SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No.

1 1/3/2023
WO# 1715 C20643000 8190C20643
FWO# 595 C20642000 8323C20642

2 1/3/2023
WO# 2700-23 C20643000 13047C20643
FWO# 597 C20642000 11330C20642

WO# 2701-23 9023C20643


C20643000
3 1/3/2023 8845C20642
FWO# 596 C20642000

4 8/2/2023 WO2664-23 - -
Order
UWO FWO )

Task NO. OTHER

32-49-82 NDT

32-49-82 NDT

32-49-82 NDT

72-200-02-02 BSI

FPI QUALIT
REQUIRED WORK DETAILS

DEFECT /TASK

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


T/C

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


T/C

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


T/C

BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM 32-49-82 FOUND NO CRACK D1-001

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-49-82


D1-001
FOUND NO CRACK

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-49-82


D1-001
FOUND NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

DANISH ANWER 1/3/2023 CLOSED 1/3/2023 NDT 002

MUHAMMAD UMER
1/3/2023 CLOSED 1/3/2023 NDT 003
KHOKHAR

DANISH ANWER 1/3/2023 CLOSED 1/3/2023 NDT 002

OPEN
REMARKS

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 2/3/2023 WO# 2714-23 - - 70-23-02-230-501

2 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

FPI OF ENGINE LIP SKIN AND BUTT STRAPS


AIRSIAL
(QTY-05)

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

FPI C/OUT ON ENGINE LIP SKIN AND BUTT STRAPS AS PER SPM TASK 70-23-
02-230-501 D1-002
FOUND NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 2/3/2023 CLOSED 2/3/2023 NDT 001

OPEN
REMARKS

SES/NDT/FPI/022/2023

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

OPEN
REMARKS

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

WO# 2717-23 44241


10-1608
1 6/3/2023 44453 32-41-75
FWO# 599 10-1609

2 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


NDT T/C

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-41-75


D1-001
FOUND NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 6/3/2023 CLOSED 6/3/2023 NDT 001

OPEN
REMARKS

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 7/3/2023
WO# 2716-23 252-149 - 32-41-75
FWO# 600

2 7/3/2023
WO# 2716-23 43-1352 - 32-41-75
FWO# 601

3 7/3/2023
WO# 2716-23 10-1608 56640
32-41-75
FWO# 602 10-1609 56640

4 7/3/2023
WO# 2716-23 10-1608 56640 32-41-75
FWO# 603 10-1609 56640

5 7/3/2023
WO# 2716-23 43-1392 - 32-41-75
FWO# 604

6 7/3/2023
WO# 2721-23 C20641210 G502C20641 32-49-83
FWO# 605 C20640300 G669C20640

7 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

FPI OF TORQUE BAR BOLTS (QTY 11)


NDT

NDT FPI OF TORQUE BAR BOLTS (QTY 11)

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


NDT O/H

FPI OF MAIN WHEEL HALVES (QTY 01 PAIR)


NDT O/H

NDT FPI OF MAIN WHEEL TIE BOLTS (QTY 22)

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


NDT T/C

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

FPI C/OUT ON TORQUE BAR BOLTS AS PER CMM-32-41-75


D1-002
FOUND NO CRACK

FPI C/OUT ON TORQUE BAR BOLTS AS PER CMM-32-41-75


D1-002
FOUND NO CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-41-75


FOUND NO CRACK D1-001

FPI C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-41-75 D1-002


FOUND NO CRACK

FPI C/OUT ON MAIN WHEEL TIE BOLTS HALVES AS PER CMM-32-41-75


D1-002
FOUND NO CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-49-83 D1-001


FOUND NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 7/3/2023 CLOSED 7/3/2023 NDT 001

