6081.hostel Management (Shalini)
6081.hostel Management (Shalini)
6081.hostel Management (Shalini)
PROJECT REPORT ON
HOSTEL MANAGEMENT
ROLL NO : 12415
NAME : M.SHALINI
CLASS : XII
PGT (CS)
TIRCHYDIST
TAMILNADU
1
RSK HIGHER SECONDARY SCHOOL
CERTIFICATE
This is to certify that Cadet M.SHALINI Roll No: 12415 has successfully
Computer Science (083) laid down in the regulations of CBSE for the purpose of
on______________.
Examiner:
Name: _______________
Signature:
2
TABLE OF CONTENTS [ T O C ]
01 ACKNOWLEDGEMENT 04
02 INTRODUCTION 05
04 PROPOSED SYSTEM 06
07 FLOW CHART 15
08 SOURCE CODE 19
09 OUTPUT 22
10 TESTING 23
3
ACKNOWLEDGEMENT
Apart from the efforts of me, the success of any project depends largely on
the encouragement and guidelines of many others. I take this opportunity to express
my gratitude to the people who have been instrumental in the successful completion
of this project.
I express deep sense of gratitude to almighty God for giving me strength for
the successful completion of the project.
The guidance and support received from all the members who contributed
and who are contributing to this project, was vital for the success of the project. I am
grateful for their constant support and help.
4
D PROJECT ON HOSTEL MANAGMENT
PROJECT ON HOSTEL PROJECT O INTRODUCTION
INTRODUCTION
the students such as his\her roll number , in department they belong to , etc. These
information can be stored in the data and can be verified whenever we want.this
The objective of this project is to let the students apply the programming
knowledge into a real- world situation/problem and exposed the students how
5
PROPOSE-SYSTEM Today
Today one cannot afford to rely on the fallible human beings of be really wants to
stand against today’s merciless competition where not to wise saying “to err is
human” no longer valid, it’s out-dated to rationalize your mistake. So, to keep pace
with time, to bring about the best result without malfunctioning and greater efficiency
so to replace the unending heaps of flies with a much sophisticated hard disk of the
computer.
One has to use the data management software. Software has been an ascent
markets, which have helped in making the organizations work easier and efficiently.
Data management initially had to maintain a lot of ledgers and a lot of paperwork has
to be done but now software producton this organization has made their work faster
and easier. Now only this software has to be loaded on the computer and work can
be done.
This prevents a lot of time and money. The work becomes fully automated
and any information regarding the organization can be obtained by clicking the
6
SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)
7
reviewing the output of each phase to ensure the system is being built to deliver the
needed functionality.
INITIATION PHASE
8
presentation of a business case. The business case should, at a minimum, describe
a proposal’s purpose, identify expected benefits, and explain how the proposed
system supports one of the organization’s business strategies. The business case
should also identify alternative solutions and detail as many informational, functional,
and network requirements as possible.
9
an important reference document to support the Information Technology
Project Request (ITPR) process.
The ITPR must be approved by the State CIO before the project can move
forward.
PICTORIAL REPRESENTATION OF SDLC:
PLANNING PHASE
10
During this phase, a plan is developed that documents the approach to be used and
includes a discussion of methods, tools, tasks, resources, project schedules, and
user input. Personnel assignments, costs, project schedule, and target dates are
established.
A Project Management Plan is created with components related to acquisition
planning, configuration management planning, quality assurance planning, concept
of operations, system security, verification and validation, and systems engineering
management planning.
REQUIREMENTSANALYSIS PHASE
This phase formally defines the detailed functional user requirements using
high-level requirements identified in the Initiation, System Concept, and Planning
phases. It also delineates the requirements in terms of data, system performance,
security, and maintainability requirements for the system. The requirements are
defined in this phase to a level of detail sufficient for systems design to proceed.
They need to be measurable, testable, and relate to the business need or
opportunity identified in the Initiation Phase. The requirements that will be used to
determine acceptance of the system are captured in the Test and Evaluation Master
Plan.
Further define and refine the functional and data requirements and document
them in the Requirements Document,
Complete business process reengineering of the functions to be supported
(i.e., verify what information drives the business process, what information is
generated, who generates it, where does the information go, and who
processes it),
Develop detailed data and process models (system inputs, outputs, and the
process.
Develop the test and evaluation requirements that will be used to determine
acceptable system performance.
11
DESIGN PHASE
12
Business Sponsor, the final System Design Document is created to serve as
the Critical/Detailed Design for the system.
This document receives a rigorous review by Agency technical and functional
representatives to ensure that it satisfies the business requirements.
Concurrent with the development of the system design, the Agency Project
Manager begins development of the Implementation Plan, Operations and
Maintenance Manual, and the Training Plan.
DEVELOPMENT PHASE
13
developed or modified system. OIT Security staff assesses the system
security and issue a security certification and accreditation prior to
installation/implementation.
