Nothing Special   »   [go: up one dir, main page]

Kevin Rick Santos - 2023

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

ENGR. KEVIN RICK F.

SANTOS
REGISTERED CIVIL ENGINEER

WORK EXPERIENCES
Hi, I’m Shierhann, with over Company : RASA Surveying and Realty
twenty years of experience in Quezon City, Philippines
drafting, designing, and Position : Department Head, High Definion Surveys Dep’t.
troubleshooting Electro-Mechanical

C O N T A C TS Accomplishments

0967 449 8249 / 0916 284


9833

shierhann9estrada@gmail.com
L0t 31-A, Blk-3, Lualhati
st.,fdgsffgfdsfgfg

 American Community School


 Hatta Pumped Hydroelectric Plant
 The Clymb Abu Dhabi
 Mina Port Cruise Terminal
 Yas Pavilion, Yas Island
 Yas Club (MAD), Yas Island
 Sheik Zayed Desert Learning Center
 Al Naeem Mall, Ras Al Khaimah

Job Description
WORK CONDITION Reynante Bautista
MDCC
- Used to either Site or MEP Revit Modeler
Office environments. +63 969 053 2603
- Exposed to computer
screen on daily basis.

REFERENCES

Ronald Allan Luna


AC Goulding Airconditioning
Senior Mechanical Engineer
rapluna_21@hotmail.com
+614 213945553
Melbourne, Australia
• In charge of all Electrical
design models using Autocad
and Revit software from the
Design phase until the As-
Built drawings stage .
• Develops Electrical Single Line
Diagrams for the whole
project.
• Overseas the proper
coordination of all MEP
models to civil,
structural &
architectural
counterparts.
• Calculates all Electrical loads as
per local regulations.
• Provides accurate
BOQ's to the
procurement
department for
purchasing.
• Does site visits and
supervision from time to
time whenever the resident
Engineer is not available to
assure proper site
installations.
• Prepares all necessary
documentations for
Municipality approvals.
• Goes to Government
approving bodies to
coordinate and facilitate

Company :MZ & Partners


MEP Consultants
Location :Doha, Qatar
Date :December 2005 -
December 2007

Project
 Al Dana Tower (2B+G+25),
Doha, Qatar
 Qatar Navigation Tower
(B+G+52), Doha, Qatar
 West Bay Lagoon Plaza Mall
(B+G+34 x 2), Doha, Qatar
 Palm Twin Tower (2B+G+57),
Doha, Qatar
 Al Misnad Tower (2B+G+27),
Doha, Qatar
 M. Tower (B+G+25), Doha,
Qatar
 Al Jazira Tower (2B+G+34),
Doha, Qatar
 Al Ahli Stadium , Doha, Qatar
 Abdulghani Tower, Doha Qatar (2B+G+25)
 Golden Tower, Doha Qatar (2B+G+15)
TRAININGS  Diplomat Tower, Doha Qatar (2B+G+29)
& SEMINARS  Fahed Al Khater Hotel Apartment, Doha Qatar (2B+G+M+54)
 Qatar International Bank, Doha Qatar (B+G+15)
 Al Khayareen Twin Tower, Doha Qatar (B+G+M+30)
Course :Revit 2015 - BIM  Al Seal Tower 29th & 30th Penthouse, Doha Qatar
Common Topics  Abdulghani Tower, Doha Qatar (2B+G+25)
Location :Abu Dhabi, UAE  Golden Tower, Doha Qatar (2B+G+15)
Date :February 2015
Job Description
Course :Revit MEP 2015 - Electrical
• In charge of all Conceptual Low Voltage design using Autocad from
Location :Abu Dhabi,
basic to detailed design phase.
UAE Date :February 2015
• In charge of all Conceptual Extra Low Voltage design using Autocad
Course :Navisworks Manage 2015 from basic to detailed design phase.
Location :Abu Dhabi, UAE • AssitingIn the coordination of all MEP systems.
Date :February 2015 • Develops Electrical Single Line Diagrams for the whole project.

Course :Autocad Release 13


Location :Quezon City, Company :VAHE R. YACOUBIAN MEP Consultants
Philippines Date :April 1997 Location :Doha, Qatar
Date : January 2005 - September 2005

Project
 4 Towers (G+36 x 3), Doha, Qatar
 Private Villa (G+1), Doha, Qatar
EDUCATION  100 Villas (G+1), Doha, Qatar

Job Description
Course :AB Political Science,
• In charge of all Conceptual Low Voltage design using Autocad from
New Era University basic to detailed design phase.
Location :Quezon City,
Philippines Date :1990-1995 • In charge of all Conceptual Extra Low Voltage design using Autocad
from basic to detailed design phase.
Course :Secondary, • AssitingIn the coordination of all MEP systems.
Camp Emilio Aguinaldo High • Develops Electrical Single Line Diagrams for the whole project.
School Location :Quezon City, • Prepares all necessary documentations for Municipality approvals.
Philippines Date : 1986-1989

Course :Primary, Company :HI-AIRE INC.


Rosario Elementary School Location :Mandaluyong City, Philippines
Location :Pasig City, Date :July 1999 - October 2004
Philippines Date :1981-1986
Project
 Infinity Tower, Makati City, Philippines
 Regency Parkway, Taguig City, Philippines
 Jamby Madrigal Residence, San Juan City,Philippines
 Ong How Residence, Ortigas Avenue, Philippines
Job Description
EXPERTISE
• In charge of all Mechanical Design and Shop Drawings using
Autocad from basic to As-Built drawing stage.
AUTOCAD
• AssitingIn the coordination of all MEP systems.
REVIT

MICROSOFT OFFICE
Company :PALMER ASIA Fire Protection Company
Location :Makati City, Philippines
Date :April 1997 - March 1999
L A N G U A G ES
Project
Well versed in speaking,  Rizal Shrine,Cavite City,Philippines
reading and writing in  Honda Factory, LIIP Laguna, Philippines
English &Filipino language
Job Description
• In charge of all Fire Fighting Shop Drawings using Autocad up to
As-Built drawing stage.

You might also like