19-F-1098 DOC 14 AMRAAM SAR Dec 2018
19-F-1098 DOC 14 AMRAAM SAR Dec 2018
19-F-1098 DOC 14 AMRAAM SAR Dec 2018
RCS: DD-A&T(Q&A)823-185
UNCLASSIFIED
UNCLASSIFIED
AMRAAM December 2018 SAR
Table of Contents
Sensitivity Originator 3
Common Acronyms and Abbreviations for MDAP Programs 4
Program Information 6
Responsible Office 6
References 7
Mission and Description 8
Executive Summary 9
Threshold Breaches 12
Schedule 13
Performance 16
Track to Budget 18
Cost and Funding 19
Low Rate Initial Production 35
Foreign Military Sales 36
Nuclear Costs 36
Unit Cost 37
Cost Variance 40
Contracts 43
Deliveries and Expenditures 49
Operating and Support Cost 50
Sensitivity Originator
PB - President's Budget
PE - Program Element
PEO - Program Executive Officer
PM - Program Manager
POE - Program Office Estimate
RDT&E - Research, Development, Test, and Evaluation
SAR - Selected Acquisition Report
SCP - Service Cost Position
TBD - To Be Determined
TY - Then Year
UCR - Unit Cost Reporting
U.S. - United States
USD(AT&L) - Under Secretary of Defense (Acquisition, Technology and Logistics)
USD(A&S) - Under Secretary of Defense (Acquisition and Sustainment)
Program Information
Program Name
AIM-120 Advanced Medium Range Air-to-Air Missile (AMRAAM)
DoD Component
Air Force
Joint Participants
Navy
Responsible Office
brian.henson@us.af.mil
References
Approved APB
Component Acquisition Executive (CAE) Approved Acquisition Program Baseline (APB) dated October 28, 2015
Executive Summary
This is the final SAR submission for the AMRAAM program. AMRAAM is well beyond 90% delivered and expended against
their original acquisition objective, but has been obligated to continue reporting a SAR given the recurring extension of
procurements. AMRAAM has no history of cost growth or schedule delays, and continually meets reliability requirements.
There is no value added by continuing to report a SAR, and therefore this is the final report for the program.
Air Intercept Missile-12007 (AIM-12007) Advanced Electronic Protection Improvement Program (AEPIP): AEPIP is
structured to deliver combat capability for the AIM-12007 via two incremental and complimentary software tapes, Tape 1
and Tape 2. Tape 1 provides enhanced capability to fielded systems. Tape 2 builds on the capabilities of Tape 1 and
expands the system's performance envelope. Tape 1 and 2 performance probability of weapons effectiveness meets or
exceeds requirements. Tape 1 fielded in March 2018. For Tape 2, four of four Operational Test (OT) shots were conducted
between June and October 2018. The Multi-Service Operational Test and Evaluation report stated AEPIP Tape 2 is effective,
suitable, and mission capable. Tape 2 planned fielding date is third quarter FY 2019.
AIM-120D System Improvement Program (SIP): SIP is a software upgrade program structured to deliver increased
combat capability and counter advanced threats and electronic attack techniques on planned intervals to the AIM-120D.
SIP 1 was fielded by the Navy in April 2017 and by the Air Force in May 2017. SIP 2 entered OT in September 2018. OT
shots were planned in first quarter FY 2019 but were delayed due to Hurricane Michael damage sustained at Tyndall AFB,
FL. OT activities will continue through fourth quarter FY 2019. SIP 2 fielding is projected for the first quarter FY 2020. SIP 3
conducted a critical design review on September 18, 2018. SIP 3 fielding is projected for the fourth quarter FY 2021. SIP 3F,
a re-host of SIP 3 capabilities on the AMRAAM Form, Fit, Function Refresh (F3R) missile, is projected to field in first quarter
FY 2023.
Form, Fit, Function Refresh (F3R): F3R is a comprehensive AMRAAM Diminishing Manufacturing Sources and Material
Shortages project to mitigate obsolescence issues in the AMRAAM guidance section and enable missile production beyond
Lot 32. Raytheon is resolving technical difficulties with hardware integration and testing; qualification and flight testing are
planned for late 2019. F3R production is planned to cut in the latter part of Lot 33 in FY 2021.
Common Air Launched Navigation System (CALNS): Due to parts obsolescence of the current -4 CALNS, a -9 CALNS
form, fit, function replacement is required until the new navigation system in F3R is cut into the production line. The
-9 CALNS program is scheduled to receive engineering change proposal approval in fourth quarter FY 2019. The -9 CALNS
will allow continued AIM-120D production from Lot 31 cut-in beginning fourth quarter FY 2019 until the planned F3R Lot 33
production cut-in.
Safe and Arming Fuze (SAF) / AMRAAM Flight Test: The SAF is a component used to initiate the warhead in AMRAAM
tactical missiles and the Flight Termination System (FTS) in instrumented flight test missiles. The FTS allows for the ability
to terminate the flight of a test missile for safety reasons. In August 2015, it was identified that the current SAF did not meet
FTS requirements. On November 2, 2018, a redesigned SAF was tested and passed Lot Acceptance Test levels, meeting
FTS requirements.
As of March 11, 2019, Raytheon has delivered 2,454 of 3,231 AIM-120D missiles on contract and has delivered 2,644 of
3,261 AIM-120C-7 FMS missiles on contract (through Lot 32). Lot 29 deliveries completed in July 2018. Lot 30 deliveries are
planned for April 2018 through July 2019. Lot 31 deliveries are planned for October 2019 through April 2020. The Production
Lot 32 pre-priced option on the Lot 31 contract was awarded on March 23, 2018. Deliveries are planned for July 2020
through April 2021. Production Lot 33 contract award anticipated in August 2019.
