1. The document provides a checklist for commissioning an oil-immersed shunt reactor.
2. The checklist includes 23 mechanical and visual inspection items to check components, labelling, wiring, oil levels, and accessories.
3. The electrical test section lists 11 items to test insulation resistance, winding resistance, reactance, dissipation factor, temperature indicators, fans, bushing current transformers, and liquid level indicators.
1. The document provides a checklist for commissioning an oil-immersed shunt reactor.
2. The checklist includes 23 mechanical and visual inspection items to check components, labelling, wiring, oil levels, and accessories.
3. The electrical test section lists 11 items to test insulation resistance, winding resistance, reactance, dissipation factor, temperature indicators, fans, bushing current transformers, and liquid level indicators.
1. The document provides a checklist for commissioning an oil-immersed shunt reactor.
2. The checklist includes 23 mechanical and visual inspection items to check components, labelling, wiring, oil levels, and accessories.
3. The electrical test section lists 11 items to test insulation resistance, winding resistance, reactance, dissipation factor, temperature indicators, fans, bushing current transformers, and liquid level indicators.
1. The document provides a checklist for commissioning an oil-immersed shunt reactor.
2. The checklist includes 23 mechanical and visual inspection items to check components, labelling, wiring, oil levels, and accessories.
3. The electrical test section lists 11 items to test insulation resistance, winding resistance, reactance, dissipation factor, temperature indicators, fans, bushing current transformers, and liquid level indicators.
Download as DOC, PDF, TXT or read online from Scribd
Download as doc, pdf, or txt
You are on page 1of 4
NATIONAL GRID
Title: Index Number:
CL-NG-6460-002-019 Check List of Oil Immersed Shunt Reactors Commissioning Page Number: Revision No.: 1 of 4 01
1.0 Equipment General Data and Information
Substation Bay/Panel Equipment Serial No 2.0 Mechanical check and Visual Inspection
Item Description Done Remarks
Check the impact Recorder for any abnormal impact during 1. Transportation. 2. Check all components are installed. 3. Frequency responses test. Check quality of paint, lifting lugs, quality of weld areas rust spots 4. and wheel stoppers. Check nameplates information (visible place) as per contract 5. specifications. Name Plate should be weather Proof and in Visible position. Check tightness of all bolts (torque wrench method), as per 6. Torque Chart which will be normally available near the name plate. Check that all groundings are securely connected. 7. (at least two grounding points to main tank are available) A two-stage Buchholz relay shall be provided for the tank and located in the pipe (with a slope of pipe not less than 1 in 12) 8. from the reactor tank leading to the conservator. Confirm that the relay is in service position, after completing the Test-If Buchholz Relay is available. Check the valves between the tank and radiator are in open 9. position with indication marked as Open. Check the bushing minimum creepage and insulation 10. requirements shall be as specified in 01-TMSS-01. Check all pipes – hoses and fan protection (not rubber or 11. plastic). 12. Perform all of the manufacturer specific checks. 13. Check labeling of all auxiliary devices as per approved drawing. Check oil level indicator has a diameter of the dial is about 210mm. The dial markings show 25ºC level as well as the high 14. and low oil levels. Check the indicator is provided with low and high level alarm and trip contacts. Archiving System Website: http://AMAS NATIONAL GRID
Title: Index Number:
CL-NG-6460-002-019 Checklist for Commissioning of Oil-Immersed Power Transformer Page Number: Revision No.: 2 of 4 01
15. Check all external wiring for correctness and tightness.
Check that the temperature sensors oil well is two thirds filled 16. with oil. a. Check Winding Temperature Indicator has a dial type indicator with a maximum indicating pointer. The dial marking shall be 20 to 160°C with ±0.5% accuracy. b. Four (4) individually adjustable sets of contacts shall be 17. available for the control of fans, alarm and trip functions. The contacts for the control of fans and pumps shall be wired to available terminal points for future use. c. The sensing element shall be supplied by CTs installed on the central phase of the winding. Check Leak testing with pressure (tightness test):- A pressure of at least 35 kPa over the normal oil pressure shall be applied and maintained for 24 h. Oil leakage shall not be observed during this 18. period. Operating pressure (kPa) due to oil preservation system shall be stated in the test report. The permanent deflection after releasing pressure shall not exceed 0.3%. 19. Check oil level in main tank and conservator. Tank and accessories shall be designed without pockets where 20. in gas may not collect. Where pockets cannot be avoided pipes shall be provided to vent the gas into main expansion pipe Check Drain/filter valve and lower sampling valve was provided 21. at a minimum height of one meter from the ground level, for easy access. 22. Check all external wiring for correctness and tightness. Check Oil Temperature Indicator with The dial marking shall 23. cover a range of 20 to 160ºC with ±0.5% accuracy. Check it is fitted with two sets of alarm/trip contacts.
3.0 Electrical Test
Archiving System Website: http://AMAS
NATIONAL GRID
Title: Index Number:
CL-NG-6460-002-019 Checklist for Commissioning of Oil-Immersed Power Transformer Page Number: Revision No.: 3 of 4 01
Item Description Done Remarks
1. Core Insulation Resistance at 1 kV DC. Winding Insulation Resistance and Polarization Index test at 5 2. kV DC. The Insulation Resistance value between bushing to Ground shall be in Gega Ω and Polarization Index (>1.5) Winding Resistance (DC) test (winding temperature shall be recorded; winding resistance shall be referred to 75°C). The 3. measured winding DC resistance should be kept as future reference value for comparing the DC resistance whenever over hauling of Reactor is taken. 4. Measurement of Reactance. Measurement of dissipation factor (tan δ) of the insulation 5. system capacitances. a. Winding temperature indicator to be calibrated by heating the sensor in oil bath and check against standard thermometer. 6. Also check by current injection, Check pick up/ Drop off of contacts: b. Proper setting as per drawing to be applied and tested. Oil temperature indicator to be calibrated by heating the sensor 7. in oil bath and check against standard thermometer. Setting as per drawing to be applied and tested. Fan motors current (starting, running, one phase removal and 8. locked rotor) shall be measured and checked against rating. Check if wiring size suitable to carry the current. Check fan running direction to get air flow towards radiator and 9. Phase sequence of supply voltage to fan motors circuits is correct. MCBs in marshalling kiosk to be checked by current injection 10. each pole for alarm and trip. Bushing Current Transformer Testing a. Polarity test b. Insulation Resistant test c. Secondary Winding Resistant (All windings and all taps). d. Current Ratio test 11. e. Magnetization Characteristics (Minimum 5 points below and 2 points above the knee point. f. Verify secondary circuits, Terminals to Terminal. g. Burden Test. h. Demagnetize CT cores after all tests. i. Ensure that No open circuit at Secondary side. Archiving System Website: http://AMAS j. Ensure that the CTs are identical in all phases. Functional Check of the following :- a. Liquid Level indicator (alarm/ trip) as applicable. NATIONAL GRID
Title: Index Number:
CL-NG-6460-002-019 Checklist for Commissioning of Oil-Immersed Power Transformer Page Number: Revision No.: 4 of 4 01