Major Project Format New
Major Project Format New
Major Project Format New
A
Project Report
submitted
in partial fulfillment
for the award of the Degree of
Bachelor of Technology
in Department of Computer Science and Engineering
CERTIFICATE
Mentor Coordinator
Name.................... Name.....................
Designation......... Designation.........
Signature............ Signature............
We hereby declare that the report of the project entitled ”. ” is a record of an orig-
inal work done by us at Swami Keshvanand Institute of Technology, Management
and Gramothan, Jaipur under the mentorship of ”....”(Dept. of Computer Science
and Engineering) and coordination of ”.........” (Dept.of Computer Science and En-
gineering). This project report has been submitted as the proof of original work for
the partial fulfillment of the requirement for the award of the degree of Bachelor
of Technology (B.Tech) in the Department of Computer Science and Technology.It
has not been submitted anywhere else, under any other program to the best of our
knowledge and belief.
We are highly indebted to our faculty mentor.........He/She has been a guide, mo-
tivator source of inspiration for us to carry out the necessary proceedings for the
project to be completed successfully. We also thank our project coordinator........for
his co-operation, encouragement, valuable suggestions and critical remarks that gal-
vanized our efforts in the right direction.
We would also like to convey our sincere thanks to Prof. Dr. Mukesh Gupta,
HOD, Department of Computer Science and Engineering, for facilitating,
motivating and supporting us during each phase of development of the
project.Also, we pay our sincere gratitude to all the Faculty Members of Swami
Keshvanand Institute of Technology, Management and Gramothan, Jaipur and all
our Colleagues for their co-operation and support.
Last but not least we would like to thank all those who have directly or indirectly
helped and cooperated in accomplishing this project.
Team Members:
(Name,RollNo) Team member 1
(Name,RollNo) Team member 2
(Name,RollNo) Team member 3
1 Introduction 2
1.1 Problem Statement and Objective . . . . . . . . . . . . . . . . . . . 2
1.2 Literature Survey /Market Survey/Investigation and Analysis . . . . 2
1.3 Introduction to Project . . . . . . . . . . . . . . . . . . . . . . . . 2
1.4 Proposed Logic / Algorithm / Business Plan / Solution / Device . . . 2
1.5 Scope of the Project . . . . . . . . . . . . . . . . . . . . . . . . . . 3
9 Future Scope 20
References 20
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Ut purus elit, vestibu-
lum ut, placeratac, adipiscing vitae, felis. Curabitur dictum gravida mauris.
Nam arcu libero, nonummy eget,consectetuer id, vulputate a, magna. Donec
vehicula augue eu nequeykashyap.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Ut purus elit, vestibu-
lum ut, placeratac, adipiscing vitae, felis. Curabitur dictum gravida mauris.
Nam arcu libero, nonummy eget,consectetuer id, vulputate a, magna. Donec
vehicula augue eu neque.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Ut purus elit, vestibu-
lum ut, placeratac, adipiscing vitae, felis. Curabitur dictum gravida mauris.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Ut purus elit, vestibu-
lum ut, placeratac, adipiscing vitae, felis. Curabitur dictum gravida mauris.
Nam arcu libero, nonummy eget,consectetuer id, vulputate a, magna. Donec
vehicula augue eu neque.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Ut puruselit, vestibulum
ut, placerat ac, adipiscing vitae, felis. Curabitur dic-tum gravida mauris. Nam arcu
libero, nonummy eget, consectetuerid, vulputate a, magnasdsks,ykashyap
explain it here
explain it here
2.1.1.7 Operations
explain it here
explain it here
2.1.1.10 Constraints
explain it here
explain it here
Explain it here
All these phases are cascaded to each other in which progress is seen
as flowing steadily downwards (like a waterfall) through the phases.
The next phase is started only after the defined set of goals are
achieved for previous phase and it is signed off, so the name
”Waterfall Model”. In this model phases do not overlap.
1. Links
(a) Internal Links: All internal links of the website were checked
by clicking each link individually and providing the appropri-
ate input to reach the other links within.
(b) External Links: Till now no external links are provided on our
website but for future enhancement we will provide the links
to the candidate’s actual profile available online and link up
with the elections updates online etc.
(c) Broken Links : Broken links are those links which so not di-
vert the page to specific page or any page at all. By testing
the links on our website, there was no link found on clicking
which we did not find any page.
2. Forms
write here
write here
Test No. of
Test Case Test Case
S.No Case Resources
Description Status
Id Consumed
1 6 87837 787
2 7 78 5415
3 545 778 7507
4 545 18744 7560
5 88 788 6344
8.1 Conclusion
WRITE HERE.
• ITEM 1
• ITEM 2
• ITEM 3
[2] Movie Success Prediction using Data Mining For Data Min-
ing;Saurabh kumar, ITA5007, April 2019
[4] research-methodology.net