Program Support and Annual Sustainment is an Indefinite-Delivery-Indefinite-Quantity contract for program support,
contractor logistics support, the Service Life Prediction Program, and non-warranty depot repair. As of March 2019, 11 Task
Joint missile availability as of March 11, 2019 is 89.8% for tactical missiles against an APB threshold of 82%. The contractor
has expanded capacity to increase and improve warfighter readiness.
There are no significant software-related issues with this program at this time.
Threshold Breaches
APB Breaches
Schedule r-
Performance I—
Cost RDT&E r-
Procurement E
MILCON r-
Acq O&M E
O&S Cost
Unit Cost PAUC
APUC r-
Nunn-McCurdy Breaches
Current UCR Baseline
PAUC None
APUC None
Original UCR Baseline
PAUC None
APUC None
Schedule
SAP Baseline Current Objective • APB Objective and Threshold • Current Estimate • Current Estimate (Breach)
78 '80 '82 '84 '86 '88 '90 '92 '94 '96 '98 '00 '02 '04 '06 '08 '10 '12 '14
'79 '81 '83 '85 '87 '89 '91 '93 '95 '97 '99 '01 '03 '05 '07 '09 '11 '13 '15
AMRAAM
91
Milestone I (DSARC)
91
Milestone II (DSARC)
Start DT&E/10T&E
•
Certification
Milestone IIIA (DAB)
DAE Program Review
Start Production Deliveries
Complete DAOT&E (Air Force)
CompletelOT&E/Captive C...
Initial Equipage
Milestone IIIB (DAB) (Lot IV ...
IOC Air Force
DAB Program Review Full R...
Full Operational Capability (...
P3I Phase 1 CDR Complete
Complete AF FOT&E Phase I
IOC (Navy)
Complete FOT&E (OPEVAL)...
•
P3I Phase 1Flight Test Com...
•
Joint Depot Activated
•
Phase 4 (AIM-120D) Contra...
•
Phase 4 (AIM-120D) CDR
•
Phase 4 (AIM-120D) Functio...
•
Phase 4 (AIM-120D) Missile ...
•
Phase 4 (AIM-120D) Missile ...
•
Phase 4 (AIM-120D) Full Pr...
Last Delivery
Schedule Events
BAR Baseline Current APB
Current
Production Production
Estimate
Estimate Objective/Threshold
Milestone I (DSARC) Nov 1978 Nov 1978 Nov 1978 Nov 1978
Milestone II (DSARC) Sep 1982 Sep 1982 Sep 1982 Sep 1982
-
Start DT&E/10T&E Oct 1983 N/A N/A Oct 1983
Certification Feb 1986 Feb 1986 Feb 1986 I Feb 1986
Milestone IIIA (DAB) Jun 1987 Jun 1987 Jun 1987 1Jun 1987
DAE Program Review May 1988 May 1988 May 1988 May 1988
Start Production Deliveries Sep 1988 Sep 1988 I Sep 1988 Sep 1988
Complete D/10T&E (Air Force) Jan 1989 Jan 1989 Jan 1989 Jan 1989
Complete 10T&E/Captive Carry Reliability Program Jun 1990 Jun 1990 Jun 1990 Jun 1990
w/Lot 1 Assets (Air Force)
Initial Equipage Dec 1990 Dec 1990 Dec 1990 Dec 1990
Milestone IIIB (DAB) (Lot IV Full Go-Ahead Rate Apr 1991 Apr 1991 Apr 1991 Apr 1991
Production)
IOC Air Force Mar 1991 Sep 1991 Sep 1991 Sep 1991
DAB Program Review Full Rate Production Approval Mar 1992 Mar 1992 Mar 1992 Mar 1992
Full Operational Capability (FOC) 1st F-16 Unit Fully Mar 1992 Mar 1992 Mar 1992 Mar 1992
Operational w/AMRAAMs
P3I Phase 1 CDR Complete Oct 1992 Oct 1992 Oct 1992 Oct 1992
Complete AF FOT&E Phase I Mar 1992 Feb 1993 Feb 1993 Feb 1993
IOC (Navy) Sep 1992 Sep 1993 Sep 1993 Sep 1993
Complete FOT&E (OPEVAL) (Navy) Mar 1992 Jan 1994 Jan 1994 Jan 1994
P3I Phase 1 Flight Test Completed Dec 1994 Dec 1994 Dec 1994 Dec 1994
Joint Depot Activated Sep 1994 Jul 1999 Jul 1999 Jul 1999
-
Phase 4 (AIM-120D) Contract Award N/A Jan 2004 Jan 2004 Jan 2004
Phase 4 (AIM-120D) CDR N/A Nov 2005 Nov 2005 Nov 2005
Phase 4 (AIM-120D) Functional Configuration Audit N/A Sep 2009 Sep 2009 Sep 2009
(FCA)
Phase 4 (A1M-1200) Missile Deliveries to Meet F/A-18 N/A May 2012 May 2012 May 2012
RAA
Phase 4 (AIM-120D) Missile Deliveries to Meet F- N/A May 2012 May 2012 May 2012
15C/D RAA
Phase 4 (AIM-120D) Full Production Go-ahead N/A Jan 2015 Jan 2015 Jan 2015
Last Delivery Sep 2001 N/A N/A IN/A (Ch-1)
Change Explanations
(Ch-1) The current estimate for Last Delivery changed from January 2027 to N/A to correct misinformation and reflects the
accurate APB deletion of this event.
