EPR FINAL SAFETY ANALYSIS REPORT

1.7 Drawings and Other Detailed Information

1.7.1 Electrical and Instrumentation and Control Drawings

Table 1.7-1—I&C Functional and Electrical One Line Diagrams, contains a list of
instrumentation and control functional diagrams and electrical one-line diagrams.
The legends for electrical and instrumentation and control functional diagrams are
provided in Figure 8.3-1—Electrical Single Line Drawing Legend and Figure 7.1-1—
Chapter 7 Symbol Legend, respectively.

A COL applicant that references the U.S. EPR design certification will list additional
site specific instrumentation and control functional diagrams and electrical one-line
diagrams included in the COL FSAR in Table 1.7-1 and supplement the figure legends,
if applicable.

1.7.2 Piping and Instrumentation Diagrams

Where appropriate, piping and instrumentation diagrams (P&ID) are provided


throughout the FSAR. The P&IDs provide needed design information or demonstrate
how the subject systems and components perform their associated safety function(s).
Valve position indications shown on these figures do not represent a specific
operational state. A list of systems and their corresponding FSAR figure numbers is
provided in Table 1.7-2—U.S. EPR System Designators and System Diagrams. The
U.S. EPR subscribes to the Kraftwerks Kennzeichen System (KKS) for coding and
nomenclature of structures, systems, and components. The KKS designators are also
used in the P&IDs. Figures appear at the end of the respective text section. The P&ID
legend is provided in Figure 1.7-1. The P&ID legend provides an explanation of U.S.
EPR symbols and characters used in these FSAR figures.

For continuation labels on the figures, the sheet number in the label refers to the
native file name shown in the lower right corner of the figures, not to the sheet
number listed above the figure with the figure title. The native file name consists of
three parts—the system designation (normally the KKS system name), followed by the
native sheet number, followed by an indication of either Tier 1 or Tier 2. For example,
native file name FAL02T1 refers to the fuel pool purification system (FAL), native
sheet 02, for Tier 1. If a continuation label refers to a figure of a different system, it is
identified in the continuation label, with the system designation preceding the native
sheet number of the continuation figure. If the continuation is on a native sheet
number within the same system, the system designation on the continuation label is
not included.

A COL applicant that references the U.S. EPR design certification will list additional
site specific P&IDs included in the COL FSAR in Table 1.7-2 and supplement the
figure legend, if applicable.

Tier 2 Revision 4 Page 1.7-1


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-1—I&C Functional and Electrical One Line Diagrams


Sheet 1 of 4
FSAR Figure Number Title
7.1-1 Chapter 7 Symbol Legend
7.1-2 Distributed Control System Functional Architecture
7.1-3 Safety Information and Control System Architecture (QDS Portion)
7.1-6 Protection System Architecture
7.1-7 Safety Automation System Architecture
7.1-8 Priority and Actuator Control System Architecture
7.1-10 Reactor Control, Surveillance, and Limitation System Architecture
7.1-11 Process Automation System Architecture (Nuclear Island)
7.1-12 Process Automation System Architecture (Turbine Island and Balance of
Plant)
7.1-13 Diverse Actuation System Architecture
7.1-14 Measuring Ranges of Excore Instrumentation
7.1-15 Excore Instrument Detector Locations
7.1-16 Boron Concentration Measurement System Arrangement
7.1-19 Implementation of Independence Between Redundant Divisions
7.1-20 Implementation of Independence Between Safety and Non-Safety I&C
7.1-22 Distributed Control System Physical Architecture
7.1-23 Signal Conditioning and Distribution System Architecture
7.1-24 Self Powered Neutron Detector Functional Arrangement
7.1-25 Rod Position Measurement System Arrangement
7.2-1 Typical RT Actuation
7.2-3 Manual RT
7.2-4 Safety Related RT Devices
7.2-5 Rod Drop Detection
7.2-6 Low DNBR
7.2-7 High Linear Power Density
7.2-8 High Neutron Flux Rate of Change
7.2-9 High Core Power Level & Low Saturation Margin
7.2-10 Low RCS Flow Rate
7.2-11 Low - Low RCS Flow Rate
7.2-12 Low RCP Speed
7.2-13 High Neutron Flux
7.2-14 Low Doubling Time

