CONTRACTOR'S DAILY REPORT

The Engineer: The Client: The Contractor:

Project Name: Dallah Service Station - ARAMCO Report No.: 054-DSS-CDR


The Employer Tas'helat Marketing Company Day: Thursday
The Engineer: Tubaili Team Workshop (TTW) Date: 17/Nov/2022
The Contractor: Art Arabia Compant Ltd. Time: 3:00 PM
Contract No.: 010/2022
WORK IN PROGRESS DESCRIPTION EQUIPMENT MANPOWER
1 Temporary fence works(Electricity works&install) Type No. Trade No.
2 dust control work Compressor Engineer 4
3 Walls formwork (Water tank) Water Pump 1-w Foreman for fence 1
4 Walls reinforcement (Water tank) Cutting Machine 1-w Surveyor 1
5 Foundation formwork (fuel tank) Welding Machine Welder
6 foundation reinforcement (Fuel Tank) Vibrator Steel Fixer 8
7 reinforcement concrete for raft foundation (fuel tank) Level Machine 1-w Pipe Fitter
Concrete Pump 1-W Carpenter 2
Concrete Mixer Mason
Plate Compactor Electrician for fenc 2
NEXT DAY PROGRAM Date : Excavator Operator
ITEM DESCRIPTION Loader Driver 1
1 Temporary fence(Electricity works&install) Manual Tools 12-W Mechanic
2 dust control work Truck fence installer 2
3 Walls reinforcement (fuel tank) Sewerage Cleaning Truck Supervisor
4 Walls formwork (Water tank) JCB Backhoe Skilled Labor
5 Walls reinforcement (Water tank) Crane Labor 4
6 W:work / N-W:non work safety manager 1
Material Delivered to Site
No. Description QTY.

1- steel rebars (12mm-10mm) 5 ton


Completed Works 2-
No. Description Unit QTY. 3-
1- 4-
2- 5-
3- 6-
4- 7-
5- 8-
6- 9-
7- 10-
Safety Information 11-
- Daily HSE Statistic Report (10) Notes:
- No. Of first aid cases
- No. of safety meetings
THE ENGINEER COMMENTS: WEATHER
Hot Rainy
Cold Cloudy
Fine Sunny
Windy

Name : _____________________
Signature : ____________ Temperature 35° C

Prepared by (Contractor),

Name :Eng.
_____________________
Ammar Jumah Signature : ____________

PM-SD-F05 Issue 03 Page 1 of 1


CONTRACTORS DAILY PROGRESS REPORT
The Engineer: The Client: The Contractor:

Project Name Dallah Services Station - ARAMCO Report No.: DSS-CDPR-009


The Employer Tas'helat Marketing Company Day: Wednesday
The Engineer TTW Date: 17-11-22
The Contractor Art Arabia Compant Ltd. Time: 2:33:00 PM
Contract No. 001/2022
PERCENTAGE ACCORDING TO PLAN

Planned percentage Actual percentage


Planned percentage remaining percantage Actual percentage remaining percantage
13.72% 86.28% 10.94% 89.06%

Planned Actual
13.72% 10.94%

86.28% 89.06%

Planned Reamining Actual Reamining

Delayed activities according to plan


No. Description Planned start Finish date Remarks
1 Reinforced concrete for Walls & Column 08-Nov-22 24-Nov-22 Underground Fuel Tanks
2 Reinforced concrete for Walls 26-Oct-22 13-Nov-22 Pump Room & Water Tank
3 Reinforced concrete for Raft 30-Oct-22 07-Nov-22 Underground Fuel Tanks
4
5
Recovery plan for delayed activities
1 Reinforced concrete for Walls 19-Nov-22 23-Nov-22 Pump Room & Water Tank
2 Reinforced concrete for Raft 16-Nov-22 21-Nov-22 Underground Fuel Tanks
3 Reinforced concrete for Walls & Column 22-Nov-22 28-Nov-22 Underground Fuel Tanks
4
5
6
Planned Resources
No. Description Number Type Remarks
1 Labor 11 Skilled
2 Labor 9 Unskilled
Roller Compactor-Dayna-Skid
Loader-Water Tanker-
3 Equipment 7
Excavator-Dump Truck-
Wheel Loader
4
5
6

Prepared by (Contractor),

Name :Abdelrhman
_____________________
Yousif Signature : ____________

PM-SD-F05 Issue 03 Page 1 of 1


DAILY HSE STATISTIC REPORT
Project Title: Dalla Service Station
Project No. 001/2022
Contractor: ART Arabia Company. LTD
Date of 17-Nov-2022
Report:
Report no. 12

