TWIN SHAFT PADDLE MIXER

SSHJ Series

Instruction manual
Catalog

1. Application Scope and Performance


Characteristics ………………………………………………1
2. Main technical
parameters ………………………………………………………1
3. Working principle ……………………………………………………………2
4 Structure ………………………………………………………………4
5. Preparation before installation, adjustmentand
use ………………………………………9
6. Use, operation and
precautions ……………………………………………9
7. Maintain
maintenance ……………………………………………………………10
8. Troubleshooting and
troubleshooting …………………………………………………………10
9. Wearing parts ………………………………………………………………10
10. Pneumatic control …………………………………………………………..11
11. Other ………………………………………………………………13
I. Scope of application and performance characteristics
1. Scope of application
SSHJ biaxial pulp leaf efficient mixer is widely used in feed, food, chemical, pharmaceutical,
pesticide, and other industries of powder, granular, flake, block, and thick material mixing, and can
carry out a variety of materials drying and cooling operations.
2, performance characteristics
SSHJ biaxial blade high-efficiency mixer is a kind of low-speed, high efficiency, energy-saving
ideal mixing equipment, with high mixing uniformity, mixing without dead Angle, and a short mixing
cycle, each batch of materials generally in 30 ~ 120 seconds can be mixed evenly; The discharging
adopts the full- length door structure at the bottom, the discharging is rapid and the residual rate is low;
Reliable discharge seal, no leakage phenomenon, large variable loading range, the machine is equipped
with grease adding pipe, can add a variety of liquids; The machine is compact in structure, beautiful in
shape, and occupies an area less than other mixing equipment. Mixing fast, soft, stable performance,
low noise, no dust, no environmental pollution, and so on.

II. Main technical parameters


The main technical parameters of the product are shown in Table 1
Table 1
Items Effective Amount of mix Mixing time per lot Evenness of Power

Model
(m3 ) (kg) (S) (CV% or less) (kW)

SSHJ0.1 0.1 50 30 ~ 120 5 2.2 (3)

SSHJ0.2 0.2 100 30 ~ 120 5 3 (4)

SSHJ0.5 0.5 250 30 ~ 120 5 5.5 (7.5)

SSHJ1 1 500 30 to 120 5 11 (15)

SSHJ2 2 1000 30 to 120 5 15 (18.5)

SSHJ3 3 1500 30 to 120 5 22

SSHJ4 4 2000 30 ~ 120 5 30 (37)

SSHJ6 6 3000 30 to 120 5 37 (45)

SSHJ8 8 4000 30 ~ 120 5 45 (55)

1
III. Working principle
1. Sample drawing

1. Sample drawing (Figure 1)

SSHJ 0.1, 0.2, 0.5 high-efficiencymixer SSHJ1, 2, 3, 4, 6, 8 high-efficiency mix

Figure 1. Sample drawing

2
The specific size of the sample is shown in the table below:

Sample size parameter table:

No. SSHJ0.1 SSHJ0.2 SSHJ0.5 SSHJ1 SSHJ2 SSHJ3 SSHJ4 SSHJ6 SSHJ8

A 816 1060 1470 1345 1800 1785 2100 1860 2250


B 1143 1366 1845 1785 2320 2765 3160 3816 4200
C 953 1100 1278 1410 1550 1695 2013 2353 2883
D 1025 1200 1368 1500 1640 1785 2100 2440 2923
E 1330 1490 1730 2340 2585 2650 2937 3325 3477
F 180 185 190 225 280 280 345 366 378
G 820 1020 1200 1695 1890 1890 2012 2352 2552
H 390 445 474 655 757.5 757.5 851 977 1024
I 400 500 580 835 935 1000 1000 1150 1260
J 1100 1280 1280 1270 1850 2130
N1 16 16 16 16 16 16 16 16 16
N2 26 40 40 26 30 40 40 40 44
T1 Phi 11 Phi 9 Phi 9 Phi 10 Phi 10 Phi 14 Phi 13 Phi 10 Phi 13
T2 Phi 11 Phi 13 Phi 13 Phi 13 Phi 13 Phi 14 Phi 14 Phi 18 Phi 18
a1 286 300 360 380 580 580 580 680 780
b1 15 16 16 20 20 20 20 20 20
C1 64 67 82 85 135 135 135 160 185
d1 35 30 30 40 40 40 40 40 40
e1 216 240 300 300 500 500 500 600 700
f1 920 1200 1300 1855 2050 2050 2212 2500 2752
h1 25 45 25 39.5 40 51 51 40 56
i1 145 111 125 222 197 156 211 242 220
j1 870 1110 1250 1766 1970 1970 2110 2420 2640
k1 23 25 25 25 25 25 20 25 40
m1 154 106 142 232 298 175 206 180 225

