Nothing Special   »   [go: up one dir, main page]

MSS03 - Strip Foundation With Bolts

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

rR002:

Pre-concrete I nspection

202L-O208

Project Description: KAMOA CENTRE OF EXCELLENCE


F#1l STRUXIT
hE PROj ECTS
Pre-concrete lnspection (lncl. Walls and Columns <2m high)

H eS -o9

Setnrq srwfing 4 slrir $*E lpua)c sg^'oe


,\aroo Ccnkc €vte Ileqce

+ t4qo. 610

Drawings and Specifications relating to the inspection:

Description of lnspection Activity

Predecessor Inspections

Setting Out

Setting out position and levels as per drawing


Survey equipment calibrated correctly
Reinforcing Bars

Reinforcing sizes as per drawing


blocks to reinforcing correct and secured
Reinforcing spacing and splice lengths correct
Reinforcing free of old concrete, rust and defects

ormwork adequately fixed and supported

Formwork clean, smoothe, sealed and oiled


Area clear of loose stones and material
Cast in items positioned and fixed correctly

bu.c^ gs^,gr(y5gS
STRUXIT-QAQC-DOC-103 2020-oL-20 Rev00
1R002:
Pre-concrete I nsPection

013 Box-outs and voids in correct position and fixed Nl* Nl tr


Concreting Activity Preparations

014 Concrete mix design approved by Engineer o;-P S.rt \


015 Vibrating equipment ready with backup available A-k S-ru 3
015 Concrete bucket ready, cleaned and oiled d2+
'TX 5. i4.<
oL7 Backup concrete bucket available
-q tn.
lSr
,

018 Lights ready if casting at night -S)t4-


019 Backup lights and generators available a-9'* 5.-ilt<
Floating equipment ready and backup available 'Lffi .S -ln.<
,:y
020

o2t Slump test equipment readY 3,m.5


-I Al
022 Cube moulds ready and cube bath SANS compliant aZt 6,m.)
o23 Access for concrete trucks safe and clear ,)tr s.4,9
o24 Plastic ready to contain concrete spills d)+ S, Yvt,
Contractor Representative Engineer RePresentative

Namez 7p*r(sf ?t'S*?ftLr n^", f .? t -tfu


o^t", zl /Zt/z-z-

NOTE: The Contractor accepts sole responsibility for the overall quality of the works and this document in
no way alleviates the Contractor from any obligation to remediate identified defects after this inspection

STRUXIT-QAQC-DOC-103 2020-ot-20 Rev00


1R002:
Pre-concrete I nsPection

Project Number: 202L-O208

Project Description: KAMOA CENTRE OF EXCELLENCE

Appendixl-lRNo:

STRUXIT-QAQC-DOC-103 2020-ot-20 Rev00


F '-/'1 lso I
lEr- I
I
r
I i'-l
l- ,-'l
r_---l

=5 lho I I

d.o lic I I

l" IE
It ln
I
le
l- u. ll
I
I

1,1 Vl o-
I ..o l=
lE

IE;
lE rl
Eli
I EIE
elE I
, il
ilEl =Tt=ltr
ill_Fil El ilg* Il3 itl
q
1!. Fffi
tFtri:------
a
;! I
i :.[HH,]
)
ii,
frl
:
E
zE
Pr
fcl
a:a
EE
cE
!i
gr \
d
;!
s=E i
E:9 : 8t
5t
r:
lt*
I,gE E

t!.
5EP nm T

': .
=l

HI

AI

,"! Y
4 rl
#l fl
,-\\i!' g
-'l

H
\\ :
ffi ffi
EI
:r\ ['i
El fl

Y:

t5
Ei
ri
lifrih ii ,
itftlL_J_l+J
t.

!
EE .,
. '.i\
LIL
t!
=@

B -\9

-\,6
H
c
Eiirifil[
g ---\t

You might also like