Performance
Performance Characteristics
SAR Baseline Current
Demonstrated Current
Production Production
Performance Estimate
Estimate Objective/Threshold
.„
Weight (lbs)
327 327 350 344 345
Reliability
Ready Storage (hrs) (mature msl - 90K operational flight hours)
60000 60000 45000 45000 45000
Availability (%)
86 86 82 89.8 189.8 (Ch-1)
Requirements Reference
Joint Service Operational Requirement dated May 22, 1991, ORD (Combat Air Forces 009-76-1/11/III-A) dated March 10, 1997
(revised January 21, 2004), and CPD Phase 4 (AIM-120D) dated June 16, 2005
Change Explanations
(Ch-1) Availability current estimate changed from 90.7 to 89.8 due to increase in unserviceable missiles (condition code F).
(Ch-2) Captive-Carry current estimate changed from 1,329 to 1,157 hours due to increased failures versus flying hours.
Track to Budget
RDT&E
2206 AMRAAM
Navy 1507 02 0206138M
Line Item ,
2206 AMRAAM
Navy 1507 06 0204162N
MEM
6120 Spares and Repair Parts (Shared)
Air Force 3020 04 0207163F
ECM
00099A Initial Spares Repair Parts (Sunk)
00099K Initial Spares / Repair Parts (Sunk)
Air Force 3020 01 0207163F
CM=
April 17, 2019 12:17:23 UNCLASSIFIED 18
UNCLASSIFIED
AMRAAM December 2018 SAR
Cost Summary
Cost Notes
If an Independent Cost Estimate, Component Cost Estimate. or Program Office Estimate has been completed for the
program in the previous year, list any program risks identified in the estimates, the potential impacts of the risks on
program cost, and approaches to mitigate the risks. A Program Office Estimate was completed for the program in August
2018. The main programmatic risk is the Form, Fit, Function Refresh program. All anticipated risks and associated costs
have been captured and are embedded within the current Cost Estimate Model.
r
Total Quantity
L t.
SAR Baseline
Current APB
Quantity Production Current Estimate I
Production
Estimate
" IL
RDT&E 0 0 0
Procurement 15450 16427 17312
Total 15450 16427 17312
Funding Summary
Appropriation Summary
FY 2020 President's Midget ibecember 2018 SAR (TY$ M)
To
Appropriation Prior FY 2019 FY 2020 ir 2021 FY 2022 FY 2023 FY 2024 Total
Complete
RDT&E 2225.0 1.8 2.0 1.9 2.0 2.0 2.0 0.0 2236.7
Procurement 12478.7 500.3 567.7 826.8 802.0 843.0 835.5 1207.7 18061.7
MILCON 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Acq O&M 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
PB 2020 Total 14703.7 502.1 569.7 828.7 804.0 845.0 837.5 1207.7 20298.4
PB 2019 Total 14769.3 558.9 685.7 819.7 789.8 801.4 870.0 985.9 20280.7
Delta -65.6 -56.8 -116.0 9.0 14.2 43.6 -32.5 221.8 17.7
Quantity Summary
FY 2020 President's Budget / December 2018 SAR (TY$ M)
FY FY FY FY FY FY To
Total"!
Quantity
Development
Undistributed Prior
8 2019
0
2020
0
2021 2022
0
2023
0
2024
0
Complete
0 0
Production 0 12703 305 389 719 749 788 812 847 17312
PB 2020 Total 0 12703 305 389 719 749 788 812 847 17312
PB 2019 Total 0 12742 363 497 704 716 725 743 822 17312
Delta 0 -39 -58 -108 15 33 63 69 25 0
111 11111
Annual Funding
3600 I RDT&E I Research, Development, Test, and Evaluation, Air Force
11111W Ty $M
Il
Fiscal Non End 11
Quantity End Item 11 Non
Year Item Total 1 Total Total 11
Recurring Recurring
Recurring Flyaway Support Program
Flyaway Flyaway
Flyaway
1977 4.8
1978 6.7
1979 16.1
1980 26.2
1981 22.9
1982 137.9
1983 212.9
1984 197.3
1985 206.6
1986 91.1
1987 37.7
1988 26.7
1989
1990 11.9
1991 17.9
1992 30.3
1993 38.9
1994 64.8
1995 63.8
1996 44.2
1997 9.7
1998 39.2
1999 33.5
2000 49.4
2001 50.4
2002 53.5
2003 39.3
2004 31.0
2005 31.9
2006 25.1
2007 30.4
2008 32.3
2009 38.3
2010 44.8
2011 47.7
2012 58.2
2013 43.1
2014 40.2
Subtotal 1956.7
Annual Funding
3600 I RDT&E I Research, Development, Test, and Evaluation. Air Force
BY 1992 $M 111111
Fiscal 111[ Non End
Quantity End Item Non
Yeari Item Total I Total Total
Recurring Recurring
Recurring Flyaway Support Program
Flyaway Flyaway
Flyaway
1977 10.3
1978 13.2
1979 29.5
1980 43.2
1981 34.1
1982 192.0
1983 283.2
1984 252.7
1985 255.9
1986 110.2
1987 43.6
