Nothing Special   »   [go: up one dir, main page]

00-Riyal Drawing

Download as pdf or txt
Download as pdf or txt
You are on page 1of 50

PAKHTUNKHWA ENERGY DEVELOPMENT ORGANIZATION (PEDO)

GOVERNMENT OF KHYBER PAKHTUNKHWA (KP)

FEASIBILITY DRAWING

440KW RIYAL HPP


LOT-III (BUNER)
PACKAGE-II (STREAMS)
ACCESS TO CLEAN ENERGY PROGRAM / CONSTRUCTION OF
MINI MICRO HYDROPOWER PROJECT (MMHPP)
DISTRICT BUNER

MANAGEMENT CONSULTANT
A JV OF M/S INTEGERATION ENVORMENT & ENERGY,
ELAN PARTNER (PVT) LTD.

SUBMITTED BY
TELCON-HEADS JV
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-MHP-LOD-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / LIST OF DRAWINGS
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE AS SHOWN
U. S. S. R CHINA

KHYBER

ER
RIV
PAKHTUNKHWA CHITRAL MASTUJ

LEGENDS:
GI
GARAM CHASMA LG RIVER
IT
BA MARDAN
LTIS CITY/TOWN
TA
N STREAM/NULLAH/KHWAR
N

CHITRAL
TA
IS

SWAT PROVINCIAL BOUNDARY


N
A

KAFIRISTAN
H

KALAM
FG

DROSH

A
METALLED ROADS
N

DI
A

A
ST

IN
KATCHA ROADS
KI
PA

LAWARI PASS
er

BAHRIN
Riv

DIR
MADYAN
K O H I S T A N
Indus

BAJOUR
AGENCY

R
VE
RI
N

KAGHAN

RA
IRA

KO
E
RIV
KHAR MINGORA

NJ
PA
S W A T

RIVER
R
NA

N
KU
T RIVER
SWA THANA

ISTA
MALAKAND

AD
S
INDU

RAB
HAN

Jindai
ARABIAN SEA
KAB
UL MOHAMMAND BUNEER

MUZ (AJK)
AFFA
Nullah
AGENCY

AFG
Kalpani Nu MANSEHRA

RI
llah

VE
R

ER
RIV
AN
SWABI

SIR
ABBOT ABAD
CHARSADDA MARDAN
UR
Muq
amN
u DA
llah
HARIPUR
h
ulla PESHAWAR
oi N KABUL RIVER R
Pla
s IVE
US R
IND
HA
BA RO
ATTOCK ER
RA RIV
KHYBER RIVER
HASSAN
ABDAL MURREE

KURRAM ORAK ZAI TAXILA


KOHAT TO KOHAT
I

HANGU
PROJECT LOCATION

ER
RIV
TAL
KU
RR

AM US
IND
RIV
ER

TO
I
RIV
ER

Bara
nN
ulla
BANNU
h
KARAK
TOCHI RIVER
KALABAGH
GAM

NORTH WAZIRISTAN
B
NJA
BILL

RAZMAK
A

KURR

RIV ISA
PU

ER KHEL
AM

RIVER

JANDOLA
SOUTH WA Z I R I S T A N
TANK

GIRIH POST
KOT MURTAZA
ER
RIV
US
IND

GUL KACH
MUGHAL KOT

D.I. KHAN
DARABAN
DAR AZINDA
AHMAD DIRGA
UMIA
FORT SANDEMAN
BA
LO
CH
IS
TA
N

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-LMP-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / LOCATION MAP
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE NTS
E 284650

E 284700

E 284750

E 284800

E 284850

E 284900

E 284950

E 285000
N 3818550 N 3818550

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

N 3818500 N 3818500

N 3818450 N 3818450
FLO
W

N 3818400 N 3818400

FLOW

N 3818350 N 3818350
E 284650

E 284700

E 284750

E 284800

E 284850

E 284900

E 284950

E 285000
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 01 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
N 3818500 N 3818500

E 285050

E 285100

E 285150

E 285200

E 285250

E 285300

E 285350
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

N 3818450 N 3818450

FLOW

N 3818400 N 3818400

FLOW

N 3818350 N 3818350

N 3818300 N 3818300

HOUSE HOUSE

HOUSE
E 285050

E 285100

E 285150

E 285200

E 285250

E 285300

E 285350
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-02 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 02 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 285400

E 285450

E 285500

E 285550

E 285600

E 285650

E 285700

E 285750
N 3818400 N 3818400

FLOW

N 3818350 N 3818350

FLOW

N 3818300 N 3818300

N 3818250 N 3818250

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
E 285400

E 285450

E 285500

E 285550

E 285600

E 285650

E 285700

E 285750
N 3818200 N 3818200

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-03 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 03 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 285800

E 285850

E 285900

E 285950

E 286000

E 286050

E 286100

E 286150
N 3818400 N 3818400

N 3818350 N 3818350

FLOW

FLO
N 3818300 W N 3818300

GE
RID
LB
ESTA
PED

N 3818250 N 3818250

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
E 285800

E 285850

E 285900

E 285950

E 286000

E 286050

E 286100

E 286150
N 3818200 N 3818200

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-04 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 04 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 286200

E 286250

E 286300

E 286350

E 286400

E 286450

E 286500
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

N 3818400 N 3818400

FLOW

N 3818350 N 3818350

N 3818300 N 3818300

N 3818250 N 3818250

FLOW
E 286200

E 286250

E 286300

E 286350

E 286400

E 286450

E 286500
N 3818200 N 3818200

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-05 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 05 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 286200

E 286250

E 286300

E 286350

E 286400

E 286450

E 286500
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

FLOW
N 3818150 N 3818150

N 3818100 N 3818100

N 3818050 N 3818050

N 3818000 N 3818000

FLO
W
E 286200

E 286250

E 286300

E 286350

E 286400

E 286450

E 286500
N 3817950 N 3817950

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-06 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 06 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 286200

E 286250

E 286300

E 286350

E 286400

E 286450

E 286500
FLOW
N 3817900 N 3817900

N 3817850 N 3817850

N 3817800 N 3817800

N 3817750 N 3817750

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS FL
UNLESS NOTED OTHERWISE. OW
E 286200

E 286250

E 286300

E 286350

E 286400

E 286450

E 286500
N 3817700 N 3817700

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-07 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 07 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 286300

E 286350

E 286400

E 286450

E 286500

E 286550

E 286600

E 286650
FL
OW

N 3817650 N 3817650

FLOW

N 3817600 N 3817600

N 3817550 N 3817550

N 3817500 N 3817500

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
E 286300

E 286350

E 286400

E 286450

E 286500

E 286550

E 286600

E 286650
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-08 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 08 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 286700

E 286750

E 286800

E 286850

E 286900

E 286950

E 287000
FLOW
N 3817650 N 3817650

N 3817600 FLOW N 3817600

N 3817550 N 3817550

N 3817500 N 3817500

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
E 286700

E 286750

E 286800

E 286850

E 286900

E 286950

E 287000
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-09 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 09 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
E 287050

E 287100

E 287150

E 287200

E 287250

E 287300

E 287350

E 287400
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

FLOW

N 3817650 N 3817650

N 3817600 N 3817600

N 3817550 N 3817550

N 3817500 N 3817500
FLOW
E 287050

E 287100

E 287150

E 287200

E 287250

E 287300

E 287350

E 287400
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-SUR-LAY-001-10 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
TELCON-HEADS JV TOPOGRAPHIC SURVEY PLAN
ENERGY & POWER DEVELOPMENT ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 (SHEET 10 OF 10)
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1000
GENERAL NOTES STRUCTURAL WORKS
H MISCELLANEOUS:-
1-GENERAL 1. REINFORCING STEEL NOTATION:
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS OTHERWISE
7-ELECTRICAL CONDUITS 6d
THE FOLLOWING IS AN EXAMPLE OF TYPICAL NOTATION USED TO CALL OUT REINFORCING STEEL ON
NOTED. (MIN) THESE DRAWINGS.
1. CONDUITS, FOR ELECTRICAL WORKS, SHALL BE PLACED WITHIN THE REINFORCED
2. DO NOT SCALE THE DRAWINGS. DIMENSIONS, GIVEN ON THE DRAWING,
CONCRETE. THEY SHALL BE PROPERLY PROTECTED AND PLACED IN SUCH 10 D 12 @125 (T1)
SHALL GOVERN.

(M d
)
10
IN
MANNER THAT THESE DO NOT IMPAIR THE STRENGTH OF STRUCTURAL
3. NOTES GIVEN IN THIS DRAWING ARE APPLICABLE TO ALL DRAWINGS UNLESS
ELEMENTS. SPACING BETWEEN PARALLEL CONDUITS SHALL NOT BE LESS THAN LOCATION OF THE BAR
MENTIONED OTHERWISE. NOTES WRITTEN ON OTHER DRAWINGS, SHALL BE D D
150 MM.
APPLICABLE TO THAT PARTICULAR DRAWING ONLY UNLESS OTHERWISE C/C SPACING IN mm
CROSS-REFERENCED.
4. MATERIAL FOR BACKFILLING AROUND FOUNDATIONS SHALL BE WELL COMPACTED 8-EMBEDDED PARTS BAR DIAMETER (IN mm)
IN 150mm LAYERS. 1. CONTRACTOR SHALL PREPARE DETAILED DRAWINGS OF EMBEDDED PARTS AND o o
90 HOOK d d TYPE REINFORCEMENT
EQUIPMENTS FOR THE ENGINEERS APPROVAL PRIOR TO CONCRETING. 135 HOOK
2. ALL EMBEDDED PARTS SHALL BE PLACED AND SECURED AT ITS DESIGNATED TOTAL NUMBERS OF BARS
2-FOUNDATIONS LOCATION BEFORE CONCRETING.

