0110 GB srvan Tove Bnowemn0 Cor ENGINEERING WORK CHECK SHEET Twe = (1-4312-020E COMMISSIONING [ssuED JAN.24,97 pace IL ame : BLOWER tug oF CHECK: TEST RUN RELATED MANUALS: WORK FLOW CHART CHECK ITEMS AND FOINTS creck REMARKS ALS] e (@)_ Driver Sole Test Run complete. olf. (2), Stu eat. nc o. aol. ne (@) Preparation of Documents for Tesi Run and a Vi 3) casing Temperature. ' ig abnormal aoise & vibration of Casing and Piping (9) No Leakage of Oil (10) No Leakage of Gas. \(11) Surrounding Equipment tight, |\2) No Oil Leakage into process side [i fnletFiters/ Suction Suaines lean tion of Oil System, Instruments (Record Sheets, Performance Curves, ation Meter, Thermometer, Gas Detector, Fire Extinguisher), Giooolnolo! Doo MEMO (i) Unevsilale Heme shouldbe ied by CHIEF OPERATION SUPERVISOR, WORKNO. (ay smacking "NAT at es) ReaNG (2) To be confemed to AUTHORIZED CONSTRUCTION PERSON, iTEMNO. ENDER Doe. No. 2 CHECKER REPORT 1 A:SN > CSV a > |e:csv> om rev, [sign | cate | sich [ pare | sign | date REMARKS, c:OM a B c OATES

You might also like