RENCANA ANGGARAN BIAYA

PEMBANGUNAN RUMAH TINGGAL TYPE 36/72


PERUMAHAN BATU INDAH REGENCY
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp

I. PEKERJAAN PERRSIAPAN
1 Pengukuran 1.00 ls. 100,000.00 100,000.00
2 Pas. Bowplank 36.00 m1 10,000.00 360,000.00
3 Listrik + Air kerja 1.00 ls. 200,000.00 200,000.00
Jumlah : 660,000.00
II. PEK. PONDASI
1 Galian tanah 40.72 m3 15,000.00 610,800.00
2 Pek. Pas. Pondasi batu kali 13.71 m3 275,000.00 3,771,556.25
Jumlah : 4,382,356.25
III. PEK. BETON
1 Kolom beton 20/20 2.94 m3 1,846,500.00 5,436,096.00
2 Kolom Praktis 0.14 m3 1,846,500.00 249,277.50
3 Sloof beton SL1 15/25 1.65 m3 1,750,000.00 2,880,937.50
4 Sloof beton SL2 15/20 0.21 m3 1,800,000.00 378,000.00
5 Ring balk 3.05 m3 1,846,500.00 5,639,211.00
6 Topi beton 0.60 m3 631,500.00 378,900.00
Jumlah : 14,962,422.00
IV. PEK. DINDING
1 Pas. Bata 152.70 m2 42,500.00 6,489,750.00
2 Plester dan acian 305.40 m2 14,800.00 4,519,920.00
Jumlah : 11,009,670.00
V. PEK.KUSEN DAN DAUN PINTU
JENDELA
1 Kusen pintu & jendela Borneo 46.17 m1 60,000.00 2,770,200.00
2 Daun pintu 4.00 bh 425,000.00 1,700,000.00
3 Daun pintu Km/Wc 1.00 bh 250,000.00 250,000.00
4 Daun jendela 3.00 bh 50,000.00 150,000.00
Jumlah : 4,870,200.00
VI. PEK. ATAP
1 Rangka atap baja ringan 53.82 m2 100,000.00 5,382,000.00
2 Genteng Multy Roof 53.82 m2 40,000.00 2,152,800.00
3 Nok 6.00 m1 45,000.00 270,000.00
4 Lisplank 35.88 m1 17,500.00 627,900.00
Jumlah : 8,432,700.00
VII. PEK. PLAFOND
1 Plafond Gypsum 46.50 m2 58,000.00 2,697,000.00
2 plafond GRC 2.55 m2 62,500.00 159,375.00
3 List Profil 50.90 m1 9,000.00 458,100.00
Jumlah : 3,314,475.00
VIII. PEK. KERAMIK
1 Pas. Keramik lantai 30 x 30 46.50 m2 71,500.00 3,324,750.00
2 Pas. Keramik lantai wc.20 x 20 2.55 m2 85,500.00 218,025.00
3 Pas. Keramik dinding wc. 9.60 m2 88,900.00 853,440.00
Jumlah : 4,396,215.00
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp
IX. PEK. FINISHING
1 Cat dinding 305.40 m2 10,300.00 3,145,620.00
2 Cat plafond 49.05 m2 10,300.00 505,215.00
3 Cat kusen pintu & jendela 46.17 m1 19,700.00 909,549.00
4 Cat Daun pintu 3.00 bh 95,000.00 285,000.00
5 Cat daun jendela 46.17 m1 19,700.00 909,549.00
Jumlah : 5,754,933.00
X. PEK. INSTALASI
1 Inst. Titik lampu + Armature 7.00 ttk 95,000.00 665,000.00
2 Inst. Titik stop kontak + Armature 6.00 ttk 87,500.00 525,000.00
3 Inst. Titik saklar + Armature 4.00 ttk 87,500.00 350,000.00
Jumlah : 1,540,000.00
XI. PEK SANITARY
1 Saluran air bersih 40.00 m1 10,000.00 400,000.00
2 Saluran air kotor Dia 4" 15.00 m1 30,000.00 450,000.00
3 Saluran air Sabun Dia 3" 20.00 m1 22,500.00 450,000.00
4 Septitank 1.00 bh 1,000,000.00 1,000,000.00
Jumlah : 2,300,000.00
XII. PEK. ACCESSORIES
1 Closet jongkok 1.00 unit 250,000.00 250,000.00
2 shower 1.00 unit 125,000.00 125,000.00
3 Kunci pintu utama 4.00 unit 100,000.00 400,000.00
4 Engsel pintu 10.00 bh 14,000.00 140,000.00
5 Engsel jendela 6.00 bh 15,000.00 90,000.00
6 Hak angin 3.00 bh 17,500.00 52,500.00
7 Slot jendela 3.00 bh 10,000.00 30,000.00
8 Kran air standar 3.00 bh 35,000.00 105,000.00
9 Kran Kitchen sink 1.00 bh 70,000.00 70,000.00
10 Kitchen sing 1.00 bh 125,000.00 125,000.00
11 Floor drain 1.00 bh 14,000.00 14,000.00
12 Kaca polos 5mm 6.59 m2 60,000.00 395,550.00
Jumlah : 1,797,050.00
XIII. PEK. AR PORT
1 Beton tumbuk 1.28 m3 631,500.00 805,162.50
2 Plat decker u. Jembatan 0.30 m3 1,250,000.00 375,000.00
Jumlah : 1,180,162.50
XIV. PEK. LAIN - LAIN
1 Pembersihan lahan 1.00 ls 200,000.00 200,000.00
Jumlah : 200,000.00