Tier 2 Revision 4 Page 1.7-2


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-1—I&C Functional and Electrical One Line Diagrams


Sheet 2 of 4
FSAR Figure Number Title
7.2-15 Low Pressurizer Pressure & High Pressurizer Pressure
7.2-16 High Pressurizer Level
7.2-17 Low Hot Leg Pressure
7.2-18 SG Pressure Drop
7.2-19 Low SG Pressure
7.2-20 High SG Pressure
7.2-21 Low SG Level
7.2-22 High SG Level
7.2-23 High Containment Pressure
7.2-24 RT Signal Generation
7.2-25 P2 Permissive Logic
7.2-26 P3 Permissive Logic
7.2-27 P5 Permissive Logic
7.2-28 P6 Permissive Logic
7.2-30 P8 Permissive Logic
7.2-31 P12 Permissive Logic
7.2-32 P13 Permissive Logic
7.2-33 P14 Permissive Logic
7.2-34 P15 and P7 Permissive Logic
7.2-35 P16 Permissive Logic
7.2-36 P17 Permissive Logic
7.2-37 P18 Permissive Logic
7.3-1 ESF Actuation
7.3-2 SIS Actuation
7.3-3 EFWS Actuation
7.3-4 EFWS SG Level Control and Pump Flow Protection
7.3-5 EFWS Isolation
7.3-6 EFWS Actuators (Div. 1&2)
7.3-7 EFWS Actuators (Div. 3&4)
7.3-8 Partial Cooldown Actuation
7.3-9 MSRT Setpoint Formation
7.3-10 MSRIV Opening (Div. 1&2)
7.3-11 MSRIV Opening (Div. 3&4)

Tier 2 Revision 4 Page 1.7-3


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-1—I&C Functional and Electrical One Line Diagrams


Sheet 3 of 4
FSAR Figure Number Title
7.3-12 MSRCV Control
7.3-13 MSRT Isolation
7.3-14 Main Steam Isolation (Div. 1&2)
7.3-15 Main Steam Isolation (Div. 3&4)
7.3-16 MFWS Isolation - Full Load
7.3-17 MFWS Isolation - SSS
7.3-18 MFW Actuators (Div. 1&2)
7.3-19 MFW Actuators (Div. 3&4)
7.3-20 Containment Isolation
7.3-21 CVCS Charging Isolation
7.3-22 CVCS Isolation for Anti-Dilution
7.3-23 EDG Actuation
7.3-24 PSRV Opening (Brittle Fracture Protection)
7.3-25 SG Isolation (Div. 1&2)
7.3-26 SG Isolation (Div. 3&4)
7.3-27 RCP Trip
7.3-28 MCR Air Conditioning System Isolation and Filtering
7.3-29 Turbine Trip on Reactor Trip Initiation
7.3-30 Hydrogen Mixing Dampers Opening.
7.6-1 CCWS Switchover Valves Interlock
7.6-2 CCWS RCP Thermal Barrier Containment Isolation Valves Interlock
7.6-3 MHSI Large Miniflow Valves Interlock Between P14 and P17 Permissives
7.6-12 CCWS RCP Thermal Barrier Containment Isolation Valves Opening
Interlock
7.7-1 Average Coolant Temperature Control Logic
7.7-2 Rod Speed Control Program
7.7-3 RCS Pressure Setpoints
7.7-4 Pressurizer Level Setpoints
7.7-5 Steam Generator Level Setpoints
7.7-6 Signal Flow from SCDS through CU
8.3-1 Electrical Single Line Drawing Legend
8.3-2 Emergency Power Supply System Single Line Drawing
8.3-3 Normal Power Supply System Single Line Drawing

Tier 2 Revision 4 Page 1.7-4


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-1—I&C Functional and Electrical One Line Diagrams


Sheet 4 of 4
FSAR Figure Number Title
8.3-4 [[Typical Station Grounding Grid]]
8.3-5 Class 1E Uninterruptible Power Supply System Single Line Drawing
8.3-6 12-Hour Uninterruptible Power Supply System Single Line Drawing
8.3-7 Non-Class 1E Uninterruptible Power Supply System Single Line Drawing

Tier 2 Revision 4 Page 1.7-5


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-2—U.S. EPR System Designators and System Diagrams