n1 770 1060 1420 1160 1490 1550 2060 1800 2250


O1 816 1060 1470 1210 1540 1785 2100 1850 2330
P1 710 950 1360 1110 1440 1490 2000 1750 2154
R1 60 100 60 90 90 90 116 90 116
S1 800 1000 1180 1675 1870 1870 1980 2320 2520

3
2. Working principle
This machine is composed of two rotors rotating in opposite directions. The rotor is
welded with several special Angle blades, which drive the material to rotate counterclockwise
along the inner wall of the groove on the one hand. On the one hand, it drives the material to
flip around, forming a weightless area at the intersection and overlap of the two rotors. In this
area, no matter how the shape, size, and density of the material can make the material float in
a state of instantaneous weightlessness, which makes the material in the groove form a full
range of continuous circulation and flip, interleaved shear, to achieve the effect of fast, soft
and uniform mixing. (See Figure 2 and Figure 3)

Figure 2. Motion trajectory diagram

Figure 3. Mixed region diagram

4
IV. Structure
This machine is a horizontal mixer, mainly composed of a rotor and drive body, a discharge
door and sealing device, a discharge control, and liquid adding system.
1. Rotor and its transmission
The rotor is composed of a blade, shaft, and support rod. Motor through the reducer, the
chain drives the rotor to run at a certain speed, at a certain Angle installed on the twin shaft of the
bladewill be material thrown into the container of the whole space, the material in the state of
instant weightlessness widely staggered to form a flow layer mixing, at the same time, the
material is also driven by the blade; Along the axial radial movement, to form a full range of
composite circulation.
2. Body
The body is W-shaped. There is a return air duct at both ends of the body, and the body
is communicated through the return air duct. When the material is in and out, the air discharged
by the material can be circulated in this space, and it will not overflow outside the machine.
3. Discharge door and sealing device
The discharge door is composed of the door body, bracket arm, and adjusting nut. Sealing
parts are arranged around the discharging door frame at the lower part of the housing. When the
door is closed, the side of the discharging door body is close to the rubber sealing strip on the
sealing part so that the material in the machine will not leak out. The sealing strip can be replaced
after damage or aging. If necessary, adjust the position of the adjusting nut, you can change the
distance between the bracket arm and the door body, and the feeding door and the circular face at
the bottom of the housing are flat so that it is sealed. (See Figure 4)
4. Discharge control
The discharge control mechanism is composed of a cylinder, connecting rod, linkage shaft,
travel switch, and so on. The discharge door is mounted on the linkage shaft, which is connected
with the driven rocker of the connecting rod mechanism, and the cylinder head is hinged with
the active rocker. The cylinder reciprocates, and the linkage shaft rotates through the connecting
rod mechanism, to drive the discharge door to open or close. (See Figure 5)
5. Liquid addition pipe
The liquid-adding pipe is installed on the top of the body and consists of pipes, nozzles,
etc., through which the liquid is fan-shaped ejection; The whole length of the casing is evenly
distributed with several nozzles.

5
The inlet end of the pipeline is provided with a flange, and connected to the oil supply
system.
6. Electric control principle.(Figure 6, Figure 7)

1. Door body 2. Bracket arm 3. Adjusting nut 4. Seals 5. Sealing strip 6. Linkage shaft

Figure 4. Discharge door and sealing device

1. Cylinder 2. Travel switch 3. Linkage shaft 4. Sidebar mechanism

Figure 5. Discharge control

6
Mixer

Figure 6. Electrical schematic diagram (SSHJ0.1 ~ 1)