1988 30.1
1989
1990 12.4
1991 18.0
1992 29.6
1993 37.2
1994 60.9
1995 58.9
1996 40.1
1997 8.7
1998 34.8
1999 29.5
2000 42.8
2001 43.1
2002 45.2
2003 32.8
2004 25.2
2005 25.3
2006 19.3
2007 22.8
2008 23.8
2009 27.8
2010 32.1
2011 33.6
2012 40.3
2013 29.3
2014 27.0
Subtotal 2098.5
Annual Funding
1319 I ADT&E I Research, Development, Test, and Evaluation, Navy
=11 1111 111111=1 TY $1\11
111111
Fiscal End Item
ir Non End
Non
Quantity Item Total I Total Total
Yeari Recurring Recurring
Recurring Flyaway Support Program
Flyaway Flyaway
Flyaway
1978 6.0
1979 18.3
1980 27.3
1981 24.2
1982 3.3
1983 4.3
1984 7.3
1985 7.8
1986 4.2
1987 5.0
1988 22.3
1989 12.4
1990 6.9
1991 3.5
1992 2.5
1993 3.1
1994
1995 7.8
1996 4.3
1997 2.1
1998 5.5
1999 4.5
2000 12.8
2001 11.3
2002 9.7
2003 7.7
2004 8.7
2005 8.5
2006 3.4
2007 3.5
2008 1.1
2009 5.2
2010 2.2
2011 1.2
2012 1.1
2013 1.2
2014 1.1
2015 1.5
2016 1.9
2017 1.8
2018 1.8
2019 1.8
2020 2.0
2021 1.9
2022 2.0
2023 2.0
2024 2.0
Subtotal 280.0
Annual Funding
1319 I ADT&E I Research, Development, Test, and Evaluation, Navy
=1 1 111111 1111111 BY 1992 $M 1=11111 111111
Fiscal End Item
ir Non End•
Non
Quantity Item Total I Total Total
Year Recurring Recurring
Recurring Flyaway Support Program
Flyaway Flyaway
Flyaway
1978 11.7
1979 32.3
1980 43.5
1981 35.4
1982 4.6
1983 5.7
1984 9.4
1985 9.7
1986 5.1
1987 5.9
1988 25.3
1989 13.5
1990 7.2
1991 3.5
1992 2.5
1993 3.0
1994
1995 7.2
1996 3.9
1997 1.9
1998 4.9
1999 4.0
2000 11.1
2001 9.7
2002 8.2
2003 6.4
2004 7.1
2005 6.7
2006 2.6
2007 2.6
2008 0.8
2009 3.8
2010 1.6
2011 0.8
2012 0.8
2013 0.8
2014 0.7
2015 1.0
2016 1.2
2017 1.2
2018 1.1
2019 1.1
2020 1.2
2021 1.1
2022 1.2
2023 1.1
2024 1.1
Subtotal 315.2
r•ndItem
Annual Funding
1507 I Procurement I Weapons Procurement, Navy
Ty $M
NIP Non E
, Item Total 191 Total Total
Recurring Ai ecurring
uantity Recurrin lelyaway Support Program
Flyaway IMP 'Flyaway
Flyaway
1989 26 26.0 2.7 28.7 2.5 31.2
1990 85 61.5 18.7 80.2 4.9 85.1
1991 300 191.5 52.9 244.4 17.5 261.9
1992 191 115.3 38.0 153.3 41.2 194.5
1993 165 72.5 20.3 92.8 12.4 105.2
1994 75 26.7 21.5 48.2 8.6 56.8
1995 106 40.5 24.6 65.1 9.9 75.0
1996 115 35.2 28.5 63.7 10.0 73.7
1997 100 30.4 16.3 46.7 6.0 52.7
1998 120 38.1 10.1 48.2 6.3 54.5
1999 100 36.5 9.0 45.5 5.4 50.9
2000 91 33.5 10.0 43.5 2.5 46.0
2001 63 25.3 9.1 34.4 3.4 37.8
2002 55 20.4 12.9 33.3 3.5 36.8
2003 76 34.4 12.5 46.9 3.5 50.4
2004 42 18.5 15.0 33.5 3.8 37.3
2005 37 16.4 9.4 25.8 3.0 28.8
2006 48 40.4 30.2 70.6 3.2 73.8
2007 42 60.4 25.0 85.4 3.4 88.8
2008 52 75.8 7.5 83.3 2.7 86.0
2009 57 80.3 2.4 82.7 2.6 85.3
2010 71 135.3 135.3 3.3 138.6
2011 101 134.2 134.2 5.0 139.2
2012 67 93.3 93.3 5.5 98.8
2013 67 82.8 82.8 4.7 87.5
2014 61 76.1 1.5 77.6 5.4 83.0
2015 1.9 1.9 0.3 2.2
2016 158 208.9 0.9 209.8 3.7 213.5
2017 144 183.7 183.7 2.4 186.1
2018 120 160.1 9.6 169.7 16.6 186.3
2019 118 183.5 2.0 185.5 5.3 190.8
2020 169 221.5 221.5 11.9 233.4
2021 331 351.2 351.2 11.8 363.0
2022 358 353.0 2.0 355.0 6.8 361.8
2023 363 358.7 2.0 360.7 9.2 369.9
2024 387 368.5 368.5 8.8 377.3
Subtotal 4461 3990.4 396.5 4386.9 257.0 4643.9
Annual Funding
1507 I Procurement I Weapons Procurement, Navy
mr BY 1992 $M
uantityI FRecurring
nd Item I
Non E
Item
ecurring
Total Total Total
Recurrin lelyaway Support Program
Flyaway *Flyaway
Flyaway
1989 26 27.1 2.9 30.0 2.6 32.6
1990 85 62.0 18.9 80.9 4.9 85.8
1991 300 188.4 52.0 240.4 17.2 257.6
1992 191 110.6 36.5 147.1 39.5 186.6
1993 165 68.3 19.1 87.4 11.7 99.1
1994 75 24.7 19.9 44.6 7.9 52.5
1995 106 36.8 22.4 59.2 9.0 68.2
1996 115 31.6 25.6 57.2 9.0 66.2
1997 100 27.0 14.6 41.6 5.3 46.9
1998 120 33.5 8.9 42.4 5.5 47.9
1999 100 31.7 7.8 39.5 4.7 44.2
2000 91 28.7 8.5 37.2 2.2 39.4
2001 63 21.4 7.7 29.1 2.9 32.0
2002 55 17.1 10.7 27.8 3.0 30.8
2003 76 28.2 10.3 38.5 2.8 41.3
2004 42 14.7 12.0 26.7 3.0 29.7
2005 37 12.7 7.3 20.0 2.3 22.3
2006 48 30.6 22.8 53.4 2.4 55.8
2007 42 44.7 18.5 63.2 2.5 65.7
2008 52 55.2 5.6 60.8 1.9 62.7
2009 57 57.7 1.7 59.4 1.9 61.3