MUHAMMAD S.K AFRIDI 7/3/2023 CLOSED 7/3/2023 NDT 001

MUHAMMAD S.K AFRIDI 7/3/2023 CLOSED 7/3/2023 NDT 001

MUHAMMAD S.K AFRIDI 7/3/2023 CLOSED 7/3/2023 NDT 001

MUHAMMAD UMER
7/3/2023 CLOSED 7/3/2023 NDT 003
KHOKHAR

DANISH ANWER 7/3/2023 CLOSED 7/3/2023 NDT 002

OPEN
REMARKS

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 8/3/2023
WO# 2727-23 C20643000 2547C20643
32-49-82
FWO# 607 C20642000 2546C20642

2 8/3/2023
WO# 2728-23 C20643000 3212C20643
32-49-82
FWO# 608 C20642000 3228C20642

3 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


NDT T/C

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


NDT T/C

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-49-82


D1-001
FOUND NO CRACK

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-49-82


D1-001
FOUND NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

DANISH ANWER 8/3/2023 CLOSED 8/3/2023 NDT 002

MUHAMMAD UMER
8/3/2023 CLOSED 8/3/2023 NDT 003
KHALID KHOKHAR

OPEN
REMARKS

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 9/3/2023
WO# 2729-23 2602540 - 32-49-01
FWO# 612

2 9/3/2023
WO# 2722-23 C20643000 8536C20643
32-49-82
FWO# 613 C20642000 8534C20642

3 9/3/2023
WO# 2729-23 2607949 B5481
32-40-09
FWO# 611 2607948 BH2494

4 9/3/2023
WO# 2731-23 C20641210 7974C20641
32-49-83
FWO# 614 C20640200 7743C20640

5 9/3/2023
WO# 2732-23 C20641210 6160C20641
32-49-83
FWO# 615 C20640200 5950C20640

6 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

FPI OF MAIN WHEEL BOLTS (QTY 16)


VISION AIR

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


NDT T/C

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


VISION AIR T/C

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


NDT T/C

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


NDT T/C

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

FPI C/OUT ON MAIN WHEEL BOLTS AS PER SPM-32-49-01


D1-002
FOUND NO CRACK

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-49-82


D1-001
FOUND NO CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-40-09


D1-001
FOUND NO CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-49-83


D1-001
FOUND NO CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-49-83


D1-001
FOUND NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 9/3/2023 CLOSED 9/3/2023 NDT 001

MUHAMMAD UMER
9/3/2023 CLOSED 9/3/2023 NDT 003
KHALID KHOKHAR

DANISH ANWER 9/3/2023 CLOSED 9/3/2023 NDT 002

MUHAMMAD S.K AFRIDI 9/3/2023 CLOSED 9/3/2023 NDT 001

DANISH ANWER 9/3/2023 CLOSED 9/3/2023 NDT 002

OPEN
REMARKS

SES/NDT/FPI/024/2023

SES/NDT/ET/023/2023

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 10/3/2023
WO# 2733-23 10-1691 1461
32-41-89
FWO# 616 10-1692 1461

2 10/3/2023
WO# 2734-23 10-1691 1494 32-41-89
FWO# 617 10-1692 1494

3 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


NDT T/C

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


NDT T/C

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-41-89


D1-001
FOUND NO CRACK

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-41-89 D1-001


FOUND NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 10/3/2023 CLOSED 10/3/2023 NDT 001

MUHAMMAD S.K AFRIDI 10/3/2023 CLOSED 10/3/2023 NDT 001

OPEN
REMARKS

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 13/3/2023
WO# 2736-23 2612117 B1640
32-41-12
FWO# 0618 2616604 B1640

2 13/3/2023
WO# 2737-23 2612117 B2511
32-41-12
FWO# 0620 2616604 B2511

3 13/3/2023
WO# 2738-23 10-1609 3383
32-41-75
FWO# 0622 10-1608 3383

4 13/3/2023
WO# 2736-23 2612131 - 32-09-01
FWO# 0619

5 13/3/2023
WO# 2737-23 2612131 - 32-09-01
FWO# 621

6 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


- T/C

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


- T/C

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


- T/C

- FPI OF MAIN WHEEL HALVES TIE BOLTS (QTY 22)

- FPI OF MAIN WHEEL HALVES TIE BOLTS (QTY 22)

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-41-12


D1-001
FOUND NO CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-41-12


D1-001
FOUND NO CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM-32-41-75


D1-001
FOUND NO CRACK

FPI CARRIED OUT ON MAIN TIE BOLTS AS PER SPM 32-09-01 FOUND NO
D1-002
CRACK

FPI CARRIED OUT ON MAIN TIE BOLTS AS PER SPM 32-09-01 FOUND NO D1-001
CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 13/3/2023 CLOSED 13/3/2023 NDT 001

DANISH ANWER 13/3/2023 CLOSED 13/3/2023 NDT 002

DANISH ANWER 13/3/2023 CLOSED 13/3/2023 NDT 002

MUHAMMAD S.K AFRIDI 13/3/2023 CLOSED 13/3/2023 NDT 001

MUHAMMAD S.K AFRIDI 13/3/2023 CLOSED 13/3/2023 NDT 001

OPEN
REMARKS

N/A

N/A

N/A

N/A

N/A

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 14/3/2023
WO# 2730-23 C20643000 15017C20643
32-49-82
FWO# 0623 C20642000 14158C20642

2 14/3/2023
WO# 2730-23 C20643000 15017C20643
32-49-82
FWO# 0624 C20642000 14158C20642

3 14/3/2023
WO# 2730-23 A36971 - 32-49-82
FWO# 625

4 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

FPI OF NOSE WHEEL HALVES (QTY 01 PAIR)


NDT O/H

ET OF NOSE WHEEL HALVES (QTY 01 PAIR)


NDT
O/H

NDT FPI OF NOSE WHEEL HALVES BOLTS (QTY 12)

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

FPI C/OUT ON NOSE WHEEL HALVES AS PER CMM-32-49-82


D1-002
FOUND NO CRACK

ET C/OUT ON NOSE WHEEL HALVES AS PER CMM 32-49-82 FOUND NO CRACK D1-001

FPI C/OUT ON NOSE WHEEL TIE BOLTS AS PER CMM 32-49-82 FOUND NO
D1-002
CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD UMER
14/3/2023 CLOSED 14/3/2023 NDT 003
KHOKHAR

DANISH ANWER 14/3/2023 CLOSED 14/3/2023 NDT 002

DANISH ANWER 14/3/2023 CLOSED 14/3/2023 NDT 002

OPEN
REMARKS

N/A

N/A

N/A

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 15/3/2023
WO# 2741-23 C20641210 F012C20641
32-49-83
FWO# 0627 C20640300 F038C20640

2 15/3/2023 - 131-9B P-7952 49-21-00

3 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


NDT
T/C

BSI OF APU DUE TO ACCELERATION PROBLEM


BSI
(AP-BND)

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM 32-49-83 FOUND NO


D1-001
CRACK

BSI C/OUT ON APU DUE TO ACCELERATION PROBLEM AS PER 49-21-00


FOUND IN FAIR CONDITION BSI

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

DANISH ANWER 15/3/2023 CLOSED 15/3/2023 NDT 002

KHALID MM KHOKHAR 15/3/2023 CLOSED 15/3/2023 BSI 001

OPEN
REMARKS

N/A

FOUND HEAVY DIRT ACCUMUALTION


ON BLADES SURFACES AND INGVS
FOUND MISSING MATERIAL ON HPT
STAGE 1 VANE FOUND EROSION ON
HPT 01 STAGE BLADE

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 16/3/2023
WO# 2722-23 2612117 B2232
32-41-12
FWO# 0629 2616604 B2232

2 16/3/2023
WO# 2744-23 C20641210 8028C20641
32-49-83
FWO# 0632 C20640200 7789C20640

3 16/3/2023
WO# 2722-23 2612117 B2232
32-41-12
FWO# 0628 2616006\ B2232

4 16/3/2023
WO# 2722-23 2612131 - 32-49-01
FWO# 0630

5 16/3/2023
WO# 2722-23 2612128 - 32-49-01
FWO# 0631

6 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

ET OF MAIN WHEEL HALVES (QTY 01 PAIR)


-
O/H

- ET ON MAIN WHEEL HALVES (QTY 01 PAIR) T/C

- FPI OF MAIN WHEEK HALVES (QTY 01 PAIR) O/H

- FPI OF MAIN WHEEL BOLTS (QTY 22)

- FPI OF ROTOR DRIVE KEYS (QTY 11)

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM 32-41-12 FOUND NO


D1-001
CRACK

ET ON MAIN WHEEL HALVES AS PER CMM 32-49-83 FOUND NO CRACK D1-001

FPI ON MAIN WHEEL HALVES AS PER CMM 32-41-12 FOUND NO CRACK D1-002

FPI ON MAIN WHEEL BOLTS AS PER SPM 32-49-01 FOUND NO CRACK D1-002

FPI ON MAIN WHEEL ROTOR DRIVE KEYS AS PER SPM 32-49-01 FOUND
D1-002
NO CRACK

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 16/3/2023 CLOSED 16/3/2023 NDT 001

DANISH ANWER 16/3/2023 CLOSED 16/3/2023 NDT 002

MUHAMMAD UMER
16/3/2023 CLOSED 16/3/2023 NDT 003
KHALID KHOKHAR

MUHAMMAD S.K AFRIDI 16/3/2023 CLOSED 16/3/2023 NDT 001

DANISH ANWER 16/3/2023 CLOSED 16/3/2023 NDT 002

OPEN
REMARKS

N/A

N/A

N/A

N/A

N/A

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 17/3/2023
WO# 2756-23 2612131 - 32-49-01
FWO# 0635

2 17/3/2023
WO# 2756-23 2612117 B1542 32-41-12
FWO# 0636

3 17/3/2023
WO# 2756-23 2616604 BH0225 32-41-12
FWO# 0637

4 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

NDT FPI OF MAIN WHEEL BOLTS (QTY 22)

NDT ET ON MAIN WHEEL HALF OUTER

NDT ET ON MAIN WHEEL HALF INNER

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

FPI ON MAIN WHEEL BOLTS AS PER SPM 32-49-01 FOUND NO CRACK D1-002

ET ON MAIN WHEEL HALF OUTER AS PER CMM 32-41-12 FOUND NO


D1-001
CRACK

ET ON MAIN WHEEL HALF INNER AS PER CMM 32-41-12 FOUND CRACK


D1-001
AT BOLT HOLE AREA

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

DANISH ANWER 17/3/2023 CLOSED 17/3/2023 NDT 002

DANISH ANWER 17/3/2023 CLOSED 17/3/2023 NDT 002

DANISH ANWER 17/3/2023 CLOSED 17/3/2023 NDT 002

OPEN
REMARKS

N/A

N/A

FOUND CRACK AT BOLT HOLE AREA

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 20/3/2023
WO# 2757-23 C20641210 8237C20641
32-49-83
FWO# 0638 C20640200 8020C20640

2 20/3/2023
WO# 2758-23 C20641200 2602C20641
32-49-83
FWO# 0639 C20640200 6612C20640

3 20/3/2023
WO#2760-23 C20643000 8465C20643
32-49-82
FWO# 0640 C20642000 8272C20642

4 20/3/2023 WO# 2661-23 - - 72-210-02-01

5 20/3/2023 WO# 2662-23 - 896668 737-72-0636

6 8/2/2023 WO2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

NDT ET OF MAIN WHEEL HALVES ( QTY 01 PAIR) T/C

NDT ET OF MAIN WHEEL HALVES ( QTY 01 PAIR) T/C

NDT ET OF NOSE WHEEL HALVES ( QTY 01 PAIR) T/C

BSI OF HPT BLADES RIGHT ENGINE#2


BSI
(AP-BND)

BSI OF HPT BLADES INSPECTION RIGHT ENGINE#2 FOR ENGINE


BSI HARDWARE DISTRESS DUE TO CONTINUOS SAND DUST AND DIRT
INGESTION
(AP-BND)

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM 32-49-83 FOUND NO


D1-001
CRACK

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM 32-49-83 FOUND NO


D1-001
CRACK

ET ON NOSE WHEEL HALF INNER AS PER CMM 32-49-82


D1-001
FOUND NO CRACK

BSI

BSI

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD UMER
20/3/2023 CLOSED 20/3/2023 NDT 003
KHALID KHOKHAR

DANISH ANWER 20/3/2023 CLOSED 20/3/2023 NDT 002

MUHAMMAD S.K AFRIDI 20/3/2023 CLOSED 20/3/2023 NDT 001

OPEN

OPEN

OPEN
REMARKS

N/A

N/A

N/A

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No. Task NO.

1 21/3/2023
WO# 2763-23 C20641210 H980C20641
32-49-83
FWO# 0641 C20640200 A160C20640

2 20/3/2023 WO# 2661-23 - - 72-210-02-01

3 20/3/2023 WO# 2662-23 - 896668 737-72-0636

4 8/2/2023 WO# 2664-23 - - 72-200-02-02


REQUIRED WORK DETAILS

OTHER DEFECT /TASK

NDT ET OF MAIN WHEEL HALVES ( QTY 01 PAIR) T/C

BSI OF HPT BLADES RIGHT ENGINE


BSI
(AP-BND)

BSI OF HPT BLADES INSPECTION RIGHT ENGINE FOR ENGINE


HARDWARE DISTRESS DUE TO CONTINUOS SAND DUST AND DIRT
BSI
INGESTION
(AP-BND)

BSI BSI OF HPT NGV'S ENG#2

FPI QUALITY CHECK PERFORMED


REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET C/OUT ON MAIN WHEEL HALVES AS PER CMM 32-49-83


D1-001
FOUND NO CRACK

BSI

BSI

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

SUPERVISOR/ ACTIVITY ESTIMATED/ Released


START DATE ACTUAL FINISH
ENGINEER STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 21/3/2023 CLOSED 21/3/2023 NDT 001

OPEN

OPEN

OPEN
REMARKS

N/A

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No.

1 22/3/2023 UWO# -23 - 811466

2 22/3/2023 UWO# -23 - 811466

3 22/3/2023 UWO# 502-23 - 962257

4 20/3/2023 WO# 2661-23 - -

5 20/3/2023 WO# 2662-23 - 896668

6 8/2/2023 WO# 2664-23 - -


Order REQUIRED W
WO FWO )

Task NO. OTHER DEFECT /TASK

BSI OF LPC STAGE BLADES ENG#2


72-21-00-290-802-A BSI
(AP-BNG)

BSI OF LPT STAGE BLADES DUE TO N1 VIBRATION


72-00-00-290-810-A BSI
(AP-BNG)

BSI OF BIRD STRIKE ON ENG#01


71-00-00 BSI
(AP-BND)

BSI OF HPT BLADES RIGHT ENGINE


72-210-02-01 BSI (AP-BND)

BSI OF HPT BLADES INSPECTION RIGHT ENGINE FOR ENGINE


HARDWARE DISTRESS DUE TO CONTINUOS SAND DUST AND DIRT
737-72-0636 BSI
INGESTION
(AP-BND)

72-200-02-02 BSI BSI OF HPT NGV'S ENG#2

FPI QUA
REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

BSI C/OUT ON ENG#2 OF LPC STAGE 02,03,04,05 BLADES AS PER TASK CARD 72-
21-00-290-802-A BSI
FOUND SATISFACTORY

BSI C/OUT ON LPT STAGE 01,02,03,04,05 BLADES ON ENG#2 AS PER TASK CARD
72-00-00-290-810-A BSI
FOUND SATISFACTORY

BSI C/OUT ON ENG#01 OF LPC STAGE 02 BLADES HPC STAGE 01,04,08 STAGE
BLADES AND COMBUSTION CHAMBER AS PER NRC-71-00-00 BSI
FOUND SATISFACTORY

BSI

BSI

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

ACTIVITY ESTIMATED/ Released


SUPERVISOR/ ENGINEER START DATE ACTUAL FINISH
STATUS DATE by(Auth No.)