1. THE LINES OF SLOPES AND EXCAVATION ARE TENTATIVE. PROPOSE ALTERNATE 9-EXPANSION JOINTS STIRRUPS AND TIE HOOKS 2. NOTATION AND SYMBOLS:
SLOPES ACCORDING TO THE SITE REQUIREMENTS SUBJECT TO THE APPROVAL. VARIOUS SYMBOLS AND NOTATIONS USED IN THE DRAWINGS ARE
2. FOUNDATION SHALL BE PLACED ON FIRM AND UNDISTURBED SOIL. 1. EXPANSION JOINTS SHALL BE CLEAR OF DEBRIS AND OTHER INCOMPRESSIBLE MATERIAL.
3. DEWATERING SHALL BE CARRIED OUT BEFORE THE POURING OF CONCRETE IN THEY SHALL BE FILLED WITH THERMOPORE SHEET UP TO WATER STOPPER FROM NON T TOP FACE
BAR DIA (mm)
FOUNDATION, IF REQUIRED. FLOW FACE AND BITUMEN IMPREGNATED SHEET UP TO WATER STOPPER FROM FLOW B BOTTOM FACE
D
FACE. THEY SHOULD BE SEALED AT THE FLOW FACE WITH SEALANT (SIKA OR T1 TOP LAYER 1 (NEAREST TO TOP FACE)
EQUIVALENT). b
d 10Ø 60 T2 TOP LAYER 2 (2ND FROM TOP FACE)
2. REINFORCEMENT STEEL DOWELS SHALL BE PROVIDED AT THE EXPANSION JOINTS B1 BOTTOM LAYER 1 (NEAREST TO BOTTOM FACE)
EXTENDING AT LEAST 300MM INTO THE CONCRETE ON EACH SIDE OF THE EXPANSION

12d b
12Ø 75 B2 BOTTOM LAYER 2 (2ND FROM BOTTOM FACE)
JOINT. ALL DOWELS SHALL BE AT LEAST 25MM IN DIAMETER WITH ONE END FIXED IN
3-REINFORCED CONCRETE CRITICAL SECTION B.F BOTH FACES
STAGE 1 CONCRETE AND SHALL BE SLEEVED IN CLOSED END POLYTHENE, PVC OR GI 16Ø 95
1. STRUCTURAL DESIGN IS BASED ON THE BUILDING CODE OF PAKISTAN & AMERICAN PIPES TO ALLOW FREE MOVEMENT OF THE STRUCTURE IN DIRECTION PARALLEL TO THE F.F. FAR FACE
CONCRETE INSTITUTE CODE OF REINFORCED CONCRETE ACI 318 & ACI 350R. DOWEL LENGTH. THERE MUST BE SUFFICIENT SPACE (AT LEAST 50MM) AT END OF THE N.F. NEAR FACE
2. ALL STRUCTURE CONCRETE IN REINFORCED SECTIONS SHALL HAVE A 28 DAYS DOWEL'S SLEEVE END TO ALLOW EXPANSION OF THE STRUCTURE. MAXIMUM SPACING OF SECTION MARKS
THE DOWELS SHALL NOT BE MORE THAN 1000MM. db
CYLINDER STRENGTH OF 20 MPa UNLESS OTHERWISE NOTED AND SHALL CONFORM
TO REQUIREMENTS OF PROJECT SPECIFICATIONS. 3. ALL WATER STOPPERS SHALL BE THERMALLY WELDED (USING APPROPRIATE EQUIPMENT) CONTINUATION MARKS
3. CEMENT CONFIRMING TO ASTM C-150 TYPE-1 (ORDINARY PORTLAND CEMENT) SHALL TO JOIN THEM AND AVOID ANY SEEPAGES.
BE USED IN ALL CONCRETE WORK.
4. AGGREGATE SHALL CONFIRM TO THE STANDARD SPECIFICATION FOR CONCRETE SPLICED
AGGREGATE ASTM C33. BARS
5. WATER SHALL BE FREE FROM OIL OR OTHER MATERIAL THAT CAN ADVERSELY AFFECT 4d b FOR Ø10 TO Ø16

MIN. 40mm
CONCRETE STRENGTH OR DURABILITY. 4d b>- 63mm
6. REINFORCEMENT SHALL CONFORM TO THE REQUIREMENTS OF THE STANDARD
SPECIFICATION FOR BILLET STEEL BARS FOR CONCRETE REINFORCEMENT ASTM A 615 6d b FOR Ø20 AND ABOVE
OR B.S 8110 HAVING YIELD STRENGTH OF 420 MPa (GRADE 60). REINFORCEMENT
STEEL SHALL BE USED WITH MILL SCALE ATTACHED AND NOT MORE THAN A LIGHT L dh
RUST COVER.NO STEEL SHALL BE USED WHERE THE MILL SCALE IS ABSENT DUE TO
RUST FLAKING. EXP. JOINT SEALANT
7. PLAIN CEMENT CONCRETE (LEAN)/ SHALL HAVE A 28 DAYS CYLINDER STRENGTH OF 10 RCC G20 WATER FACE MIN. 40mm MIN. 40mm
MPa. STANDARD HOOK DETAIL FOR LONGITUDINAL BARS.
8. MASS CONCRETE SHALL HAVE A 28 DAYS CYLINDER STRENGTH OF 15 MPa. BITUMEN WATER FACE RCC G20/G35
9. PLUM CONCRETE SHALL HAVE A 28 DAYS CYLINDER STRENGTH OF 15 MPa WITH 50% IMPREGNATED
BOULDERS. >500mm RCC STAGE
10. ALL REINFORCING STEEL SHALL BE ACCURATELY LOCATED IN THE FORMS AND HELD
2 SHEET GENERAL BAR SPACING
CONSTRUCTIN JOINT
FIRMLY IN PLACE BEFORE & DURING THE PLACEMENT OF CONCRETE BY MEANS OF
RCC STAGE 1 75mmX75mm
WIRE AND SUPPORTS ADEQUATE TO PREVENT DISPLACEMENT DURING THE MIN. 50mm 300 300
COURSE OF CONSTRUCTION. 225mm WIDE 225mm WIDE WATER KEY
STEEL
11. FABRICATION AND ERECTION OF STEEL REINFORCEMENT SHALL BE IN ACCORDANCE PVC SLEEVE WATER STOPPERS SPACING BETWEEN LAYERS
DOWELS
WITH ACI-318-99. PIPE STOPPERS USE Ø25 SPACER BAR
@1m THERMOPORE
12. SPLICING OF REINFORCEMENT SHALL BE STAGGERED. SHEET
13. FOR BUNDLED BARS THE FOLLOWING MULTIPLIERS SHALL BE APPLIED TO VALUES IN EXPANSION JOINT DETAILS FOR CONSTRUCTION JOINT BELOW WATER SURFACE LEVEL
TABLES.
A. 3-BAR BUNDLED IN TENSION OR COMPRESSION = 1.20 x TABLE VALUES. MEMBERS > 500mm THICK
B. 4-BAR BUNDLED IN TENSION OR COMPRESSION = 1.33 x TABLE VALUES.
C. LAP SLICES FOR EACH BAR IN A BUNDLE SHALL BE STAGGERED. ENTIRE BUNDLES
SHALL NOT BE LAP SLICED.
14. LAP SPLICES SHALL NOT BE USED IN LOCATIONS OF MAXIMUM MOMENTS
SPACING BETWEEN BARS IN A LAYER
UNLESS OTHERWISE PERMITTED ON THE DRAWINGS.
15. WHEN BARS OF DIFFERENT SIZES ARE LAP SPLICED ,SPLICE LENGTH SHALL BE THE SHALL BE LARGER BAR DIAMETER OR 25mm
LARGER OF THE TWO. WHICHEVER IS GREATER.