2010 71 95.5 95.5 2.4 97.9
2011 101 93.0 93.0 3.5 96.5
2012 67 63.7 63.7 3.7 67.4
2013 67 55.7 55.7 3.2 58.9
2014 61 50.5 1.0 51.5 3.6 55.1
2015 1.2 1.2 0.2 1.4
2016 158 134.0 0.6 134.6 2.4 137.0
2017 144 115.5 115.5 1.6 117.1
2018 120 98.7 5.9 104.6 10.2 114.8
2019 118 110.9 1.2 112.1 3.2 115.3
2020 169 131.2 131.2 7.1 138.3
2021 331 204.0 204.0 6.9 210.9
2022 358 201.0 1.1 202.1 3.9 206.0
2023 363 200.3 1.1 201.4 5.1 206.5
2024 387 201.7 201.7 4.8 206.5
Subtotal 4461 2708.4 345.8 3054.2 204.0 3258.2
Annual Funding
3020 I Procurement I Missile Procurement, Air Force
111 1111 11111M- TY $1V1
il Non End
Fiscal I End Item Non
Quantity Item Total Total Total
Year Recurring Recurring
Recurring Flyaway Support Program
Flyaway Flyaway
Flyaway
1984 29.2 29.2 29.2
1985 74.1 74.1 74.1
1986 193.8 193.8 4.1 197.9
1987 180 405.2 170.4 575.6 20.5 596.1
1988 400 535.5 160.6 696.1 15.2 711.3
1989 874 667.3 102.6 769.9 16.3 786.2
1990 803 576.3 88.4 664.7 17.9 682.6
1991 600 397.5 190.2 587.7 24.2 611.9
1992 700 438.5 73.2 511.7 18.1 529.8
1993 1000 422.2 140.5 562.7 30.6 593.3
1994 983 347.1 81.5 428.6 18.4 447.0
1995 412 123.3 75.5 198.8 31.7 230.5
1996 291 146.2 21.7 167.9 11.9 179.8
1997 133 93.6 10.8 104.4 8.2 112.6
1998 173 53.6 44.6 98.2 4.8 103.0
1999 180 67.0 22.4 89.4 1.0 90.4
2000 163 68.4 6.2 74.6 9.2 83.8
2001 170 75.3 9.4 84.7 10.6 95.3
2002 190 80.5 7.1 87.6 12.6 100.2
2003 124 69.9 4.1 74.0 11.0 85.0
2004 159 84.6 84.6 13.8 98.4
2005 159 87.7 87.7 19.2 106.9
2006 84 99.9 99.9 2.2 102.1
2007 59 103.9 103.9 11.6 115.5
2008 133 167.2 167.2 27.2 194.4
2009 133 161.3 161.3 45.8 207.1
2010 170 248.4 248.4 29.1 277.5
2011 246 311.9 311.9 28.2 340.1
2012 112 146.7 146.7 20.9 167.6
2013 113 176.5 176.5 24.9 201.4
2014 279 302.5 302.5 9.5 312.0
2015 223 303.2 303.2 14.6 317.8
2016 281 330.5 330.5 25.5 356.0
2017 256 306.5 306.5 21.3 327.8
2018 185 239.9 239.9 26.5 266.4
2019 187 282.1 282.1 27.4 309.5
2020 220 310.6 310.6 23.7 334.3
2021 388 439.7 439.7 24.1 463.8
2022 391 415.6 415.6 24.6 440.2
2023 425 448.0 448.0 25.1 473.1
Annual Funding
3020 I Procurement I Missile Procurement, Air Force
BY 1992 $M
Fisc IP
Non E'
uanti nd ItedT
Yea Item Total Total Total
Recurring di o ecurring
Recurrin lyaway Support Program
Flyaway le Flyaway
Flyaway
1984 36.0 36.0 36.0
1985 88.9 88.9 88.9
1986 222.1 222.1 4.7 226.8
1987 180 445.0 187.1 632.1 22.6 654.7
1988 400 567.6 170.2 737.8 16.1 753.9
1989 874 677.3 104.0 781.3 16.6 797.9
1990 803 574.4 88.1 662.5 17.8 680.3
1991 600 384.9 184.2 569.1 23.4 592.5
1992 700 419.5 70.0 489.5 17.3 506.8
1993 1000 395.9 131.8 527.7 28.7 556.4
1994 983 319.1 75.0 394.1 16.9 411.0
1995 412 112.3 68.7 181.0 28.9 209.9
1996 291 131.4 19.5 150.9 10.7 161.6
1997 133 83.0 9.5 92.5 7.3 99.8
1998 173 47.1 39.1 86.2 4.2 90.4
1999 180 58.1 19.4 77.5 0.9 78.4
2000 163 58.6 5.3 63.9 8.0 71.9
2001 170 63.9 8.0 71.9 8.9 80.8
2002 190 67.2 5.9 73.1 10.5 83.6
2003 124 57.6 3.4 61.0 9.1 70.1
2004 159 68.3 68.3 11.1 79.4
2005 159 68.8 68.8 15.1 83.9
2006 84 76.2 76.2 1.7 77.9
2007 59 77.3 77.3 8.6 85.9
2008 133 122.2 122.2 19.8 142.0
2009 133 116.2 116.2 33.0 149.2
2010 170 176.4 176.4 20.7 197.1
2011 246 217.1 217.1 19.6 236.7
2012 112 100.4 100.4 14.3 114.7
2013 113 118.1 118.1 16.6 134.7
2014 279 199.4 199.4 6.3 205.7
2015 223 197.6 197.6 9.5 207.1
2016 281 211.5 211.5 16.3 227.8
2017 256 191.7 191.7 13.3 205.0
2018 185 147.0 147.0 16.3 163.3
2019 187 169.5 169.5 16.5 186.0
2020 220 183.0 183.0 13.9 196.9
2021 388 254.0 254.0 13.9 267.9
2022 391 235.3 235.3 14.0 249.3
2023 425 248.7 248.7 13.9 262.6
The Current Total LRIP Quantity is more than 10% of the total production quantity due to the LRIP extension to include six
lots, FY 1987 through FY 1992. The follow-on DAB Program Review, held on April 23, 1992, resulted in approval of FRP for
Lot VII (FY 1993) procurement. The original LRIP decision was made at the Milestone IIIA review by the DAB in June 1987 to
