Boq Format Per Scope
Boq Format Per Scope
Boq Format Per Scope
Location
Date
Subject
Bill of Quantities
Subject
Bill of Quantities
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
TO COLLECTION -
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
DIVISION 03 – CONCRETE
03 11 00 Concrete Forming
Supply, fabrication , installation, stripping and/or leaving formwork
with the actual surface in contact with the concrete, including
provision of block-outs, chamfered edges, notching and overlaps,
necessary greasing or coating with form oil, all necessary hardware,
scaffolding, shoring and staging, all fixing accessories, use of plant,
tools and equipment, and all necessary items to complete the works.
03 20 00 CONCRETE REINFORCING
03 21 00 Reinforcing Steel
03 30 00 CAST-IN-PLACE CONCRETE
03 31 00 Structural Concrete
Supply and delivery and placing of concrete including necessary
grouting, vibrating, hammering, tamping, consolidating, curing,
hardening, wetting, sealing, brooming and scratching, protecting,
sampling, all fixing accessories, use of plant, tools and equipment,
and all necessary items to complete the works.
OTHER ITEMS
TO COLLECTION 1,468,979.98
Subject
Bill of Quantities
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
1 150mm Thick CHB wall load bearing m2 360.78 500.00 200.00 700.00 252,546.00
2 100mm Thick CHB wall load bearing m2 52.08 400.00 160.00 560.00 29,164.80
OTHER ITEMS
Allow other items for which the contractor requires payment to
comply with all respect with the provisions of the relevant
conditions of the contract particular specifications and drawings
which are not in the Bills of Quantities.
TO COLLECTION 281,710.80
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
DIVISION 05 – METALS
Truss / Rafter
1 HSS5X4X5/16 (RF-1&2) kg 1,361.76 334.00 116.90 450.90 614,017.58
2 2-L125x125x12 kg 1,089.41 334.00 116.90 450.90 491,214.97
3 2-L100x100x6 kg 777.38 250.00 87.50 337.50 262,365.75
4 2-L50x50x5 kg 267.67 132.00 46.20 178.20 47,698.79
5 2-L75x75x5 kg 1,565.82 197.00 68.95 265.95 416,429.83
6 LC 150x65x20x2.0 kg 2,329.40 120.00 42.00 162.00 377,362.80
Connection
7 Base Plate, Gusset Plate, Connecting Plate kg 532.00 - - -
8 Ø25mm Anchor Bolt pcs 48.00 38.00 13.30 51.30 2,462.40
9 Ø20mm Anchor Bolt pcs 28.00 30.00 10.50 40.50 1,134.00
10 Ø12mm A325 Bolt pcs - -
Connection/Bracing/Purlins
11 Ø12 Tension Rod kg 106.56 38.00 13.30 51.30 5,466.53
12 Ø10 Sag Rod kg 56.06 28.00 9.80 37.80 2,119.07
13 Turnbuckle sets 16.00 150.00 52.50 202.50 3,240.00
Pedestal
14 Ø200mm GI Pipe to PC-1 lm 17.70 670.00 234.50 904.50 16,009.65
14 Ø100mm GI Pipe to Guard House lm - -
Steel Tubular (2" x 4" & 1"x 1")
15 Turnstile Area kg 1,252.94 40.00 14.00 54.00 67,658.76
16 Sidewalk kg - -
17 Waiting Area kg 1,453.49 40.00 14.00 54.00 78,488.46
18 Typical Fence kg - -
19 Pedestrian Gate (1.2m x 2.4m - 4sets) kg 156.66 40.00 14.00 54.00 8,459.64
Automatic Collapsible Gate
20 13.84mL x 2mH Stainless Steel Retractable Gate sets 1.00 - - -
Guard Post
21 Prefab Guard Booth (1.5mLx1.5mWx2.5mH) sets 1.00 - - -
22 Boom Barrier sets 1.00 - - -
OTHER ITEMS
Allow other items for which the contractor requires payment to
comply with all respect with the provisions of the relevant
conditions of the contract particular specifications and drawings
which are not in the Bills of Quantities.
TO COLLECTION 2,394,128.23
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
31 30 00 EARTHWORK METHODS
31 31 00 Soil Treatment
Soil treatment for termite control for all areas and surfaces in
contact with the ground.
OTHER ITEMS
TO COLLECTION 488,733.00
Subject
Bill of Quantities
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
FINISHES
Supply of materials, labor and consumable to finish/complete the
works, with regards to standard and as specified by the designer
and shall comply to any necessary requirement for the testing of
materials or as specified.