TOTAL 64,800,183.75

DIBULATKAN 64,800,000.00

Harga per m2 : 1,800,000.00


RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp

I. PEKERJAAN PERRSIAPAN
1 Pengukuran 1.00 ls. 83,000.00 83,000.00
2 Pas. Bowplank 36.00 m1 8,300.00 298,800.00
3 Listrik + Air kerja 1.00 ls. 166,000.00 166,000.00
Jumlah : 547,800.00
II. PEK. PONDASI
1 Galian tanah 40.72 m3 12,450.00 506,964.00
2 Pek. Pas. Pondasi batu kali 13.71 m3 228,250.00 3,130,391.69
Jumlah : 3,637,355.69
III. PEK. BETON
1 Kolom beton 20/20 2.94 m3 1,532,595.00 4,511,959.68
2 Kolom Praktis 0.14 m3 1,532,595.00 206,900.33
3 Sloof beton SL1 15/25 1.65 m3 1,452,500.00 2,391,178.13
4 Sloof beton SL2 15/20 0.21 m3 1,494,000.00 313,740.00
5 Ring balk 3.05 m3 1,532,595.00 4,680,545.13
6 Topi beton 0.60 m3 524,145.00 314,487.00
Jumlah : 12,418,810.26
IV. PEK. DINDING
1 Pas. Bata 152.70 m2 35,275.00 5,386,492.50
2 Plester dan acian 305.40 m2 12,284.00 3,751,533.60
Jumlah : 9,138,026.10
V. PEK.KUSEN DAN DAUN PINTU
JENDELA
1 Kusen pintu & jendela Borneo 46.17 m1 49,800.00 2,299,266.00
2 Daun pintu 4.00 bh 352,750.00 1,411,000.00
3 Daun pintu Km/Wc 1.00 bh 207,500.00 207,500.00
4 Daun jendela 3.00 bh 41,500.00 124,500.00
Jumlah : 4,042,266.00
VI. PEK. ATAP
1 Rangka atap baja ringan 53.82 m2 83,000.00 4,467,060.00
2 Genteng Multy Roof 53.82 m2 33,200.00 1,786,824.00
3 Nok 6.00 m1 37,350.00 224,100.00
4 Lisplank 35.88 m1 14,525.00 521,157.00
Jumlah : 6,999,141.00
VII. PEK. PLAFOND
1 Plafond Gypsum 46.50 m2 48,140.00 2,238,510.00
2 plafond GRC 2.55 m2 51,875.00 132,281.25
3 List Profil 50.90 m1 7,470.00 380,223.00
Jumlah : 2,751,014.25
VIII. PEK. KERAMIK
1 Pas. Keramik lantai 30 x 30 46.50 m2 59,345.00 2,759,542.50
2 Pas. Keramik lantai wc.20 x 20 2.55 m2 70,965.00 180,960.75
3 Pas. Keramik dinding wc. 9.60 m2 73,787.00 708,355.20
Jumlah : 3,648,858.45
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp
IX. PEK. FINISHING
1 Cat dinding 305.40 m2 8,549.00 2,610,864.60
2 Cat plafond 49.05 m2 8,549.00 419,328.45
3 Cat kusen pintu & jendela 46.17 m1 16,351.00 754,925.67
4 Cat Daun pintu 3.00 bh 78,850.00 236,550.00
5 Cat daun jendela 46.17 m1 16,351.00 754,925.67
Jumlah : 4,776,594.39
X. PEK. INSTALASI
1 Inst. Titik lampu + Armature 7.00 ttk 78,850.00 551,950.00
2 Inst. Titik stop kontak + Armature 6.00 ttk 72,625.00 435,750.00
3 Inst. Titik saklar + Armature 4.00 ttk 72,625.00 290,500.00
Jumlah : 1,278,200.00
XI. PEK SANITARY
1 Saluran air bersih 40.00 m1 8,300.00 332,000.00
2 Saluran air kotor Dia 4" 15.00 m1 24,900.00 373,500.00
3 Saluran air Sabun Dia 3" 20.00 m1 18,675.00 373,500.00
4 Septitank 1.00 bh 830,000.00 830,000.00
Jumlah : 1,909,000.00
XII. PEK. ACCESSORIES
1 Closet jongkok 1.00 unit 207,500.00 207,500.00
2 shower 1.00 unit 103,750.00 103,750.00
3 Kunci pintu utama 4.00 unit 83,000.00 332,000.00
4 Engsel pintu 10.00 bh 11,620.00 116,200.00
5 Engsel jendela 6.00 bh 12,450.00 74,700.00
6 Hak angin 3.00 bh 14,525.00 43,575.00
7 Slot jendela 3.00 bh 8,300.00 24,900.00
8 Kran air standar 3.00 bh 29,050.00 87,150.00
9 Kran Kitchen sink 1.00 bh 58,100.00 58,100.00
10 Kitchen sing 1.00 bh 103,750.00 103,750.00
11 Floor drain 1.00 bh 11,620.00 11,620.00
12 Kaca polos 5mm 6.59 m2 49,800.00 328,306.50
Jumlah : 1,491,551.50
XIII. PEK. AR PORT
1 Beton tumbuk 1.28 m3 524,145.00 668,284.88
2 Plat decker u. Jembatan 0.30 m3 1,037,500.00 311,250.00
Jumlah : 979,534.88
XIV. PEK. LAIN - LAIN
1 Pembersihan lahan 1.00 ls 166,000.00 166,000.00
Jumlah : 166,000.00

TOTAL 53,784,152.51

DIBULATKAN 53,784,000.00

Harga per m2 : 1,494,000.00


KONTRAK 64,800,000.00
PROFIT 11,016,000.00
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp

I. PEKERJAAN PERRSIAPAN
1 Pengukuran 1.00 ls. 100,000.00 100,000.00
2 Pas. Bowplank 45.00 m1 10,000.00 450,000.00
3 Listrik + Air kerja 1.00 ls. 200,000.00 200,000.00
Jumlah : 750,000.00
II. PEK. PONDASI
1 Galian tanah 54.91 m3 15,000.00 823,680.00
2 Pek. Pas. Pondasi batu kali 18.83 m3 275,000.00 5,178,888.33
Jumlah : 6,002,568.33
III. PEK. BETON
1 Kolom beton 20/20 3.38 m3 1,846,500.00 6,239,692.80
2 Kolom Praktis 0.26 m3 1,846,500.00 478,612.80
3 Sloof beton SL1 15/25 1.98 m3 1,750,000.00 3,465,000.00
4 Sloof beton SL2 15/20 0.29 m3 1,800,000.00 518,400.00
5 Ring balk 3.80 m3 1,846,500.00 7,019,654.40
6 Topi beton 0.84 m3 631,500.00 530,460.00
Jumlah : 18,251,820.00
IV. PEK. DINDING
1 Pas. Bata 184.87 m2 42,500.00 7,856,917.20
2 Plester dan acian 369.74 m2 14,800.00 5,472,111.74
Jumlah : 13,329,028.94
V. PEK.KUSEN DAN DAUN PINTU
JENDELA
1 Kusen pintu & jendela Borneo 52.57 m1 60,000.00 3,154,200.00
2 Daun pintu 4.00 bh 425,000.00 1,700,000.00
3 Daun pintu Km/Wc 1.00 bh 250,000.00 250,000.00
4 Daun jendela 3.00 bh 50,000.00 150,000.00
Jumlah : 5,254,200.00
VI. PEK. ATAP
1 Rangka atap baja ringan 70.88 m2 100,000.00 7,087,500.00
2 Genteng Multy Roof 70.88 m2 40,000.00 2,835,000.00
3 Nok 8.00 m1 45,000.00 360,000.00
4 Lisplank 26.00 m1 17,500.00 455,000.00
Jumlah : 10,737,500.00
VII. PEK. PLAFOND
1 Plafond Gypsum 68.88 m2 58,000.00 3,995,040.00
2 plafond GRC 2.55 m2 62,500.00 159,375.00
3 List Profil 84.48 m1 9,000.00 760,320.00
Jumlah : 4,914,735.00
VIII. PEK. KERAMIK
1 Pas. Keramik lantai 30 x 30 68.88 m2 71,500.00 4,924,920.00
2 Pas. Keramik lantai wc.20 x 20 2.55 m2 85,500.00 218,025.00
3 Pas. Keramik dinding wc. 14.08 m2 88,900.00 1,251,712.00
Jumlah : 6,394,657.00
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp
IX. PEK. FINISHING
1 Cat dinding 369.74 m2 10,300.00 3,808,293.98
2 Cat plafond 71.43 m2 10,300.00 735,729.00
3 Cat kusen pintu & jendela 52.57 m1 19,700.00 1,035,629.00
4 Cat Daun pintu 3.00 bh 95,000.00 285,000.00
5 Cat daun jendela 52.57 m1 19,700.00 1,035,629.00
Jumlah : 6,900,280.98
X. PEK. INSTALASI
1 Inst. Titik lampu + Armature 7.00 ttk 95,000.00 665,000.00
2 Inst. Titik stop kontak + Armature 6.00 ttk 87,500.00 525,000.00
3 Inst. Titik saklar + Armature 4.00 ttk 87,500.00 350,000.00
Jumlah : 1,540,000.00
XI. PEK SANITARY
1 Saluran air bersih 40.00 m1 10,000.00 400,000.00
2 Saluran air kotor Dia 4" 15.00 m1 30,000.00 450,000.00
3 Saluran air Sabun Dia 3" 20.00 m1 22,500.00 450,000.00
4 Septitank 1.00 bh 1,000,000.00 1,000,000.00
Jumlah : 2,300,000.00
XII. PEK. ACCESSORIES
1 Closet duduk 1.00 unit 1,150,000.00 1,150,000.00
2 shower 1.00 unit 125,000.00 125,000.00
3 Kunci pintu utama 4.00 unit 100,000.00 400,000.00
4 Engsel pintu 10.00 bh 14,000.00 140,000.00
5 Engsel jendela 6.00 bh 15,000.00 90,000.00
6 Hak angin 3.00 bh 17,500.00 52,500.00
7 Slot jendela 3.00 bh 10,000.00 30,000.00
8 Kran air standar 3.00 bh 35,000.00 105,000.00
9 Kran Kitchen sink 1.00 bh 70,000.00 70,000.00
10 Kitchen sing 1.00 bh 125,000.00 125,000.00
11 Floor drain 1.00 bh 14,000.00 14,000.00
12 Kaca polos 5mm 7.86 m2 60,000.00 471,600.00
Jumlah : 2,773,100.00
XIII. PEK. AR PORT
1 Beton tumbuk 1.79 m3 631,500.00 1,127,385.38
2 Plat decker u. Jembatan 0.30 m3 1,250,000.00 375,000.00
3 Bak Kontrol 1.00 unit 150,000.00 150,000.00
Jumlah : 1,652,385.38
XIV. PEK. LAIN - LAIN
1 Pembersihan lahan 1.00 ls 200,000.00 200,000.00
Jumlah : 200,000.00