5-CONSTRUCTION JOINTS BAR SPACING IN BEAM


1. PVC WATER STOPS SHALL BE PROVIDED AT EVERY CONSTRUCTION JOINT.
EXP. JOINT TABLE-1
SEALANT 40mm(SIKA / EQUIVALENT)
RCC G20
WATER FACE 1.5 x LARGER BAR DIAMETER
fc'= 20 MPa fy= 420 MPa
OR 40 MINIMUM
BITUMEN BAR MIN. DEVELOPMENT LENGTH (MM) MIN. SPLICE/LAP LENGTH (MM) HOOK DEVELOPMENT
RCC STAGE 2
>500mm

6-SHORING AND BRACING IMPREGNATED SHEET DIAMETER LENGTH (MM) VERTICAL BAR SPACING IN COLUMNS
IN (MM) TOP BARS* OTHER BARS TOP BARS* OTHER BARS
1. SHORE & BRACE ALL PARTS OF THE STRUCTURE DURING CONSTRUCTION, TO
THE EXTENT NECESSARY TO ENSURE COMPLETE SAFETY, STRENGTH & RCC STAGE 1
MIN. 50mm 300 300 10 500 350 650 500 200
STABILITY OF ALL STRUCTURAL ELEMENTS UNDER ALL CONDITIONS OF LOADS 200mm WIDE WATER LEGEND
WHICH MAY OCCUR DURING CONSTRUCTION. SUCH SHORING & BRACING IS THE STOPPERS
PVC SLEEVE PIPE 50mm 13 650 525 850 650 250
CONTRACTOR'S SOLE RESPONSIBILITY AND IS NOT SHOWN ON STRUCTURAL STEEL DOWELS D25 MS = MILD STEEL
THERMOPORE SHEET
DRAWINGS OR SPECIFIED IN THE PROJECT. @1m PVC = POLYVINYLE CHLORIDE
16 800 625 1050 800 300
EXPANSION JOINT DETAILS IN WALLS CI = CAST IRON
19 950 750 1250 950 350 DI = DUCTILE IRON
<500mm THICK
SQ = SQUARE
22 1150 875 1425 1100 425 C.Jt = CONSTRUCTION JOINT
T&B = TOP AND BOTTOM
25 1250 975 1600 1250 475 NSL = NATURAL SURFACE LEVEL
EF = EACH FACE
29 1400 1100 1800 1400 550
FGL = FINISHED GROUND LEVEL
32 1600 1225 2050 1600 650 Ø = DIAMETER OF BAR
BF = BOTTOM FACE
* NOTE: HORIZONTAL OR NEARLY HORIZONTAL BARS SO PLACED THAT MORE THAN 300MM FRESH CONCRETE IS CAST
EF = EACH FACE
BELOW THEM.
db = BAR DIAMETER

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-GEN-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / GENERAL NOTES
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE NTS
WATERMILL (JRANDA) NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

PROTECTION WALL
625

620

PROTECTION WALL WEIR (GABION WALL)

FLOW

615

620
PROTECTION WALL
625 FISH PASS GRAVEL TRAP

HEADRACE CHANNEL
630

635

640
INTAKE

CONNECTING CHANNEL

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-GBN-LAY-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / GABION WALL
A JV OF M/S INTEGRATION CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
GOVERNMENT OF KHYBER
ENVIRONMENT & ENERGY,
CONSTRUCTION OF MINI HYDROPOWER LAYOUT PLAN
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD. 1:600
FISH PASS
74000

10000 10000 54000 1

2300
STONE APRON STONE APRON

600
3
STONE APRON

1000 800 800 800


1000 800 800 700

STONE APRON

9200
GABION WALL TOP EL.617.50 GABION WALL TOP EL.617.50
5600

600
2000

2300

2300
DRY STONE DRY STONE DRY STONE

3
2 PLAN 1
SCALE 1:175
HFL.619.50
HFL.619.50

DIA US STEEL
DESCRIPTION mm WIRE GUAGE
PCC G-21
2000

PCC G-21 BODY WIRE 2.3 11

2000
150mm THICK
150mm THICK
PERIMETER WIRE 2.8 9
TYING & CONNECTING WIRE 1.95 13
2000 300 1350
2000 300 1350
EL.617.50

800
POLYTHENE HEAVY GRADE / POLYTHENE HEAVY GRADE /

800
GEO MEMBRANE 5mm THICK 800 GEO MEMBRANE 5mm THICK 800 EL.617.50

1 NSL
1 NSL

800

800
1 800
1 800
DRY STONE
DRY STONE

3850
800

800
600 800 600
600 800

4650
BACKFILL STONE APRON
STONE APRON GABION WALL

800
GABION WALL 1
1

1450
1
BACKFILL 1

1 1 PCC G-21

1450
1 1
HFL.619.50
1700 350 4000 300 1700
PCC G-21 8050

2500 350 4600 300 2500 SECTION 2-2


10250 SCALE 1:75

2000
1000
PCC G-21
NOTES: SECTION 1-1 150mm THICK
SCALE 1:75

800
2000 300 1350
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS EL.617.50 800
NOTED OTHERWISE.
2. ALL WIRE USED IN FABRICATION OF GABIONS AND IN POLYTHENE HEAVY GRADE /

800
GEO MEMBRANE 5mm THICK

800
WIRING OPERATION SHALL BE MILD STEEL WIRE WITH 800 NSL
800
AVG. TENSILE STRENGTH OF AT LEAST 44 KG/SQ.MM.
1
3. ALL WIRE USED IN FABRICATION OF GABIONS AND IN DRY STONE

varies
WIRING OPERATIONS SHALL BE GALVANIZED. THE 1

800

800
600
MINIMUM WEIGHT OF ZINC COATING SHALL BE NSL 800 800

3050
274 G/IN².
4. WIRES APPLIED AT RATE NOT LESS THAN 0.8 OUNCES GABION WALL BACKFILL GABION WALL BACKFILL
PER SQ.FT (0.25KG/SQ.MM) OF UN COATED WIRE.
5. STONES FOR GABION CONSIST OF HARD , DURABLE 1

1450
BACKFILL STONE APRON 1

1450
ROCK HAVING MINIMUM DENSITY 1360 KB/M³. 1
1
6. VOID SPACES SHALL BE EVENLY DISTRIBUTED SHALL
NOT EXCEED 30 % MAXIMUM. PCC G-21 1 1
7. GABION SHALL MADE OD STEEL WIRE TRIPLE TWISTED 1 1
FORMING A UNIFORM HEXAGON MESH PATTERN
WITH OPENINGS 8 CM X 10 CM.
SECTION 3-3 900 350 3200 300 900
350 4000 300
SCALE 1:75 5650
PROTECTION WALL
SCALE 1:75

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-GBN-SEC-001-02 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / GABION WALL PLAN AND
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
ENVIRONMENT & ENERGY, SECTIONAL DETAILS
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD. AS SHOWN
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

200
POOL LENGTH
2000 200 200 1700 200 1700 200 1700 200 2000
1700

1240
1340
POOL WIDTH

A A

2200
1800

1800
200

100
200

200
100

100
300 200 1800

360
100

200
B
7900

400
160 200 1440

PLAN
SCALE 1:50

OPENING

2000
1400
400

200 1700 RCC G-28

W.L
1800

W.L
1400

W.L

200
1400

W.L
W.L
1400

W.L

1800
1400
200 1800 200

2000
1400
200

2200
RCC-28

SECTION B-B

200
RCC-28 SCALE 1:30

1982 7818 2000

11800

SECTION A-A
SCALE 1:50

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FIS-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / FISH PASS PLAN
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
ENVIRONMENT & ENERGY, AND SECTION
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD. 1:100
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.

D13@200(B.F) D13@200(B.F)

B
D13@200(B.F)

200
POOL LENGTH
2000 200 200 1700 200 1700 200 1700 200 2000
1700

D13@200(B.F)
POOL WIDTH

A A

2200
1800

1800
200
D13@200(B.F)
B
D13@200(B.F) D13@200(B.F)

D13@200(B.F)
D13@200(B.F) D13@200(B.F)

PLAN
SCALE 1:50

D13@200(B.F) D13@200(B.F)
400

200 1700

W.L SECTION B-B


1800

W.L SCALE 1:40


1400

W.L
D13@200(B.F)
1400

W.L
W.L

D13@200(B.F)
W.L

1800

2000
1400
200

D13@200(B.F)

200
D13@200(B.F)
D13@200(B.F)

D13@200(B.F) D13@200(B.F)

D13@200(B.F)

SECTION A-A
SCALE 1:50

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FIS-001-02 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV FISH PASS
ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 REINFORCEMENT DETAILS
CONSTRUCTION OF MINI HYDROPOWER
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE ----
NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS


NOTED OTHERWISE.

STOP LOG

2500
FLOW

1500
SLAB

CLAW COUPLING CLAW COUPLING


4000
A SLAB A NSL

2500
FLOW
GATE CROSS SHAFT CROSS SHAFT

2500 2500
350 350 350
OPENING WIDTH OPENING WIDTH
0 0
25 EL.619.80

1500 1500 2800 5000


HFL 619.50
150°
MONKEY LADDER
B

1500

12

MONKEY LADDER

2200
400 R.C.C G-28
PLAN

GATE TOP GATE TOP

GATE & HOIST ARRANGEMENTS R.C.C G-28 R.C.C G-28


W.L. 617.36 W.L. 617.36

300

1500
1665 1500 1200 NSL

300
EL.619.80
HFL.619.50
200

SLAB
EL.616.10
2200
2000

R.C.C G-28 C.J WITH W.S

300
EL.617.60

600
W.L 350 2500 350 2500 350
STOPLOG
1260

1250
GATE
300

EL.616.10 FLOW EL.616.10 616.00


SECTION B-B

600
R.C.C G-28
1500

75mm THICK P.C.C


STONE MASONRY
CONNECTING CHANNEL

CUTOFF WALL 1865 2500


300
SECTION A-A

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-INT-SEC-001-03 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / INTAKE PLAN AND
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
ENVIRONMENT & ENERGY, SECTIONAL DETAILS
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD. 1:200
CLAW COUPLING CLAW COUPLING

CROSS SHAFT CROSS SHAFT


GATE & HOIST ARRANGEMENTS

2500 2500
350 350 350
OPENING WIDTH OPENING WIDTH
DETAIL "A"

D19@175

D13@150
(B.F) D19@175 D19@175

D13@150(B.F)
DETAIL "B"

