license
b. Strengthening of BSWMC
c. IEC campaign
Basic Things You Should Know To Save and Protect Mother Earth
Republic Act 9003 and its Implementing Rules and Regulations (IRR)-
Ecological Solid Waste Management Act of 2000
Zero Basura