procure 810 LRIP missiles which covered two lots. On May 23, 1991, the DAB for Milestone IIIB approved a procurement
quantity of 4,159 missiles.
Nuclear Costs
None
Unit Cost
0.2-
0
It c) 4
,ef.q"b
o'• I•. .44'
000 •41
os
.; ob •Q.() Ci°
eto..
,i-
Initial APUCji 1
Current SAR Baseline to Current Estimate (TY $M)
Changes APUC
Production
Estimate
'
i
h
rl Lii, iii.a ih
apL
i
Total
Current •
Estimate
0.761 -0.013 0.001 0.169 0.031 0.065 0.000 0.029 0.282 1.043
Milestone I
Item Planning
Estimate
N/A
Development
Estimate
Nov 1978
Jr Production
Estimate
Nov 1978
Estimate
Nov 1978
Milestone ll N/A Nov 1982 Sep 1982 Sep 1982
Milestone III N/A Dec 1984 Apr 1991 Apr 1991
IOC N/A Sep 1986 Sep 1992 Sep 1993
Total Cost (TY $M) N/A 11591.6 13112.4 20298.4
Total Quantity N/A 24335 15450 17312
PAUC N/A 0.476 0.849 1.173
Cost Variance
Summary TY $M
Item RDT&E Procurement MILCON Total
SAR Baseline (Production 1350.6 11761.8 13112.4
Estimate)
Previous Changes
Economic -50.8 -289.1 -339.9
Quantity +1437.1 +1437.1
Schedule +26.5 +2886.8 +2913.3
Engineering +643.8 +541.9 +1185.7
Estimating +266.6 +1182.1 +1448.7
Other
Support +523.4 +523.4
Subtotal +886.1 +6282.2 +7168.3
Current Changes
Economic +65.7 +65.7
Quantity
Schedule +43.3 +43.3
Engineering
Estimating -62.8 -62.8
Other
Support -28.5 -28.5
Subtotal +17.7 +17.7
Total Changes +886.1 +6299.9 +7186.0
CE - Cost Variance 2236.7 18061.7 20298.4
CE - Cost & Funding 2236.7 18061.7 20298.4
Summary BY 1992 $M
Item RDT&E Procurement MILCON Total
SAR Baseline (Production 1725.7 10552.5 12278.2
Estimate)
Previous Changes
Economic
Quantity +879.0 +879.0
Schedule +13.6 +1273.6 +1287.2
Engineering +510.9 +393.6 +904.5
Estimating +163.5 +522.3 +685.8
Other
Support +293.7 +293.7
Subtotal +688.0 +3362.2 +4050.2
Current Changes
Economic
Quantity
Schedule +7.0 +7.0
Engineering
Estimating -36.1 -36.1
Other
Support -15.2 -15.2
Subtotal -44.3 -44.3
Total Changes +688.0 +3317.9 +4005.9
CE - Cost Variance 2413.7 13870.4 16284.1
CE - Cost & Funding 2413.7 13870.4 16284.1
Procurement $M
Base Then
Current Change Explanations
Year Year
Revised escalation indices. (Economic) N/A +65.7
Stretch-out of procurement buy profile from FY 2017 to FY 2024 (Navy). (Schedule) 0.0 +7.6
Additional Schedule variance in FY 2024 as a result of PB FY 2020 procurement buy profile -58.0 -101.1
adjustments (Navy). (Schedule)
Shift of procurement buy profile across FY 2018 to FY 2026 (Air Force). (Schedule) 0.0 +8.8
Additional Schedule variance in FY 2024 as a result of PB FY 2020 procurement buy profile +65.0 +128.0
adjustments (Air Force). (Schedule)
Adjustment for current and prior escalation. (Estimating) -10.2 -16.0
Revised estimate to reflect application of new outyear inflation indices (Navy). (Estimating) -17.5 -33.4
Revised estimate to reflect application of new outyear inflation indices (Air Force). -8.4 -13.4
(Estimating)
Adjustment for current and prior escalation. (Support) -0.4 -1.0
Decrease in Other Support to address shift of procurement buy profile across FY 2017 -2.3 -5.1
through FY 2024 (Navy). (Support)
Increase in Initial Spares due to shift in procurement buy profile in FY 2020 (Navy). +2.6 +4.3
(Support)
Decrease in Other Support to reflect test support actual costs (Air Force). (Support) -15.1 -26.8
Decrease in Initial Spares due to application of new outyear inflation indices (Air Force). 0.0 +0.1
(Support)
Procurement Subtotal -44.3 +17.7
Contracts
Contract Identification
Appropriation: Procurement
Contract Name: Program Support and Sustainment (PSAS)
Contractor: Raytheon Company
Contractor Location: 1151 East Hermans Road
Tucson, AZ 85706
Contract Number: FA8675-14-C-0026
Contract Type: Firm Fixed Price (FFP)
Award Date: June 27, 2014
Definitization Date: June 27, 2014
Contract Price
Initial Contract Price ($M) Current Contract Price ($M) Estimated Price At Completion ($M)
Target J. , Ceiling Qty Target Ceiling Qty Contractor Program Manager
163.2 N/A N/A 190.3 N/A N/A 190.3 190.3
Notes
No additional task orders were awarded to this contract in 2018.