Mixer

7
Figure 7. Electrical schematic diagram (SSHJ2 ~ 8)

V.Preparation before installation, adjustment

8
1. Comprehensive inspection should be carried out before the installation of equipment.
2. The machine is a big door discharging, and the discharging connection port is the flange
of the casing. The body should be installed below the volume of the hopper.
3. Install the transmission chain, adjust the position of the tensioning sprocket, make the
chain drive smooth, and make its spindle steering and the direction indicated by the arrow on the
mixing machine housing, and then install the sprocket cover. (See Figure 8)
4. Install the liquid addition system.
5, before use, should check the opening and closing of the discharge door, adjust the
cylinder pressure and stroke switch position, the discharge door can be closed and the bottom of
the housing flat, open can reach a certain Angle, and make the cylinder run smoothly and at a

suitable speed.
1. Small sprocket 2. Big sprocket 3. Tension sprocket

Figure 8. Transmission system

VI. Operation, and precautions


1, before use, should be advanced empty car operation, the body should be stable, cross
overlap without friction, no more than normal vibration, and should observe whether the
discharge mechanism works normally.
2. When used, the deceleration motor should be started first, and the feed should be fed after
the rotor rotates normally.
3, additives should be added in the machine after the main material is into half of the batch,
grease should be in the main material into the machine after all injections after spraying should
be mixed for a while before discharge.
4. When the machine is not in use, the oil-adding pipe shall not keep the oil, so as not to
block the pipe after the oilsolidifies.
9
5, the material shall not be mixed with metal impurities, so as not to damage the rotor blade.
6. The use of decelerating motor and cylinder, auxiliary components, etc., should conform
to the provisions of its operation manual.

VII. Maintenance
1, the discharge mechanism should keep the movement flexible, and should often remove
the dust.
2, the bearing should be regularly replaced with lubricating oil.The grease should be sodium-
based grease (GB492-65) Zn-3.
3. The transmission chain should be brushed with an appropriate amount of No. 30
mechanical oil and the chain should be cleaned regularly.
4. Lubricating grease (LD-2H) is recommended for decelerating motor lubrication.
5. The deceleration motor is lubricated once every 8 months.
6. In any case, the equipment should be repaired in the state of complete shutdown.
When the equipment is running, any part of the body shall not enter the body or contact the
moving parts.

VIII. Fault and removal


1. In case of a sudden stop during use, the motor should be started after opening the
discharge door and discharging the material.
2. If there is material leakage in the discharge door, the contact between the discharge
door and the sealing parts of the housing should be checked. If the discharge door is not closed
strictly or the sealing strip is aging, the adjustment nut on the travel switch or bracket arm
should be adjusted or the sealing strip should be replaced.
3, the discharge mechanism, if it can not operate normally, should check the cylinder
and the air supply system has no fault.

IX. Wearing parts (see the following table)

NO. Code name Quantity/station

10
1 Chain 1

2 Bearings 4

3 Travel switch 4

4 Sealing ring 4

5 Seal strip 4

X. Pneumatic control
1、Working principle (see Figure 9)

FIG. 9 Pneumatic schematic diagram

1.1 The compressed air generated by the air compressor with a rated working pressure of 0.7
~ 0.8MPa is selected as the power source to ensure the working pressure of the cylinder at

11
0.63MPa.
1.2 Connect the air source pipeline, check whether all pipelines are connected reliably,
and inject the appropriate amount of lubricating oil into the oil mist 7 according to the regulations.
1.3 Before ventilation, turn the handwheel 10 on the pressure-reducing valve
counterclockwise to make the valve setting spring to unload, then open the air source to turn
the handwheel clockwise, and the pressure gradually increases until the pressure indicated by
the pressure gauge is the required working pressure. At this time, brake knob 11 is used to lock
the handwheel and make the system work under working pressure.
1.4 No load, under the specified working pressure through the manual switch 4, press the
two-position five-way solenoid directional valve by hand and make cylinder 1 action, to check
whether the cylinder and the air supply system a r e normal.
When the load is working, the flow is adjusted by adjusting the opening of the one-way
throttle valve through knob 5 first, so that the cylinder piston can speed up in a wide speed
range.
1.6 When the normal load is working, the solenoid valve is energized, so that the two-
position five-way solenoid directional valve accepts an electrical signal or gas signal to change
the direction of the flow of compressed air, to promote the cylinder action, to realize the
automatic control of the pneumatic transmission.
1.7 Periodically check the oil level and water level in oil mist 7 and water filter 8. When
the oil level is near the lowest oil level, oil should be replenished in time. The type of oil
should be selected according to the viscosity range of 2.5 ~ 7°E.
2. Maintenance:
2.1 Dust accumulation in the discharge control mechanism should be removed regularly.
2.2 The filter element, water storage cup, and oil cup should be cleaned regularly.
2.3 If disassembly is necessary, all the removed parts should be carefully handled to
prevent damage.
3. Troubleshooting and troubleshooting
Cause obstacle cause Elimination method