D13@200

D13@150
D13@150

(B.F)

(B.F)
(B.F)

D13@175 GATE
(T&B)

D19@175
(B.F)

D19@175 D19@175

D19@175 D13@175
(T&B) C.J WITH W.S C.J WITH W.S

D13@150
(B.F)
D13@150 D13@150
D19@175 (T&B) (T&B)

SECTION A-A
SCALE 1:75
SECTION B-B
SCALE 1:50

D13@175
(T&B)

D19@200

D13@175
D13@200

(B.F)
D13@200
D13@175

D13@200
(B.F)

3-D13
D19@200

D13@175
(T&B)

DETAIL "A" DETAIL "B" NOTES:


SCALE 1:40 SCALE 1:40 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-INT-REF-002-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / INTAKE
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 REINFORCEMENT DETAILS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE AS SHOWN
7600

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

2000
STONE APRON

300 C 300

SPILL SECTION

600
7000

4800
B

2500 1000

2845

350
1150

800
PLATFORM

600
600
FLUSHING GATE

A A

2500

6000

2800
1595
600

600
CONNECTING CHANNEL
1150

HEADRACE CHANNEL

1350
350
2500 8000 1245
B C 350

PLAN

PLATFORM

NSL GATE ARRANGEMENT

200
2845
2500 8000 EL.618.03
EL.617.83
SPILL SECTION
7000
600

600

600
600

EL.617.23
W.L. 617.23 W.L.617.23

607

1950
2450
1250

2750
1550
1750

200
EL.615.98 EL.616.65

1427
EL.615.68
600

STONE MASONRY EL.615.47

600
EL.615.20 STONE MASONRY
350

CONNECTING CHANNEL HEADRACE CHANNEL

350
100mm PCC G-21
R.C.C G-20 FLUSHING GATE
100mm PCC G-21
100mm PCC G-21

SECTION A-A

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-TRP-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / GRAVEL TRAP PLAN AND
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTION A-A DETAIL
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:100
EL.617.83

500
600
WL.617.23

3825
1000
2

2750
HFL.616.25

1750
800
C.J WITH W.S 1
BACKFILL

EL.615.47 BACKFILL

2400
800

400
NSL

800
400 6000 400
GABION WALL
1000 6800 1000
1300

100mm PCC G-21

SECTION B-B

4000

NSL
PLATFORM
GATE ARRANGEMENT
1950
EL.618.03
4800

800

600

5350
600

200
SPILLWAY WL.617.23
SIDE WALL 600 2
PLUM WITH 50%
400

BOULDERS (1:2:4)
HFL.616.25 1

3040
2040
600

C.J WITH W.S BACKFILL


2800

400

FLUSHING GATE
600 600mm x 600mm
EL.615.20

400
STONE APRON

EL.614.43
400 6000 400
400
500

100mm PCC G-21


2000

1500 2300 1000 6800 1000

SECTION C-C
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-TRP-001-02 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / GRAVEL TRAP
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
ENVIRONMENT & ENERGY, SECTION B-B AND SECTION C-C
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD. 1:75
NOTES:
7600
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.

2000
STONE APRON

300 C 300

SPILL SECTION

600
7000

4800
B

D13@150 (B.F)
2500 1000
D13@150 (B.F)

)
B.F
0(
15
3 @
D1

1150
D13@150 (B.F)

600
600
FLUSHING GATE

A A

2500

6000

2800
1595

600

600
CONNECTING CHANNEL D13@150 (B.F)
1150

HEADRACE CHANNEL
D1
3@
15
0(

D13@150 (B.F)
B.F
)

D13@150 (B.F)

B C

PLAN

GATE ARRANGEMENT

2500 8000

SPILL SECTION
7000
600

600
600
2450
1250

2750
1550
600

STONE MASONRY

600
STONE MASONRY
D13@1
5 0 (B.F)
CONNECTING CHANNEL D13@150 (B.F) HEADRACE CHANNEL

FLUSHING GATE
D13@150 (B.F)

SECTION A-A

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-TRP-001-03 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / GRAVEL TRAP
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 REINFORCEMENT DETAILS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1 : 100
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.

D13@150 (B.F) D13@150 (B.F)

C.J WITH W.S

D13@150 (B.F) D13@150 (B.F) D13@150 (B.F)

D13@150 (B.F)

SECTION B-B

D13@125 (B.F)
D13@125 (B.F)

SPILLWAY
SIDE WALL
PLUM WITH 50% BOULDERS (1:2:4)

D13@150 (B.F)
D13@150 (B.F)

D13@150 (B.F) C.J WITH W.S

D13@150 (B.F) D13@150 (B.F)

D13@150 (B.F)

SECTION C-C
2000

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO GK-SAN-STR-002-05 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION GARVEL TRAP
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / REINFORCEMENT DETAILS
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1 : 200
NSL

NSL

100
600 2800 600

100 mm PCC G-21

100
600 2500 600

300
100 mm PCC G-21

600
300
W.L
600

W.L BACKFILL

BACKFILL STONE MASONRY

1850
STONE MASONRY

2750
1550

1550
2450
1250

100 mm PCC G-21 100 mm PCC G-21

3 3 3 3

600

600
1 1 1 1

300 1000 2500 1000 300 300 1000 2800 1000 300
5100 5400

100 mm PCC G-21 100 mm PCC G-21


CONNECTING CHANNEL HEADRACE CHANNEL
TYPICAL TYPICAL

100
600 2600 600
NSL
100 mm PCC G-21

600

W.L

STONE MASONRY BACKFILL

1950
2550
1350

100 mm PCC G-21

3 3

600
1 1

300 1000 2600 1000 300


5199

100 mm PCC G-21 NOTES:


TAILRACE CHANNEL 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
TYPICAL UNLESS NOTED OTHERWISE.

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-CHL-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / CONNECTING, HEADRACE AND
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
ENVIRONMENT & ENERGY, TAILRACE CHANNELS SECTION
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD. 1:50
620
FLOW

615

FLOW
GABION WALL

0+350
0+325
0+300
0+ 275
0+200

0+450
0+225

0+250

5
5

0+425
0+37
0+17

0+400
0+150
0+125
0+100
0+075
00
0+0

PLATFORM
0+05

620
0+025

625 HEADRACE CHANNEL

630
GRAVEL TRAP
CONNECTING CHANNEL
INTAKE 635

640

645
650

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
NSL

630

625

620

615

610

605

600
INTAKE CONNECTING CHANNEL GRAVEL TRAP
617.350

617.332

617.282

617.232

617.219

617.203

617.186

617.169

617.153

617.136

617.119

617.103

617.086

617.069

617.053

617.036

617.019

617.003

616.986
W.S.L.
616.100

616.083

616.033

615.983

615.670

615.653

615.636

615.620

615.603

615.586

615.570

615.553

615.536

615.520

615.503

615.486

615.470

615.453

615.436
D.B.L.
615.954

623.139

616.855

616.822

616.202

616.902

616.932

617.911

615.024

618.149

616.233

617.843

616.674

617.857

616.057

616.009

619.084

617.236

616.293
N.S.L.
100.00

125.00

150.00

175.00

200.00

225.00

250.00

275.00

300.00

325.00

350.00

375.00

400.00

425.00

450.00
25.00

50.00

75.00
0.00

OFFSET

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-LAY-PRO-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / PLAN AND PROFILE
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1200
FLOW
610

610

610 610 FLOW


0+475

0+500

0+525

0+550

25
0+9
0+575

0+850
0+825

0+875

0
0+800
0+600

0+90
0+625

0+775
0+650

0+750
0+675

5
615

0+72
0+700
620
625
HEADRACE CHANNEL 630
635

640

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

NSL

HEADRACE CHANNEL
616.986

616.970

616.953

616.936

616.920

616.903

616.886

616.870

616.853

616.836

616.820

616.803

616.786

616.770

616.753

616.736

616.720

616.703

616.686
615.436

615.420

615.403

615.386

615.370

615.353

615.336

615.320

615.303

615.286

615.270

615.253

615.236

615.220

615.203

615.186

615.170

615.153

615.136
616.293

617.386

616.960

624.232

616.558

616.149

615.041

616.974

617.691

616.920

616.807

618.734

619.002

617.535

616.042

621.470

621.600

620.274

619.027
450.00

475.00

500.00

525.00

550.00

575.00

600.00

625.00

650.00

675.00

700.00

725.00

750.00

775.00

800.00

825.00

850.00

875.00

900.00
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-LAY-PRO-001-02 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / PLAN AND PROFILE
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1200
FLOW

FLOW

615 610

75

00

1+125
1+0

1+1

1+150

1+175
1+050
620

1+200

1+225

1+250
5

1+275
1+02

1+300
00
625

1+325
1+0
HEADRACE CHANNEL

0+975
0+950
630
5

0+925
0+87

0+900

FB

FOREBAY

635

640

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
NSL

CONTROL GATE

CONTROL GATE

EL. 799.52
EL. 799.15
W.L. 798.92

SLOPE 2%

LEAN CON. 50mm THICK RCC G-25

HEADRACE CHANNEL
SANDTRAP FOREBAY
616.686

616.670

616.653

616.636

616.620

616.603

616.586

616.570

616.553

616.536

616.520

616.503

616.486

616.470

616.453

616.438

616.440

616.440

616.440
615.136

615.120

615.103

615.086

615.070

615.053

615.036

615.020

615.003

614.986

614.970

614.953

614.936

614.920

614.903

612.050

610.365

614.572

609.644
619.027

618.335

620.328

620.813

618.837

620.063

621.042

618.985

617.819

617.051

617.315

616.879

618.107

616.916

617.141

616.049

615.320

613.209

609.137
1000.00

1025.00

1050.00

1075.00

1100.00

1125.00

1150.00

1175.00

1200.00

1225.00

1250.00

1275.00

1300.00

1325.00

1350.00
900.00

925.00

950.00

975.00

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-LAY-PRO-001-03 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / PLAN AND PROFILE
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1200
FL O
W

NOTES:

08
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS

1+5
00
UNLESS NOTED OTHERWISE.