This contract is more than 90% complete; therefore, this is the final report for this contract.
Contract Identification
Appropriation: Procurement
Contract Name: Program Support and Sustainment (PSAS 15)
Contractor: Raytheon Company
Contractor Location: 11 51 East Hermans Road
Tucson, AZ 85706
Contract Number: FA8675-15-D-0062
Contract Type: Indefinite Delivery Definite Quantity (IDDQ). Fixed Price Incentive(Firm Target) (FPIF)
Award Date: September 03, 2015
Definitization Date: September 03, 2015
Contract Price
I- Initial Contract Price ($M) Current ContreIME($M) Estimated Price At Completion ($M)
Target Ceiling Qty Target Ceiling Qty Contractor Program Manager
17.9 180.0 N/A 103.5 180.0 N/A 180.0 180.0
Notes
This is the first time this contract is being reported.
The contract has met the $40M SAR reporting threshold. The PSAS contract includes Air Force non warranty repairs, FMS
non warranty repairs, program support and flight plug procurement.
Contract Identification
Appropriation: Procurement
Contract Name: Form, Fit, Function Refrest (F3R) Phase 4A
Contractor: Raytheon Company
Contractor Location: 11 51 East Hermans Road
Tuscon, AZ 85706
Contract Number: FA8675-16-C-0044/0
Contract Type: Cost Plus Incentive Fee (CPIF)
Award Date: April 01, 2016
Definitization Date: May 05, 2016
Contract Price
Initial Contract Price ($M) Current Contrellia($111) Estimated Price At Completion ($M)
Target Ceiling Qty Target Ceiling Qty Contractor Program Manager
104.6 N/A 0 137.3 N/A 0 140.7 140.7
Contract Variance
Cost Variance_jilli Schedimpiji
_____
Cumulative Variances To Date (2/28/2019) -36.4 -2.4
Previous Cumulative Variances -19.8 -3.3
Net Change -16.6 +0.9
The favorable net change in the schedule variance is due to integration issues encountered during the ASIC re-spin and
efforts associated with resolving those issues.
Notes
This contract includes F3R Phase 4A to complete the F3R hardware and software design through the interim Test
Readiness Review. This effort supports Air Force, Navy, and FMS customers to enable AMRAAM production beyond Lot 32.
Contract Identification
Appropriation: Procurement
Contract Name: Form, Fit, Function Referesh (F3R) Phase 4B
Contractor: Raytheon Company
Contractor Location: 11 51 East Hermans Road
Tuscon, AZ 85706
Contract Number: FA8675-16-C-0044/1
Contract Type: Cost Plus Incentive Fee (CPIF)
Award Date: April 13, 2017
Definitization Date: April 13, 2017
Contract Price
..
Initial Contract Price ($M) Current ContriaiIMEC$111) Estimated Price At Completion ($1111)
Target Ceiling Qty Target Ceiling Qty Contractor Program Manager i
64.6 N/A 0 65.9 N/A 0 67.7 69.6
The unfavorable net change in the schedule variance is due to integration issues encountered in Phase 4A activities for
which Phase 4B has linked dependencies.
Notes
This contract includes F3R Phase 4B to complete design and integration of the F3R hardware and software design through
the test readiness review. This effort supports Air Force, Navy, and FMS customers to enable AMRAAM production beyond
Lot 32.
Contract Identification
Appropriation: Procurement
Contract Name: AMRAAM Production LOTS 28, 29, 30
Contractor: Raytheon Company
Contractor Location: 1151 E Hermans Road
Tucson, AZ 85756
Contract Number: FA8675-15-C-0022
Contract Type: Fixed Price Incentive(Firm Target) (FPIF)
Award Date: December 22, 2014
Definitization Date: December 22, 2014
Contract Price
Initial Contract Price ($M) Current CongMnicMil Estimated Price At Completion ($M)
Target Ceiling Qty Target Ceiling Qty Contractor Program Manager
1020.3 1020.3 1133 1768.9 1768.9 1856 1768.9 1768.9
Cost and schedule variances are not reported for this contract because an earned value management waiver was granted
by the Assistant Secretary of the Air Force for Acquisition on September 19, 201 4 due to the contract transition from a firm
fixed price (FFP) contract type to a firm-fixed-price incentive (fixed target) contract type, in an effort to conform to the Better
Buying Power initiative.