Testing as a deployed system with end users working together with contract
personnel
IMPLEMENTATION PHASE
This phase is initiated after the system has been tested and accepted by the
user. In this phase, the system is installed to support the intended business functions.
System performance is compared to performance objectives established during the
planning phase. Implementation includes user notification, user training, installation
of hardware, installation of software onto production computers, and integration of
the system into daily work processes. This phase continues until the system is
operating in production in accordance with the defined user requirements.
14
effectively adapted to respond to the organization’s needs. When modifications or
changes are identified, the system may re-enter the planning phase.
start
CHOICE=INT(I
NPUT(“ENTER
THE
CHOICE”))
IF
CHOICE==
1:
v_name=input("ENTER YOUR
NAME")
v_add=input("ENTER YOUR 15
ADDRESS")
print(abc)
Elif
Choice==2;
roll_no=int(input("enter
your roll number"))
mysql="select*from
hostel_management where
roll_no={}".format(roll_no)
16
print("roll_no:",data[0][0])
print("name:",data[0][1])
print("address:",data[0][2])
print("room_no:",data[0][3])
elif
choice==2:
print("AVAILABLE DEPARTMENTS AS
FOLLOWS")
print("1.COMPUTER")
print("2.BIO")
print("3.TECH")
print("4.PHYSICS")
print("5.ECO")
17
department=input("ENTER
YOUR DEPARTMENT")
mysql="select*from fees
where
department='{}'".format(depa
rtment)
elif
choice==4:
print("your fees
is:",data[0][1])
print( "SORRY,YOU
ARE NOT
AUTHORIZED TO
USE THIS SITE ")
else
18
print("QUITTING!!!!!!!!!")
stop
SOURCE CODE
conn=sql.connect(host='localhost',user='root',passwd='admin@12
3',database='hostel_management')
conn.autocommit=True
if conn.is_connected():
print('connected succesfully')
else:
print('not connected')
c1=conn.cursor()
19
#c1.execute("create table hostel_management(roll_no int
")
print("1.ADMISSION FORM")
print("2.FEE CHECKING")
print("3.MODIFY DATA")
print("4.EXIT")
if choice==1:
20
abc=("insert into hostel_management values
("+v_roll+",'"+v_name+"','"+v_add+"',"+v_room_no+",'"+v_dept+"
',"+v_fees+","+v_bal+")")
print(abc)
c1.execute(abc)
conn.commit()
elif choice==3:
roll_no={}".format(roll_no)
c1.execute(mysql)
data=c1.fetchall()
print("roll_no:",data[0][0])
print("name:",data[0][1])
print("address:",data[0][2])
print("room_no:",data[0][3])
print("dept:",data[0][4])
print("fees:",data[0][5])
print("bal:",data[0][6])
elif choice==2:
print("1.COMPUTER")
print("2.BIO")
print("3.TECH")
print("4.PHYSICS")
print("5.ECO")
21
print("6.ENG")
department='{}'".format(department)
c1.execute(mysql)
data=c1.fetchall()
else:
print("QUITTING!!!!!!!!!")
OUTPUT
22
TESTING
23
Test techniques include, but are not limited to, the process of executing a program or
application with the intent of finding software bugs.
It can also be stated as the process of validating and verifying that a software
program/application/product meets the business and technical requirements that
guided its design and development, so that it works as expected and can be
implemented with the same characteristics. Software Testing, depending on the
testing method employed, can be implemented at any time in the development
process, however the most test effort is employed after the requirements have been
defined and coding process has been completed.
TESTING METHODS
Software testing methods are traditionally divided into black box testing and
white box testing. These two approaches are used to describe the point of view that
a test engineer takes when designing test cases.
SPECIFICATION-BASED TESTING
24
ADVANTAGES AND DISADVANTAGES
The black box tester has no "bonds" with the code, and a tester's perception
is very simple: a code must have bugs. Using the principle, "Ask and you shall
receive," black box testers find bugs where programmers don't. But, on the other
hand, black box testing has been said to be "like a walk in a dark labyrinth without a
flashlight," because the tester doesn't know how the software being tested was
actually constructed.
That's why there are situations when (1) a black box tester writes many test
cases to check something that can be tested by only one test case, and/or (2) some
parts of the back end are not tested at all. Therefore, black box testing has the
advantage of "an unaffiliated opinion," on the one hand, and the disadvantage of
"blind exploring," on the other.
25
CODE COMPLETENESS EVALUATION
White box testing methods can also be used to evaluate the completeness of
a test suite that was created with black box testing methods. This allows the software
team to examine parts of a system that are rarely tested and ensures that the most
important function points have been tested.
26
IV. RAM : 512MB+
SOFTWARE REQUIREMENTS:
I. Windows OS
II. Python
27