TOTAL 81,000,275.63

DIBULATKAN 81,000,000.00

Harga per m2 : 1,800,000.00


RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp

I. PEKERJAAN PERRSIAPAN
1 Pengukuran 1.00 ls. 83,000.00 83,000.00
2 Pas. Bowplank 45.00 m1 8,300.00 373,500.00
3 Listrik + Air kerja 1.00 ls. 166,000.00 166,000.00
Jumlah : 622,500.00
II. PEK. PONDASI
1 Galian tanah 54.91 m3 12,450.00 683,654.40
2 Pek. Pas. Pondasi batu kali 18.83 m3 228,250.00 4,298,477.31
Jumlah : 4,982,131.71
III. PEK. BETON
1 Kolom beton 20/20 3.38 m3 1,532,595.00 5,178,945.02
2 Kolom Praktis 0.26 m3 1,532,595.00 397,248.62
3 Sloof beton SL1 15/25 1.98 m3 1,452,500.00 2,875,950.00
4 Sloof beton SL2 15/20 0.29 m3 1,494,000.00 430,272.00
5 Ring balk 3.80 m3 1,532,595.00 5,826,313.15
6 Topi beton 0.84 m3 524,145.00 440,281.80
Jumlah : 15,149,010.60
IV. PEK. DINDING
1 Pas. Bata 184.87 m2 35,275.00 6,521,241.28
2 Plester dan acian 369.74 m2 12,284.00 4,541,852.75
Jumlah : 11,063,094.02
V. PEK.KUSEN DAN DAUN PINTU
JENDELA
1 Kusen pintu & jendela Borneo 52.57 m1 49,800.00 2,617,986.00
2 Daun pintu 4.00 bh 352,750.00 1,411,000.00
3 Daun pintu Km/Wc 1.00 bh 207,500.00 207,500.00
4 Daun jendela 3.00 bh 41,500.00 124,500.00
Jumlah : 4,360,986.00
VI. PEK. ATAP
1 Rangka atap baja ringan 70.88 m2 83,000.00 5,882,625.00
2 Genteng Multy Roof 70.88 m2 33,200.00 2,353,050.00
3 Nok 8.00 m1 37,350.00 298,800.00
4 Lisplank 26.00 m1 14,525.00 377,650.00
Jumlah : 8,912,125.00
VII. PEK. PLAFOND
1 Plafond Gypsum 68.88 m2 48,140.00 3,315,883.20
2 plafond GRC 2.55 m2 51,875.00 132,281.25
3 List Profil 84.48 m1 7,470.00 631,065.60
Jumlah : 4,079,230.05
VIII. PEK. KERAMIK
1 Pas. Keramik lantai 30 x 30 68.88 m2 59,345.00 4,087,683.60
2 Pas. Keramik lantai wc.20 x 20 2.55 m2 70,965.00 180,960.75
3 Pas. Keramik dinding wc. 14.08 m2 73,787.00 1,038,920.96
Jumlah : 5,307,565.31
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp
IX. PEK. FINISHING
1 Cat dinding 369.74 m2 8,549.00 3,160,884.01
2 Cat plafond 71.43 m2 8,549.00 610,655.07
3 Cat kusen pintu & jendela 52.57 m1 16,351.00 859,572.07
4 Cat Daun pintu 3.00 bh 78,850.00 236,550.00
5 Cat daun jendela 52.57 m1 16,351.00 859,572.07
Jumlah : 5,727,233.22
X. PEK. INSTALASI
1 Inst. Titik lampu + Armature 7.00 ttk 78,850.00 551,950.00
2 Inst. Titik stop kontak + Armature 6.00 ttk 72,625.00 435,750.00
3 Inst. Titik saklar + Armature 4.00 ttk 72,625.00 290,500.00
Jumlah : 1,278,200.00
XI. PEK SANITARY
1 Saluran air bersih 40.00 m1 8,300.00 332,000.00
2 Saluran air kotor Dia 4" 15.00 m1 24,900.00 373,500.00
3 Saluran air Sabun Dia 3" 20.00 m1 18,675.00 373,500.00
4 Septitank 1.00 bh 830,000.00 830,000.00
Jumlah : 1,909,000.00
XII. PEK. ACCESSORIES
1 Closet duduk 1.00 unit 954,500.00 954,500.00
2 shower 1.00 unit 103,750.00 103,750.00
3 Kunci pintu utama 4.00 unit 83,000.00 332,000.00
4 Engsel pintu 10.00 bh 11,620.00 116,200.00
5 Engsel jendela 6.00 bh 12,450.00 74,700.00
6 Hak angin 3.00 bh 14,525.00 43,575.00
7 Slot jendela 3.00 bh 8,300.00 24,900.00
8 Kran air standar 3.00 bh 29,050.00 87,150.00
9 Kran Kitchen sink 1.00 bh 58,100.00 58,100.00
10 Kitchen sing 1.00 bh 103,750.00 103,750.00
11 Floor drain 1.00 bh 11,620.00 11,620.00
12 Kaca polos 5mm 7.86 m2 49,800.00 391,428.00
Jumlah : 2,301,673.00
XIII. PEK. AR PORT
1 Beton tumbuk 1.79 m3 524,145.00 935,729.86
2 Plat decker u. Jembatan 0.30 m3 1,037,500.00 311,250.00
3 Bak Kontrol 1.00 unit 124,500.00 124,500.00
Jumlah : 1,371,479.86
XIV. PEK. LAIN - LAIN
1 Pembersihan lahan 1.00 ls 166,000.00 166,000.00
Jumlah : 166,000.00

TOTAL 67,230,228.78

DIBULATKAN 67,230,000.00

Harga per m2 : 1,494,000.00


KONTRAK 81,000,000.00
PROFIT 13,770,000.00
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY TIME SCHEDULE
Bulan Ke 1 Bulan Ke 2
NO. URAIAN PEKERJAAN BOBOT Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu KETERANGAN
1 2 3 4 5 6 7 8

I. PEKERJAAN PERRSIAPAN 1.019 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127

II. PEK. PONDASI 6.763 2.254 2.254 2.254

III. PEK. BETON 23.090 5.773 11.545 5.773

IV. PEK. DINDING 16.990 4.248 8.495 4.248

V. PEK.KUSEN DAN DAUN PINTU JENDELA 7.516 2.255 3.758 1.503

VI. PEK. ATAP 13.013 3.904 6.507 2.603

VII. PEK. PLAFOND 5.115 1.279 2.557 1.279

VIII. PEK. KERAMIK 6.784 1.357 1.357 2.714 1.357

IX. PEK. FINISHING 8.881 2.960 2.960 2.960

X. PEK. INSTALASI 2.377 0.594 0.594 0.594 0.594

XI. PEK SANITARY 3.549 0.887 0.887 0.887 0.887

XII. PEK. ACCESSORIES 2.773 1.387 1.387

XIII. PEK. CAR PORT 1.821 0.607 0.607 0.607

XIV. PEK. LAIN - LAIN 0.309 0.103 0.103 0.103

Jumlah 100.00
RENCANA KEMAJUAN PEKERJAAN PER MINGGU ( % ) 2.382 8.748 16.171 16.306 18.966 20.551 10.804 6.072
RENCANA KEMAJUAN PEKERJAAN KOMULATIF ( % ) 0 2.382 11.130 27.301 43.607 62.573 83.124 93.929 100.00
REALISASI KEMAJUAN PEKERJAAN PER MINGGU ( % )
REALISASI KEMAJUAN PEKERJAAN KOMULATIF ( % )
DEVIASI ( % )
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY TIME SCHEDULE
Bulan Ke 1 Bulan Ke 2 Bulan Ke 3
NO. URAIAN PEKERJAAN BOBOT Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu KETERANGAN
1 2 3 4 5 6 7 8 9 10 11 12

