Al Dahra 1.

2MW PV Project

Project: Al Dahra 1.2MW PV Solar power Contract No. 02 642 6555 Report No. 1

Employer: GOLDEN FALCON / COMPLETE ENERGY Consultant: EMERGE

Project Start On : Apr/2023 Report Period: 1 day

OSH Manager/Engineer: KAREEM Project Manager: HOSSAM HAMOUDA

Sr. Year-to-
Description This Month Job Inception Remarks
No. Date

Average No. of Employees


1.
(Including Sub-Contractors)
- 25 - -

2. Man-Hours Worked - 624 - 1/Apr to 1/Jul


3. Man-Hours worked since the last L.T.I - - -
-
4. No. of Lost Time Incidents (LTI) - - -
5. Lost time days (LTD) - - - -

Incident Frequency No. of LTI x 100,000 -


6.
Rate:
- - -
Total Man hours worked
Incident Severity Man Days Lost x 100,000 -
7.
Rate:
- - -
Total Man hours worked
8. Fatalities - - -
9. No. of First-Aid Injuries - - - -

10. No. of Cases Treated in Hospital (not L.T.I) - - - -

11. No. of ‘Fire Incidents - - - -


12. Near Miss Incidents / Dangerous Occurrence - - - -

13. Number of Traffic accident - - - -

14. Number of Environmental Incidents - - - -

Induction - 3 - -

Tool Box Talks Topics - 4 - -


Total EHS
15.
Trainings 3rd Party Training Topics - 3 - -

Internal Training Topics - 5 - -

16. No. of Internal OSHE Meetings - 2 - -


17. No. of OSHE Meetings with Consultant 2 2 - -
No. of Joint OSHE tours carried out on Site with
18.
Consultant/ Employer
- 1 - -

Violation slips/ NCR’s Consultant - - - -


19. received from employer
and consultant Employer - - - -
20. No of Mock Drills - - - -
21. No of OSHE Awards - - - -
22. No of OSHE Alerts - 1 - -

Report prepared by: IBRAHIM ESMAT Report Date: 20/8/2023

Commentary: Work will start once compliance with the health and safety of the environment and approval from
the client with the PTW.