PTW Hot Work Uoko3a

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3
At a glance
Powered by AI
The document outlines a permit process that must be followed when performing hot work such as welding or cutting to ensure safety. A risk assessment must be conducted and various safety requirements like fire extinguishers and fire watchers must be in place.

Safety precautions that must be followed include conducting a safety induction and risk assessment, using proper PPE, maintaining good housekeeping, having sufficient fire extinguishers available, and implementing the precautions outlined in the risk assessment.

Before work begins the permit must be requested and issued. During work the permit requirements and precautions must be followed. After work is complete, a one hour fire watch period is required and the permit must be closed out.

PTW

Document Number
Hot Work

Project Permit No
Company Date

SECTION I PERMIT REQUEST


Description of hot work:  Welding  Gas Cutting  Soldering  Brazing  Blow torch  Abrasive wheel cutting
Location: ________________________________________________ No. of personnel involved: ______ (list on reverse)

Name of Welder/ cutter: ____________________________________ Name of Fire watcher: ______________________


Duration of work -  Date: __________________ from ____________ hours to______________ hours.

Safety Requirement Checklist


Yes N/A Yes N/A
1. Safety Induction- All persons have completed safety 2. Competency of Operatives- Persons engaged are qualified,
induction. trained and competent to do the job.
3. Equipment/ Machine / Tools- Well maintained and in 4. PPEs- Required PPEs as per risk assessment are provided /
good condition. available.
5. Housekeeping- workplace is clean and free from 6. Fire Extinguisher- Sufficient suitable fire extinguishers
flammable and combustible materials. provided / available.
7. Risk assessment- addressed to the crew and all are aware 8. Safety Precautions- all precaution on Risk assessment
of the same.. implemented.
9. Fire Blanket/Fire Resistance Cloth- Available. 10. Supervision- Will be available full time.
11. Working platform- Proper working platform provided/ 12. Fire Watcher- Provided full time. 1 hour fire watching to be
available. completed after hot work.
13. Gas/ LPG Cylinders:- 14. Grinder / Cutting Machine:-
 Kept on the trolley, fittings are free from oil, grease,  Abrasive wheels are of EN/ BS standard.
leakage and in good condition.  Machine spindle speed is less than that of the
 Placed at safe place and properly labeled. maximum speed of the wheel / Disc.
 Flash back arrester provided.  Abrasive wheel flange (front or back) is of right size
 Spark light on available. and fitting.
15. Location plan / Layout attached. 16.
Important Instructions (Read and Tick )

* Permit is issued only for a shift (day /night).


* Permit should be available and displayed at workplace till completion of fire watch time.
* Permit extension is allowed only for one time till the end of same shift.
* Site Manager, Engineer, Supervisor and Safety Officer must inspect the workplace to ensure the correct implementation of permit to
work.
* Permit to work will be suspended by the inspecting official if any non-compliance noticed.
* Permit should be closed-out upon completion of work and handed over to Safety office on the same day.

Declaration of Work in Charge

I hereby declare that:  the above requirement / precautions are in place and addressed to the team and we are fully aware of the same.  I will
be responsible for the proper implementation of this permit  ______________________________________

Work-in-charge (Name): ___________________________ Signature: _______________________ Date: _______________

Site Manager / Engineer (Name): ___________________________ Signature: _______________________ Date: _______________

Safety Officer / Representative (Name): ___________________________ Signature: _______________________ Date:_______________

SECTION II PERMIT ISSUE


This Permit is valid till (Date): Time: Hours.
Site Manager / Engineer Safety Officer

Prepared by: Engr. Mohsin www.hsefiles.com


PTW
Document Number
Hot Work

Name: ________________________ Signature: _________________ Name: _________________ Signature: ______________________

SECTION III CREW DETAILS


Sr. No Induction Number Name of Operative Designation / Trade

1.

2.

3.

4.

5.

6.

7.

8.

Note: Attach separate sheet if necessary

Work-in-charge (Name): ___________________________ Signature: ___________________________

SECTION IV PERMIT INSPECTION


Name Designation Company PTW Date Time Signature
Compliance
(Yes / No)

SECTION V PERMIT CANCELLATION

This permit is cancelled due to:-  Recommended precautions not in place:  Fire Watcher not available
 Other (specify) ______________________

Cancelled by Name: _________________________ Signature: ________________ Date: ___________ Time: ________

SECTION VI PERMIT EXTENSION

Request to extend the Permit till (Date): ___________________ Time _________________ Hrs.
Time:
Work in charge / Site Engineer Safety Officer

Name: _____________________ Signature: ___________ Name: ____________________ Signature: ________________

SECTION VII PERMIT CLOSURE

It is to confirm that the work completed on ____________at __________hours . One hour fire watch period completed  The area inspected and
found safe  Permit closed at _____________ hours.

Work in charge (Name): ______________________ Signature: _______________ Date: ____________ Time: ___________

Prepared by: Engr. Mohsin www.hsefiles.com


PTW
Document Number
Hot Work

Prepared by: Engr. Mohsin www.hsefiles.com