I. PEKERJAAN PERRSIAPAN 1.019 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085 0.085

II. PEK. PONDASI 6.763 1.691 1.691 1.691 1.691

III. PEK. BETON 23.090 4.618 6.927 5.773 5.773

IV. PEK. DINDING 16.990 2.832 2.832 2.832 2.832 2.832 2.832

V. PEK.KUSEN DAN DAUN PINTU JENDELA 7.516 1.074 1.074 1.074 1.074 1.074 1.074 1.074

VI. PEK. ATAP 13.013 1.301 4.555 5.856 1.301

VII. PEK. PLAFOND 5.115 1.279 1.279 1.279 1.279

VIII. PEK. KERAMIK 6.784 1.131 1.131 1.131 1.131 1.131 1.131

IX. PEK. FINISHING 8.881 2.220 2.220 2.220 2.220

X. PEK. INSTALASI 2.377 0.475 0.475 0.475 0.475 0.475

XI. PEK SANITARY 3.549 0.710 0.710 0.710 0.710 0.710

XII. PEK. ACCESSORIES 2.773 0.693 0.693 0.693 0.693

XIII. PEK. CAR PORT 1.821 0.455 0.455 0.455 0.455

XIV. PEK. LAIN - LAIN 0.309 0.103 0.103 0.103

Jumlah 100.00
RENCANA KEMAJUAN PEKERJAAN PER MINGGU ( % ) 1.776 6.869 10.543 11.454 11.121 9.676 10.977 8.870 10.260 7.094 7.094 4.267
RENCANA KEMAJUAN PEKERJAAN KOMULATIF ( % ) 0 1.776 8.645 19.188 30.641 41.762 51.438 62.415 71.285 81.545 88.640 95.734 100.00
REALISASI KEMAJUAN PEKERJAAN PER MINGGU ( % )
REALISASI KEMAJUAN PEKERJAAN KOMULATIF ( % )
DEVIASI ( % )
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY TIME SCHEDULE
Bulan Ke 1 Bulan Ke 2
NO. URAIAN PEKERJAAN BOBOT Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu KETERANGAN
1 2 3 4 5 6 7 8

I. PEKERJAAN PERRSIAPAN 0.926 0.116 0.116 0.116 0.116 0.116 0.116 0.116 0.116

II. PEK. PONDASI 7.411 2.470 2.470 2.470

III. PEK. BETON 22.533 5.633 11.267 5.633

IV. PEK. DINDING 16.456 4.114 8.228 4.114

V. PEK.KUSEN DAN DAUN PINTU JENDELA 6.487 1.946 3.243 1.297

VI. PEK. ATAP 13.256 3.977 6.628 2.651

VII. PEK. PLAFOND 6.068 1.517 3.034 1.517

VIII. PEK. KERAMIK 7.895 1.579 1.579 3.158 1.579

IX. PEK. FINISHING 8.519 2.840 2.840 2.840

X. PEK. INSTALASI 1.901 0.475 0.475 0.475 0.475

XI. PEK SANITARY 2.840 0.710 0.710 0.710 0.710

XII. PEK. ACCESSORIES 3.424 1.712 1.712

XIII. PEK. CAR PORT 2.040 0.680 0.680 0.680

XIV. PEK. LAIN - LAIN 0.247 0.082 0.082 0.082

Jumlah 100.00
RENCANA KEMAJUAN PEKERJAAN PER MINGGU ( % ) 2.586 8.695 16.141 15.786 19.223 20.423 11.008 6.139
RENCANA KEMAJUAN PEKERJAAN KOMULATIF ( % ) 0 2.586 11.280 27.422 43.208 62.430 82.853 93.861 100.00
REALISASI KEMAJUAN PEKERJAAN PER MINGGU ( % )
REALISASI KEMAJUAN PEKERJAAN KOMULATIF ( % )
DEVIASI ( % )
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY TIME SCHEDULE
Bulan Ke 1 Bulan Ke 2 Bulan Ke 3
NO. URAIAN PEKERJAAN BOBOT Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu KETERANGAN
1 2 3 4 5 6 7 8 9 10 11 12

I. PEKERJAAN PERRSIAPAN 0.926 0.077 0.077 0.077 0.077 0.077 0.077 0.077 0.077 0.077 0.077 0.077 0.077

II. PEK. PONDASI 7.411 1.853 1.853 1.853 1.853

III. PEK. BETON 22.533 4.507 6.760 5.633 5.633

IV. PEK. DINDING 16.456 2.743 2.743 2.743 2.743 2.743 2.743

V. PEK.KUSEN DAN DAUN PINTU JENDELA 6.487 0.927 0.927 0.927 0.927 0.927 0.927 0.927

VI. PEK. ATAP 13.256 1.326 4.640 5.965 1.326

VII. PEK. PLAFOND 6.068 1.517 1.517 1.517 1.517

VIII. PEK. KERAMIK 7.895 1.316 1.316 1.316 1.316 1.316 1.316

IX. PEK. FINISHING 8.519 2.130 2.130 2.130 2.130

X. PEK. INSTALASI 1.901 0.380 0.380 0.380 0.380 0.380

XI. PEK SANITARY 2.840 0.568 0.568 0.568 0.568 0.568

XII. PEK. ACCESSORIES 3.424 0.856 0.856 0.856 0.856

XIII. PEK. CAR PORT 2.040 0.510 0.510 0.510 0.510

XIV. PEK. LAIN - LAIN 0.247 0.082 0.082 0.082

Jumlah 100.00
RENCANA KEMAJUAN PEKERJAAN PER MINGGU ( % ) 1.930 6.817 10.573 11.232 11.094 9.702 11.027 9.141 10.167 7.047 7.047 4.223
RENCANA KEMAJUAN PEKERJAAN KOMULATIF ( % ) 0 1.930 8.746 19.320 30.552 41.647 51.349 62.376 71.517 81.684 88.731 95.777 100.00
REALISASI KEMAJUAN PEKERJAAN PER MINGGU ( % )
REALISASI KEMAJUAN PEKERJAAN KOMULATIF ( % )
DEVIASI ( % )
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp

I. PEKERJAAN PERRSIAPAN
1 Pengukuran 1.00 ls. 100,000.00 100,000.00
2 Pas. Bowplank 36.00 m1 10,000.00 360,000.00
3 Listrik + Air kerja 1.00 ls. 200,000.00 200,000.00
Jumlah : 660,000.00
II. PEK. PONDASI
1 Galian tanah 40.72 m3 15,000.00 610,800.00
2 Pek. Pas. Pondasi batu kali 13.71 m3 275,000.00 3,771,556.25
Jumlah : 4,382,356.25
III. PEK. BETON
1 Kolom beton 20/20 2.94 m3 1,846,500.00 5,436,096.00
2 Kolom Praktis 0.14 m3 1,846,500.00 249,277.50
3 Sloof beton SL1 15/25 1.65 m3 1,750,000.00 2,880,937.50
4 Sloof beton SL2 15/20 0.21 m3 1,800,000.00 378,000.00
5 Ring balk 3.05 m3 1,846,500.00 5,639,211.00
6 Topi beton 0.60 m3 631,500.00 378,900.00
Jumlah : 14,962,422.00
IV. PEK. DINDING
1 Pas. Bata 152.70 m2 42,500.00 6,489,750.00
2 Plester dan acian 305.40 m2 14,800.00 4,519,920.00
Jumlah : 11,009,670.00
V. PEK.KUSEN DAN DAUN PINTU
JENDELA
1 Kusen pintu & jendela Borneo 46.17 m1 60,000.00 2,770,200.00
2 Daun pintu 4.00 bh 425,000.00 1,700,000.00
3 Daun pintu Km/Wc 1.00 bh 250,000.00 250,000.00
4 Daun jendela 3.00 bh 50,000.00 150,000.00
Jumlah : 4,870,200.00
VI. PEK. ATAP
1 Rangka atap baja ringan 53.82 m2 100,000.00 5,382,000.00
2 Genteng Multy Roof 53.82 m2 40,000.00 2,152,800.00
3 Nok 6.00 m1 45,000.00 270,000.00
4 Lisplank 35.88 m1 17,500.00 627,900.00
Jumlah : 8,432,700.00
VII. PEK. PLAFOND
1 Plafond Gypsum 46.50 m2 58,000.00 2,697,000.00
2 plafond GRC 2.55 m2 62,500.00 159,375.00
3 List Profil 50.90 m1 9,000.00 458,100.00
Jumlah : 3,314,475.00
VIII. PEK. KERAMIK
1 Pas. Keramik lantai 30 x 30 46.50 m2 71,500.00 3,324,750.00
2 Pas. Keramik lantai wc.20 x 20 2.55 m2 85,500.00 218,025.00
3 Pas. Keramik dinding wc. 9.60 m2 88,900.00 853,440.00
Jumlah : 4,396,215.00
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp
IX. PEK. FINISHING
1 Cat dinding 305.40 m2 10,300.00 3,145,620.00
2 Cat plafond 49.05 m2 10,300.00 505,215.00
3 Cat kusen pintu & jendela 46.17 m1 19,700.00 909,549.00
4 Cat Daun pintu 3.00 bh 95,000.00 285,000.00
5 Cat daun jendela 46.17 m1 19,700.00 909,549.00
Jumlah : 5,754,933.00
X. PEK. INSTALASI
1 Inst. Titik lampu + Armature 7.00 ttk 95,000.00 665,000.00
2 Inst. Titik stop kontak + Armature 6.00 ttk 87,500.00 525,000.00
3 Inst. Titik saklar + Armature 4.00 ttk 87,500.00 350,000.00
Jumlah : 1,540,000.00
XI. PEK SANITARY
1 Saluran air bersih 40.00 m1 10,000.00 400,000.00
2 Saluran air kotor Dia 4" 15.00 m1 30,000.00 450,000.00
3 Saluran air Sabun Dia 3" 20.00 m1 22,500.00 450,000.00
4 Septitank 1.00 bh 1,000,000.00 1,000,000.00
Jumlah : 2,300,000.00
XII. PEK. ACCESSORIES
1 Closet jongkok 1.00 unit 250,000.00 250,000.00
2 shower 1.00 unit 125,000.00 125,000.00
3 Kunci pintu utama 4.00 unit 100,000.00 400,000.00
4 Engsel pintu 10.00 bh 14,000.00 140,000.00
5 Engsel jendela 6.00 bh 15,000.00 90,000.00
6 Hak angin 3.00 bh 17,500.00 52,500.00
7 Slot jendela 3.00 bh 10,000.00 30,000.00
8 Kran air standar 3.00 bh 35,000.00 105,000.00
9 Kran Kitchen sink 1.00 bh 70,000.00 70,000.00
10 Kitchen sing 1.00 bh 125,000.00 125,000.00
11 Floor drain 1.00 bh 14,000.00 14,000.00
12 Kaca polos 5mm 6.59 m2 60,000.00 395,550.00
Jumlah : 1,797,050.00
XIII. PEK. AR PORT
1 Beton tumbuk 1.28 m3 631,500.00 805,162.50
2 Plat decker u. Jembatan 0.30 m3 1,250,000.00 375,000.00
Jumlah : 1,180,162.50
XIV. PEK. LAIN - LAIN
1 Pembersihan lahan 1.00 ls 200,000.00 200,000.00
Jumlah : 200,000.00

TOTAL 64,800,183.75

DIBULATKAN 64,800,000.00

Harga per m2 : 1,800,000.00


RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 36/72
PERUMAHAN BATU INDAH REGENCY
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp

I. PEKERJAAN PERRSIAPAN
1 Pengukuran 1.00 ls. 100,000.00 100,000.00
2 Pas. Bowplank 45.00 m1 10,000.00 450,000.00
3 Listrik + Air kerja 1.00 ls. 200,000.00 200,000.00
Jumlah : 750,000.00
II. PEK. PONDASI
1 Galian tanah 54.91 m3 15,000.00 823,680.00
2 Pek. Pas. Pondasi batu kali 18.83 m3 275,000.00 5,178,888.33
Jumlah : 6,002,568.33
III. PEK. BETON
1 Kolom beton 20/20 3.38 m3 1,846,500.00 6,239,692.80
2 Kolom Praktis 0.26 m3 1,846,500.00 478,612.80
3 Sloof beton SL1 15/25 1.98 m3 1,750,000.00 3,465,000.00
4 Sloof beton SL2 15/20 0.29 m3 1,800,000.00 518,400.00
5 Ring balk 3.80 m3 1,846,500.00 7,019,654.40
6 Topi beton 0.84 m3 631,500.00 530,460.00
Jumlah : 18,251,820.00
IV. PEK. DINDING
1 Pas. Bata 184.87 m2 42,500.00 7,856,917.20
2 Plester dan acian 369.74 m2 14,800.00 5,472,111.74
Jumlah : 13,329,028.94
V. PEK.KUSEN DAN DAUN PINTU
JENDELA
1 Kusen pintu & jendela Borneo 52.57 m1 60,000.00 3,154,200.00
2 Daun pintu 4.00 bh 425,000.00 1,700,000.00
3 Daun pintu Km/Wc 1.00 bh 250,000.00 250,000.00
4 Daun jendela 3.00 bh 50,000.00 150,000.00
Jumlah : 5,254,200.00
VI. PEK. ATAP
1 Rangka atap baja ringan 70.88 m2 100,000.00 7,087,500.00
2 Genteng Multy Roof 70.88 m2 40,000.00 2,835,000.00
3 Nok 8.00 m1 45,000.00 360,000.00
4 Lisplank 26.00 m1 17,500.00 455,000.00
Jumlah : 10,737,500.00
VII. PEK. PLAFOND
1 Plafond Gypsum 68.88 m2 58,000.00 3,995,040.00
2 plafond GRC 2.55 m2 62,500.00 159,375.00
3 List Profil 84.48 m1 9,000.00 760,320.00
Jumlah : 4,914,735.00
VIII. PEK. KERAMIK
1 Pas. Keramik lantai 30 x 30 68.88 m2 71,500.00 4,924,920.00
2 Pas. Keramik lantai wc.20 x 20 2.55 m2 85,500.00 218,025.00
3 Pas. Keramik dinding wc. 14.08 m2 88,900.00 1,251,712.00
Jumlah : 6,394,657.00
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp
IX. PEK. FINISHING
1 Cat dinding 369.74 m2 10,300.00 3,808,293.98
2 Cat plafond 71.43 m2 10,300.00 735,729.00
3 Cat kusen pintu & jendela 52.57 m1 19,700.00 1,035,629.00
4 Cat Daun pintu 3.00 bh 95,000.00 285,000.00
5 Cat daun jendela 52.57 m1 19,700.00 1,035,629.00
Jumlah : 6,900,280.98
X. PEK. INSTALASI
1 Inst. Titik lampu + Armature 7.00 ttk 95,000.00 665,000.00
2 Inst. Titik stop kontak + Armature 6.00 ttk 87,500.00 525,000.00
3 Inst. Titik saklar + Armature 4.00 ttk 87,500.00 350,000.00
Jumlah : 1,540,000.00
XI. PEK SANITARY
1 Saluran air bersih 40.00 m1 10,000.00 400,000.00
2 Saluran air kotor Dia 4" 15.00 m1 30,000.00 450,000.00
3 Saluran air Sabun Dia 3" 20.00 m1 22,500.00 450,000.00
4 Septitank 1.00 bh 1,000,000.00 1,000,000.00
Jumlah : 2,300,000.00
XII. PEK. ACCESSORIES
1 Closet duduk 1.00 unit 1,150,000.00 1,150,000.00
2 shower 1.00 unit 125,000.00 125,000.00
3 Kunci pintu utama 4.00 unit 100,000.00 400,000.00
4 Engsel pintu 10.00 bh 14,000.00 140,000.00
5 Engsel jendela 6.00 bh 15,000.00 90,000.00
6 Hak angin 3.00 bh 17,500.00 52,500.00
7 Slot jendela 3.00 bh 10,000.00 30,000.00
8 Kran air standar 3.00 bh 35,000.00 105,000.00
9 Kran Kitchen sink 1.00 bh 70,000.00 70,000.00
10 Kitchen sing 1.00 bh 125,000.00 125,000.00
11 Floor drain 1.00 bh 14,000.00 14,000.00
12 Kaca polos 5mm 7.86 m2 60,000.00 471,600.00
Jumlah : 2,773,100.00
XIII. PEK. AR PORT
1 Beton tumbuk 1.79 m3 631,500.00 1,127,385.38
2 Plat decker u. Jembatan 0.30 m3 1,250,000.00 375,000.00
3 Bak Kontrol 1.00 unit 150,000.00 150,000.00
Jumlah : 1,652,385.38
XIV. PEK. LAIN - LAIN
1 Pembersihan lahan 1.00 ls 200,000.00 200,000.00
Jumlah : 200,000.00

TOTAL 81,000,275.63

DIBULATKAN 81,000,000.00

Harga per m2 : 1,800,000.00


RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 55
PERUMAHAN BANDUNG CITY VIEW

HARGA
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN JUMLAH KETERANGAN
Rp. Rp