S/# Description Current Date-ART Accumulative


i. Safe
1 Man Hours 198 1188
ii. Manpower
3 (Incl. HSE & Engineer) 18 -
iii. Toolbox
5 Talks 1 8
iv. Safety
6 Induction 02 14
v. Safety
7 Training 1 13
vi. Near
8 Misses 0 0
vii. Safety
9 Improvement Notice 0 0
viii. Safety
1 Stop Work Notice 0 0
0
ix. TTW
1 site safety Instructions (Open) 0 0
1
x. TTW site safety Instructions (Closed) 0 1
xi. First
1 Aid Cases 0 0
2
xii. Incident
1 & Accident Cases 0 0
3
xiii. 1 SITE 1. Steel fixing (fabrication) for raft foundation 2. purring concrete for fuel tank
4 ACTIVITIES
xiv. 1 Unsafe
5 Condition
xv. Unsafe Act Unsafe Condition Positive Observation
Today Cumulative Toda Cumulative Tod Cumulative
xvi. 1 OBSERVATIONS
y ay
6
0 0 0 2 2 6
Total 0 0 0 0 2 4
xvii. Overall Condition – today
xviii. 1 WEATHER Sunny Rainy Dust
7
Cloudy Windy Fog
xix. 1 WIND SPEED 16 km/h 17 km/h 18 km/h
8
9:00 AM 9:00 1:00
xx. 1 HUMIDITY 10% PM 11% PM 10%
9
xxi. 2 TEMPERATUR 35 c 37 c 36 c
0 E
Date DAILY HSE SITE ACTIVITY REPORT 17/Nov/2022
Project no. DALLAH SERVICE STATION (DSS-001/2022) DSS-001/2022

Actual Site Activities


S/N supervisor Activities Equipment Used Manpower @ Site
1 Ahmed Omer Steel fixing for raft foundation for Power tools/ Manuel 7
water tank tools
2 Imtiaz safety preparation of site Manuel tools & 3
power tools
3 Abdo Purring concrete Pump / mixer 2
4
5

Daily Safety Precautions


1 permit to work
2 competent supervision to avoid activity
3 (PTB) (Pre-Task Briefing) & induction
4 Barricading of Area, sign board before lifting
5 Fire extinguishers
6 Proper Earthing of Welding generators
7 Proper PPE's
8
DAILY SITE INSPECTION CHECKLIST

No. Observations Yes No N/A Action Taken Responsible Completion


Person Date
yes
1 Is Tool Box Talk conducting today?
Is a PTW for all activities available and yes
2 records
Is the use of Personal Protection Gears yes
3 such as Safety Helmet, Safety Footwear,
Safety Google and Safety Harness Apparent?
Is the condition of Scaffolding, Ladders and N/A We don’t have scaffold --- ---
4 Work Platforms Satisfactory? works until now

Are openings and other potential fall Yes


5
points appropriately protected or
barricaded and marked?
Yes
6 Are the daily checklist available for all the
equipment's?
Yes
7 Are Electric Equipment earthed properly?
Yes
8 Are distribution and switch boards
properly insulated/locked?
Yes
9 Are Electric connections proper and
without bare conductors visible?
Yes
10 Is the condition of cables satisfactory?
Are Combustible and Inflammable Yes
11 materials properly stocked to prevent fire
hazards?
Traffic Signs and Hazard Signs installed? yes
12
13 Properly guard rails and toe-boards to the Yes
open (excavation)?
14 Are firefighting equipment adequate and Yes
serviceable and Fire extinguisher tags
checked regularly?
15 Is any accident/incident reported today? If No
yes then attach report's copy.
16 Is site and office toilets being clean? Yes

17 Is housekeeping in site offices being taken Yes


care of?
18 Is housekeeping on site being taken care Yes
of?
19 Properly barricaded the storage area? yes
ART CO. ATTENDANCE SHEET

NO. NAME POSITION


1 JEHAD BAHAR PROJECT MANAGER
2 AMMAR PROJECT ENGINEER
3 MOHAMED Bakri SAFETY MANAGER
4 ABDU ALRAHMAN PLANNER
5 SHEZAD KHAN QC/ENGINEER
6 HUSSAIN SURVEYOR
7 EMTYAZ HELPER
8 ZAKIR HELPER
9 QASIM HELPER

SUB-CONTRACTOR ATTENDANCE SHEET

1 MOHAMMED STEEL FIXER SUPERVISOR


2 ALI STEEL FIXER
3 BASHAR STEEL FIXER
4 KAMAL SREEL FIXER
5 AHMED STEEL FIXER
6 HANI LABOUR
7 RAYAN HELPER
8 MARWAN HELPER
9 MOHAMMED HELPER
10 HELPER
11
12
13
14
15
16
17
18
19
20
DAILY TOOL BOX MEETING
TOPIC: personal protective equipment (PPE)

PICTURE

Prepared MOHAMED BAKRI / SAFETY MANAGER


by:
Approved JEHAD BAHAR / PROJECT MANAGER
by: