Plan For Cost Estimation-6
Plan For Cost Estimation-6
Plan For Cost Estimation-6
S7 S3 S2
BCA ENERGY COMPLIANCE:
CEILING INSULATION TO NEW AREAS AS PER E3
ENERGY REPORT.
SELF SEALING EXHAUST FANS TO NEW AREAS. TO RAINWATER TANK TO RAINWATER TANK
ROOF BELOW
CONSTRUCTION NOTES:
DOWNPIPES & FLOOR WASTES POSITIONED AT
PLUMBERS DISCRETION. FINAL POSITION MAY
S6 VARY TO PLAN. S6
HIDDEN BOXED
R.W.H. GUTTER
100
PARAPET WALLS TO PERIMETER R.W.H.
180
180
COLORBOND ROOF
S1 S1
ROOFING
3,450
7° FALL
180
FW
180
FW
BAR
1,100
FW CONNECTED TO
PASS
BOXED GUTTER
DN
17 HIDDEN BOXED
10,990
10,990
FW CONNECTED TO
16 GUTTER
ROOFING
BOXED GUTTER
10,530
TIMBER FRAMED STAIRS FF TO TERRACE 15
(WATER PROOF MEMBRANE TO U/SIDE OF 14 COLORBOND ROOF
TIMBER TREADS IN ACCORDANCE WITH AS 13
4654.2) 12 7° FALL
11
10
9
TERRACE
6,900
TERRACE
TERRACE
5,800
S4 FW CONNECTED TO S4
BOXED GUTTER
FW
PARAPET WALLS TO PERIMETER
180
180
180
MODERN
Two-Storey Residence STAIRS INFO GF TO FF:
NUMBER OF RISERS = 19
ENGINEERS DETAILS:
PLANS ARE TO BE READ IN CONJUNCTION WITH
CULTURE.
RISER HEIGHT = 173.30mm ENGINEERS DETAILS RE: BEAM LAYOUTS AND
Working Drawings TREAD WIDTH = 250.00mm STRUCTURAL COLUMNS. ARCHITECTURAL DRAFTING/
616 Great Northern Highway DEVELOPMENT/
Herne Hill, WA 6056 RENOVATION.
Modern Culture 88a Telford Crescent, Stirling WA 6021 [BUILDING MADE EASY]
T: 0411 770 753 E: info@modernculture.com.au ABN: 31 048 491 511
GSPublisherVersion 0.0.100.100