KHALID M.M KHOKHAR 22/3/2023 CLOSED 22/3/2023 BSI-001

MUHAMMAD UMER BSI-002


KHOKHAR 22/3/2023 CLOSED 22/3/2023
BSI-003
DANISH ANWER

KHALID M.M KHOKHAR 22/3/2023 CLOSED 22/3/2023 BSI-001

OPEN

OPEN

OPEN
REMARKS

N/A

N/A

FOUND SAME CONDITION AS PER


PREVIOUSLY INSPECTED

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No.

1 24/3/2023
WO:2768-23 C20641210 F037C20641
FWO: 0642 C20640300 F035C20640

2 20/3/2023 WO# 2661-23 - -

3 20/3/2023 WO# 2662-23 - 896668

4 8/2/2023 WO# 2664-23 - -


Order REQUIRED W
WO FWO )

Task NO. OTHER DEFECT /TASK

32-49-83 NDT ET OF MAIN WHEEL HALVES ( QTY-01 PAIR)

BSI OF HPT BLADES RIGHT ENGINE


72-210-02-01 BSI
(AP-BND)

BSI OF HPT BLADES INSPECTION RIGHT ENGINE FOR ENGINE


HARDWARE DISTRESS DUE TO CONTINUOS SAND DUST AND DIRT
737-72-0636 BSI
INGESTION
(AP-BND)

72-200-02-02 BSI BSI OF HPT NGV'S ENG#2

FPI QUA
REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET CARRIED OUT ON MAIN WHEEL HALVES AS PER CMM 32-49-83 FOUND NO


NDT
CRACK

BSI

BSI

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

ACTIVITY ESTIMATED/ Released


SUPERVISOR/ ENGINEER START DATE ACTUAL FINISH
STATUS DATE by(Auth No.)

MUHAMMAD S.K AFRIDI 24/3/2023 CLOSED 24/3/2023 NDT 001

OPEN

OPEN

OPEN
REMARKS

N/A

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT


SHOP PRODUCTION REPORT

Section: NDT/ BSI


Work Order
(WO,ARO,UWO FWO )
Induction
S.No.
DATE
SS WO Part Number Serial No.

1 27/3/2023
WO:2772-23 C20643000 2975C20643
FWO: 0643 C20642000 3052C20642

2 20/3/2023 WO# 2661-23 - -

3 20/3/2023 WO# 2662-23 - 896668

4 8/2/2023 WO# 2664-23 - -


Order REQUIRED W
WO FWO )

Task NO. OTHER DEFECT /TASK

32-49-82 NDT ET OF NOSE WHEEL HALVES ( QTY-01 PAIR)

BSI OF HPT BLADES RIGHT ENGINE


72-210-02-01 BSI
(AP-BND)

BSI OF HPT BLADES INSPECTION RIGHT ENGINE FOR ENGINE


HARDWARE DISTRESS DUE TO CONTINUOS SAND DUST AND DIRT
737-72-0636 BSI
INGESTION
(AP-BND)

72-200-02-02 BSI BSI OF HPT NGV'S ENG#2

FPI QUA
REQUIRED WORK DETAILS

RECTIFICATION DETAILS Applicable


SCL Ref.

ET CARRIED OUT ON NOSE WHEEL HALVES AS PER CMM 32-49-82 FOUND NO


D1-001
CRACK

BSI

BSI

BSI

FPI QUALITY CHECK PERFORMED


SES-SHOP-1201

Report Date: Time:

ACTIVITY ESTIMATED/ Released


SUPERVISOR/ ENGINEER START DATE ACTUAL FINISH
STATUS DATE by(Auth No.)

MUHAMMAD UMER
27/3/2023 CLOSED 27/3/2023 NDT 003
KHALID KHOKHAR

OPEN

OPEN

OPEN
REMARKS

N/A

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT

WAITING FOR AIRCRAFT