1+5
75
1+4
50
1+4
25
1+4
SPILL PIPE
625

00
1+4
620

75
64000000

60160000

1+3
25
1+3

615
TAILRACE
50
1+3

24960000
22400000

PH 610
60
FB 615 610 POWERHOUSE 5

605
PENSTOCK
62 0
FOREBAY 625

FLO
E
US

W
HO

630
635
E
US
HO

POWERHOUSE
(TYPICAL)
630

625
NSL
CONTROL GATE

TAILRACE
CONTROL GATE
620

615

610
HFL.605.00 HFL.604.00
605

600

FOREBAY
616.440

616.440

605.118

605.093

605.068

605.052
614.572

609.644

602.187

603.743

603.718

603.701
613.209

609.137

606.606

606.109

605.722

602.942

603.186

622.989
1325.00

1350.00

1375.00

1400.00

1425.00

1450.00

1475.00

1499.33

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-LAY-PRO-001-04 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / PLAN AND PROFILE
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:1200
0+025.00
637

0+014.06 636

635 635

634 634

633 633

632 632

00%
200.
631 631

630 630

629 629

00%
628 628

200.
627 627

00%
200.
626 626

625 625

624 624

00%
623 623

00
200.

200.
622 622

621 621

620 620

619 619

00%

00%
618 618
WL.617.35 WL.617.33

200.

200.
617 617

616 616

615 615

620.13

632.43

615.03

620.53

628.63
615.12

615.15

615.17

615.19

615.21

615.25

617.97

626.92

629.55

630.99

615.29

616.39

623.71

625.75

629.61

631.65
615.10

615.80

616.70

622.40

624.44

625.68

628.16

615.04

615.06

615.08

615.84

619.20

622.06

627.28

630.36

633.28

634.94
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-18

-16
-14

-10

-14

-10
12

16

18

12

16

18
10

14

10

14
0 0
-2

-2
OFFSET
-8

-6

-4 OFFSET

-8

-6

-4
2

8
6

6
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
0+050.00
632

631

630

629 0+076.52
628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618
WL.617.28 WL.617.23
00%
200.

617 617

00%
200.
616 616
00%
200.

615 615

614 614
614.83

614.82

614.79

620.72

625.75

627.43

630.09

614.51

614.39

614.63

614.95

615.51

616.65

617.22

617.79

625.03

626.82
614.80

615.38

615.96

617.78

619.20

622.40

624.08

628.97

614.56

614.46

614.40

616.08

618.36

619.86

621.46
614.84

614.84

616.44

616.94

623.24

627.14
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-14

-10

-18

-16

-14

-10
12

12
10

14

16

18

10

14

16

18
0 0
-2

-2
-8

-6

-8

-6
OFFSET
-4

OFFSET

-4
4

4
2

8
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-CON-SEC-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / CONNECTING CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:400
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

0+100.00
634

633

632

0+080.00 631

629 630

628 629

627 628

626 627

625 626

624 625

623 624

622 623

621 622

620 621

619 620

618 619
WL.617.22

00%
618

200.
617 W.L

WL.617.23 W.L

616 617

00%
200.
615 616

614 615
614.53

614.43

615.53

621.03
614.49

614.37

614.89

616.82

617.47

618.12

619.41

622.97

627.87
614.46

614.40

616.18

618.76

625.08

627.18
614
EXISTING

614.43

614.42

614.42

614.41

614.41

614.59

615.21

615.71

617.62

620.31

621.65

627.99
614.40

614.47

616.28

618.96

630.00
623.94

631.94
ELEVATIONS EXISTING
ELEVATIONS
-12
-18

-16

-14

-10

12

16

18
10

14
-2
OFFSET
-8

-6

-4

8
6

-18

-12
-16

-14

-10

12
10

14

16

18
-2
OFFSET

-8

-6

-4

4
0

8
0+150.00
631

630
0+125.00
629
622
628
621
627
620
626
619
625
618
WL.617.20 W.L 624
617
00%

623
200.

616
622
615
621
614
620
614.42

614.41

614.35

614.33

614.31

615.22

616.25

617.02

618.65

619.15

619.63
614.39

614.37

617.46

617.69

619.37
617.24

619.60

619.00

EXISTING
619
ELEVATIONS
618
WL.617.18 W.L

617
-12
-18

-16

-14

-10

12
10

16

18
14
-2
-8

-6

OFFSET
-4

8
6

616

00%
200.
615

614

614.63

614.83

616.33
614.47

615.51

615.97

616.21

616.89

617.19

624.31

629.75

628.59
615.06

615.28

615.74

616.74

617.48

618.88

630.28
EXISTING
ELEVATIONS

-12
-18

-16

-14

-10

12

16

18
10

14
-2
OFFSET

-8

-6

-4

8
6
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-02 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:400
NOTES:
0+175.00 0+200.00 1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
631 630 UNLESS NOTED OTHERWISE.
630 629

629 628

628 627

627 626

626 625

625 624

624 623

623 622

622 621

621 620

620 619

619 618
WL.617.15

00%
200.
W.L

618 617
WL.617.16

00%
200.
W.L

617 616

616 615

615 614

614 613

614.65

614.73

614.95

615.71

616.79

618.85

620.91

623.02

625.13

626.09

626.05

625.91

614.13

614.09

614.05

614.02

614.11

614.31

614.51

617.89

618.91

621.03

622.25

625.22
614.57

614.80

615.20

615.46

615.97

625.80

614.17

613.98

614.70

618.40

619.90
628.14

623.74

627.44
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-18

-12

-18

-12
-16

-14

-10

-16

-14

-10
12

12
10

14

16

18

10

14

16

18
-2

-2
OFFSET

-8

-6
OFFSET

-8

-6
-4

-4
4

4
0

8
0+250.00
635

634

633

632

0+225.00 631

630 630

629 629

628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618
WL.617.13 WL.617.11
00%

00%
200.

200.
W.L W.L

617 617

616 616
200.
00%

615 615

614 614

613 613
613.77

614.02

614.51

615.17

616.03

616.89

617.75

619.97

618.23

624.13

613.61

613.83

614.05

615.02

615.32

618.83

629.93

631.55

632.49

633.43
613.76

613.78

613.78

621.66

618.14

621.14

626.98

627.96

628.96

614.28

614.64

615.58

616.40

619.30

619.78

620.50

624.04

626.98
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-18

-16
-14

-10

-14

-10
12

18

12

18
10

14

16

10

14

16
-2

-2
OFFSET
-8

-6

OFFSET

-8

-6
-4

-4
2

8
0

6
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-03 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:400
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
0+275.00 UNLESS NOTED OTHERWISE.
631 0+300.00
630 630

629 629

628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618

00%
WL.617.10 WL.617.08

00%

200.
200.
W.L W.L

617 617

200.
616 616

% 00
615 615

614 614

613 613
613.91

614.11

614.35

614.95

615.72

615.91

627.63

627.21

627.75

615.62

619.35

620.81

621.42

622.23
615.27

615.48

618.09

620.37

624.76

627.77

613.89

614.09

614.39

614.77

615.19

616.58

617.96

620.19

620.67

623.76

625.37

626.99
613.74

614.60

619.64

629.24

616.04

628.60
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-14

-10

-18

-16

-14

-10
12

12
10

16

18

10

16

18
14

14
-2

-2
-8

-6

-8

-6
OFFSET

-4
OFFSET

-4
0

8
6

6
0+325.00 0+350.00
630 630

629 629

628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618
WL.617.06 WL.617.05
617 617
W.L W.L

% 00
%

200.
00
200.

616 616

615 615

614 614

613 613
613.31

613.51

613.62

614.12

615.01

617.21

625.11

625.23

626.61

613.72

613.65

613.62

615.05

616.51

617.73

618.62

624.21

625.53

628.05
613.39

615.10

615.10

615.77

616.98

617.19

619.40

624.48

623.66

628.00

613.99

614.40

614.59

615.68

617.39

620.56

622.26

626.79
613.64
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-14

-10

-18

-16

-14

-10
12

12
10

16

18

10

16

18
14

14
-2

-2
-8

-6

-8

-6
OFFSET
-4

OFFSET

-4
0

8
6

6
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-04 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:400
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

0+400.00
634

633

0+375.00 632

631 631

630 630

629 629

628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618

00%

00%
WL.617.03 WL.617.01

200.

200.
617 W.L

617 W.L

616 616

615 615

614 614
614.41

614.73

620.01

620.63

626.11

627.95

614.03

615.43

617.63

625.33
614.10

614.19

614.28

614.30

614.29

614.56

616.16

617.58

619.00

621.69

623.90

629.30

614.07

614.07

614.28

615.07

615.37

616.48

618.86

620.76

621.68

622.76

628.47

632.06
615.14

614.64

621.84

630.44
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-14

-10

-18

-16

-14

-10
12

12
10

16

18

10

16

18
14

14
-2

-2
-8

-6

-8

-6
OFFSET
-4

OFFSET

-4
0

8
6

6
0+425.00
632

631 0+450.00
630 630

629 629

628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618
%

00%
WL.617.00 WL.616.98
00
200.

200.
617 W.L

617 W.L

616 616

615 615

614 614

613 613
615.25

615.73

615.85

616.32

626.33

628.61

629.71

613.35

613.63

614.61

614.82

615.25

615.23

618.35

626.31

627.45
613.67

613.69

616.26

617.29

618.77

621.36

623.97

626.26

627.09

615.06

623.29

626.78

627.09

628.06

628.66
613.64

614.30

630.70

613.40

613.40

616.30

620.70
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-14

-10

-18

-16

-14

-10
12

12
10

16

18

10

16

18
14

14
-2

-2
-8

-6

-8

-6
OFFSET
-4

OFFSET

-4
0

8
6

6
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-05 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:400
NOTES:
0+475.00 1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
629 0+500.00
628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618

00%
WL.616.97 WL.616.95

00%
200.

200.
617 W.L
617 W.L

616 616

615 615

614 614

613 613
613.15

613.11

614.81

622.55

623.23

624.95

613.32

614.15

615.02

623.13

626.03

627.51
613.19

613.17

613.89

616.17

619.58

621.07

625.86

626.78

627.69

613.28

613.49

613.97

614.77

614.76

617.39

620.88

625.69

626.77
613.14

614.70

615.00

624.04

614.44

613.44

626.40

627.14
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-10

-18

-16

-10
-14

-14
12

12
10

16

18

10

16

18
14

14
-2

-2
-8

-6

-8

-6
OFFSET

-4
OFFSET

-4
0

8
6

6
0+525.00
628

627

626

625

624 0+550.00
623 623

622 622

621 621

620 620

619 619

618 618

00%
WL.616.93 WL.616.92
00%

200.
200.

617 W.L
617 W.L

616 616

615 615

614 614

613 613
625.33

627.75

626.93

619.23

620.85
613.42

613.49

613.57

615.31

615.72

615.68

619.09

621.41

624.32

626.79

627.48

614.39

615.01

616.91

618.62

619.77

620.31

621.39

622.48
613.34

613.84

617.14

623.86

627.20

615.64

617.80

621.94
EXISTING EXISTING 614.05614.10614.15613.58613.63613.93
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-10

-18

-16

-10
-14

-14
12

12
16

18

16

18
10

14

10

14
-2

-2
OFFSET
-8

-6

-4

OFFSET

-8

-6

-4
0

8
6

6
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-06 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:400
0+600.00
628
NOTES:
627
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
626
UNLESS NOTED OTHERWISE.
625

624

0+575.00 623

623 622

622 621

621 620

620 619

619 618

618 617 WL.616.88 W.L

617 WL.616.90 W.L


616

00%
200.
616 615

615 614

614 613

613 612

614.01

615.62

616.53

617.92

619.81

620.53

612.85

614.01

614.33

615.33

615.85

627.05
613.27

613.49

613.88

614.77

615.46

617.28

622.37

613.18

613.36

613.69

614.68

616.36

617.06

621.97

625.79

627.58

627.08
614.14

614.44

615.10

617.60

613.04
EXISTING EXISTING
ELEVATIONS ELEVATIONS

-12

-12
-18

-16

-14

-10

-18

-16

-14

-10
12

12
10

16

18

10

16

18
14

14
-2

-2
-8

-6

-8

-6
OFFSET

-4
OFFSET

-4
0

8
6

6
0+650.00
635

0+625.00 634

633 633

632 632

631 631

630 630

629 629

628 628

627 627

626 626

625 625

624 624

623 623

622 622

621 621

620 620

619 619

618 618
WL.616.87 WL.616.85
00%

00%
617 617
200.

200.
W.L W.L

616 616

615 615

614 614

613 613

612 612
612.62

612.72

613.65

614.93

623.23

624.52

631.15

632.23

612.32

612.63

612.92

612.93

617.43

621.32

628.35

629.43

632.62
612.61

612.59

612.88

613.26

620.87

625.16

626.46

629.38

612.27

612.49

615.18

617.68

626.17

627.49

630.89
613.44

617.80

627.90

612.74

618.20

633.80
EXISTING EXISTING
ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-10

-18

-16

-10
-14

-14
12

12
10

16

18

10

16

18
14

14
-8

-2

-8

-2
OFFSET
-6

-4

OFFSET

-6

-4
0

8
6

6
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-07 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:400
NOTES:
0+725.00 1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
0+700.00 644
UNLESS NOTED OTHERWISE.
642 643
641 642
0+675.00 640 641
640 639 640
639 638 639
638 637 638
637 636 637
636 635 636
635 634 635
634 633 634
633 632 633
632 631 632
631 630 631
630 629 630
629 628 629
628 627 628
627 626 627
626 625 626
625 624 625
624 623 624
623 622 623
622 621 622
621 620 621
620 619 620
619 618 619

0%
WL.616.82

200.0
618 617 W.L

618
WL.616.83
0%

0%
WL.616.80
200.0

200.0
617 W.L 616 617 W.L

616 615 616


615 614 615
614 613 614
613 612 613
612 611 612
612.52

612.55

612.52

612.85

613.95

619.55

634.82

638.82

611.92

614.83

626.95

633.93
612.39

612.49

614.88

616.77

617.49

624.59

627.80

632.11

637.76

639.38

611.97

612.66

613.69

615.37

616.06

619.56

635.91

640.30

641.66
617.94

611.94

612.24

612.64

638.04
EXISTING EXISTING 611
ELEVATIONS ELEVATIONS

614.93

616.53

618.13
611.62

611.61

611.59

612.28

613.11

613.67

619.35

620.52

622.28

624.17

628.41

640.97
611.60

636.30
EXISTING
ELEVATIONS
-18

-16

-12

-18

-16

-12
-14

-10

-14

-10
12

12
10

14

16

18

10

14

16

18
-2

-2
OFFSET
-8

-6

-4

OFFSET

-8

-6

-4
0

8
6

-12
-18

-16

-14

-10

12
10

14

16

18
-2
-8

-6
OFFSET

-4

8
6
0+750.00 0+800.00
642 641
0+775.00
641 640
641
640 639
640
639 638
639
638 637
638
637 636
637
636 635
636
635 634
635
634 633
634
633 632
633
632 631
632
631 630
631
630 629
630
629 628
629
628 627
628
627 626
627
626 625
626
625 624
625
624 623
624
623 622
623
622 621
622
621 620
621
620 619
620
619 618
619
618 617 WL.616.75 W.L

618
617 WL.616.78 616
W.L

617 WL.616.77 W.L

616 615
616
615 614
615
614 613
614
613 612
613
612 611
612
611 610
611
611.21

611.19

611.37

612.47

613.45

613.57

614.06

615.96

620.52

631.19

632.27

635.37

640.76

610.93

611.69

611.67

611.71

612.36

614.03

614.01

615.76

617.68

619.69

625.48

632.12

637.85
611.20

618.24

637.80

611.20

611.50
EXISTING EXISTING
611.13

612.43
611.07

611.10

611.60

613.47

615.27

617.32

619.51

621.62

623.71

632.68

637.99

640.70
611.04

627.04

EXISTING
ELEVATIONS ELEVATIONS
ELEVATIONS
-12

-12
-18

-16

-14

-10

-18

-16

-14

-10
12

12
10

14

16

18

10

14

16

18
-8

-6

-2

-8

-6

-2
OFFSET
-4

OFFSET

-4
4

4
0

8
-18

-16

-12
-14

-10

12
10

14

16

18
-2

OFFSET
-8

-6

-4

8
6

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-08 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:550
0+825.00 0+850.00 0+875.00
640 639 638
639 638 637
NOTES:
638 637 636
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE
637 636 635
IN METERS UNLESS NOTED OTHERWISE.
636 635 634
635 634 633
634 633 632
633 632 631
632 631 630
631 630 629
630 629 628
629 628 627
628 627 626
627 626 625
626 625 624
625 624 623
624 623 622
623 622 621
622 621 620
621 620 619
620 619 618
619 618 617 WL.616.70 W.L

618 617 616


WL.616.72 W.L

617 616 615


WL.616.73 W.L

616 615 614


615 614 613
614 613 612
613 612 611
612 611 610
611 610 609
610 609 608
610.09

610.13

610.19

611.59

621.37

624.92

632.52

609.37

609.22

609.15

613.75

616.32

620.63

624.97

629.31

636.89
610.06

610.16

610.20

614.04

618.68

629.34

634.66

636.38

638.84

609.30

609.16

609.20

611.36

631.98

634.44

608.73

615.75

629.03

631.35
608.79

608.68

608.62

608.88

612.59

617.98

623.91

631.71
608.84

620.20
EXISTING EXISTING EXISTING
ELEVATIONS ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-10

-18

-16

-10
-14

-14

-12
-18

-16

-14

-10
12

16

18

12

16

18
10

14

10

14

12
10

14

16

18
-2

-2
OFFSET
-8

-6

-4

OFFSET

-8

-6

-4

-2
OFFSET

-8

-6

-4
4

4
0

8
6
0+925.00
638 0+950.00
0+900.00
637 635
639
636 634
638
635 633
637
634 632
636
633 631
635
632 630
634
631 629
633
630 628
632
629 627
631
628 626
630
627 625
629
626 624
628
625 623
627
624 622
626
623 621
625
622 620
624
621 619
623
620 618
622

