Classification: Internal Use

JUBAIL UNITED PETROCHEMICAL COMPANY (UNITED) JOB SAFETY ANALYSIS – WORKSHEET (Attachment V)

JOB DESCRIPTION: DATE: 16 MAY 2018 JSA number: 02-IKK-2018

OFFICE RENOVATION & MODIFICATION IN  NEW  REVISED


ADMIN BUILDING 1 & 2
JOB LOCATION :ADMIN BUILDING AREA: ADMIN BUILDING
Sl
BASIC STEPS POTENTIAL HAZARDS MITIGATION PLAN RESPONSIBILITY
No.

 UNITED traffic rules to be adhered


 Follow Safe work permit procedure
 Traffic Accident  Tool box talk before starting the daily job.
Mobilization and Site  Falling and Tripping Hazard  Barricade the area and install warning signs.
Preparation ISAM KABBANI
1  Obstruction  Proper arrangement of tools and materials
 Follow material handling procedure
 Utilize appropriate Personal Protective Equipment,
respiratory protection, coverall, gloves, eye and foot
protection

2
 Utility damage  All planted utilities that may be encountered
during the breaking must be protected and
 slip, trip, fall marked prior to breaking ground ISAM KABBANI
 Remove unsuitable materials from work place.
Gypsum wall breaking &  Provide proper barricades and place warning
rebuild
 dust
signs and signage’s to avoid personnel from
intervention.
 flying objects  Use ear plugs
 Use the face mask
 noise  Safety googles must be used
 Only competent persons will perform the task
 electric shock, electrocution and the meticulous supervision
 Ensure that all tools are in good working
 entanglement, drawing in condition along the valid inspection sticker
 Avoid the loose clothing
 sharp edges  Use hand gloves
 Use proper PPE‘s at site
Classification: Internal Use

 Wear dust mask while removing broken gypsum


 Dust. pieces.
 Personal Injuries  Use hand gloves
Removal of waste material  slip, trip, fall  Provide proper barricades and place warning ISAM KABBANI
3  sharp edges signs and signage’s to avoid personnel from
falling.
 Introduce the job rotation
 Ensure personnel wearing appropriate PPE’s.

 Un-inspected, uncertified  Power tools must have valid united inspection


equipment’s/ incompetent sticker & hand tools must have color code
personnel  Only authorized and qualified people should
 Use of defective tools & perform the job.
equipment  Ensure that manual tools are not blunt.
Removal & re-fixing of ceiling
tiles  Unauthorized entry.  Ensure all crew members wearing PPE. ISAM KABBANI
4  Damage to planted  Start the work only if valid work permit is
utilities(CCTV, Data lines, obtained
electric lines)  Provide barricade with warning tape as required
 Personnel injury around the working area and provide and display
 Fall of material & personnel signs.
 Visually all equipment should be inspected prior
to start the job.
 Proper housekeeping shall be done.

5 ISAM KABBANI
 Task will be supervised closely.
 The workers will be informed about the task
before starting.
 Sharpe edges  Ensure all workers are physically fit to lift up the
 Glass shattering hefty object
Removal & re-fixing of  Back/twisting injury  Ensure to use proper PPE.
partition glass.  Poor ergonomics  Proper supervision is required to monitor the
 Hand injury activities all the time
 Drawing in while shifting the  Tools used in the activity must be inspected and
glass have color coding.
 Only UNITED approved with valid stickers tools
will be used.
 Leather gloves must be wear.
Classification: Internal Use

 Follow the instructions of supervisor and safety


officer

 Use hand gloves & all other required PPE as per


work permit
 Use Ear Plugs & All other requirement PPE as
work permit
 Hand Injury  Use dust mask & all other required PPE as per
 Noise, Dust work permit
 Lack of supervision  Proper supervision is required to monitor the
Fixing of metallic channel  Slip, trip & fall activities all the time ISAM KABBANI
6 support behind the gypsum  Trap In  Area shall be free from unwanted materials.
wall  Vibration  Debris shall be removed accordingly.
 Flying Debris, Protruding  Housekeeping shall be maintained at all times.
Objects  Avoid loose clothing operators should wear
coverall
 Rotate the tasks to minimize worker exposure to
equipment vibration
 Barricade or enclose the work area
 Restrict work area entry to authorized personnel
only during activities

 Unsafe means of access onto  Ensure access are free from any obstruction ISAM KABBANI
the work area cause slip & trip  Personnel to be provided with appropriate PPE’s,
 Health Hazard protective clothing, dust mask, face shield, ear
 Dust hazard plugs, hand gloves, etc. during mixing with drill /
7  Defective of hand / power tools application of coating materials.
Tile removal & fixing
can cause hand & body injury  Hand and power tools to be color-coded /
 Fire Hazard inspected.
 Fire Extinguisher available in the work area
8

ISAM KABBANI

 Falling & Tripping Hazard  Ensure SWP adherence


 Improper material handling  Maintain good housekeeping
Classification: Internal Use

 Obstruction  Wear mandatory PPE’s


Housekeeping and
Demobilization  Personnel injury  Follow material handling procedure.
 Flying tiny particles lead to eye
injury

REQUIRED AND/OR RECOMMENDED P.P.E.:____________________________________________________________________


______________________________________________________________________________________________________
All recommendations suggested in JSA have been implemented at site:(Maintenance Supervisor)
Acknowledged by: Manager/Shift Supervisor
Prepared by: JSA Team Leader

Name:______________ Signature:__________ Badge#: __________


Classification: Internal Use

Reviewed and acknowledged by Operation Sr. Manager In case of Major /


Name:__________________ Signature:________ Badge #: _______ Significant Risk (Critical Activity).

Name:______________ Signature:__________ Badge#: __________


JSA Team Members
Comment:
Departmen
Name ID # Signature Date …………………………………………………………………………………………………
t
………………………………………………………………………………………………………
…………..
………………………………………………………………………………………………………
…………..
………………………………………………………………………………………………………
…………..
………………………………………………………………………………………………………
Approved by Maintenance Manager / Supervisor …………..

Name:_____________________ Signature:__________ Badge #:________

Approved by Maintenance Sr. Manager in case of Major / Significant Risk


(Critical Activity).