1 Interior Partition m2 - -
2 Plastering m2 70.80 300.00 200.00 500.00 35,400.00
3 Ceiling Works -
1/2" thk. Moisture Resistant Gypsum Board in Metal Furring Frame m2 117.80 600.00 200.00 800.00 94,240.00
1/2" thk. Gypsum Board in Metal Furring Frame m2 25.80 600.00 200.00 800.00 20,640.00
PVC Ceiling Eaves (Silver Gray Finish from Gemkonstruct) m2 196.40 600.00 200.00 800.00 157,120.00
4 Interior Painting Works m2 70.80 300.00 120.00 420.00 29,736.00
5 Exterior Painting Works m2 155.70 300.00 120.00 420.00 65,394.00
4 Baseboard Finish m2 16.00 300.00 120.00 420.00 6,720.00
Tiling Works 0.6x0.6 Polished Homogenous Tiles to Floor (CCTV,
6 m2 30.20 350.00 350.00 10,570.00
Storage, Guard Area, Lactation Room)
Tiling Works 0.3x0.3mm Homogenous Tiles Ceramica De Milano to
7 m2 28.80 350.00 350.00 10,080.00
Floor (Male Toilet Floor Finish, Toilet)
Tiling Works 0.3x0.6mm Homogenous to Wall Tiles Ceramica De
8 m2 350.00 350.00 -
Milano (Male Toilet, Female Staff Lockers, Toilet)
9 Tiling Works 0.6x0.6 Non-Skid Tiles (Turnstile Area) m2 55.00 350.00 350.00 19,250.00
10 Broom Concrete Finish - Pathways, Sidewalk, Waiting Area m2 173.80 300.00 300.00 52,140.00
11 Smooth Concrete Finish - Male & Female Lockers m2 86.76 300.00 300.00 26,028.00
ROOFING WORKS
Ga.22 Pre-Painted Long Span Roofing, Color Steel Supreme (CS
1 m2 340.00 300.00 300.00 102,000.00
Blue)
2 Ga.22 Pre-painted G.I Flashing (CS Blue) LM 24.30 350.00 350.00 8,505.00
3 Ga.22 Stainless Steel Gutter (0.20m W x 0.30m D) LM 61.30 350.00 350.00 21,455.00
4 Ga.22 Pre-painted Ridge Roll, Color Steel Supreme (CS Blue) LM 30.65 300.00 300.00 9,195.00
5 1/2" thk Fiber Cement Fascia Board LM 91.95 350.00 350.00 32,182.50
OTHER ITEMS
Allow other items for which the contractor requires payment to
comply with all respect with the provisions of the relevant
conditions of the contract particular specifications and drawings
which are not in the Bills of Quantities.
TO COLLECTION 700,655.50
Subject
Bill of Quantities
Unit Rate
Item Description Unit Amount
Materials Labor Total
TO COLLECTION
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
TO COLLECTION 120,225.00
Subject
Bill of Quantities
Unit Rate
Item Description Unit Amount
Materials Labor Total
Tee Reducer
50 mm x 40 mm pcs. 5.00 250.00 87.50 337.50 1,687.50
50 mm x 32 mm pcs. 3.00 250.00 87.50 337.50 1,012.50
20 mm x 15 mm pcs. 3.00 30.00 10.50 40.50 121.50
Elbow 90deg
50 mm Ø pcs. 10.00 215.00 75.25 290.25 2,902.50
20 mm Ø pcs. 40.00 25.00 8.75 33.75 1,350.00
Reducer
50 mm x 40 mm pcs. 5.00 250.00 87.50 337.50 1,687.50
End cap
50 mm Ø pcs. 2.00 120.00 42.00 162.00 324.00
40 mm Ø pcs. 2.00 80.00 28.00 108.00 216.00
25 mm Ø pcs. 2.00 30.00 10.50 40.50 81.00
20 mm Ø pcs. 2.00 22.00 7.70 29.70 59.40
Female Coupling
20 mm Ø pcs. 10.00 45.00 15.75 60.75 607.50
Plumbing Fixtures
Lavatory set/s 7.00 3,500.00 3,500.00 24,500.00
Shower Drain w/ water heater set/s 5.00 3,500.00 3,500.00 17,500.00
Urinal set/s 3.00 3,500.00 3,500.00 10,500.00
Water Closet set/s 5.00 3,500.00 3,500.00 17,500.00
Fittings
Wye Equal
100 mm Ø pcs. 5.00 160.00 56.00 216.00 1,080.00
Elbow 90deg
75 mm Ø pcs. 5.00 80.00 28.00 108.00 540.00
50 mm Ø pcs. 20.00 55.00 19.25 74.25 1,485.00
Tee Equal
100 mm Ø pcs. 5.00 160.00 56.00 216.00 1,080.00
50 mm Ø pcs. 8.00 55.00 19.25 74.25 594.00
Floor Drain
50 mm Ø pcs. 8.00 200.00 70.00 270.00 2,160.00
Fittings
Elbow 90deg
75 mm Ø pcs. 36.00 80.00 28.00 108.00 3,888.00
Gutter Drain
75 mm Ø pc. 12.00 900.00 315.00 1,215.00 14,580.00
Fittings
Elbow 90deg
75 mm Ø pcs. 6.00 80.00 28.00 108.00 648.00
50 mm Ø pcs. 25.00 55.00 19.25 74.25 1,856.25
Tee Equal
100 mm Ø pcs. 2.00 160.00 56.00 216.00 432.00
50 mm Ø pcs. 25.00 80.00 28.00 108.00 2,700.00
Tee reducer
75 mm x 50 mm pcs. 8.00 80.00 28.00 108.00 864.00
P-trap
50 mm Ø pcs. 20.00 80.00 28.00 108.00 2,160.00
TO COLLECTION 719,995.17
Bill of Materials
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
ELECTRICAL WORKS
1 PANELBOARDS
Supply and installation of Distribution Panels including nameplates,
supports, terminal lugs, connectors, busbar, breakers, consumable
and all necessary materials as specified.
