ENGINEERING WORK CHECK SHEET Twe = (1-4312-020E
COMMISSIONING
[ssuED JAN.24,97
pace IL
ame : BLOWER
tug oF CHECK: TEST RUN RELATED MANUALS:
WORK FLOW CHART CHECK ITEMS AND FOINTS creck REMARKS
ALS] e
(@)_ Driver Sole Test Run complete. olf.
(2), Stu eat. nc o. aol. ne
(@) Preparation of Documents for Tesi Run and a
Vi
3)
casing Temperature. '
ig abnormal aoise & vibration of Casing and Piping
(9) No Leakage of Oil
(10) No Leakage of Gas.
\(11) Surrounding Equipment tight,
|\2) No Oil Leakage into process side
[i fnletFiters/ Suction Suaines lean
tion of Oil System,
Instruments (Record Sheets, Performance Curves,
ation Meter, Thermometer, Gas Detector, Fire
Extinguisher),
Giooolnolo!
Doo
MEMO (i) Unevsilale Heme shouldbe ied by CHIEF OPERATION SUPERVISOR, WORKNO.
(ay smacking "NAT at es) ReaNG
(2) To be confemed to AUTHORIZED CONSTRUCTION PERSON, iTEMNO.
ENDER
Doe. No.
2 CHECKER REPORT
1 A:SN > CSV
a > |e:csv> om
rev, [sign | cate | sich [ pare | sign | date REMARKS, c:OM
a B c
OATES