Sheet 1 of 4
KKS
Designator System FSAR Section FSAR Figure
JA, JDA, JE RCS Schematic Flow Diagram 5.1 5.1-1
JA, JDA, JE RCS Piping and Instrumentation Diagram 5.1 5.1-4
KLB AVS Normal Operation Train 6.2 6.2.3-1
KLB AVS Accident Trains 6.2 6.2.3-2
JNA, JND, Safety Injection System Overview 6.2 6.3-1
JNG
JNA, JND, Safety Injection / Residual Heat Removal System 6.3 6.3-2
JNG Train (Typical)
JNK IRWST Layout 6.3 6.3-3
JDH Extra Borating System 6.8 6.8-1
FAK Fuel Pool Cooling System 9.1 9.1.3-1
FAL Fuel Pool Purification System 9.1 9.1.3-2
PEB Essential Service Water System Piping & 9.2 9.2.1-1
Instrumentation Diagram
KA Component Cooling Water System Trains 1 9.2 9.2.2-1
through 4
KA Component Cooling Water System Common 9.2 9.2.2-2
Loop 1
KA Component Cooling Water System Common 9.2 9.2.2-3
Loop 2
KA Component Cooling Water System Dedicated 9.2 9.2.2-4
CCWS Trains
PE Ultimate Heat Sink Piping and Instrumentation 9.2 9.2.5-1
Diagram
GHW Seal Water Supply System 9.2 9.2.7-1
QK Safety Chilled Water System Diagram 9.2 9.2.8-1
KU Nuclear Sampling System 9.3 9.3.2-1
KUL Severe Accident Sampling System 9.3 9.3.2-2
KT Nuclear Island Drain and Vent System 9.3 9.3.3-1
KBA, KBD, Chemical and Volume Control System 9.3 9.3.4-1
JEW
KBE Coolant Purification System 9.3 9.3.4-2
KBG Coolant Degasification System 9.3 9.3.4-3
KBC Reactor Boron and Water Makeup System 9.3 9.3.4-4
KBB Coolant Supply and Storage System 9.3 9.3.4-5

Tier 2 Revision 4 Page 1.7-6


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-2—U.S. EPR System Designators and System Diagrams


Sheet 2 of 4
KKS
Designator System FSAR Section FSAR Figure
KBF Coolant Treatment System 9.3 9.3.4-6
SAB Control Room Air Intake and CREF (Iodine 9.4 9.4.1-1
Filtration) Train Subsystems
SAB Control Room Air Conditioning and 9.4 9.4.1-2
Recirculation Air Handling Subsystem
SAB Control Room Envelope Air Supply and 9.4 9.4.1-3
Recirculation Subsystem
KLL Fuel Building Ventilation System 9.4 9.4.2-1
KLE Nuclear Auxiliary Building Supply Air Filtration 9.4 9.4.3-1
and A/C Trains
KLE Nuclear Auxiliary Building Air Supply and 9.4 9.4.3-2
Exhaust Subsystem
KLE Nuclear Auxiliary Building Exhaust Filtration 9.4 9.4.3-3
Trains Subsystem
KLE Nuclear Auxiliary Building Exhaust Iodine 9.4 9.4.3-4
Filtration Train Subsystem
KLE Nuclear Auxiliary Building Laboratory Iodine 9.4 9.4.3-5
Exhaust Filtration Train
KLC Safeguard Buildings Air Supply Subsystem 9.4 9.4.5-1
KLC Safeguard Buildings Exhaust Air Subsystem 9.4 9.4.5-2
KLC Safeguard Building Electrical Divisions 1 and 4 9.4 9.4.6-1
Air Intake
KLC Safeguard Building Electrical Divisions 1 and 4 9.4 9.4.6-2
Air Supply and Exhaust
KLC Safeguard Building Electrical Divisions 2 and 3 9.4 9.4.6-3
Air Intake
KLC Safeguard Building Electrical Divisions 2 and 3 9.4 9.4.6-4
Air Supply and Exhaust
KLA Containment Building Low Flow and Full Flow 9.4 9.4.7-1
Purge Supply Subsystem
KLA Containment Building Low Flow and Full Flow 9.4 9.4.7-2
Purge Exhaust Subsystem
KLA Containment Building Internal Filtration 9.4 9.4.7-3
Subsystem
KLA Containment Building Cooling Subsystem 9.4 9.4.7-4
KLA Containment Building Service Compartments 9.4 9.4.7-5
Cooling Subsystem