Air leakage between cylinder Damaged seal ring Replace the sealing ring

block and end cap

The regulating rod of the cylinder Damaged seal ring Replace the sealing ring

buffer throttle valve leaks

Insufficient cylinder output force Poor lubrication Check for malfunctioning oil

mist
12
Insufficient gas supply Increase the inside diameter of

the connecting pipe or pipe joint

The pressure does not rise when Spring break Spring replacement
the pressure reducing valveadjusts

Oil mist works without dripping Reduced inlet flow Oil refill

oil Blocked oil needle Cleaning or replacing

Electromagnets are noisy There is dirt between the Clean it up


suction surfaces of the core

Voltage below rated Adjust the voltage

Solenoid valve wiring is Check the circuit

The main valve does not reverse or does not good

not work The electromagnet emits Clean the electromagnet

slow or no gas
Poor lubrication Check cleaning to raise the air source
condition low working pressure pressure for the oil mist to see if there is
air leakage

4. Precautions for regular disassembly inspection and re-installation.


4.1 When cleaning metal parts with mineral oil, rubber parts with soap, an oil cup water
cup should be put into the petroleum solution rinsed, do not clean in acetone, ethyl acetate,
toluene, and other solutions.
4.2 All the dismantled parts should be handled with care to prevent damage and hair.

13
XI.Other
1. The SSHJ series mixer sometimes adds the injection system according to the user's needs.
1.1 Working principle: After discharge, the mixer uses compressed air to blow the wallboard,
pulp blade, and machine groove, so that the residual material in the body is reduced

(see Figure 10).

1. Airbag 2. Solenoid valve 3. Nozzle 4. Sprinkler head

Figure 10. Jet system


1.2 Power selection: The air compressor with a working pressure of 0.7-0.8MPa is selected as

14
the power source to ensure the injection capacity.
2. SSHJ series mixers sometimes switch to an electric door opening system according to
user needs.
2.1 Working principle: After the motor decelerates through a pair of gears, it drives a pair of
lead screw nuts to change the rotation motion of the motor into a straight-line motion. The
positive and negative rotation of the motor is used to complete the push and pull operation,

to rotate the door opening shaft through the rocker to achieve the purpose of opening and
closing the door (see Figure 11).
1. Travel switch 2. Linkage shaft 3. Rocker 4. Electric push rod

Figure 11. Schematic diagram of the electric dooropening


2.2 Precautions for electric push rod installation
The push rod shell is provided with a mounting shaft, which can be prepared to install the
support hanger in the appropriate position. The end shaft connecting sleeve is connected with the
pushed member. The bracket and the connecting sleeve are optional for the pushing rod
accessories.
(1) The safety switch installed on the push rod must be connected in series to the motor
power line, see the attached figure.
(2) According to the actual situation, the user must install the travel switch to control the
work of the push rod. The safety protection switch in the machine shall not be used as the
travel switch.
2.3 Electric push rod maintenance and overhaul
(1) Working environment temperature between -10℃ ~ 60℃, relative humidity below 85%
can operate normally.
15
(2) The protective sleeve installed at the front end of the push rod is designed to
prevent dust intrusion into the machine, so do not remove it when used.
(3) After running for a while (about one year), it should be checked and repaired, and the
ball bearing grease (SY1514-65) in the machine can be replaced with 70% full degree.

16
User Feedback List

Device model

Purchase time

Installation and use time

Evaluation of equipment
performance

Major existing problems

Any suggestions for


improvement

Reserve note

Use the name of the unit

Mailing address

Contact
Contact person
number

17
Certificate of conformity

The product has been inspected to pass muster

Product Name:

Model specification:

Product Number:

Quality Inspector:

Quality Inspection Department

18

You might also like