Notes
Production Lot 28: The following missiles were purchased on the Lot 28 contract: 190 Air Force and 2 Navy Air Intercept
Missile-120D (AIM-120D) AMRAAM Air Vehicles (AAVs), 10 Air Force AIM-120D AMRAAM Air Vehicles Instrumented (AAVIs),
18 Air Force and 54 Navy AIM-120D Captive Air Training Missiles (CATMs), 2 Air Force Instrumented Test Vehicles (ITVs).
and 301 AIM-120C-7 AMRAAM missiles for FMS customers. Lot 28 missile deliveries completed in October 2017.
Production Lot 29: The following missiles were purchased on the Lot 29 contract: 285 Air Force and 7 Navy AIM- 120D
AAVs and 334 AIM-120C-7 AMRAAM missiles for FMS customers. Lot 29 missile deliveries completed in July 2018.
Production Lot 30: The following missiles were purchased on the Lot 30 contract: 280 Air Force and 117 Navy AIM-120D
AAVs, 1 Air Force AIM-120D AAVIs. 41 Navy AIM-120D CATMs, 2 Air Force ITVs and 212 AIM-120C-7 AMRAAM missiles for
FMS customers. Lot 30 missile deliveries began in April 2018 and are projected to be complete by July 2019.
The current contract price was updated from $1760.7M to $1768.8M due to contract modifications that were within scope.
Contract Identification
Appropriation: Procurement
Contract Name: AMRAAM Production LOTS 31, 32
Contractor: Raytheon Missile Systems
Contractor Location: 11 51 East Hermans Road
Tucson, AZ 20191
Contract Number: FA8675-18-C-0003
Contract Type: Fixed Price Incentive(Firm Target) (FPIF)
Award Date: December 28, 2017
Definitization Date: December 28, 2017
Contract Price
Initial Contract Price ($M) Current ConMPRICIIMINI Estimated Price At Completion ($M)
Target Ceiling Qty Target Ceiling Qty Contractor Program Manager
634.2 634.2 708 1186.8 1186.8 1304 1186.8 1186.8
Notes
Production Lot 31: The following missiles were purchased on the Lot 31 contract: 246 Air Force, 144 Navy and 25 FMS Air
Intercept Missile-120D (AIM-120D) missiles. 10 Air Force AIM-120D Instrumented Missiles, 184 Telemetry Kits and 283 FMS
AIM-120C-7 AMRAAM missiles. Lot 31 missile deliveries begin in May 2019 and are projected to be complete by April 2020.
Production Lot 32: The following missiles were purchased on the Lot 32 contract: 185 Air Force, 120 Navy and 54 FMS
AIM-120D missiles. 154 Telemetry Kits and 225 FMS AIM-120C-7 AMRAAM missiles. Lot 32 missile deliveries begin in July
2020 and are projected to be complete by January 2021.
The contract price was updated from $634.2M to $1186.8M due to the exercise of Lot 32 in March 2018, the Lot 32
additional spares (Field and Depot), additional Navy missiles, and Form. Fit, Function Refresh program transition to
Production activities.
Deliveries
MI
Development
Delivered to Date
L_
Planned to Date Actual to Date Total Quantity
Percent
Delivered
The O&S costs are the direct costs for the tactical missile, the Captive Carry Missile (CCM), and the Captive Air Training
Missile associated with operating, supporting, and maintaining the AMRAAM missile over a 60-year deployment phase
starting in FY 1991 for the Air Force and FY 1992 for the Navy. The Air Force estimate covers base operations including
CCM. All-Up-Round (AUR) fault verification, operational firings, depot repairs (seven year Interim Contractor Support
(ICS)), supply/item management, transportation, replenishment spares, and field software updates. The Navy estimate
includes AMRAAM fleet operations and support, depot rework (five years ICS), technical support (fleet support,
engineering services, quality surveillance, program management), supply support, replenishment spares, and contractor
augmented support.
Sustainment Strategy
The AUR maintenance concept calls for aircraft loading/unloading, removal/replacement of wings and fins and missile
Built-In-Test (BIT). A missile failing BIT will be sent to the Intermediate-Level Shop for test verification on the Missile BIT
Test Set (Air Force only). Common Field-Level Memory Reprogramming Equipment, or Common Munitions BIT
Reprogramming Equipment Plus. Failed missiles will be returned to the contractor AMRAAM depot for repair.
Antecedent Information
The antecedent system is the Air Intercept Missile-7 (AIM-7). The AIM-7 is the last semi-active air-to-air missile while the
AIM-120 AMRAAM provides the first fully active and autonomous launch and leave medium range capability. The AIM-7
cost data was obtained from the Naval Visibility and Management of Operating and Support Cost database (FY 1990 - FY
2013) and is historical in nature.
Total O&S Cost = Average Annual O&S Cost per Total Quantity *total O&S years = $38.354 * 60 years = $2,301.26
Letterkenny Munitions Center is utilized to demilitarize AMRAAM. The decision to demilitarize individual missiles or entire
lots in lieu of refurbishment or retrofit will be made by Air Combat Command for the Air Force and Navy Resource
Sponsor for the Navy.