0%
WL.616.65

200.0
619 617 W.L

621
618 616
620
WL.616.67
0%
617 615
200.0
W.L

619
616 614
618
615 613
617 WL.616.68 W.L

614 612
616
613 611
615
612 610
614
611 609
613
610 608
612
609 607
611
608 606
610
607 605
609
606 604
608
607.25

607.47

613.03

615.67

618.43

628.55

634.91

605.51

605.03

604.85

613.19

618.87

621.83

624.82

627.93

630.95

632.37
607.04

607.68

608.28

610.56

621.20

623.96

637.14

635.64

634.06

636.08

605.20

606.98

610.10

616.24

633.56

633.88

634.40
EXISTING EXISTING
608.78

608.73

609.15

609.98

610.81

612.56

613.68

615.11

616.65

620.57

625.07

630.19

637.33
618.34

622.84

632.34

634.50

EXISTING ELEVATIONS ELEVATIONS


ELEVATIONS
-12

-12
-18

-16

-10

-18

-16

-10
-14

-14
12

16

18

12

16

18
10

14

10

14
-2

-2
OFFSET
-8

-6

-4

OFFSET

-8

-6

-4
4

4
0

8
-12
-18

-16

-14

-10

12
10

16

18
14

OFFSET
-8

-6

-2
-4

8
6

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-09 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:500
NOTES:
0+975.00 1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
634
UNLESS NOTED OTHERWISE.
633 1+000.00
632 633 1+025.00
631 632 633

630 631 632

629 630 631

628 629 630

627 628 629

626 627 628

625 626 627

624 625 626

623 624 625

622 623 624

621 622 623

620 621 622

619 620 621

618 619 620

WL.616.63

0%
617 618 619

200.0
W.L

0%
WL.616.62

200.0
616 617 W.L
618

WL.616.60

0%
615 616 617

200.0
W.L

614 615 616

613 614 615

612 613 614

611 612 613

610 611 612

609 610 611

608 609 610

607 608 609

606 607 608

605 606 607


609.32

611.61

613.93

616.75

620.45

630.39

632.51

606.02

606.02

606.03

606.03

606.62

608.83

611.05

613.59

620.31

632.39

632.49

607.99

608.31

610.99

613.32

615.93

624.45

626.45

628.01

628.31

632.39
606.20

606.48

606.76

607.04

607.34

618.57

622.84

625.46

628.08

616.27

618.18

623.46

626.67

630.00

632.56

607.34

607.67

608.64

608.96

619.26

620.76

622.60

630.64
EXISTING EXISTING EXISTING
ELEVATIONS ELEVATIONS ELEVATIONS
-18

-16

-12

-18

-16

-12

-18

-16

-12
-14

-10

-14

-10

-14

-10
12

12

12
10

14

16

18

10

14

16

18

10

14

16

18
-2

-2

-2
OFFSET
-8

-6

-4

OFFSET

-8

-6

-4
OFFSET

-8

-6

-4
0

8
1+050.00
633
1+075.00 1+100.00
631 631
632
630 630
631
629 629
630
628 628
629
627 627
628
626 626
627
625 625
626
624 624
625
623 623
624
622 622
623
621 621
622
620 620
621
619 619
620
618 618
619

0%

0%
617 WL.616.57 617 WL.616.55

200.0

200.0
618 W.L W.L

616 616
WL.616.58
0%

617
200.0

W.L

615 615
616
614 614
615
613 613
614
612 612
613
611 611
612
610 610
611
609 609
610
608 608
609
607 607
608
606 606
607
605 605
606
606.27

606.19

606.12

605.97

613.41

617.17

619.62

620.87

621.83

626.22

627.01

628.23

629.67

606.57

607.71

612.37

615.41

617.35

620.17

622.19

623.43

626.22
606.34

606.04

609.30

621.36

623.70

624.94

605.96

605.96

605.96

608.74

609.54

619.80

620.88

624.56

627.80

629.26
EXISTING EXISTING
606.13

613.73
606.16

606.19

606.22

608.86

611.29

617.49

621.99

625.02

626.42

627.88

629.12

630.36

631.42

631.55

632.21
606.24

624.54

EXISTING
ELEVATIONS ELEVATIONS ELEVATIONS
-12

-12
-18

-16

-10

-18

-16

-10
-14

-14
12

16

18

12

16

18
10

14

10

14
-2

-2
OFFSET
-8

-6

-4

OFFSET

-8

-6

-4
4

4
-12

8
-18

-16

-14

-10

12
10

16

18
14

OFFSET
-8

-6

-2
-4

8
6

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-10 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:500
NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

1+125.00
633 1+175.00
632 633

631 1+150.00 632

630 630 631

629 629 630

628 628 629

627 627 628

626 626 627

625 625 626

624 624 625

623 623 624

622 622 623

621 621 622

620 620 621

619 619 620

618 618 619

0%

0%
617 WL.616.53 617 WL.616.52 618

200.0

200.0
W.L W.L

616 616 617 WL.616.50

0%
200.0
W.L

615 615 616

614 614 615

613 613 614

612 612 613

611 611 612

610 610 611

609 609 610

608 608 609

607 607 608

606 606 607


607.22

619.35

621.13

629.71

631.31

606.92

607.63

608.25

609.15

619.22

620.43

621.65

626.52

607.62

607.85

609.63

614.52

615.63

618.95

623.33

627.21
607.00

607.07

609.18

613.57

615.80

617.58

622.88

625.59

628.29

610.56

611.98

613.08

613.99

615.56

616.78

618.00

622.87

624.09

625.30

627.76

608.68

610.59

613.08

616.70

617.76

620.30

625.27

630.79
606.94

611.54

614.24

624.24

626.94

611.54

621.64

629.14
EXISTING EXISTING EXISTING
ELEVATIONS ELEVATIONS ELEVATIONS
-12

-12

-12
-18

-16

-14

-10

-18

-16

-14

-10

-18

-16

-14

-10
12

12

12
10

14

16

18

10

14

16

18

10

14

16

18
-2

-2

-2
OFFSET
-8

-6

OFFSET

-8

-6
OFFSET

-8

-6
-4

-4

-4
0

8
6

6
1+200.00 1+225.00
630 630 1+250.00
629 629 629

628 628 628

627 627 627

626 626 626

625 625 625

624 624 624

623 623 623

622 622 622

621 621 621

620 620 620

619 619 619

618 618 618


0%

0%

0%
617 WL.616.48 617 WL.616.47 617 WL.616.45
200.0

200.0

200.0
W.L W.L W.L

616 616 616

615 615 615

614 614 614

613 613 613

612 612 612

611 611 611

610 610 610

609 609 609

608 608 608

607 607 607


608.05

608.15

609.03

612.67

613.72

614.57

616.37

618.19

618.98

619.78

620.57

624.79

626.23

627.72

608.02

608.29

608.62

609.41

614.23

616.27

617.12

617.97

618.85

619.87

622.52

623.99

626.87

628.35

607.98

610.11

611.93

613.75

615.57

616.88

619.58

620.42

622.09

622.93

623.77

625.07

626.63
608.26

610.86

621.26

622.00

623.40

607.76

611.10

612.60

621.04

625.40

607.80

608.16

608.34

617.86

618.74

621.26
EXISTING EXISTING EXISTING
ELEVATIONS ELEVATIONS ELEVATIONS
-12

-12

-12
-18

-16

-10

-18

-16

-10

-18

-16

-10
-14

-14

-14
12

12

12
10

16

18

10

16

18

10

16

18
14

14

14
-8

-6

-2

-8

-6

-2

-8

-6

-2
OFFSET
-4

OFFSET
-4

OFFSET

-4
0

8
6

6
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-HRC-SEC-001-11 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / HEADRACE CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:600
E 286075

E 286100

E 286125

E 286150

E 286175

E 286200

E 286225

E 286250
W
FLO

N 3818325 605 N 3818325

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

SPILL PIPE

N 3818300 N 3818300

TAILRACE

64000000

60160000
605

24960000
N 3818275 N 3818275

22400000
POWERHOUSE

610
PENSTOCK
615

620
HEADRACE CHANNEL

FOREBAY
FB
N 3818250 N 3818250
625

630

635

N 3818225 N 3818225
E 286075

E 286100

E 286125

E 286150

E 286175

E 286200

E 286225

E 286250
CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT
DRAWN BY ZAKIR DRAWING NO RYL-FOR-LAY-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / FOREBAY
A JV OF M/S INTEGRATION CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
GOVERNMENT OF KHYBER
ENVIRONMENT & ENERGY,
CONSTRUCTION OF MINI HYDROPOWER LAYOUT PLAN
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD.
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.
16400 37000 13380