Section 26 24 16 Panelboards
Panel Board
Supply and installation Panelboards including nameplates, supports,
terminal lugs, connectors, busbar, breakers, consumables and all
necessary materials as specified.
DP-LSGH-01 assy 1.0 17,000.00 17,000.00 17,000.00
Main: 100AT,100AF,3P,230V MCCB with MTS
Branches: 1- 100AT, 100AF, 3P, 230V MCB
1- 40AT, 50AF, 3P, 230V MCB
14 - 20AT, 60AF, 2P, 230V MCB
Terminal Lugs
125mm2 pcs 1.0 250.00 250.00 250.00
14mm2 pcs 1.0 250.00 250.00 250.00
8.0mm2 pcs 1.0 250.00 250.00 250.00
5.5mm2 pcs 1.0 250.00 250.00 250.00
3.5mm2 pcs 1.0 250.00 250.00 250.00
Bill of Materials
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
rods, stroke counter,air terminal and all necessary works required
to complete the system.
9.5mm ɸ, 600mm Copper Air Terminal, Solid Surface Mounted pcs 12.0 250.00 250.00 3,000.00
25mm x 1.2mm Copper Tape Conductor m 110.0 100.00 100.00 11,000.00
6 WIRING DEVICES
Supply and installation of wiring devices including supports,
consumables and other necessary materials
Single pole switch, flush tumbler, 15A, 230V pcs 4.0 700.00 700.00 2,800.00
Two gang switch, flush, 15A, 230V pcs 5.0 500.00 500.00 2,500.00
Duplex receptacle outlet, 15A, 250V, parallel blade grounding type, parallel slot wall
pcs 15.0 500.00 500.00 7,500.00
mounted
Single receptacle outlet, 15A, 250V, parallel blade grounding type, parallel slot ceiling
pcs 15.0 500.00 500.00 7,500.00
mounted
Floor Mounted power outlet, 15A, 230V pcs 4.0 500.00 500.00 2,000.00
Special Purpose Outlet (IDF) pcs 1.0 500.00 500.00 500.00
4" x 2" Utility Boxes pcs 40.0 250.00 250.00 10,000.00
4" x 4" Junction Boxes pcs 7.0 250.00 250.00 1,750.00
Bill of Materials
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
LIGHTING FIXTURES
Interior Lighting
Supply and installation of lighting fixtures including supports,
connectors, consumables and all necessary materials
5 watts self-contained, maintained exit light and 2 hours battery pack. pcs 3.0 300.00 300.00 900.00
8 OTHER ITEMS
Unistrut Channel, gauge 12, 41mm x 41mm x 3m H.D lm 30.0 300.00 300.00 9,000.00
Unistrut Clamp 1/2" pc 15.0 150.00 150.00 2,250.00
Unistrut Clamp 3/4" pc 15.0 150.00 150.00 2,250.00
C and Z purlin Clip pc 20.0 150.00 150.00 3,000.00
Full threaded rod 3/8 G.I. lm 45.0 150.00 150.00 6,750.00
Electrical Tape 16mm x 20m pc 10.0 65.00 65.00 650.00
G.I. Tie Wire kg 20.0 75.00 75.00 1,500.00
Other Miscellaneous and Consumable lot 1.0 - -
(including wire tapes, labels, etc.)
OTHER ITEMS
Allow other items for which the contractor require payment to comply with all respect
with the provision of the relevanr conditions of the contract particular specifications
and drawings which are not in bill of Quantities
TO COLLECTION 289,700.00