I. PEKERJAAN PERRSIAPAN
a. Pengukuran 1.00 ls. 134,117.64 134,117.64
b. Pas. Bowplank 54.00 m1 8,941.18 482,823.49
c. Air kerja 1.00 ls. 223,529.39 223,529.39
Jumlah : 840,470.52
II. PEK. PONDASI
a. Galian tanah 79.50 m3 22,352.94 1,777,058.67
b. Pek. Pas. Pondasi batu kali 32.00 m3 277,176.45 8,869,646.30
Jumlah : 10,646,704.97
III. PEK. BETON
a. Poer plat 3.20 m3 1,680,941.03 5,379,011.30
b. Kolom beton Struktur 3.15 m3 1,698,823.38 5,351,293.66
c. Kolom Praktis 1.31 m3 1,698,823.38 2,225,458.63
d. Sloof beton uk. 15/25 1.76 m3 1,698,823.38 2,989,929.16
e. Sloof beton uk. 15/20 1.20 m3 1,698,823.38 2,038,588.06
f. Ring balk 1.56 m3 1,698,823.38 2,650,164.48
g. Dak beton 0.98 m3 1,698,823.38 1,664,846.92
h. Topi beton 1.20 m3 1,698,823.38 2,038,588.06
Jumlah : 24,337,880.27
IV. PEK. DINDING
a. Pas. Bata trasraam 30.15 m2 35,764.70 1,078,305.79
b. Pas. Bata 160.00 m2 27,717.64 4,434,823.15
c. Plester dan acian 168.00 m2 22,352.94 3,755,293.80
d. Pas. Nat alumunium U 2cm 36.00 m1 15,647.06 563,294.07
Jumlah : 9,831,716.81
V. PEK.KUSEN DAN DAUN PINTU
JENDELA
a. Kusen pintu & jendela 0.66 m3 6,258,822.99 4,130,823.18
b. Daun pintu utama 1.00 bh 1,072,941.08 1,072,941.08
c. Daun pntu standar 4.00 bh 536,470.54 2,145,882.17
d. Daun jendela 23.80 m1 53,647.05 1,276,799.89
e. Roster kayu 23.00 bh 20,117.65 462,705.84
Jumlah : 9,089,152.16
VI. PEK. ATAP
a. Rangka atap baja ringan 68.00 m2 111,764.70 7,599,999.35
b. Genteng cisangkan 68.00 m2 55,882.35 3,799,999.67
c. Nok 32.00 m1 55,882.35 1,788,235.14
d. Lisplank 19.00 m1 15,647.06 297,294.09
Jumlah : 13,485,528.26
VII. PEK. PLAFOND
a. Rangka plafond 67.00 m2 31,294.11 2,096,705.70
b. Gypsum 9mm 67.00 m2 26,823.53 1,797,176.32
c. List Profil 84.00 m1 8,047.06 675,952.88
Jumlah : 4,569,834.90
VIII. PEK. KERAMIK
a. Pas. Keramik lantai 40 x 40 52.00 m2 105,058.81 5,463,058.36
b. Pas. Keramik lantai wc.20 x 20 6.00 m2 102,823.52 616,941.12
c. Pas. Keramik dinding wc. 24.50 m2 111,764.70 2,738,235.06
Jumlah : 8,818,234.54
IX. PEK. FINISHING
a. Cat dinding 356.79 m2 12,517.65 4,466,170.91
b. Cat plafond 70.66 m2 11,176.47 789,729.34
c. Melamik kusen pintu & jendela 73.72 m1 31,294.11 2,307,002.16
d. Melamik Daun pintu 5.00 bh 223,529.39 1,117,646.96
e. Melamik daun jendela 25.00 m1 22,352.94 558,823.48
Jumlah : 9,239,372.86
X. PEK. INSTALASI
a. Inst. Listrik 25.00 ttk 62,588.23 1,564,705.75
b. Inst. Antena 1.00 ttk 62,588.23 62,588.23
c. Inst. Telephone 1.00 ttk 62,588.23 62,588.23
Jumlah : 1,689,882.21
XI. PEK SANITARY
a. Saluran air bersih 40.00 m1 10,729.41 429,176.43
b. Saluran air kotor Dia 4" 38.00 m1 31,294.11 1,189,176.37
c. Saluran air Sabun Dia 3" 46.00 m1 22,352.94 1,028,235.21
d. Septitank Biotech 1.00 bh 2,235,293.93 2,235,293.93
Jumlah : 4,881,881.94
XII. PEK. ACCESSORIES
a. Closet duduk 2.00 unit 1,063,999.91 2,127,999.82
b. Wastafel 1.00 unit 500,705.84 500,705.84
c. Kunci pintu utama 1.00 unit 93,882.34 93,882.34
d. Kunci pintu standar 4.00 unit 62,588.23 250,352.92
e. Engsel pintu 15.00 bh 12,517.65 187,764.69
f. Engsel jendela 34.00 bh 13,411.76 455,999.96
g. Hak angin 17.00 bh 15,647.06 265,999.98
h. Slot jendela 17.00 bh 8,941.18 151,999.99
i. Kran air standar 2.00 bh 31,294.11 62,588.23
j. Kran Kitchen sink 1.00 bh 62,588.23 62,588.23
k. Kitchen sing 1.00 bh 93,882.34 93,882.34
l. Floor drain 2.00 bh 12,517.65 25,035.29
m. Kaca polos 5mm 15.80 m2 67,058.82 1,059,529.32
Jumlah : 5,338,328.96
XIII. PEK. AR PORT
a. Beton tumbuk 1.30 m3 607,999.95 790,399.93
b. Plat decker u. Jembatan 0.30 m3 1,341,176.36 402,352.91
Jumlah : 1,192,752.84
XIV. PEK. LAIN - LAIN
a. Perapihan 1.00 ls 91,199.99 91,199.99
b. Pembersihan lahan 1.00 ls 447,058.79 447,058.79
Jumlah : 538,258.78

TOTAL : 104,500,000.00

Harga per m2 : 1,900,000.00


KUSEN T-36
PJ1 = 1 8.47
PJ2 = 1 8
J1 = 1 7.6
J2 = 1 5.4
J3 = 1 6.4
P1 = 4 5.2
PVC = 1 5.1
46.17

KUSEN T-36
PJ1 = 1 8.47
PJ2 = 1 8
J1 = 1 7.6
J2 = 1 5.4
J3 = 2 12.8
P1 = 4 5.2
PVC = 1 5.1
52.57