Tier 2 Revision 4 Page 1.7-7


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-2—U.S. EPR System Designators and System Diagrams


Sheet 3 of 4
KKS
Designator System FSAR Section FSAR Figure
KLF Radioactive Waste Building Ventilation System 9.4 9.4.8-1
Air Supply
KLF Radioactive Waste Building Ventilation System 9.4 9.4.8-2
Exhaust Air Station
SAD Emergency Power Generating Building 9.4 9.4.9-1
Ventilation System
SAQ Essential Service Water Pump Building 9.4 9.4.11-1
Ventilation System
SAM3 Main Steam and Feedwater Valve Room 9.4 9.4.12-1
Ventilation System
KLD Access Building Ventilation System – Supply Air 9.4 9.4.14-1
Subsystem
KLD Access Building Ventilation System – Supply and 9.4 9.4.14-2
Exhaust Air Subsystem
SGA, SGB Fire Water Distribution System 9.5 9.5.1-1
SGC Spray Deluge Systems Layout 9.5 9.5.1-2
SGE Sprinkler Systems Layout 9.5 9.5.1-3
SGJ Gaseous Fire Extinguishing Systems Layout 9.5 9.5.1-4
XJN Emergency Diesel Generator Fuel Oil Storage and 9.5 9.5.4-1
Transfer System
XJG Emergency Diesel Generator Cooling Water 9.5 9.5.5-1
System
XJX Emergency Diesel Generator Starting Air System 9.5 9.5.6-1
XJV Emergency Diesel Generator Lubricating Oil 9.5 9.5.7-1
System
XJR Emergency Diesel Generator Air Intake and 9.5 9.5.8-1
Exhaust System
MAH Design Heat Balance for Steam and Power 10.1 10.1-1
Conversion System Cycle
MAH Valves Wide Open Heat Balance for Steam and 10.1 10.1-2
Power Conversion System Cycle
N/A Turbine Generator System 10.2 10.2-1
LBA Main Steam Supply System 10.3 10.3-1
MAJ Main Condenser Evacuation System 10.4 10.4.2-1
MAQ Vent System for Air Removal 10.4 10.4.2-2
MAW Turbine Gland Sealing System 10.4 10.4.3-1

Tier 2 Revision 4 Page 1.7-8


U.S. EPR FINAL SAFETY ANALYSIS REPORT

Table 1.7-2—U.S. EPR System Designators and System Diagrams


Sheet 4 of 4
KKS
Designator System FSAR Section FSAR Figure
PA Circulating Water System Flow Diagram 10.4 10.4.5-1
LD Condensate Polishing System Flow Diagram 10.4 10.4.6-1
LCA Condensate and Feedwater System 10.4 10.4.7-1
LCA Feedwater Full Load Isolation Valve Hydraulic 10.4 10.4.7-2
Actuators
LCQ Steam Generator Blowdown System Discharge 10.4 10.4.8-1
and Cooling
GDA Steam Generator Blowdown Demineralizing 10.4 10.4.8-2
System Flow Diagram
LAR Emergency Feedwater System Flow Diagram 10.4 10.4.9-1
KPK Liquid Waste Storage System 11.2 11.2-1
KPF Liquid Waste Processing System, Evaporator 11.2 11.2-2
System
KPF Liquid Waste Processing, Demineralizer System 11.2 11.2-3
KPL Gaseous Waste Processing System - Normal 11.3 11.3-1
Operation
KPL Gaseous Waste Processing System - Gaseous 11.3 11.3-2
Waste Sources
KPC Solid Waste Management Flow Diagram 11.4 11.4-1
KPL Radioactive Effluent Flow Paths With Process 11.5 11.5-1
and Effluent Radiation Monitors
KPG Simplified Flow Diagram for the Primary Coolant 12.2 12.2-3
Degasification System Degasifier
JYK Main Control Room Airborne Monitoring 12.3 12.3-72
JYK Reactor and Fuel Buildings Airborne Monitoring 12.3 12.3-73

Tier 2 Revision 4 Page 1.7-9