SPILL PIPE E
C
36400 D

A
3000
SPILL CHANNEL

18
00
B 25000 FLUSHING PIPE

800

800
SPILL SECTION

500
550
1475
650
TRASHRACK

3600

2500
FLUSHING GATE

1475
800
A
2800

8000

8000
1900
1475
650

3600

2500
FLUSHING GATE

550
1475

500
800

1250
10000 B 45000 24655

750
79655
C D
PLATFORM
E
PLAN

CONTROL GATE

MONKEY LADDER EL.619.44


1055
NSL 873
54815 2905 2500 17062

25000 500
26700 3115
SPILL SECTION
500 1500 EL.615.44
600

EL.617.04
EL.614.44
W.L. 614.44 WL.614.44
2150

2465

2465
GATE
600

EL.614.89 CONTROL GATE EL.612.58 STOPLOG

4320
6235

2 TRASHRACK

250
1

6795
EL.610.49

4672

1800

2400
3074

250
SLOPE 2% EL.608.44
LEAN 100mm EL.607.65

1250
RCC G-20
LEAN 100mm FLUSHING PIPE DIA 650mm

800
RCC G-20
10000 45110 16020 7280 2300

HFL.606.45
SECTION A - A

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-01 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / FOREBAY PLAN AND
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
ENVIRONMENT & ENERGY, SECTION DETAIL
PAKHTUNKHWA PROJECT DISTRICT BUNER APPROVED BY SCALE
ELAN PARTNER (PVT) LTD. 1:250
2

1000 1

5000
2

1000

5000
2

1000

5000
2

1000

5000
2

NSL 1

1000

5000
2
CL CL
1
800 3600 800 3600 800

600
1000
1000
WL.614.44 WL.614.44
BACKFILL
4200

3600
RCC G-20
1
C.J WITH WS 4
1

6635
EL.610.84
1385 1
650
650

BACKFILL 650
2835

2835

EL.608.01 650

800 3600 800 3600 800


1000 9600
100mm PCC G-21

SECTION B - B
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-02 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 FOREBAY SECTION B-B
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:175
2

3575
1

5000
2

1
1000

5000
2

1
1000

5000
2

1
NSL 1000

1000

5000
2

200
1
800 3600 800 3600 800

WL.614.44 WL.614.44
BACKFILL

1000
5050

5050
RCC G-20
WL.611.44
1760

1160

SPILL CHANNEL

7530
C.J WITH WS
300

4
EL.610.28
EL.609.99
1
1 3000
1385

1
650

300

2836
BACKFILL

650 EL.607.16

800 3600 800 3600 800


1000 9600

100mm PCC G-21

SECTION C - C

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-03 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 FOREBAY SECTION C-C
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:175
1498
5000
2

1
1000

5000
2

1
1000

5000
2
NSL 1
1000

1000
CL CL

5000
2
800 3600 800 3600 800

400
EL.615.44 1

WL.614.44 WL.614.44
BACKFILL

2466

5505
2500 2500
550 550 550 550

3035

7530
C.J WITH WS 4
3600 3600
1000 EL.609.54
RCC G-20 1
1386

WL.609.00
1760

SPILL CHANNEL
300

2530
650

EL.607.88
500

1
EL.607.01
1 3000
300 800 3600 800 3600 800
BACKFILL 9600
100mm PCC G-21

SECTION D - D

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-04 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 FOREBAY SECTION D-D
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:175
3839
2

1
1000

5000
NSL 2

1
1000

5000
2

1
1000

500 500

5000
400
8000 2

WL.614.44 WL.614.44 1

2465
1000

EL.612.58

1
4928

7085
1 4

C.J WITH WS 1

EL.607.65 RCC G-20


1250

1250 8000 1250


10500
100mm PCC G-21

SECTION E - E

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-05 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM /
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 FOREBAY SECTION E-E
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:175
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
UNLESS NOTED OTHERWISE.

SPILL PIPE

36700
300

2800 2800 2800 2800 2800 2800 2800 2800 2800 2800 2800 2800 2800

300 B
3000

5900
A A

B
25000
SPILL SECTION
FLUSHING PIPE

PLAN

36400
300
2986 27348 6368
1760

1760
300

EL.613.28
1760
600

600

600

2800 RCC G-20

600
2800

600
2800 FLUSHING PIPE

600
5900
2800

300
EL.609.48

600
2800

600
2800

600
2800

3100
600
2800

600

1280

Ø1200
2800

150

300
300 2800 EL.606.08
800

2800

2800
WL.614.44
2800 SPILL PIPE
1760

SECTION A - A
SPILL CHANNEL SCALE 1:125

EL.613.28
300

300 3000

SECTION B-B
SCALE 1:75

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-06 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / SPILL CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 PLAN AND SECTIONS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE ----
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.

SPILL PIPE E
C
D

A
D16@125 (B.F)
D16@125 (B.F)
B SPILL CHANNEL
25000 D20@125(B.F)
SPILL SECTION
.F)
125(B
D20@
D20@125(B.F)
.F) TRASHRACK
125(B D16@125 (B.F) FLUSHING GATE
D20@
D20@125(B.F)
A
2800

D20@125(B.F)
D20@125(B.F)
D20@
125(B
.F D16@125 (B.F) FLUSHING GATE
D20@125(B.F)
D20@
125(B
.F )

D20@125(B.F) D20@125(B.F)
D16@125 (B.F)
D16@125 (B.F) D16@125 (B.F)
C D
B
E
PLAN

CONTROL GATE

25000
SPILL SECTION

GATE
CONTROL GATE STOPLOG

2 TRASHRACK
1
D20@125(B.F)
D16@125 (B.F)

1800
D2
SLOPE 2% 0@
1 25(
D16@125 (B.F) B.F
)

D20@125(B.F) D20@125(B.F)
FLUSHING PIPE DIA 650mm
D16@125 (B.F) D20@125(B.F)

D16@125 (B.F)

SECTION A - A

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-07 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / FOREBAY PLAN AND SECTION A-A
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 REINFORCEMENT DETAILS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:250
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.

D16@125 (B.F)

D16@125 (B.F) D16@125 (B.F) D16@125 (B.F) D16@125 (B.F) D16@125 (B.F)

D20@125(B.F)
D20@125(B.F)

D20@125(B.F) D20@125(B.F) D20@125(B.F) D20@125(B.F)

D13@125 D13@125
D16@125 D16@125 D16@125 D16@125

D16@125 D16@125 D13@125 D16@125 D16@125


C.J WITH W.S C.J WITH W.S C.J WITH W.S
D13@125

D20@125 D20@125

D16@125 D16@125
D20@125 D16@125 D20@125 D16@125

SECTION B - B SECTION C - C

D13@125 D16@125

D16@125 (B.F)
D20@125 (B.F)
D20@125 (B.F)

D20@125
D16@125 (B.F) D16@125 (B.F)

D16@125 D16@125

D16@125 D16@125
D25@125 (B.F)
C.J WITH W.S D25@125 (B.F)
D13@125 D13@125

D20@125

D13@125
C.J WITH W.S C.J WITH W.S
D13@125
D16@125
D20@125 D16@125 D25@125 D20@125 (B.F) D25@125 D16@125 (B.F)

SECTION D - D SECTION E - E

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-08 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / FOREBAY REINFORCEMENT DETAILS
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE 1:125
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.

SPILL PIPE

36700
300

2800 2800 2800 2800 2800 2800 2800 2800 2800 2800 2800 2800 2800
300

D13@125(B.F) D13@125(B.F)

D13@125(B.F)
3000

D13@125(B.F) D13@125(B.F)

A A

B
25000
SPILL SECTION
FLUSHING PIPE

PLAN

36400
300
2986 27348 6368
1760
300

D13@125(B.F)

D13@125(B.F)

D13@125(B.F)

D13@125(B.F) D13@125(B.F)
D13@125(B.F) FLUSHING PIPE
5900

300
D13@125(B.F) D13@125(B.F)

D13@125(B.F)

D13@125(B.F)

600
D13@125(B.F)

3100
D16@125 (B.F)
D13@125(B.F)
D13@125(B.F)

Ø1200
D13@125(B.F) D13@125(B.F)

300
D13@125(B.F) D13@125(B.F)

D13@125(B.F) D20@125(B.F) D13@125(B.F)


2800
D13@125(B.F)
SPILL PIPE

D13@125(B.F)

SECTION B-B SECTION A - A


SCALE 1:75 SCALE 1:125

CLIENT MANAGEMENT CONSULTANT SUBMITTED BY PROJECT NAME REFERENCE SHEET CONTENT


DRAWN BY ZAKIR DRAWING NO RYL-MHP-FOR-001-09 DETAIL DESIGN DRAWING
PAKHTUNKHWA ENERGY 373KW LOT-III (BUNER)
DEVELOPMENT ORGANIZATION (PEDO) PACKAGE-II (STREAMS) DESIGN BY SHAKIR REVISION
ENERGY & POWER DEVELOPMENT TELCON-HEADS JV ACCESS TO CLEAN ENERGY PROGRAM / SPILL CHANNEL
GOVERNMENT OF KHYBER A JV OF M/S INTEGRATION CONSTRUCTION OF MINI HYDROPOWER CHECKED BY DR FAYYAZ A KHAN DATE JUNE, 2023 REINFORCEMENT DETAILS
PAKHTUNKHWA ENVIRONMENT & ENERGY, PROJECT DISTRICT BUNER
ELAN PARTNER (PVT) LTD. APPROVED BY SCALE AS SHOWN

You might also like